CN211873325U - Steel construction prefabricated formula building coupling assembling - Google Patents

Steel construction prefabricated formula building coupling assembling Download PDF

Info

Publication number
CN211873325U
CN211873325U CN202020171822.7U CN202020171822U CN211873325U CN 211873325 U CN211873325 U CN 211873325U CN 202020171822 U CN202020171822 U CN 202020171822U CN 211873325 U CN211873325 U CN 211873325U
Authority
CN
China
Prior art keywords
support column
mount pad
connecting piece
hole
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020171822.7U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Bilan Tianbolai Construction Co ltd
Original Assignee
Zhaoqing Zhongcai Electromechanical Technology Research and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhaoqing Zhongcai Electromechanical Technology Research and Development Co Ltd filed Critical Zhaoqing Zhongcai Electromechanical Technology Research and Development Co Ltd
Priority to CN202020171822.7U priority Critical patent/CN211873325U/en
Application granted granted Critical
Publication of CN211873325U publication Critical patent/CN211873325U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a prefabricated formula of steel construction building coupling assembling relates to building engineering technical field, specifically is a prefabricated formula of steel construction building coupling assembling, which comprises a supporting column, the bottom fixedly connected with fixture block of support column, the mounting hole has been seted up in the left side of support column, the bottom joint of support column has the connecting piece, the left side joint of support column has the mount pad, the left side of mount pad is provided with the crossbeam, the right side fixedly connected with spliced pole of crossbeam. This prefabricated formula building coupling assembling of steel construction uses through the cooperation of connecting piece and mount pad, utilizes the fixture block to carry out the joint to the connecting piece fixed, fixes the mount pad by the left fixed rod of connecting piece again, has improved the fixed stability of mount pad, adopts the connected mode of concatenation formula, conveniently carries out the dismouting to the crossbeam, makes building element can used repeatedly, has improved the utilization efficiency of prefabricated formula building.

Description

一种钢结构预制式建筑连接组件A steel structure prefabricated building connection assembly

技术领域technical field

本实用新型涉及建筑工程技术领域,具体为一种钢结构预制式建筑连接组件。The utility model relates to the technical field of construction engineering, in particular to a steel structure prefabricated building connecting component.

背景技术Background technique

预制式建筑又叫装配式建筑是指把传统建造方式中的大量现场作业工作转移到工厂进行,在工厂加工制作好建筑用构件和配件(如楼板、墙板、楼梯、阳台等),运输到建筑施工现场,通过可靠的连接方式在现场装配安装而成的建筑,预制式建筑主要包括预制装配式混凝土结构、钢结构、现代木结构建筑等,因为采用标准化设计、工厂化生产、装配化施工、信息化管理、智能化应用,是现代工业化生产方式的代表。Prefabricated buildings, also known as prefabricated buildings, refer to the transfer of a large number of on-site operations in traditional construction methods to factories, where building components and accessories (such as floors, wall panels, stairs, balconies, etc.) are processed and fabricated, and then transported to The construction site is a building assembled and installed on site through reliable connection methods. Prefabricated buildings mainly include prefabricated concrete structures, steel structures, modern wood structure buildings, etc. , information management, intelligent application, is the representative of modern industrial production.

现有的预制式建筑的支撑钢架大多采用焊接的方式进行连接,在建造房屋时需要先焊接钢架,再将建筑配件装配到钢架上,采用焊接的方式进行连接,导致钢架无法进行拆除,影响钢架的重复使用,而且在对钢架进行焊接时,钢梁与钢梁之间内有着力点,导致钢梁之间难以对齐,影响建造的速度,为此我们提供了一种钢结构预制式建筑连接组件。The supporting steel frames of the existing prefabricated buildings are mostly connected by welding. When building the house, the steel frame needs to be welded first, and then the building accessories are assembled on the steel frame and connected by welding, which makes the steel frame impossible to carry out. Demolition affects the reuse of the steel frame, and when the steel frame is welded, there is a force point between the steel beam and the steel beam, which makes it difficult to align the steel beams and affects the speed of construction. For this reason, we provide a Steel prefabricated building connection components.

