CN211901812U - Supporting structure for hanging pipeline by support and hanger in corridor - Google Patents
Supporting structure for hanging pipeline by support and hanger in corridor Download PDFInfo
- Publication number
- CN211901812U CN211901812U CN202020028755.3U CN202020028755U CN211901812U CN 211901812 U CN211901812 U CN 211901812U CN 202020028755 U CN202020028755 U CN 202020028755U CN 211901812 U CN211901812 U CN 211901812U
- Authority
- CN
- China
- Prior art keywords
- corridor
- pipeline
- wall
- hanger
- positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 210000001503 joint Anatomy 0.000 claims abstract description 15
- 230000006835 compression Effects 0.000 claims description 10
- 238000007906 compression Methods 0.000 claims description 10
- 230000000694 effects Effects 0.000 abstract description 10
- 230000001105 regulatory effect Effects 0.000 abstract description 7
- 238000003466 welding Methods 0.000 abstract description 5
- 230000003139 buffering effect Effects 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000035939 shock Effects 0.000 description 4
- 238000005299 abrasion Methods 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a pipeline bearing structure is hung to a corridor gallows, including the corridor, the inside wall in corridor is provided with the gallows framework, it has fastening bolt to run through on the lateral wall of gallows framework, and fastening bolt's tip threaded connection in the wall in corridor, the horizontal welding of inside wall of gallows framework has the regulating plate, the adjustment tank has been seted up on the surface of regulating plate, the inner wall rotation of adjustment tank is connected with the pivot, the outer wall of pivot is fixed with the locating plate, positioning hole has been seted up on the surface of locating plate, the downside of regulating plate is equipped with the pipeline cassette. This pipeline bearing structure is hung to a corridor gallows places on the pipeline cassette through the pipeline that will support, and the locating plate of upset both sides again makes its joint in the inside of butt joint groove, and rethread long bolt runs through in the location through-hole to make its tip and nut threaded connection, reach the effect of pipeline location in the pipeline cassette, the locating plate of cooperation both sides prevents the skew of pipeline.
Description
Technical Field
The utility model belongs to the technical field of the piping erection, concretely relates to pipeline bearing structure is hung to a gallows in corridor.
Background
The corridor is a main component in a modern building, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are required to be installed on the corridor in cooperation with a hanging bracket on the corridor, and a special overhaul port, a lifting port and a monitoring system are arranged on the corridor to realize the integration of the modern building. However, the structure for supporting the pipeline on the market is complex in general structure, inconvenient to detach, poor in bearing effect of the pipeline, and not beneficial to supporting the large pipeline, so that the corridor hanging bracket is needed to be used for hanging the pipeline supporting structure in order to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline bearing structure is hung to a corridor gallows to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline bearing structure is hung to a corridor gallows, includes the corridor, the inside wall in corridor is provided with the gallows framework, it has fastening bolt to run through on the lateral wall of gallows framework, and fastening bolt's tip threaded connection in the wall in corridor, the horizontal welding of inside wall of gallows framework has the regulating plate, the adjustment tank has been seted up on the surface of regulating plate, the inner wall of adjustment tank rotates and is connected with the pivot, the outer wall of pivot is fixed with the locating plate, positioning hole has been seted up on the surface of locating plate, the downside of regulating plate is equipped with the pipeline cassette, butt joint groove has been seted up at the middle part of pipeline cassette, the outer wall welding of pipeline cassette has the connecting plate, guiding hole has been seted up on the surface of connecting plate, guiding hole's inside has been run.
The device is used for placing a pipeline to be supported on the pipeline clamping seat and then overturning the positioning plates at two sides to clamp the positioning plates in the butt joint groove; through running through the direction slide bar in the connecting plate, cooperation compression spring reaches the shock attenuation buffering when forming the pull down to the pipeline of placing, has reduced the wearing and tearing of pipeline at the installation with dismantle the in-process, has also improved the bearing effect to the pipeline.
Preferably, the top end of the guide sliding rod is welded at the bottom end of the adjusting plate, and the bottom end of the guide sliding rod is welded at the bottom end of the inner wall of the hanger frame body.
Preferably, the outer side wall of the pipeline clamping seat is provided with four connecting plates, and the compression springs are arranged on the lower sides of the four connecting plates.
This arrangement is used to improve the stability of the support of the pipe clamp.
Preferably, the inner wall symmetry of adjustment tank is provided with two sets of pivots and locating plate, and two locating plates all the joint in the butt joint inslot.
Preferably, a long bolt penetrates through the positioning through hole, and a nut is connected to the end of the long bolt in a threaded manner.
This setting is used for through the stay bolt through in the location through-hole to make its tip and nut threaded connection, reach the effect of pipeline location in the pipeline cassette, the locating plate of cooperation both sides prevents the skew of pipeline.
Preferably, the pipeline clamping seat is in a semi-circular arc shape, and the width of the positioning plate is equal to that of the butt joint groove.
