CN211899444U - Discharge structure of building rubbish pipeline - Google Patents

Discharge structure of building rubbish pipeline Download PDF

Info

Publication number
CN211899444U
CN211899444U CN202020366367.6U CN202020366367U CN211899444U CN 211899444 U CN211899444 U CN 211899444U CN 202020366367 U CN202020366367 U CN 202020366367U CN 211899444 U CN211899444 U CN 211899444U
Authority
CN
China
Prior art keywords
pipeline
sides
post
fixedly connected
construction waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020366367.6U
Other languages
Chinese (zh)
Inventor
刘晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020366367.6U priority Critical patent/CN211899444U/en
Application granted granted Critical
Publication of CN211899444U publication Critical patent/CN211899444U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a discharge structure of building rubbish pipeline, including the blowdown pipeline, the discharge end fixedly connected with fixed panel of blowdown pipeline, one side that the blowdown pipeline was kept away from to fixed panel is provided with baffle mechanism, baffle mechanism includes and rotates the barrier plate of being connected with fixed panel, the inside of barrier plate is provided with extends the mechanism. The utility model discloses a press and move the post, the inner chamber that stimulates the mount pad afterwards to make spacing post roll-off rectangle spout can reach the purpose of buffering the ejection of compact, this construction waste pipeline's ejection of compact structure, through the discharge platform that provides certain angle to construction waste, current pipeline discharge device has been solved at the in-service use in-process, because construction waste is mostly the more hard grit of texture or the great grit of quality and reinforcing bar, the ground that leads to the pipeline discharge gate to go out is pounded badly, if the pipeline is direct to arranging the material in the transport vechicle, the problem that probably leads to the impaired phenomenon of transport vechicle to take place.