实用新型内容Utility model content

针对现有技术的不足,本实用新型提供了一种钢结构预制式建筑连接组件,解决了上述背景技术中提出的问题。Aiming at the deficiencies of the prior art, the present invention provides a steel structure prefabricated building connection assembly, which solves the problems raised in the above background technology.

为实现以上目的,本实用新型通过以下技术方案予以实现:一种钢结构预制式建筑连接组件,包括支撑柱,所述支撑柱的底部固定连接有卡块,所述支撑柱的左侧开设有安装孔,所述支撑柱的底部卡接有连接件,所述支撑柱的左侧卡接有安装座,所述安装座的左侧设置有横梁,所述横梁的右侧固定连接有连接柱,所述连接柱的内部螺纹连接有中心杆,所述中心杆的右侧活动套接有连接块,所述连接块的顶部铰接有固定件。In order to achieve the above purpose, the present utility model is achieved through the following technical solutions: a steel structure prefabricated building connection assembly, including a support column, the bottom of the support column is fixedly connected with a clamping block, and the left side of the support column is provided with a A mounting hole, the bottom of the support column is clamped with a connecting piece, the left side of the support column is clamped with a mounting seat, the left side of the mounting seat is provided with a beam, and the right side of the beam is fixedly connected with a connecting column A central rod is threadedly connected inside the connecting column, a connecting block is movably sleeved on the right side of the central rod, and a fixing piece is hinged on the top of the connecting block.

可选的,所述连接件呈[形,所述连接件的中部开设有卡接孔,所述卡接孔与卡块相匹配,所述连接件的右侧固定连接有固定杆,所述固定杆的右侧活动套接在安装座的内部并通过螺母进行固定。Optionally, the connecting piece is [-shaped, a clamping hole is formed in the middle of the connecting piece, the clamping hole is matched with the clamping block, a fixing rod is fixedly connected to the right side of the connecting piece, and the The right side of the fixing rod is sleeved inside the mounting seat and fixed by a nut.

可选的,所述安装座的中部开设有通孔,所述通孔与安装孔相对应,所述安装座的左侧固定连接有U型固定板,所述U型固定板对称分布在横梁的两侧,所述U型固定板通过固定螺栓与横梁固定连接在一起。Optionally, a through hole is opened in the middle of the mounting seat, the through hole corresponds to the mounting hole, a U-shaped fixing plate is fixedly connected to the left side of the mounting seat, and the U-shaped fixing plate is symmetrically distributed on the beam. On both sides of the U-shaped fixing plate, the U-shaped fixing plate is fixedly connected with the beam through fixing bolts.

可选的,所述连接柱通过通孔、安装孔延伸至支撑柱的内部,所述连接柱的右侧与固定件的左端铰接在一起。Optionally, the connecting column extends to the inside of the supporting column through the through hole and the mounting hole, and the right side of the connecting column is hinged with the left end of the fixing member.

可选的,所述固定件由两个短板铰接而成,所述固定件呈V字型且对称分布在连接块的上下两侧。Optionally, the fixing member is formed by hinged connection of two short plates, and the fixing member is V-shaped and symmetrically distributed on the upper and lower sides of the connecting block.

可选的,所述横梁的内部活动套接有套管,所述套管的外表面固定套接有伞状轮,所述伞状轮的正面啮合有螺杆,所述螺杆延伸至横梁的外部。Optionally, a sleeve is movably sleeved inside the beam, an umbrella-shaped wheel is fixedly sleeved on the outer surface of the sleeve, and a screw rod is engaged with the front of the umbrella-shaped wheel, and the screw rod extends to the outside of the beam. .

本实用新型提供了一种钢结构预制式建筑连接组件,具备以下有益效果:The utility model provides a steel structure prefabricated building connection component, which has the following beneficial effects:

1、该钢结构预制式建筑连接组件,通过连接件和安装座的配合使用,利用卡块对连接件进行卡接固定,再由连接件左侧的固定杆对安装座进行固定,提高了安装座固定的稳定性,采用拼接式的连接方式,方便对横梁进行拆装,使建筑组件可以重复的使用,提高了预制式建筑的利用效率。1. The steel structure prefabricated building connecting component is used in conjunction with the connecting piece and the mounting seat, and the connecting piece is clamped and fixed by the clamping block, and then the mounting seat is fixed by the fixing rod on the left side of the connecting piece, which improves the installation performance. The stability of the seat is fixed, and the spliced connection method is adopted to facilitate the disassembly and assembly of the beam, so that the building components can be reused, and the utilization efficiency of the prefabricated building is improved.

2、该钢结构预制式建筑连接组件,通过设置连接柱,在进行连接时,将连接柱插入到支撑柱的内部,然后旋转螺杆带动套管转动,使连接柱向左移动,再由连接柱带动连接块向左移动,使固定件变形堵住安装孔,避免连接柱从安装孔内移动,使连接柱与支撑柱连接的更加的牢固,提高了建筑连接的稳定性。2. The steel structure prefabricated building connection assembly, by setting the connecting column, inserts the connecting column into the inside of the supporting column when connecting, and then rotates the screw to drive the casing to rotate, so that the connecting column moves to the left, and then the connecting column is connected by the connecting column. The connecting block is driven to move to the left, so that the fixed piece is deformed to block the installation hole, so as to prevent the connection column from moving from the installation hole, so that the connection between the connection column and the support column is more firm, and the stability of the building connection is improved.

附图说明Description of drawings

图1为本实用新型剖视结构示意图;Fig. 1 is the sectional structure schematic diagram of the utility model;

图2为本实用新型支撑柱的结构示意图。FIG. 2 is a schematic structural diagram of a support column of the present invention.

图中:1、支撑柱;2、卡块;3、安装孔;4、连接件;5、卡接孔;6、固定杆;7、安装座;8、通孔;9、U型固定板;10、横梁;11、连接柱;12、中心杆;13、连接块;14、固定件;15、套管;16、伞状轮;17、螺杆;18、固定螺栓。In the figure: 1. Support column; 2. Clamping block; 3. Mounting hole; 4. Connecting piece; 5. Clamping hole; 6. Fixing rod; 7. Mounting seat; 8. Through hole; 9. U-shaped fixing plate ; 10, beam; 11, connecting column; 12, central rod; 13, connecting block; 14, fixing part; 15, casing; 16, umbrella wheel; 17, screw rod; 18, fixing bolt.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.