The utility model discloses a technological effect and advantage: the corridor supporting and hanging frame is used for hanging a pipeline supporting structure,
1. the pipeline to be supported is placed on the pipeline clamping seat, the positioning plates on the two sides are turned over to be clamped in the butt joint grooves, the long bolts penetrate through the positioning through holes, the end parts of the long bolts are in threaded connection with the nuts, the effect that the pipeline is positioned in the pipeline clamping seat is achieved, and the positioning plates on the two sides are matched to prevent the pipeline from deviating;
2. through running through the direction slide bar in the connecting plate, cooperation compression spring reaches the shock attenuation buffering when forming the pull down to the pipeline of placing, has reduced the wearing and tearing of pipeline at the installation with dismantle the in-process, has also improved the bearing effect to the pipeline.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the adjusting plate of the present invention;
fig. 3 is a schematic structural diagram of the pipeline clamping seat of the present invention.
In the figure: 1. a corridor; 2. a hanger frame body; 3. fastening a bolt; 4. an adjusting plate; 41. an adjustment groove; 42. a rotating shaft; 43. positioning a plate; 44. positioning the through hole; 5. a pipe clamp seat; 51. a butt joint groove; 52. a connecting plate; 53. a guide through hole; 6. a guide slide bar; 7. a compression spring; 8. a long bolt; 9. and a nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a corridor hanging bracket pipeline supporting structure as shown in figures 1-3, which comprises a corridor 1, wherein the inner side wall of the corridor 1 is provided with a hanger frame body 2, a fastening bolt 3 penetrates through the outer side wall of the hanger frame body 2, the end part of the fastening bolt 3 is in threaded connection with the wall of the corridor 1, an adjusting plate 4 is transversely welded on the inner side wall of the hanger frame body 2, an adjusting groove 41 is arranged on the surface of the adjusting plate 4, the inner wall of the adjusting groove 41 is rotatably connected with a rotating shaft 42, a positioning plate 43 is fixed on the outer wall of the rotating shaft 42, concretely, the inner wall of the adjusting groove 41 is symmetrically provided with two groups of rotating shafts 42 and positioning plates 43, two positioning plates 43 are respectively clamped in a butt joint groove 51, the surface of the positioning plate 43 is provided with a positioning through hole 44, concretely, a long bolt 8 penetrates through the positioning through hole 44, and the end part of the long, a pipeline clamping seat 5 is arranged at the lower side of the adjusting plate 4, specifically, the pipeline clamping seat 5 is in a semi-circular arc shape, the width of the positioning plate 43 is equal to that of the butt joint groove 51, the middle part of the pipeline clamping seat 5 is provided with the butt joint groove 51, the outer wall of the pipeline clamping seat 5 is welded with connecting plates 52, specifically, the outer side wall of the pipeline clamping seat 5 is provided with four connecting plates 52, and the compression springs 7 are all arranged at the lower sides of the four connecting plates 52, the surfaces of the connecting plates 52 are provided with guide through holes 53, the pipeline to be supported is placed on the pipeline clamping seat 5, the positioning plates 43 on the two sides are turned over to be clamped in the butt joint groove 51, the long bolt 8 penetrates through the positioning through hole 44, the end part of the pipeline is in threaded connection with the nut 9, so that the pipeline is positioned in the pipeline clamping seat 5, and the positioning plates 43 on the two sides are matched to prevent the pipeline from deviating;
the inside of direction through-hole 53 runs through there is direction slide bar 6, and is concrete, the top welding of direction slide bar 6 is in the bottom of regulating plate 4, and the bottom welding of direction slide bar 6 is in the inner wall bottom of gallows framework 2, the outside cover of direction slide bar 6 has compression spring 7, through running through direction slide bar 6 in connecting plate 52, cooperation compression spring 7 reaches the shock attenuation buffering when forming the pipeline of placing and pulling down, has reduced the wearing and tearing of pipeline at the installation with dismantle the in-process, has also improved the bearing effect to the pipeline.
When the corridor supporting and hanging bracket pipeline supporting structure is used, a pipeline to be supported is placed on the pipeline clamping seat 5, the positioning plates 43 on the two sides are turned over to be clamped in the butt joint groove 51, the long bolts 8 penetrate through the positioning through holes 44, the end parts of the positioning through holes are in threaded connection with the nuts 9, the effect that the pipeline is positioned in the pipeline clamping seat 5 is achieved, and the positioning plates 43 on the two sides are matched to prevent the pipeline from deviating; through penetrating the guide slide bar 6 in the connecting plate 52 and matching with the compression spring 7, the purpose of shock absorption and buffering when the placed pipeline is pulled downwards is achieved, the abrasion of the pipeline in the installation and disassembly processes is reduced, and the bearing effect of the pipeline is also improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (6)
1. The utility model provides a pipeline bearing structure is hung to a corridor gallows, includes corridor (1), its characterized in that: the inner side wall of the corridor (1) is provided with a hanger frame body (2), a fastening bolt (3) penetrates through the outer side wall of the hanger frame body (2), the end part of the fastening bolt (3) is in threaded connection with the wall of the corridor (1), an adjusting plate (4) is transversely welded on the inner side wall of the hanger frame body (2), an adjusting groove (41) is formed in the surface of the adjusting plate (4), a rotating shaft (42) is rotatably connected to the inner wall of the adjusting groove (41), a positioning plate (43) is fixed on the outer wall of the rotating shaft (42), a positioning through hole (44) is formed in the surface of the positioning plate (43), a pipeline clamping seat (5) is arranged on the lower side of the adjusting plate (4), a butt joint groove (51) is formed in the middle part of the pipeline clamping seat (5), a connecting plate (52) is welded on the outer wall of the pipeline clamping seat, a guide sliding rod (6) penetrates through the guide through hole (53), and a compression spring (7) is sleeved on the outer side of the guide sliding rod (6).
2. The corridor support and hanger piping support structure of claim 1, wherein: the top end of the guide sliding rod (6) is welded at the bottom end of the adjusting plate (4), and the bottom end of the guide sliding rod (6) is welded at the bottom end of the inner wall of the hanger frame body (2).
3. The corridor support and hanger piping support structure of claim 1, wherein: the outer side wall of the pipeline clamping seat (5) is provided with four connecting plates (52), and the compression springs (7) are arranged on the lower sides of the four connecting plates (52).
4. The corridor support and hanger piping support structure of claim 1, wherein: the inner wall of the adjusting groove (41) is symmetrically provided with two groups of rotating shafts (42) and positioning plates (43), and the two positioning plates (43) are clamped in the butt joint groove (51).
5. The corridor support and hanger piping support structure of claim 1, wherein: the positioning through hole (44) is internally penetrated with a long bolt (8), and the end part of the long bolt (8) is connected with a nut (9) through a thread.
6. The corridor support and hanger piping support structure of claim 1, wherein: the pipeline clamping seat (5) is in a semi-circular arc shape, and the width of the positioning plate (43) is equal to that of the butt joint groove (51).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020028755.3U CN211901812U (en) | 2020-01-08 | 2020-01-08 | Supporting structure for hanging pipeline by support and hanger in corridor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020028755.3U CN211901812U (en) | 2020-01-08 | 2020-01-08 | Supporting structure for hanging pipeline by support and hanger in corridor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211901812U true CN211901812U (en) | 2020-11-10 |
Family
ID=73296564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020028755.3U Expired - Fee Related CN211901812U (en) | 2020-01-08 | 2020-01-08 | Supporting structure for hanging pipeline by support and hanger in corridor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211901812U (en) |
-
2020
- 2020-01-08 CN CN202020028755.3U patent/CN211901812U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216952028U (en) | Height-adjustable's antidetonation gallows | |
CN211901812U (en) | Supporting structure for hanging pipeline by support and hanger in corridor | |
CN209585107U (en) | Use super large diameter pipeline steel support pipe support at utility tunnel | |
CN212012561U (en) | Photovoltaic support convenient to it is folding | |
CN212070589U (en) | Pipe fitting cutting device for mechanical production | |
CN209839341U (en) | Novel heat supply engineering heating pipeline fixed bolster | |
CN218622482U (en) | Special hoop for flexible interface of building drainage | |
CN214699526U (en) | Anti-seismic finished product support and hanger of shear structure | |
CN210476698U (en) | Novel supporting mechanism for pipe penetrating processing of pipe wrapping | |
CN212377447U (en) | Single-tube double-side double-hinge anti-seismic support hanger | |
CN212435302U (en) | Dual thermal-insulated bus duct | |
CN214838929U (en) | Protection device for high-pressure water pipe | |
CN206958386U (en) | A kind of fire water-supply Pipe installing standpipe mounting bracket | |
CN221186272U (en) | Spray tower pipeline elbow mounting tool | |
CN217842961U (en) | Pipeline bracket for tap water supply engineering | |
CN201952745U (en) | Vertical assembling tooling for corrugated pipe culvert unit sheets | |
CN215763678U (en) | Pipeline positioning support for water supply and drainage engineering | |
CN220006535U (en) | Auxiliary processing device for irregular bent pipe | |
CN221547985U (en) | Pipeline bracket for building construction | |
CN217786840U (en) | Special support for metal corrugated pipe leakage resistance test | |
CN217328815U (en) | Anti-seismic support and hanger with high load capacity | |
CN210152990U (en) | Suspension device for fan | |
CN216590304U (en) | Suspension pipe clamp mechanism of anti-seismic support hanger | |
CN220470844U (en) | Municipal administration water supply and drainage energy-saving mounting structure | |
CN221461788U (en) | Construction hanging plate for municipal engineering house building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201110 |
|
CF01 | Termination of patent right due to non-payment of annual fee |