Description

Discharge structure of building rubbish pipeline
Technical Field
The utility model relates to a building engineering technical field specifically is a building rubbish pipeline's ejection of compact structure.
Background
The construction waste refers to residue, waste soil, waste material, sludge and other wastes generated in the process of constructing, laying or dismantling and repairing various buildings, structures, pipe networks and the like by construction and construction units or individuals.
Along with the acceleration of industrialization, urbanization process, the construction industry is rapid development simultaneously also, and the building rubbish that produces is increasing concomitantly, and current rubbish discharge mode is various, and the pipeline is arranged the material and is exactly one of them, and current pipeline discharge device is in the in-service use in-process, because the building rubbish is mostly the grit and the reinforcing bar that the texture is more hard or the quality is great, leads to the ground of pipeline discharge gate play to be pounded, if the pipeline is direct to arranging the material in the transport vechicle, probably leads to the impaired phenomenon of transport vechicle to take place.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building rubbish pipeline's ejection of compact structure possesses the advantage that the buffering was arranged the material, has solved current pipeline discharge device in the in-service use, because building rubbish is mostly the more hard grit of texture or the great grit of quality and reinforcing bar, leads to the ground of pipeline discharge gate play to be pounded badly, if the pipeline directly arranges the material in to the transport vechicle, probably leads to the problem that the impaired phenomenon of transport vechicle takes place.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction waste pipeline's ejection of compact structure, includes the row material pipeline, the discharge end fixedly connected with fixed panel of row material pipeline, one side that fixed panel kept away from row material pipeline is provided with baffle mechanism, baffle mechanism includes rotates the barrier plate of being connected with fixed panel, the inside of barrier plate is provided with extends the mechanism, extend the mechanism including the extension board that runs through the barrier plate top, the spacing post of the equal fixedly connected with in both sides of extension board, spacing spout one and the rectangle spout with spacing post and extension board looks adaptation are seted up respectively to the top of barrier plate, the top of extension board is provided with installation mechanism, installation mechanism's inner chamber is provided with slewing mechanism, slewing mechanism's inner chamber is provided with stop gear.
Preferably, the limiting mechanism comprises a movable column, movable grooves are formed in two sides of the front surface of the movable column, a clamp is arranged in an inner cavity of each movable groove in a penetrating mode, two sides of each clamp are rotatably connected with two sides of the inner cavity of each movable groove, limiting strips are fixedly connected to two sides of the movable column, and springs are welded to two sides of the bottom of the movable column.
Preferably, the rotating mechanism comprises a rotating column sleeved on the surface of the moving column, the bottom end of the spring is welded with the rotating column, two limiting sliding grooves matched with the limiting strips are formed in two sides of an inner cavity of the rotating column, rectangular through holes matched with the clamping tools are formed in two sides of the front surface of the rotating column, and rotating columns are fixedly connected to two sides of the rotating column.
Preferably, the mounting mechanism comprises a mounting seat fixedly connected to the top of the limiting column, the two sides of the front surface of the mounting seat are provided with L-shaped grooves matched with the clamping apparatus, and the two sides of the inner cavity of the mounting seat are provided with circular grooves matched with the rotating column.
Preferably, the top of the fixing panel is fixedly connected with a fixing column matched with the fixture.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a press and move the post, make activity fixture and fixed column separation, stimulate the inner chamber that the mount pad made spacing post roll-off rectangle spout afterwards can reach the purpose of buffering the ejection of compact, the ejection of compact structure of this construction waste pipeline, through the discharge platform that provides certain angle to construction waste, current pipeline discharge device has been solved at the in-service use in-process, because construction waste is mostly the more hard grit of texture or the great grit of quality and reinforcing bar, the ground that leads to the pipeline discharge gate to go out is pounded badly, if the pipeline is direct to arranging the material in the transport vechicle, probably lead to the problem that the impaired phenomenon of transport vechicle takes place.
2. The utility model discloses a setting of stop gear, under the cooperation use of removal post and fixed column, can make baffle mechanism and extension mechanism keep laminating with fixed panel, then seal the building rubbish in the row material pipeline inner chamber, prevent the rubbish in row material pipeline inner chamber from sliding off by oneself, the setting of spring, play an ascending thrust to the removal post, the fixture is kept away from the one end downstream of removal post, then make the connection of fixture and fixed column more firm, through the setting of slewing mechanism, spacing spout two uses with the cooperation of spacing, avoided the removal post because the thrust of spring slides off the inner chamber of rotation post, the setting of rectangle through-hole, make rectangle through-hole and movable recess form certain difference in height, when the removal post drives the rear end of fixture upwards, because of lever principle, make the front end of fixture downwards be connected with the fixed column firmly, through the setting of installation mechanism, under the cooperation of circular recess and rotation post is used for the rotation post can be rotatory, and the seting up of cooperation L shape recess for can rotate the front side of post to the inner chamber of mount pad through rotatory rotation post when the blowing, avoid building rubbish to slewing mechanism and stop gear's damage, prolong ejection of compact structure's life.
Drawings
FIG. 1 is a perspective view of the present invention;
fig. 2 is a schematic perspective view of the extension mechanism, the mounting mechanism, the rotating mechanism and the limiting mechanism of the present invention;
fig. 3 is a schematic perspective view of the baffle mechanism of the present invention;
fig. 4 is a schematic perspective view of the mounting mechanism, the rotating mechanism and the limiting mechanism of the present invention.
In the figure: 1. a discharge conduit; 2. a baffle mechanism; 21. a blocking plate; 22. a first limiting sliding groove; 23. a rectangular chute; 3. an extension mechanism; 31. a limiting column; 32. an extension plate; 4. an installation mechanism; 41. a mounting seat; 42. an L-shaped groove; 43. a circular groove; 5. a rotating mechanism; 51. rotating the column; 52. a spin column; 53. a second limiting sliding chute; 54. a rectangular through hole; 6. a limiting mechanism; 61. moving the column; 62. a movable groove; 63. a fixture; 64. a limiting strip; 65. a spring; 7. fixing the panel; 8. and (5) fixing the column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a discharging structure of a construction waste pipeline comprises a discharging pipeline 1, a fixed panel 7 is fixedly connected at the discharging end of the discharging pipeline 1, a fixed column 8 matched with a clamping apparatus 63 is fixedly connected at the top of the fixed panel 7, a baffle mechanism 2 is arranged at one side of the fixed panel 7 far away from the discharging pipeline 1, the baffle mechanism 2 comprises a stop plate 21 rotatably connected with the fixed panel 7, an extension mechanism 3 is arranged inside the stop plate 21, the extension mechanism 3 comprises an extension plate 32 penetrating through the top of the stop plate 21, limiting columns 31 are fixedly connected at two sides of the extension plate 32, a first limiting chute 22 and a rectangular chute 23 matched with the limiting columns 31 and the extension plate 32 are