CN211899201U - Steel structure suspended ceiling - Google Patents

Steel structure suspended ceiling Download PDF

Info

Publication number
CN211899201U
CN211899201U CN202020198648.5U CN202020198648U CN211899201U CN 211899201 U CN211899201 U CN 211899201U CN 202020198648 U CN202020198648 U CN 202020198648U CN 211899201 U CN211899201 U CN 211899201U
Authority
CN
China
Prior art keywords
wall body
suspended ceiling
fossil fragments
mounting
steel structural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020198648.5U
Other languages
Chinese (zh)
Inventor
孙玉锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Juming Metal Technology Co ltd
Original Assignee
Yantai Juming Metal Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Juming Metal Technology Co ltd filed Critical Yantai Juming Metal Technology Co ltd
Priority to CN202020198648.5U priority Critical patent/CN211899201U/en
Application granted granted Critical
Publication of CN211899201U publication Critical patent/CN211899201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a steel construction furred ceiling, fossil fragments including the level setting, fossil fragments are connected with the wall body in house, fossil fragments are equipped with the axle of inserting with the wall body department of meeting, the wall body has been seted up and has been inserted the shaft hole, it pegs graft in inserting the shaft hole to insert the axle slip, it is equipped with the stopper to insert the axle, be equipped with damping spring between stopper and the wall body, the fossil fragments lower extreme is connected with the jib of a plurality of vertical settings, the jib is kept away from the one end of fossil fragments and is equipped with the installation roof beam, the installation roof beam lower extreme is equipped with a plurality of installed parts, installed part and installation roof beam are the longitude and latitude subsection, the installed part includes the horizontally flat board and locates flat middle part and flat vertically baffle, the decorative board has been erect between the adjacent. The utility model discloses have the absorbing effect of messenger's furred ceiling.

Description

Steel structure suspended ceiling
Technical Field
The utility model belongs to the technical field of the metal furred ceiling technique and specifically relates to a steel construction furred ceiling is related to.
Background
The existing suspended ceiling is decoration for decorating the top of a house, and a keel of the suspended ceiling is connected with a wall of the house to support the suspended ceiling. The suspended ceiling has the functions of heat preservation, heat insulation, sound insulation and sound absorption.
The prior Chinese patent with publication number CN2098240Y discloses a metal suspended ceiling, which comprises a decorative plate, an adjustable suspender component and a keel component, wherein the adjustable suspender component comprises a suspender and a fastener, the suspender is connected with a bolt, the other end of the suspender is connected with the fastener, the fastener is composed of two concave connecting blocks which are connected through a pin, the upper connecting block is provided with a thread and is connected with the suspender through the thread, a main keel is arranged in a groove of the lower connecting block, the keel component comprises a main keel, an auxiliary keel and a hanging component, and a plurality of groups of buckling edges which are arranged on two turned edges respectively and are in a left group and a right group. The suspended ceiling is simple in structure, firm, reliable and various in shape, and can be widely applied to municipal facilities, modern buildings and even indoor suspended ceiling decoration of the whole building industry.
The above prior art solutions have the following drawbacks: the damage of the keel of the suspended ceiling in the earthquake is very serious through earthquake damage investigation, the earthquake influence which possibly occurs is not considered in the arrangement form of the suspended ceiling structure in the existing relevant specification, the suspended ceiling is easy to deform in the earthquake, the keel is easy to break and the decorative plate falls off, and the escape personnel are injured by smashing, so that the occurrence of great casualties is caused.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a steel construction furred ceiling, this furred ceiling have good shock-absorbing function, have reduced fossil fragments fracture and decorative board when having reduced because of the earthquake and have dropped, lead to a large amount of casualties that appear.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme: the utility model provides a steel construction furred ceiling, includes the fossil fragments that the level set up, fossil fragments are connected with the wall body in house, fossil fragments and wall body department of meeting are equipped with the axle of inserting, and the wall body has been seted up and has been inserted the axle hole, it slides and pegs graft in inserting the axle hole to insert the axle, it is equipped with the stopper to insert the axle, be equipped with damping spring between stopper and the wall body, the fossil fragments lower extreme is connected with the jib of a plurality of vertical settings, the one end that fossil fragments were kept away from to the jib is equipped with the installation roof beam, installation roof beam lower extreme is equipped with a plurality of installed parts, the installed part is the longitude and latitude subsection with the installation roof beam, the installed part includes the horizontally flat board and locates flat middle.
Through adopting above-mentioned technical scheme, fossil fragments link to each other with the wall body, the jib is connected the installation roof beam on fossil fragments, the installed part sets up on the installation roof beam, the decoration board erects on the flat board of installed part, the baffle plays the effect of separating the decorative board of erectting on same installed part, when the earthquake takes place, the wall body takes place to rock, because the axle of inserting of fossil fragments one end setting can slide in the wall body, and be equipped with damping spring, can avoid rocking the wall body because of the earthquake, with fossil fragments extrusion fracture, then fossil fragments fracture leads to the furred ceiling to collapse, cause furred ceiling frame and decorative board to injure personnel of fleing by a large number, this furred ceiling has.
The present invention may be further configured in a preferred embodiment as: the damping spring is characterized in that hooks are arranged at two ends of the damping spring, and hanging rings matched with the hooks are respectively arranged on the limiting block and the wall body.
Through adopting above-mentioned technical scheme, through the cooperation of link and couple, damping spring easily pulls down from stopper and wall body, and the damping spring who is convenient for change is renewed after elastic fatigue appears in damping spring.
The present invention may be further configured in a preferred embodiment as: the both ends of jib are equipped with first lifting hook, first lifting hook passes through the bolt with fossil fragments and can dismantle with the installation roof beam and be connected.
Through adopting above-mentioned technical scheme, the jib is equipped with first lifting hook at both ends, and the jib links to each other with the installation roof beam through first lifting hook, and even has fixing bolt between first lifting hook and fossil fragments and the installation roof beam, through this kind of connected mode, when connecting firmly, the workman of being convenient for installs.
The present invention may be further configured in a preferred embodiment as: the first lifting hook is detachably connected with the lifting rod through a bolt.
Through adopting above-mentioned technical scheme, first lifting hook passes through the bolt with the jib and can dismantle and be connected, is convenient for install first lifting hook, and also convenient to detach has made things convenient for subsequent maintenance to change simultaneously.
The present invention may be further configured in a preferred embodiment as: the middle part of the suspender is provided with a chain.
Through adopting above-mentioned technical scheme, the jib middle part is equipped with the chain, and when the earthquake takes place, the chain at jib middle part can play certain cushioning effect, can avoid the decorative board to drop.
The present invention may be further configured in a preferred embodiment as: the installed part is equipped with a plurality of second lifting hooks, the installation roof beam passes through the bolt with the second lifting hook and can dismantle the connection.
Through adopting above-mentioned technical scheme, the installed part passes through the second lifting hook and links to each other with the installation roof beam, and even has the bolt between second lifting hook and the installation roof beam, passes through the bolt through the second lifting hook and can dismantle with the installation roof beam and be connected, the installation of being convenient for.
The present invention may be further configured in a preferred embodiment as: the flat plate is provided with a plurality of limiting shafts, and the decorative plate is provided with a plurality of limiting holes matched with the limiting shafts.
Through adopting above-mentioned technical scheme, through the cooperation in spacing axle and spacing hole, can make the decorative board be difficult for dropping when making the decorative board be convenient for erect above the installed part, increased factor of safety.
The present invention may be further configured in a preferred embodiment as: the decorative plate is provided with a sound absorption layer.
Through adopting above-mentioned technical scheme, the decorative board sets up the attraction layer, can carry out certain absorption elimination to indoor noise.
To sum up, the utility model discloses a following at least one useful technological effect:
