CN211875533U - Engineering cost progress management device - Google Patents

Engineering cost progress management device Download PDF

Info

Publication number
CN211875533U
CN211875533U CN202020463517.5U CN202020463517U CN211875533U CN 211875533 U CN211875533 U CN 211875533U CN 202020463517 U CN202020463517 U CN 202020463517U CN 211875533 U CN211875533 U CN 211875533U
Authority
CN
China
Prior art keywords
display screen
fixedly connected
groove
management device
screen box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020463517.5U
Other languages
Chinese (zh)
Inventor
胡苗
周小川
郭春红
卢陈涛
林格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang College of Security Technology
Original Assignee
Zhejiang College of Security Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang College of Security Technology filed Critical Zhejiang College of Security Technology
Priority to CN202020463517.5U priority Critical patent/CN211875533U/en
Application granted granted Critical
Publication of CN211875533U publication Critical patent/CN211875533U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The utility model discloses an engineering cost progress management device belongs to building engineering technical field. The engineering cost progress management device comprises a base, wherein a support column is fixedly connected to the upper surface of the base, a connecting block is fixedly connected to the upper surface of the support column, an insertion hole is formed in the middle of the upper surface of the connecting block, a threaded groove is formed in the insertion hole, a threaded column is connected to the inner portion of the threaded groove in a threaded mode, and an LED clamping groove is fixedly connected to one end face of the threaded column; the utility model discloses, effectual messenger management device fixes the display screen box through the inside draw-in groove of LED draw-in groove, makes the display screen avoid taking place broken phenomenon under the touching, through screw thread post and support column, makes the display screen can keep balance, makes things convenient for staff's operation, for convenient use of management device, at a side fixedly connected with mount pad of display screen box, a side swing joint of mount pad has starting switch, facilitates the operation and uses.