respectively arranged at the top of the stop plate 21, an installation mechanism 4 is arranged at the top of the extension plate 32, the installation mechanism 4 comprises an installation seat 41 fixedly connected at the top of the limiting columns 31, L-shaped grooves 42 matched with the clamping apparatus 63 are respectively arranged at two sides of the front surface of the installation seat, the two sides of the inner cavity of the mounting seat 41 are respectively provided with a circular groove 43 matched with the rotating column 52, the rotating column 51 can rotate under the matching use of the circular groove 43 and the rotating column 51 through the arrangement of the mounting mechanism 4, and the L-shaped groove 42 is matched, so that the front side of the rotating column 51 can be rotated to the inner cavity of the mounting seat 41 through the rotating column 51 when discharging, the damage of construction waste to the rotating mechanism 5 and the limiting mechanism 6 is avoided, the service life of the discharging structure is prolonged, the inner cavity of the mounting mechanism 4 is provided with the rotating mechanism 5, the rotating mechanism 5 comprises the rotating column 51 sleeved on the surface of the moving column 61, the bottom end of the spring 65 is welded with the rotating column 51, the two sides of the inner cavity of the rotating column 51 are respectively provided with a limiting chute two 53 matched with a limiting strip 64, the two sides of the front surface of the rotating column 51 are respectively provided with a rectangular through hole 54 matched with, the two sides of the rotating column 51 are fixedly connected with the rotating column 52, the arrangement of the rotating mechanism 5 and the matching use of the limiting sliding grooves 53 and the limiting strips 64 prevent the moving column 61 from sliding out of the inner cavity of the rotating column 51 due to the thrust of the springs 65, the arrangement of the rectangular through holes 54 ensures that the rectangular through holes 54 and the movable grooves 62 form a certain height difference, when the moving column 61 drives the rear end of the fixture 63 to be upward, the front end of the fixture 63 is downwards and stably connected with the fixed column 8 due to the lever principle, the inner cavity of the rotating mechanism 5 is provided with the limiting mechanism 6, the limiting mechanism 6 comprises the moving column 61, the two sides of the front surface of the moving column 61 are both provided with the movable grooves 62, the inner cavity of the movable grooves 62 is provided with the fixture 63 in a penetrating manner, the two sides of the fixture 63 are rotatably connected with the two sides of the inner cavity of the movable grooves 62, the two sides of the moving column, through stop gear 6's setting, use under the cooperation of removing post 61 and fixed column 8, can be so that baffle mechanism 2 keeps the laminating with fixed panel 7 with extension mechanism 3, then seal the building rubbish of arranging in the 1 inner chamber of material pipeline, prevent to arrange the rubbish roll-off by oneself in the 1 inner chamber of material pipeline, spring 65's setting, play an ascending thrust to removing post 61, the one end downstream of removing post 61 is kept away from to fixture 63, then make fixture 63 and fixed column 8's connection more firm.
The working principle is as follows: the utility model discloses during the use, the user is through pressing removal post 61, remove post 61 compression spring 65 and downstream, it drives the rear end downstream of fixture 63 to remove post 61, because rectangle through-hole 54 and fixture 63 have certain difference in height, make the front end upward movement of fixture 63, remove the connection to fixed column 8, stimulate mount pad 41 afterwards, mount pad 41 drives the inner chamber of extension board 32 roll-off rectangle spout 23, put mount pad 41 to the platform of arranging the material position after, anticlockwise rotation rotates post 51, make the positive surface of rotating post 51 towards the inner chamber of mount pad 41, fixture 63 gets into the inner chamber of L shape recess 42 this moment, can reach the purpose of buffering the ejection of compact.
In summary, the following steps: this construction waste pipeline's ejection of compact structure, through pressing removal post 61, make movable fixture 63 and the separation of fixed column 8, pulling mount pad 41 makes the inner chamber of spacing post 31 roll-off rectangle spout 23 can reach the purpose of buffering the ejection of compact afterwards, this construction waste pipeline's ejection of compact structure, through the discharge platform that provides certain angle to construction waste, current pipeline discharge device has been solved at the in-service use in-process, because construction waste is mostly the more hard grit of texture or the great grit of quality and reinforcing bar, lead to pipeline discharge gate play ground to be pounded badly, if the pipeline is direct to arranging material in the transport vechicle, probably lead to the problem that the impaired phenomenon of transport vechicle takes place.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a building rubbish pipeline's ejection of compact structure, includes discharge pipe (1), its characterized in that: the discharge end of the discharge pipeline (1) is fixedly connected with a fixing panel (7), one side of the fixing panel (7) far away from the discharge pipeline (1) is provided with a baffle mechanism (2), the baffle mechanism (2) comprises a stop plate (21) rotatably connected with the fixing panel (7), an extension mechanism (3) is arranged inside the stop plate (21), the extension mechanism (3) comprises an extension plate (32) penetrating through the top of the stop plate (21), both sides of the extension plate (32) are fixedly connected with limit posts (31), the top of the stop plate (21) is respectively provided with a limit chute I (22) and a rectangular chute (23) matched with the limit posts (31) and the extension plate (32), the top of the extension plate (32) is provided with an installation mechanism (4), the inner cavity of the installation mechanism (4) is provided with a rotating mechanism (5), and the inner cavity of the rotating mechanism (5) is provided with a limiting mechanism (6).
2. The discharging structure of the construction waste pipeline according to claim 1, wherein: stop gear (6) are including removing post (61), movable recess (62) have all been seted up to the both sides on removal post (61) positive surface, the inner chamber of activity recess (62) runs through and is provided with fixture (63), the both sides of fixture (63) are rotated with the both sides of activity recess (62) inner chamber and are connected, the equal fixedly connected with spacing (64) in both sides of removing post (61), spring (65) have all been welded to the both sides of removing post (61) bottom.
3. The discharging structure of the construction waste pipeline according to claim 2, wherein: slewing mechanism (5) establish rotation post (51) on removal post (61) surface including the cover, the bottom and rotation post (51) of spring (65) weld mutually, the both sides of rotating post (51) inner chamber all offer with spacing two (53) of spout of spacing (64) looks adaptation, the rectangle through-hole (54) with fixture (63) looks adaptation are all offered to the both sides of rotating post (51) positive surface, the equal fixedly connected with column spinner (52) in both sides of rotating post (51).
4. The discharging structure of the construction waste pipeline according to claim 3, wherein: the mounting mechanism (4) comprises a mounting seat (41) fixedly connected to the top of the limiting column (31), L-shaped grooves (42) matched with the clamping apparatus (63) are formed in two sides of the front surface of the mounting seat (41), and circular grooves (43) matched with the rotating column (52) are formed in two sides of the inner cavity of the mounting seat (41).
5. The discharging structure of the construction waste pipeline according to claim 1, wherein: the top of the fixed panel (7) is fixedly connected with a fixed column (8) matched with the fixture (63).
CN202020366367.6U 2020-03-22 2020-03-22 Discharge structure of building rubbish pipeline Expired - Fee Related CN211899444U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020366367.6U CN211899444U (en) 2020-03-22 2020-03-22 Discharge structure of building rubbish pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020366367.6U CN211899444U (en) 2020-03-22 2020-03-22 Discharge structure of building rubbish pipeline