请参阅图1至图2,本实用新型提供一种技术方案:一种钢结构预制式建筑连接组件,包括支撑柱1,支撑柱1的底部固定连接有卡块2,支撑柱1的左侧开设有安装孔3,支撑柱1的底部卡接有连接件4,连接件4呈[形,连接件4的中部开设有卡接孔5,卡接孔5与卡块2相匹配,连接件4的右侧固定连接有固定杆6,通过设置连接件4,利用卡块2对连接件4进行卡接固定,再由连接件4左侧的固定杆6对安装座7进行固定,提高了安装座7固定的稳定性,避免安装座7在使用的过程中松动,保证了建筑的安全性,固定杆6的右侧活动套接在安装座7的内部并通过螺母进行固定,支撑柱1的左侧卡接有安装座7,安装座7的中部开设有通孔8,通孔8与安装孔3相对应,安装座7的左侧固定连接有U型固定板9,U型固定板9对称分布在横梁10的两侧,通过设置安装座7,先将安装座7与支撑柱1进行固定,在支撑柱1的表面形成着力点,在将横梁10放置到安装座7上进行安装,使横梁10安装更加的方便,提高了安装的安全性,U型固定板9通过固定螺栓18与横梁10固定连接在一起,安装座7的左侧设置有横梁10,横梁10的右侧固定连接有连接柱11,连接柱11通过通孔8、安装孔3延伸至支撑柱1的内部,通过设置连接柱11,利用连接柱11将支撑柱1、安装座7、横梁10连接在一起,提高了三者连接的稳定性,使建筑安装的更加的牢固,防止横梁10从安装座7内脱落,连接柱11的右侧与固定件14的左端铰接在一起,连接柱11的内部螺纹连接有中心杆12,中心杆12的右侧活动套接有连接块13,连接块13的顶部铰接有固定件14,固定件14由两个短板铰接而成,固定件14呈V字型且对称分布在连接块13的上下两侧,然后旋转螺杆17带动套管15转动,使连接柱11向左移动,再由连接柱11带动连接块13向左移动,使固定件14变形堵住安装孔3,避免连接柱11从安装孔3内移动,使连接柱11与支撑柱1连接的更加的牢固,提高了建筑连接的稳定性,横梁10的内部活动套接有套管15,套管15的外表面固定套接有伞状轮16,伞状轮16的正面啮合有螺杆17,螺杆17延伸至横梁10的外部。Please refer to FIG. 1 to FIG. 2 , the present utility model provides a technical solution: a steel structure prefabricated building connection assembly, comprising a support column 1 , a clamping block 2 is fixedly connected to the bottom of the support column 1 , and the left side of the support column 1 is A mounting hole 3 is provided, the bottom of the support column 1 is clamped with a connecting piece 4, the connecting piece 4 is in the shape of a [, a clamping hole 5 is opened in the middle of the connecting piece 4, and the clamping hole 5 is matched with the clamping block 2. The connecting piece The right side of 4 is fixedly connected with a fixing rod 6. By setting the connecting piece 4, the connecting piece 4 is clamped and fixed by the clamping block 2, and then the mounting seat 7 is fixed by the fixing rod 6 on the left side of the connecting piece 4, which improves the performance. The stability of the fixing of the mounting seat 7 prevents the mounting seat 7 from loosening during use and ensures the safety of the building. The right side of the fixing rod 6 is movably sleeved inside the mounting seat 7 and fixed by a nut. A mounting seat 7 is clamped on the left side of the mounting seat 7, and a through hole 8 is opened in the middle of the mounting seat 7. The through hole 8 corresponds to the mounting hole 3, and the left side of the mounting seat 7 is fixedly connected with a U-shaped fixing plate 9. The U-shaped fixing plate 9 are symmetrically distributed on both sides of the beam 10. By setting the mounting seat 7, the mounting seat 7 and the support column 1 are first fixed, and a force point is formed on the surface of the support column 1, and the beam 10 is placed on the mounting seat 7 for installation. , making the installation of the beam 10 more convenient and improving the safety of the installation, the U-shaped fixing plate 9 is fixedly connected with the beam 10 through the fixing bolts 18, the left side of the mounting seat 7 is provided with the beam 10, and the right side of the beam 10 is fixed A connecting column 11 is connected, and the connecting column 11 extends to the inside of the supporting column 1 through the through hole 8 and the mounting hole 3. By setting the connecting column 11, the supporting column 1, the mounting seat 7 and the beam 10 are connected together by the connecting column 11, The stability of the connection between the three is improved, the building is installed more firmly, and the cross beam 10 is prevented from falling off from the mounting seat 7. The right side of the connecting column 11 is hinged with the left end of the fixing member 14, and the inner thread of the connecting column 11 is connected. There is a center rod 12, a connecting block 13 is movably sleeved on the right side of the center rod 12, and a fixing piece 14 is hinged on the top of the connecting block 13. The fixing piece 14 is hinged by two short plates, and the fixing piece 14 is V-shaped and Symmetrically distributed on the upper and lower sides of the connecting block 13, and then the rotating screw 17 drives the casing 15 to rotate, so that the connecting column 11 moves to the left, and then the connecting column 11 drives the connecting block 13 to move to the left, so that the fixing member 14 is deformed to block the installation. Hole 3, to prevent the connection column 11 from moving from the installation hole 3, so that the connection column 11 and the support column 1 are connected more firmly, and the stability of the building connection is improved. An umbrella-shaped wheel 16 is fixedly sleeved on the outer surface of the umbrella-shaped wheel 15 , and a screw rod 17 is engaged with the front surface of the umbrella-shaped wheel 16 , and the screw rod 17 extends to the outside of the beam 10 .