1. the improved suspended ceiling has better shock absorption performance by arranging the shock absorption springs, and the keels are not easy to break when an earthquake occurs;
2. through set up spacing hole at the decorative board to and set up spacing axle at the installed part, make the decorative board installation firm, be difficult for dropping.
Drawings
FIG. 1 is a schematic structural view of a steel structural suspended ceiling;
FIG. 2 is an enlarged partial schematic view of portion A of FIG. 1;
FIG. 3 is an enlarged partial schematic view of portion B of FIG. 1;
in the figure, 1, keel; 11. inserting a shaft; 12. a limiting block; 13. a damping spring; 14. a wall body; 2. a boom; 21. a chain; 3. mounting a beam; 4. a mounting member; 41. a flat plate; 42. a baffle plate; 43. a decorative plate; 5. hooking; 51. hanging a ring; 6. a first hook; 61. a second hook; 7. a limiting shaft; 71. and a limiting hole.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a steel structure furred ceiling, including fossil fragments 1, jib 2, installation roof beam 3 and installed part 4. The keel 1 is connected with the wall 14 and plays a main supporting role. The upper end of the suspender 2 is connected with a keel 1, and the lower end is connected with a mounting beam 3. The lower end of the mounting beam 3 is connected with a mounting part 4, the mounting part 4 and the mounting beam 3 are distributed in a longitude and latitude mode, and a plurality of decorative plates 43 are erected on the adjacent mounting parts 4.
Referring to fig. 1 and 2, an inserting shaft 11 is arranged at the joint of the keel 1 and the wall 14, an inserting shaft hole is formed in the wall 14, the inserting shaft 11 is inserted into the inserting shaft hole in a sliding mode, and the inserting shaft 11 is provided with a limiting block 12. A damping spring 13 is arranged between the limiting block 12 and the wall 14. Through setting up damping spring 13, make the furred ceiling have certain shock-absorbing function, but the fossil fragments 1 of this furred ceiling makes fossil fragments 1 difficult fracture in the earthquake in wall body 14 horizontal slip.
The limiting block 12 and the wall 14 are respectively provided with a hanging ring 51, the two ends of the damping spring 13 are respectively provided with a hook 5, the hook 5 is connected with the hanging ring 51, and the hook 5 and the hanging ring 51 are arranged, so that the damping spring 13 is easy to disassemble and the damping spring 13 is convenient to replace.
Referring to fig. 1 and 2, a chain 21 is provided in the middle of the boom 2, and the chain 21 may also serve a certain damping function. The both ends of jib 2 are equipped with first lifting hook 6, and first lifting hook 6 can be dismantled with jib 2 through the bolt and be connected, and first lifting hook 6 can be dismantled through the bolt with fossil fragments 1 and installation roof beam 3 respectively and be connected, can dismantle the dismouting of being convenient for between each structure.
Referring to fig. 1 and 2, installed part 4 is equipped with a plurality of second lifting hooks 61, and installation roof beam 3 passes through the bolt with second lifting hook 61 and can dismantle and be connected, and installed part 4 is equipped with the lifting hook, links to each other with installation roof beam 3 through the lifting hook, connects firmly, and is convenient for install and dismantle through bolted connection.
Referring to fig. 1 and 3, the fitting part includes a horizontal flat plate 41 and a baffle 42 disposed in the middle of the flat plate 41 and perpendicular to the flat plate 41, the flat plate 41 is provided with a plurality of limiting shafts 7, the decorative plate 43 is provided with a plurality of limiting holes 71, and the limiting shafts 7 and the limiting holes 71 are disposed. The decorative board 43 erected on the mounting part 4 is not easy to drop when an earthquake occurs, and the safety factor of the suspended ceiling is enhanced.
Referring to fig. 1 and 3, the lower end of the decorative plate 43 is provided with a sound absorption layer, and the sound absorption layer can absorb certain noise and has some noise reduction functions.
The implementation principle of the embodiment is as follows: when the suspended ceiling is installed, the keel 1 is connected with the wall 14, the first lifting hook 6 is hung on the keel 1, the bolt between the first lifting hook 6 and the keel 1 is screwed, the installation beam 3 is continuously connected with the first lifting hook 6 at the lower end of the suspension rod 2, the bolt is screwed, the second lifting hook 61 on the installation part 4 is hung on the installation beam 3, the bolt is screwed, the limiting hole 71 of the decorative plate 43 is aligned with the limiting shaft 7 on the installation part 4, the decorative plate 43 is erected on the installation part 4, and the suspended ceiling is installed.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a steel construction furred ceiling, includes fossil fragments (1) that the level set up, fossil fragments (1) are connected its characterized in that with wall body (14) in house: an inserting shaft (11) is arranged at the joint of the keel (1) and the wall body (14), the wall body (14) is provided with an inserting shaft hole, the inserting shaft (11) is inserted in the inserting shaft hole in a sliding way, the inserting shaft (11) is provided with a limiting block (12), a damping spring (13) is arranged between the limiting block (12) and the wall body (14), the lower end of the keel (1) is connected with a plurality of vertically arranged hanging rods (2), one end of the suspender (2) far away from the keel (1) is provided with a mounting beam (3), the lower end of the mounting beam (3) is provided with a plurality of mounting pieces (4), the mounting pieces (4) and the mounting beam (3) are longitude and latitude branches, the mounting piece (4) comprises a horizontal flat plate (41) and a baffle plate (42) which is arranged in the middle of the flat plate (41) and is vertical to the flat plate (41), the baffle plates (42) are connected with the mounting beams (3), and a plurality of decorative plates (43) are erected between the adjacent mounting pieces (4).
2. A steel structural suspended ceiling as claimed in claim 1, wherein: the two ends of the damping spring (13) are provided with hooks (5), and the limiting block (12) and the wall body (14) are respectively provided with hanging rings (51) matched with the hooks (5).
3. A steel structural suspended ceiling as claimed in claim 1, wherein: the both ends of jib (2) are equipped with first lifting hook (6), first lifting hook (6) can be dismantled through the bolt with fossil fragments (1) and installation roof beam (3) and be connected.
4. A steel structural suspended ceiling as claimed in claim 3, wherein: the first lifting hook (6) is detachably connected with the hanging rod (2) through a bolt.
5. A steel structural suspended ceiling as claimed in claim 1, wherein: the middle part of the suspender (2) is provided with a chain (21).
6. A steel structural suspended ceiling as claimed in claim 1, wherein: the mounting part (4) is provided with a plurality of second lifting hooks (61), and the mounting beam (3) is detachably connected with the second lifting hooks (61) through bolts.
7. A steel structural suspended ceiling as claimed in claim 1, wherein: the flat plate (41) is provided with a plurality of limiting shafts (7), and the decorative plate (43) is provided with a plurality of limiting holes (71) matched with the limiting shafts (7).
8. A steel structural suspended ceiling as claimed in claim 1, wherein: the decorative plate (43) is provided with a sound absorption layer.
CN202020198648.5U 2020-02-23 2020-02-23 Steel structure suspended ceiling Active CN211899201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020198648.5U CN211899201U (en) 2020-02-23 2020-02-23 Steel structure suspended ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020198648.5U CN211899201U (en) 2020-02-23 2020-02-23 Steel structure suspended ceiling