Description

Engineering cost progress management device
Technical Field
The utility model relates to a building engineering technical field especially relates to engineering cost progress management device.
Background
The project cost refers to the construction cost of the project predicted or actually paid in the construction period, including the project measurement pricing standard related to pricing content, pricing method and price standard, project pricing quota and project cost information, etc. in the prior art, the carried project needs to be detected on site, accompanied by persons and supervise the working of workers, thus the project cost progress management device is needed, and the project cost progress management device is troublesome, wastes a lot of time of the workers, reduces the working efficiency of the workers, and in the aspect of progress management, most devices are not easy to operate and are easy to cause errors.
SUMMERY OF THE UTILITY MODEL
The utility model aims at increasing the work efficiency of staff and simultaneously protection device increases device life's problem, and the engineering cost progress management device who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
engineering cost progress management device, the on-line screen storage device comprises a base, the last fixed surface of base is connected with the support column, the last fixed surface of support column is connected with the connecting block, the jack has been seted up at the middle part of connecting block upper surface, the inside of jack is provided with the thread groove, the inside threaded connection of thread groove has the screw thread post, a terminal surface fixedly connected with LED draw-in groove of screw thread post, the LED draw-in groove passes through screw thread post fixedly connected with connecting block, the draw-in groove has been seted up to the inside of LED draw-in groove, the inside joint of draw-in groove.
Preferably, a baffle is fixedly connected to one side face of the display screen box body, an LED clamping groove is fixedly connected to one side face of the baffle, and a protective support is arranged at the top of the display screen box body.
Preferably, a cavity is formed in one side face of the display screen box body, a display screen is arranged inside the cavity, and a connecting plate is fixedly connected to the top end of one side face of the display screen.
Preferably, one side of the outer surface of the protective support is provided with a jack, a screw is inserted into the jack, the outer surface of the screw is movably connected with a gasket, and the protective support is fixedly connected with the display screen box body through the screw.
Preferably, a mounting seat is fixedly connected to one side face of the display screen box body, a jack is formed in the middle of one side face of the mounting seat, and a starting switch is inserted into the jack.
Preferably, the outer surface of the connecting plate is fixedly connected with four indicator lights, and the four indicator lights are parallel to each other.
Compared with the prior art, the utility model provides an engineering cost progress management device possesses following beneficial effect:
1. the utility model discloses, through the fixed connection of the upper surface of base support column, the upper surface of support column is fixed and is connected with the connecting block, the middle part of the upper surface of connecting block has seted up the jack, the inside of jack is provided with the thread groove, the inside screw thread connection of thread groove has the screw thread post, a terminal surface of screw thread post is fixed and is connected with the LED draw-in groove, the inside draw-in groove has seted up the draw-in groove, the inside joint of draw-in groove has the display screen box, the effectual management device that makes the display screen fix the display screen box through the draw-in groove inside the LED draw-in groove, make the display screen under touching, avoid taking place broken phenomenon, simultaneously through screw thread post and support column, make the display screen keep balance, make things convenient for staff's operation, in order to facilitate the use of management device, at a, and through the mode of touch screen, greatly increased staff's work efficiency.
2. The utility model is characterized in that a baffle is fixedly connected with one side of the display screen box body, an LED clamping groove is fixedly connected with one side of the baffle, a protective support is arranged at the top of the display screen box body, a cavity is arranged at one side of the display screen box body, a display screen is arranged in the cavity, a connecting plate is fixedly connected with the top end of one side of the display screen, an indicator lamp is fixedly connected with the outer surface of the connecting plate, when the management device is effectively checked and operated, the indicator lamp at the upper end can be operated, the color of the indicator lamp is yellow and green in turn, when the progress is achieved, the indicating lamp can display green light, thereby saving a great deal of time for workers, simultaneously, the protective support at the upper end of the display screen box body prevents the display screen at the upper end from directly impacting the display screen box body when colliding when the management device is used, so that the display screen is broken, and the protection effect on the display screen is further increased.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the support pillar of the present invention;
fig. 3 is a schematic structural diagram of the starting switch of the present invention;
fig. 4 is a schematic side view of the LED card slot of the present invention;
fig. 5 is an enlarged schematic view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a support pillar; 3. connecting blocks; 4. a thread groove; 5. an LED card slot; 6. a baffle plate; 7. a display screen; 8. a display screen box body; 9. a connecting plate; 10. protecting the support; 11. an indicator light; 12. a mounting seat; 13. starting a switch; 14. a gasket; 15. a screw; 16. a threaded post.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-5, the engineering cost progress management device comprises a base 1, wherein a support column 2 is fixedly connected to the upper surface of the base 1, the support column 2 is used for supporting and keeping the management device balanced, the stability of the management device is improved, a connecting block 3 is fixedly connected to the upper surface of the support column 2, a jack is formed in the middle of the upper surface of the connecting block 3, a threaded groove 4 is formed in the jack, a threaded column 16 is connected to the inner thread of the threaded groove 4, an LED clamping groove 5 is fixedly connected to one end face of the threaded column 16, the LED clamping groove 5 is used for fixing a display screen box body 8 and a display screen 7, the display screen 7 is prevented from losing balance, the LED clamping groove 5 is fixedly connected to the connecting block 3 through the threaded column 16, a clamping groove is formed in the LED clamping groove 5, a display screen box body 8 is clamped in the clamping groove, a baffle 6 is fixedly connected to one, one side surface of the baffle 6 is fixedly connected with an LED clamping groove 5, the top of the display screen box body 8 is provided with a protective support 10, the protective support 10 is used for preventing the display screen 7 from directly impacting the ground when the display screen box body 8 impacts the ground, the display screen 7 is broken when the display screen 7 is broken, the display screen 7 is protected by the protective support 10, one side of the outer surface of the protective support 10 is provided with a jack, a screw 15 is inserted into the jack, the outer surface of the screw 15 is movably connected with a gasket 14, the protective support 10 is fixedly connected with the display screen box body 8 through the screw 15, one side surface of the display screen box body 8 is provided with a cavity, the display screen 7 is arranged inside the cavity, the top end of one side surface of the display screen 7 is fixedly connected with a connecting plate 9, the outer surface of the connecting plate 9 is fixedly connected with an indicator lamp 11, the indicator lamp 11, and four pilot lamps 11 all are parallel to each other between two liang, and a side fixedly connected with mount pad 12 of display screen box 8, and the jack has been seted up at the middle part of a side of mount pad 12, and the inside grafting of jack has starting switch 13, and starting switch 13 is used for controlling the start-up and the termination of display screen 7, and simultaneously for the convenience of staff's operation, display screen 7 takes to be the touch-sensitive screen, facilitates for the staff.
In the utility model, a support column 2 is fixedly connected with the upper surface of a base 1, a connecting block 3 is fixedly connected with the upper surface of the support column 2, a jack is arranged at the middle part of the upper surface of the connecting block 3, a thread groove 4 is arranged inside the jack, a thread column 16 is connected with the inner thread of the thread groove 4, an LED clamping groove 5 is fixedly connected with one end surface of the thread column 16, a clamping groove is arranged inside the LED clamping groove 5, a display screen box body 8 is clamped inside the clamping groove, the display screen box body 8 is effectively fixed by a management device through the clamping groove inside the LED clamping groove 5, the display screen 7 is prevented from being broken under touch, meanwhile, the display screen 7 can be kept balanced through the thread column 16 and the support column 2, the operation of workers is convenient, the use of the management device is facilitated, a mounting seat 12 is fixedly connected with one side surface of the display screen box body 8, a starting switch 13, the display screen 7 is convenient to use, the working efficiency of workers is greatly improved by a touch screen mode, a baffle 6 is fixedly connected to one side face of a display screen box body 8, an LED clamping groove 5 is fixedly connected to one side face of the baffle 6, a protective support 10 is arranged at the top of the display screen box body 8, a cavity is formed in one side face of the display screen box body 8, the display screen 7 is arranged in the cavity, a connecting plate 9 is fixedly connected to the top end of one side face of the display screen 7, an indicating lamp 11 is fixedly connected to the outer surface of the connecting plate 9, when the management device is effectively checked and operated, the management device can be operated through the indicating lamp 11 at the upper end, the color of the indicating lamp 11 is yellow and green in sequence, when the progress is achieved, the indicating lamp 11 can display green light, a large amount of time is saved for the workers, meanwhile, the protective support 10, the display screen 7 of preventing the upper end directly strikes display screen box 8 when colliding, makes 7 broken display screens, and further 7 increase the effect of protection to display screen.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. Engineering cost progress management device, including base (1), its characterized in that, the last fixed surface of base (1) is connected with support column (2), the last fixed surface of support column (2) is connected with connecting block (3), the jack has been seted up at the middle part of connecting block (3) upper surface, the inside of jack is provided with thread groove (4), the internal thread connection of thread groove (4) has screw thread post (16), a terminal surface fixedly connected with LED draw-in groove (5) of screw thread post (16), LED draw-in groove (5) are through screw thread post (16) fixedly connected with connecting block (3), the draw-in groove has been seted up to the inside of LED draw-in groove (5), the inside joint of draw-in groove has display screen box (8).
2. The project cost progress management device according to claim 1, characterized in that a baffle (6) is fixedly connected to one side of the display screen box body (8), an LED clamping groove (5) is fixedly connected to one side of the baffle (6), and a protective support (10) is arranged at the top of the display screen box body (8).
3. The project cost progress management device according to claim 1, characterized in that a cavity is formed in one side face of the display screen box body (8), a display screen (7) is arranged in the cavity, and a connecting plate (9) is fixedly connected to the top end of one side face of the display screen (7).
4. The construction cost progress management device according to claim 2, characterized in that one side of the outer surface of the guard support (10) is provided with a jack, a screw (15) is inserted into the jack, the outer surface of the screw (15) is movably connected with a gasket (14), and the guard support (10) is fixedly connected with the display screen box body (8) through the screw (15).
5. The project cost progress management device according to claim 1, characterized in that a mounting seat (12) is fixedly connected to one side of the display screen box body (8), a jack is formed in the middle of one side of the mounting seat (12), and a starting switch (13) is inserted into the jack.
6. The construction cost progress management device according to claim 3, characterized in that indicator lights (11) are fixedly connected to the outer surface of the connecting plate (9), the number of the indicator lights (11) is four, and the four indicator lights (11) are parallel to each other.
CN202020463517.5U 2020-04-02 2020-04-02 Engineering cost progress management device Active CN211875533U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020463517.5U CN211875533U (en) 2020-04-02 2020-04-02 Engineering cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020463517.5U CN211875533U (en) 2020-04-02 2020-04-02 Engineering cost progress management device