Publications (1)

Publication Number Publication Date
CN211899444U true CN211899444U (en) 2020-11-10

Family

ID=73268906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020366367.6U Expired - Fee Related CN211899444U (en) 2020-03-22 2020-03-22 Discharge structure of building rubbish pipeline

Country Status (1)

Country Link
CN (1) CN211899444U (en)

Similar Documents

Publication Publication Date Title
CN106000527A (en) Environment-friendly construction waste recycling device
CN211899444U (en) Discharge structure of building rubbish pipeline
CN210369645U (en) Prefabricated railing
CN211446533U (en) Road patching device that town road had flattening function
CN213329010U (en) Municipal works are with pile device
CN213896659U (en) Municipal works are maintained with level and smooth device with road surface
CN213710249U (en) Ceramic tile device of caulking for building engineering
CN209891720U (en) Static pressure anchor rod pile reserved hole trapezoidal combined steel mould
CN106824478A (en) A kind of waste asphalt material recovery pre-processing device of the building field of environmental protection
CN207819405U (en) A kind of sliding cable trench cover
CN100507155C (en) Portable assembling type steel structure temporary water dash device
CN210753767U (en) Screening sand device for civil engineering
CN211774892U (en) Mobilizable high anti-seismic performance stone material curtain
CN215630437U (en) Anti-blocking stainless steel drainage channel
CN217079834U (en) Ancient building crack is restoreed and is used interim bearing structure
CN212201407U (en) Concrete crack repairing device
CN217385012U (en) A compression testing machine for concrete
CN215750078U (en) Wall body ditching cutting device is used in building engineering construction
CN113818547B (en) Sewage deodorization treatment device for municipal environmental protection engineering
CN210708875U (en) Automatic sand discharging device for blind well loading station
CN220461205U (en) Waterproof coiled material coating device capable of adjusting waterproof coiled material size
CN212651976U (en) Metal object screening device for construction waste
CN210874604U (en) Building engineering construction dust collector
CN217897343U (en) Fragment of brick material loading machine for construction
CN214460085U (en) Hydraulic engineering flood control wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201110