综上,该钢结构预制式建筑连接组件,使用时,对准卡块2和卡接孔5,将连接件4卡接在支撑柱1上,再在支撑柱1的两侧固定安装座7,使用螺母将安装座7和连接件4连接在一起,然后将横梁10放置到U型固定板9内,使连接柱11插入到支撑柱1的内部,使用固定螺栓18对U型固定板9和横梁10进行固定,然后旋转螺杆17带动套管15转动,使连接柱11向左移动并拉动连接块13,使固定件14变形将连接柱11卡接在支撑柱1的内部,即可。To sum up, the steel structure prefabricated building connection assembly, when in use, align the clamping block 2 and the clamping hole 5, clamp the connecting piece 4 on the support column 1, and then fix the mounting seat 7 on both sides of the support column 1. , use the nut to connect the mounting seat 7 and the connecting piece 4 together, and then place the beam 10 into the U-shaped fixing plate 9, so that the connecting column 11 is inserted into the inside of the supporting column 1, and use the fixing bolts 18 to the U-shaped fixing plate 9. It is fixed with the beam 10, and then the rotating screw 17 drives the casing 15 to rotate, so that the connecting column 11 moves to the left and pulls the connecting block 13, so that the fixing member 14 is deformed and the connecting column 11 is clamped inside the support column 1.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.

Claims (6)

1. The utility model provides a prefabricated formula building coupling assembling of steel construction, includes support column (1), its characterized in that: the bottom fixedly connected with fixture block (2) of support column (1), mounting hole (3) have been seted up in the left side of support column (1), the bottom joint of support column (1) has connecting piece (4), the left side joint of support column (1) has mount pad (7), the left side of mount pad (7) is provided with crossbeam (10), the right side fixedly connected with spliced pole (11) of crossbeam (10), the internal thread of spliced pole (11) is connected with well core rod (12), connecting block (13) have been cup jointed in the right side activity of well core rod (12), the top of connecting block (13) articulates there is mounting (14).
2. The prefabricated building connection assembly of steel structure of claim 1, wherein: the connecting piece (4) is [ shaped ], a clamping hole (5) is formed in the middle of the connecting piece (4), the clamping hole (5) is matched with the clamping block (2), a fixing rod (6) is fixedly connected to the right side of the connecting piece (4), and the right side of the fixing rod (6) is movably sleeved inside the mounting seat (7) and fixed through a nut.
3. The prefabricated building connection assembly of steel structure of claim 1, wherein: through-hole (8) have been seted up at the middle part of mount pad (7), through-hole (8) are corresponding with mounting hole (3), the left side fixedly connected with U type fixed plate (9) of mount pad (7), U type fixed plate (9) symmetric distribution is in the both sides of crossbeam (10), U type fixed plate (9) are in the same place through fixing bolt (18) and crossbeam (10) fixed connection.
4. The prefabricated building connection assembly of steel structure of claim 1, wherein: the connecting column (11) extends to the inside of the supporting column (1) through the through hole (8) and the mounting hole (3), and the right side of the connecting column (11) is hinged with the left end of the fixing piece (14).
5. The prefabricated building connection assembly of steel structure of claim 1, wherein: the fixing piece (14) is formed by hinging two short plates, and the fixing piece (14) is V-shaped and symmetrically distributed on the upper side and the lower side of the connecting block (13).
6. The prefabricated building connection assembly of steel structure of claim 1, wherein: the inner part of the cross beam (10) is movably sleeved with a sleeve (15), an umbrella-shaped wheel (16) is fixedly sleeved on the outer surface of the sleeve (15), a screw rod (17) is meshed with the front surface of the umbrella-shaped wheel (16), and the screw rod (17) extends to the outer part of the cross beam (10).
CN202020171822.7U 2020-02-15 2020-02-15 Steel construction prefabricated formula building coupling assembling Expired - Fee Related CN211873325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020171822.7U CN211873325U (en) 2020-02-15 2020-02-15 Steel construction prefabricated formula building coupling assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020171822.7U CN211873325U (en) 2020-02-15 2020-02-15 Steel construction prefabricated formula building coupling assembling

