CN211898368U - Pile driver is used in bridge construction - Google Patents

Pile driver is used in bridge construction Download PDF

Info

Publication number
CN211898368U
CN211898368U CN202020512238.3U CN202020512238U CN211898368U CN 211898368 U CN211898368 U CN 211898368U CN 202020512238 U CN202020512238 U CN 202020512238U CN 211898368 U CN211898368 U CN 211898368U
Authority
CN
China
Prior art keywords
controller
pile driver
rod
pile
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020512238.3U
Other languages
Chinese (zh)
Inventor
李科
陈科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Yunnan Investment Development Co ltd
Original Assignee
China Construction Yunnan Investment Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Yunnan Investment Development Co ltd filed Critical China Construction Yunnan Investment Development Co ltd
Priority to CN202020512238.3U priority Critical patent/CN211898368U/en
Application granted granted Critical
Publication of CN211898368U publication Critical patent/CN211898368U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pile driver for bridge construction, a driving device is arranged in a moving vehicle body, a slide rail is arranged on the moving vehicle body, a fixed plate is arranged on the moving vehicle body, a slide ball is arranged on the lower surface of the fixed plate, the slide ball is arranged in the slide rail, a first hydraulic rod is arranged on the moving vehicle body, one end of the first hydraulic rod is connected on the side wall of the fixed plate, the first hydraulic rod is connected with a first hydraulic pump, and the first hydraulic pump is connected with a first controller; a pile driver body is arranged on the fixed plate, one end of the pile driver body is connected with a pile hammer, the pile driver body is connected with a first driving motor, and the first driving motor is connected with a second controller; the dead lever that is provided with the slope is connected to fixed plate one end, and the carriage release lever is connected on dead lever upper portion, is provided with the spout on the carriage release lever lateral wall, is provided with the latch in the spout, is provided with the cardboard on the carriage release lever lateral wall, and cardboard one end is provided with the fixture block, and the fixture block setting is in the spout. The problem of difficult pile is driven when solving the bridge construction.

Description

Pile driver is used in bridge construction
Technical Field
The utility model relates to a bridge construction technical field, concretely relates to pile driver is used in bridge construction.
Background
Pile driving machines utilize impact forces to drive piles into the earth. Consists of a pile hammer, a pile frame, accessory equipment and the like. The pile hammer is attached between two parallel vertical guide rods at the front part of the pile frame and is hoisted by a hoisting hook. The pile frame is a steel structure tower frame, the rear part of the pile frame is provided with a winch for lifting the pile and the pile hammer, and the front part of the pile frame is provided with a guide frame consisting of two guide rods for controlling the piling direction so that the pile can accurately penetrate into the stratum according to the designed direction. The tower and the guide frame may be deflected together for raking the pile. The guide frame can also be extended down the tower for driving underwater piles along the bank or dock. The pile frame can rotate and also can move. The basic technical parameters of the pile driver are the impact section weight, the impact kinetic energy and the impact frequency. The power source of the pile hammer according to the movement can be divided into a drop hammer, a steam hammer, a diesel hammer, a hydraulic hammer and the like.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pile driver is used in bridge construction, the difficult problem of pile when solving the bridge construction.
In order to solve the technical problem, the utility model adopts the following technical scheme:
a pile driver for bridge construction comprises a pile driver main body, wherein the pile driver main body comprises a movable vehicle body and a fixed plate;
a driving device is arranged in the moving vehicle body, a sliding rail is arranged on the moving vehicle body, a fixing plate is arranged on the moving vehicle body, a sliding ball is arranged on the lower surface of the fixing plate and is arranged in the sliding rail, a first hydraulic rod is arranged on the moving vehicle body, one end of the first hydraulic rod is connected to the side wall of the fixing plate, the first hydraulic rod is connected with a first hydraulic pump, and the first hydraulic pump is connected with a first controller;
a pile driver body is arranged on the fixed plate, one end of the pile driver body is connected with a pile hammer, the pile driver body is connected with a first driving motor, and the first driving motor is connected with a second controller;
the dead lever that is provided with the slope is connected to fixed plate one end, and the carriage release lever is connected on dead lever upper portion, is provided with the spout on the carriage release lever lateral wall, is provided with the latch in the spout, is provided with the cardboard on the carriage release lever lateral wall, and cardboard one end is provided with the fixture block, and the fixture block setting is in the spout.
Further, the method comprises the following steps of; one end of the clamping plate is connected with a telescopic rod, one end of the telescopic rod is connected to the fixed rod, the telescopic rod is connected with a second driving motor, and the second driving motor is connected with a third controller;
the cardboard other end is connected the second hydraulic stem, and second hydraulic stem one end is connected on the dead lever, and the second hydraulic stem is connected with the second hydraulic pump, and the second hydraulic pump is connected with the fourth controller.
Further, the method comprises the following steps of; and a vertical instrument is arranged on the side wall of the clamping plate and connected with an alarm, and the alarm is connected with a fifth controller.
Further, the method comprises the following steps of; the pile driving hammer is arranged between the clamping plates.
Further, the method comprises the following steps of; and sound absorption cotton is fixedly arranged on the wall of the clamping plate.
Further, the method comprises the following steps of; the first controller, the second controller, the third controller, the fourth controller and the fifth controller are connected with each other.
Compared with the prior art, the utility model discloses an at least, have one of following beneficial effect:
1. during bridge construction, the pile driver main part is including removing the automobile body, the fixed plate, it moves appointed place as required to remove the automobile body, the first hydraulic pump that first controller is connected makes first hydraulic stem drive the fixed plate and moves on in the slide rail, the fixed plate motion of being convenient for, the pile driver organism on the fixed plate can make the pile hammer carry out the pile as required at the first driving motor that the second controller is connected, before the pile, the cardboard carries out certain fixed action to the object that bridge construction needs the pile, the pile of being convenient for.
2. The telescopic rod is extended or contracted by the aid of the second driving motor connected with the third controller, so that the clamping plates move, objects needing to be constructed for piling are fixed between the clamping plates, the second hydraulic pumps connected with the fourth controller enable the second hydraulic rods to move, and the lower portions of the clamping plates connected with the second hydraulic rods are good in fixing effect.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the connection between the fixed rod and the movable rod of the present invention.
In the figure: the pile driver comprises a pile driver main body (1), a movable vehicle body (2), a fixing plate (3), a sliding rail (4), a sliding ball (5), a first hydraulic rod (6), a first hydraulic pump (7), a first controller (8), a pile driver body (9), a pile driving hammer (10), a first driving motor (11), a second controller (12), a fixing rod (13), a movable rod (14), a sliding groove (15), a latch (16), a clamping plate (17), a clamping block (18), an expansion rod (19), a second driving motor (20), a third controller (21), a second hydraulic rod (22), a second hydraulic pump (23), a fourth controller (24), a vertical instrument (25), an alarm (26), a fifth controller (27) and sound absorption cotton (28).
Detailed Description
Fig. 1-2 are schematic views illustrating the present invention, and the embodiments and examples are further detailed below to make the objects, technical solutions and advantages of the present invention more clearly understood. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1:
a pile driver for bridge construction comprises a pile driver main body 1, wherein the pile driver main body 1 comprises a movable vehicle body 2 and a fixed plate 3;
a driving device is arranged in the moving vehicle body 2, a slide rail 4 is arranged on the moving vehicle body 2, a fixed plate 3 is arranged on the moving vehicle body 2, a slide ball 5 is arranged on the lower surface of the fixed plate 3, the slide ball 5 is arranged in the slide rail 4, a first hydraulic rod 6 is arranged on the moving vehicle body 2, one end of the first hydraulic rod 6 is connected to the side wall of the fixed plate 3, the first hydraulic rod 6 is connected with a first hydraulic pump 7, and the first hydraulic pump 7 is connected with a first controller 8;
a pile driver body 9 is arranged on the fixed plate 3, one end of the pile driver body 9 is connected with a pile driving hammer 10, the pile driver body 9 is connected with a first driving motor 11, and the first driving motor 11 is connected with a second controller 12;
one end of the fixed plate 3 is connected with an inclined fixed rod 13, the upper part of the fixed rod 13 is connected with a movable rod 14, the side wall of the movable rod 14 is provided with a sliding groove 15, the sliding groove 15 is internally provided with a latch 16, the side wall of the movable rod 14 is provided with a clamping plate 17, one end of the clamping plate 17 is provided with a clamping block 18, and the clamping block 18 is arranged in the sliding groove 15; during bridge construction, pile driver main part 1 is including removing automobile body 2, fixed plate 3, remove automobile body 2 and move appointed place as required, first hydraulic pump 7 that first controller 8 connects makes first hydraulic stem 6 drive fixed plate 3 and moves on in slide rail 4, the fixed plate 3 motion of being convenient for, and pile driver organism 9 on the fixed plate 3 can make pile hammer 10 pile as required at the first driving motor 11 that second controller 12 is connected, and simultaneously, before the pile driver, cardboard 17 carries out certain fixed action to the object that bridge construction needs the pile driver, be convenient for the pile driver.
Example 2:
on the basis of the embodiment 1, one end of the clamping plate 17 is connected with the telescopic rod 19, one end of the telescopic rod 19 is connected to the fixed rod 13, the telescopic rod 19 is connected with the second driving motor 20, and the second driving motor 20 is connected with the third controller 21;
the other end of the clamping plate 17 is connected with a second hydraulic rod 22, one end of the second hydraulic rod 22 is connected to the fixing rod 13, the second hydraulic rod 22 is connected with a second hydraulic pump 23, and the second hydraulic pump 23 is connected with a fourth controller 24; the second driving motor 20 connected with the third controller 21 enables the telescopic rod 19 to extend or contract, so that the clamping plates 17 move, objects needing piling in construction are fixed between the clamping plates 17, the second hydraulic pump 23 connected with the fourth controller 24 enables the second hydraulic rod 22 to move, and the lower portions of the clamping plates 17 connected with the second hydraulic rod 22 enable the fixing effect to be good.
Example 3:
on the basis of the embodiment 1-2, the side wall of the clamping plate 17 is provided with a vertical instrument 25, the vertical instrument 25 is connected with an alarm 26, and the alarm 26 is connected with a fifth controller 27; the monitoring of the vertical gauge 25 allows for better vertical fixation of the object to be driven.
Example 4:
on the basis of the embodiments 1-3, the piling hammer 10 is arranged between the clamping plates 17; facilitating the piling of the hammer 10.
Example 5:
on the basis of the embodiments 1 to 4, the sound absorption cotton 28 is fixedly arranged on the wall of the clamping plate 17; together have certain silencing function.
Example 6:
on the basis of the embodiments 1-5, the first controller 8, the second controller 12, the third controller 21, the fourth controller 24 and the fifth controller 27 are connected with each other; so that the piling effect is good in the piling process.
Although the invention has been described herein with reference to a number of illustrative embodiments thereof, it should be understood that numerous other modifications and embodiments can be devised by those skilled in the art that will fall within the spirit and scope of the principles of this invention. More specifically, various variations and modifications are possible in the component parts and/or arrangements of the subject combination arrangement within the scope of the disclosure, the drawings and the appended claims. In addition to variations and modifications in the component parts and/or arrangements, other uses will also be apparent to those skilled in the art.

Claims (6)

1. The utility model provides a pile driver for bridge construction, includes pile driver main part (1), its characterized in that: the pile driver main body (1) comprises a movable vehicle body (2) and a fixed plate (3);
a driving device is arranged in the moving vehicle body (2), a sliding rail (4) is arranged on the moving vehicle body (2), a fixed plate (3) is arranged on the moving vehicle body (2), a sliding ball (5) is arranged on the lower surface of the fixed plate (3), the sliding ball (5) is arranged in the sliding rail (4), a first hydraulic rod (6) is arranged on the moving vehicle body (2), one end of the first hydraulic rod (6) is connected to the side wall of the fixed plate (3), the first hydraulic rod (6) is connected with a first hydraulic pump (7), and the first hydraulic pump (7) is connected with a first controller (8);
a pile driver body (9) is arranged on the fixed plate (3), one end of the pile driver body (9) is connected with a pile driving hammer (10), the pile driver body (9) is connected with a first driving motor (11), and the first driving motor (11) is connected with a second controller (12);
one end of the fixing plate (3) is connected with an inclined fixing rod (13), the upper portion of the fixing rod (13) is connected with a moving rod (14), a sliding groove (15) is formed in the side wall of the moving rod (14), a clamping tooth (16) is arranged in the sliding groove (15), a clamping plate (17) is arranged on the side wall of the moving rod (14), a clamping block (18) is arranged at one end of the clamping plate (17), and the clamping block (18) is arranged in the sliding groove (15).
2. The pile driver for bridge construction according to claim 1, wherein: one end of the clamping plate (17) is connected with an expansion rod (19), one end of the expansion rod (19) is connected to the fixing rod (13), the expansion rod (19) is connected with a second driving motor (20), and the second driving motor (20) is connected with a third controller (21);
the cardboard (17) other end is connected second hydraulic stem (22), and second hydraulic stem (22) one end is connected on dead lever (13), and second hydraulic stem (22) are connected with second hydraulic pump (23), and second hydraulic pump (23) are connected with fourth controller (24).
3. The pile driver for bridge construction according to claim 1, wherein: the side wall of the clamping plate (17) is provided with a vertical instrument (25), the vertical instrument (25) is connected with an alarm (26), and the alarm (26) is connected with a fifth controller (27).
4. The pile driver for bridge construction according to claim 1, wherein: the piling hammer (10) is arranged between the clamping plates (17).
5. The pile driver for bridge construction according to claim 1, wherein: and sound absorption cotton (28) is fixedly arranged on the wall of the clamping plate (17).
6. The pile driver for bridge construction according to claim 1, wherein: the first controller (8), the second controller (12), the third controller (21), the fourth controller (24) and the fifth controller (27) are mutually connected.
CN202020512238.3U 2020-04-09 2020-04-09 Pile driver is used in bridge construction Expired - Fee Related CN211898368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020512238.3U CN211898368U (en) 2020-04-09 2020-04-09 Pile driver is used in bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020512238.3U CN211898368U (en) 2020-04-09 2020-04-09 Pile driver is used in bridge construction

Publications (1)

Publication Number Publication Date
CN211898368U true CN211898368U (en) 2020-11-10

Family

ID=73273320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020512238.3U Expired - Fee Related CN211898368U (en) 2020-04-09 2020-04-09 Pile driver is used in bridge construction

Country Status (1)

Country Link
CN (1) CN211898368U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561948A (en) * 2022-03-03 2022-05-31 中铁建工集团山东有限公司 Piling device for building construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561948A (en) * 2022-03-03 2022-05-31 中铁建工集团山东有限公司 Piling device for building construction
CN114561948B (en) * 2022-03-03 2023-09-01 中铁建工集团山东有限公司 Piling device for construction

Similar Documents

Publication Publication Date Title
CN107476303A (en) A kind of construction site ringing engine
CN211898368U (en) Pile driver is used in bridge construction
CN212248238U (en) Pile driver is used in bridge construction
CN206721878U (en) A kind of piling machine
CN216551923U (en) Piling mechanism for civil engineering
CN213926256U (en) Pile driver for construction
CN213173716U (en) Civil engineering uses high-efficient pile driver
CN211523211U (en) Pile extractor for hydraulic engineering
CN115142414A (en) Hydraulic pile driver
CN211523212U (en) Pile driving and drawing machine
CN220868210U (en) Pile driver for building construction
CN210288386U (en) Civil engineering is with a tractor serves several purposes pile driver
CN216339525U (en) Pile sinking equipment for pressing and driving combined precast pile
CN220953391U (en) Pile driving equipment for foundation construction
CN214940122U (en) Foundation engineering building pile driver elevating system fixed connection cover
CN112502146A (en) Piling device for industrial and civil buildings
CN217174757U (en) Pile driver for highway engineering
CN218843088U (en) Piling equipment for water conservancy construction
CN217974372U (en) Long spiral pile driver suitable for piling in hard soil
CN217128217U (en) Pile driver
CN213014274U (en) Walking type pile driver chassis structure
CN220953385U (en) Pile driver for highway engineering
CN212052744U (en) Stable pile driver for traffic engineering construction
CN210829068U (en) Pile driver for civil engineering
CN220013665U (en) Pile driver with supporting function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201110

Termination date: 20210409

CF01 Termination of patent right due to non-payment of annual fee