Publications (1)

Publication Number Publication Date
CN211899201U true CN211899201U (en) 2020-11-10

Family

ID=73291641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020198648.5U Active CN211899201U (en) 2020-02-23 2020-02-23 Steel structure suspended ceiling

Country Status (1)

Country Link
CN (1) CN211899201U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162600A (en) * 2022-06-24 2022-10-11 广东众安建筑工程有限公司 Construction method of ceiling with concealed keel and mineral wool board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162600A (en) * 2022-06-24 2022-10-11 广东众安建筑工程有限公司 Construction method of ceiling with concealed keel and mineral wool board
CN115162600B (en) * 2022-06-24 2024-01-26 广东众安建筑工程有限公司 Construction method of suspended ceiling of hidden keel mineral wool board

Similar Documents

Publication Publication Date Title
CN211899201U (en) Steel structure suspended ceiling
CN110656698B (en) Shock resistance connection structure of concrete beam column
CN210917906U (en) Detachable ceiling edge keel system
CN109113369B (en) Safe demolition method for manual demolition of cylindrical building
Zhou et al. Shaking table tests on seismic response of discontinuous suspended ceilings
CN110206329B (en) Civil engineering is with construction protector
CN109537793A (en) It is easily installed the ceiling structure and its installation method of leveling
CN201874135U (en) Novel ceiling
CN209468909U (en) It is easily installed the ceiling structure of leveling
CN114673834B (en) Integrated comprehensive bearing anti-seismic system
CN208185619U (en) Multitube is total to frame side longitudinal direction seismic support hanger
CN216239854U (en) Subway station foundation pit steel support anti-falling protection device
CN212129995U (en) Safety device is used in room construction
CN204983338U (en) Buckle formula conversion layer pendant
CN211420885U (en) Protective device for high-altitude safety in construction of bent cap support base cushion stone and support installation
CN209603344U (en) A kind of building glass curtain wall installing structure
CN212224383U (en) Suspended ceiling component with vibration reduction function
CN207906600U (en) The electromechanical unidirectional antidetonation suspension and support of building
CN208251653U (en) A kind of unit glass curtain wall hanging apparatus
CN211880550U (en) Loudspeaker mounting bracket
CN107700830B (en) Climbing form structure for building
CN219138362U (en) Formwork system of high-altitude suspended beam
CN219840356U (en) Hanging basket support
CN111794402A (en) Damping device for civil engineering