Publications (1)

Publication Number Publication Date
CN211873325U true CN211873325U (en) 2020-11-06

Family

ID=73253014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020171822.7U Expired - Fee Related CN211873325U (en) 2020-02-15 2020-02-15 Steel construction prefabricated formula building coupling assembling

Country Status (1)

Country Link
CN (1) CN211873325U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900621A (en) * 2021-01-25 2021-06-04 徐新奎 Light steel assembled building structure
CN113490361A (en) * 2021-06-22 2021-10-08 长春电子科技学院 Electronic communication cabinet body structure with monitoring and protecting functions
CN113668876A (en) * 2021-07-16 2021-11-19 齐珊珊 Steel construction with pre-installation butt-joint structural

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900621A (en) * 2021-01-25 2021-06-04 徐新奎 Light steel assembled building structure
CN113490361A (en) * 2021-06-22 2021-10-08 长春电子科技学院 Electronic communication cabinet body structure with monitoring and protecting functions
CN113668876A (en) * 2021-07-16 2021-11-19 齐珊珊 Steel construction with pre-installation butt-joint structural

Similar Documents

Publication Publication Date Title
CN211873325U (en) Steel construction prefabricated formula building coupling assembling
CN209817088U (en) A prefabricated balcony
CN216516120U (en) Stable form assembly type structure for construction steel
CN202577600U (en) Assembled joint of latticed shell steel structure with free space and curved surface
CN106522374A (en) Connecting device for connecting modular steel frames and connecting method thereof
CN102535642A (en) Assembling type node of spatial freeform curved latticed shell steel structure and assembling method of assembling type node
CN108678278A (en) A kind of assembly-type light partition
WO2022028152A1 (en) Improved aluminum connecting structure in shape of chinese character 工 for aluminum alloy building
CN213897557U (en) Reinforced steel structure mounted in multiple ways
CN206289743U (en) Connectors for connecting modular steel frames
CN208329155U (en) A kind of assembled hollow hub node applied to grid shell
CN210105122U (en) A roof structure for assembling houses
CN109838034B (en) A roof structure for assembling a house
CN218970269U (en) Beam-column connection node structure
CN209260924U (en) A mortise and tenon joint at the corner of a modular building
CN213038595U (en) Connecting mechanism between steel structure stand column and cross beam
CN214531185U (en) Assembly type socket beam column rigidity strengthening connection assembly
CN220080287U (en) Energy-saving steel structure installation mechanism
CN212053696U (en) A steel beam wall high-altitude welding safety protection operation platform
CN110541558B (en) Building construction scaffold fastener
CN223293158U (en) A prefabricated reinforced steel beam-column node
CN220117442U (en) A connection structure between steel structure columns and steel structure beams
CN216238959U (en) A spliced shock-absorbing steel structure for building
CN216810425U (en) Shear wall convenient to location installation
CN220451099U (en) Supporting steel structure building assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220510

Address after: 438000 Chengnan Industrial Park, Tuanfeng County, Huanggang City, Hubei Province

Patentee after: Hubei Bilan tianbolai Construction Co.,Ltd.

Address before: 526500 first floor of demolition and resettlement area a in Changzheng new area, Jiangkou street, Fengkai County, Zhaoqing City, Guangdong Province

Patentee before: Zhaoqing Zhongcai electromechanical technology research and Development Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201106