Publications (1)

Publication Number Publication Date
CN211875533U true CN211875533U (en) 2020-11-06

Family

ID=73250154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020463517.5U Active CN211875533U (en) 2020-04-02 2020-04-02 Engineering cost progress management device

Country Status (1)

Country Link
CN (1) CN211875533U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113408998A (en) * 2021-02-05 2021-09-17 浙江安防职业技术学院 Construction cost consultation service implementation method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113408998A (en) * 2021-02-05 2021-09-17 浙江安防职业技术学院 Construction cost consultation service implementation method and system

Similar Documents

Publication Publication Date Title
CN211875533U (en) Engineering cost progress management device
CN206143682U (en) Afforestation type municipal administration engineering protection fence
CN211973117U (en) Road and bridge rail guard
CN210402956U (en) Sign is used in gardens convenient to change sign
CN212658271U (en) Environmental monitor rack of high adaptability
CN211853438U (en) Be used for theater construction project construction management device
CN213477715U (en) Building construction is with rail guard that has concatenation mechanism
CN215010397U (en) Outdoor monitor with waterproof construction
CN215056095U (en) Safety device is used in road and bridge engineering construction
CN208477742U (en) A kind of multifunction combined traffic lights
CN212865669U (en) Roadside signboard convenient to change
CN220184557U (en) Scaffold with protective structure
CN220705368U (en) Warning fence for construction site
CN218095249U (en) Outdoor high-reliability anti-collision monitoring rod
CN213926012U (en) Novel plastic-wood guardrail
CN217214049U (en) Signboard is used in landscape design
CN218509395U (en) Stable in structure's electric power overhaul ladder
CN213953211U (en) Rail guard that construction was with having alarm function
CN210766484U (en) Road traffic facilities sign
CN210865386U (en) Label with lattice plate
CN218027289U (en) Open-air road that anti-wind sand ability is strong marks tablet with road
CN216844243U (en) Energy-saving building brightening window curtain lamp strip convenient to install
CN216748146U (en) Construction work site safety helmet monitoring devices
CN220869017U (en) Protection device for engineering construction
CN213389802U (en) Highway construction auxiliary device with warning function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant