CN211873085U - A piping lane bottom plate for piping lane construction - Google Patents

A piping lane bottom plate for piping lane construction Download PDF

Info

Publication number
CN211873085U
CN211873085U CN202020283020.5U CN202020283020U CN211873085U CN 211873085 U CN211873085 U CN 211873085U CN 202020283020 U CN202020283020 U CN 202020283020U CN 211873085 U CN211873085 U CN 211873085U
Authority
CN
China
Prior art keywords
bottom plate
construction
boss
piping lane
connecting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020283020.5U
Other languages
Chinese (zh)
Inventor
桂钱君
张波
黄贺
陈晓飞
李文峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Installation Engineering Co Ltd filed Critical China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority to CN202020283020.5U priority Critical patent/CN211873085U/en
Application granted granted Critical
Publication of CN211873085U publication Critical patent/CN211873085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a piping lane bottom plate for piping lane construction, which comprises a base plate, base plate top install the bottom plate, bottom plate one end be equipped with boss one, the bottom plate other end be equipped with recess one, the bottom plate on install the wallboard, bottom plate surface be equipped with boss two, wallboard bottom be equipped with boss two phase fit's recess two, wallboard bottom be equipped with the bolt one of connecting boss two with recess two, wallboard bottom and bottom plate surface between be equipped with and be connected with the reinforcement body, reinforcement body both ends be equipped with connecting block one and connecting block two respectively, connecting block one install in bottom plate surface's mounting groove one, connecting block two install in the mounting groove two of wallboard bottom. Compared with the prior art, the utility model the advantage lie in: construction convenience can effectively shorten the time limit for a project, reduce cost, very big improvement piping lane efficiency of construction and construction quality.

Description

A piping lane bottom plate for piping lane construction
Technical Field
The utility model relates to a piping lane building technical field specifically indicates a piping lane bottom plate for piping lane construction.
Background
When the piping lane is under construction, adopt the template construction usually, and adopt the template construction, then have to accomplish one section piping lane construction back, when needing to continue to extend the piping lane construction, need take out the template, continue again and extend the piping lane construction, and current piping lane construction is the whole construction of piping lane cabin basically, and the efficiency of construction is low, and the construction maintenance degree of difficulty is big, the construction cycle length.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming above technical defect, providing a piping lane bottom plate for piping lane construction, construction convenience can effectively shorten time limit for a project, reduce cost, very big improvement piping lane efficiency of construction and construction quality.
In order to solve the technical problem, the utility model provides a technical scheme does: a pipe gallery bottom plate for pipe gallery construction comprises a base plate, a bottom plate is arranged above the base plate, one end of the bottom plate is provided with a first boss, the other end of the bottom plate is provided with a first groove, adjacent bottom plates are connected with the first groove in a matching way through the first boss, the bottom plate is provided with a wall plate, the surface of the bottom plate is provided with a second boss, the bottom of the wall plate is provided with a second groove matched with the second boss, a sealing layer is arranged at the joint of the second boss and the second groove, a first bolt for connecting the second boss and the second groove is arranged at the bottom of the wallboard, a reinforcing body is connected between the bottom end of the wall board and the surface of the bottom plate, a first connecting block and a second connecting block which are integrally formed are respectively arranged at the two ends of the reinforcing body, the first connecting block is arranged in the first mounting groove in the surface of the bottom plate, and the second connecting block is arranged in the second mounting groove in the bottom end of the wallboard.
Compared with the prior art, the utility model the advantage lie in: the utility model discloses required each piping lane bottom subdivision is under construction earlier, improves the easy feasibility and the agility of location operation of follow-up piping lane cabin construction, improves the efficiency of construction in subdivision cabin on the piping lane cabin, reduces the difficult way of construction, and the construction is maintained more simply convenient, and whole construction cycle is short.
As an improvement, the cross section of the first boss is semi-spherical.
As an improvement, the cross section of the first groove is in a semi-spherical shape.
And as an improvement, a second bolt for fixing is arranged between the second connecting block and the wall plate.
As an improvement, the horizontal area size of the base plate is larger than the whole area size of the bottom plate.
Drawings
Figure 1 is the utility model relates to a piping lane bottom plate's for piping lane construction structural schematic.
Figure 2 is the utility model relates to a A department's structural schematic of piping lane bottom plate for piping lane construction.
As shown in the figure: 1. the reinforcing body comprises a base plate, 2, a bottom plate, 3, a first boss, 4, a first groove, 5, a wall plate, 6, a second boss, 7, a second groove, 8, a first bolt, 9, a reinforcing body, 10, a first connecting block, 11, a second connecting block, 12 and a second bolt.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
A pipe gallery bottom plate for pipe gallery construction comprises a base plate 1, a bottom plate 2 is installed above the base plate 1, a boss I3 is arranged at one end of the bottom plate 2, a groove I4 is arranged at the other end of the bottom plate 2, adjacent bottom plates 2 are connected with the groove I4 in a matching mode through the boss I3, a wall plate 5 is installed on the bottom plate 2, a boss II 6 is arranged on the surface of the bottom plate 2, a groove II 7 matched with the boss II 6 is arranged at the bottom of the wall plate 5, a sealing layer is arranged at the joint of the boss II 6 and the groove II 7, a bolt I8 for connecting the boss II 6 and the groove II 7 is arranged at the bottom of the wall plate 5, a reinforcing body 9 is connected between the bottom end of the wall plate 5 and the surface of the bottom plate 2, a connecting block I10 and a connecting block II 11 which are integrally formed are respectively arranged at two ends of the reinforcing body 9, and the connecting block, and the second connecting block 11 is arranged in the second mounting groove at the bottom end of the wallboard 5.
The cross section of the boss I3 is semi-spherical.
The cross section of the first groove 4 is a semi-spherical surface.
And a second bolt 12 for fixing is arranged between the second connecting block 11 and the wall plate 5.
The horizontal area size of the base plate 1 is larger than the whole area size of the bottom plate 2.
The utility model discloses when concrete implementation, on hanging into the base plate with the bottom plate, take one's place and look for the level according to the measuring position accuracy, pass through boss one and recess equipment with each bottom plate in proper order, carry out the hoist and mount of wallboard again, through two plug-in connections of boss two and recess, rethread bolt is fixed, installs the stiffening body on bottom plate and wallboard at last, and the stiffening body passes through two fixes of bolt with the wallboard junction.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (5)

1. The utility model provides a piping lane bottom plate for piping lane construction which characterized in that: the novel wall plate comprises a base plate (1), a base plate (2) is installed above the base plate (1), a boss I (3) is arranged at one end of the base plate (2), a groove I (4) is arranged at the other end of the base plate (2), adjacent base plates (2) are connected with the groove I (4) in a matching mode through the boss I (3), a wall plate (5) is installed on the base plate (2), a boss II (6) is arranged on the surface of the base plate (2), a groove II (7) matched with the boss II (6) is arranged at the bottom of the wall plate (5), a sealing layer is arranged at the joint of the boss II (6) and the groove II (7), a bolt I (8) for connecting the boss II (6) and the groove II (7) is arranged at the bottom of the wall plate (5), a reinforcing body (9) is connected between the bottom end of the wall plate (5) and the surface of the base plate (2), and a first connecting block (10) and a second connecting block (11) which, connecting block one (10) install in the mounting groove one on bottom plate (2) surface, connecting block two (11) install in the mounting groove two of wallboard (5) bottom.
2. A pipe gallery floor for construction of a pipe gallery according to claim 1, characterized in that: the cross section of the boss I (3) is semi-spherical.
3. A pipe gallery floor for construction of a pipe gallery according to claim 1, characterized in that: the cross section of the first groove (4) is in a semi-spherical shape.
4. A pipe gallery floor for construction of a pipe gallery according to claim 1, characterized in that: and a second bolt (12) for fixing is arranged between the second connecting block (11) and the wallboard (5).
5. A pipe gallery floor for construction of a pipe gallery according to claim 1, characterized in that: the horizontal area size of the base plate (1) is larger than the whole area size of the bottom plate (2).
CN202020283020.5U 2020-03-10 2020-03-10 A piping lane bottom plate for piping lane construction Active CN211873085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020283020.5U CN211873085U (en) 2020-03-10 2020-03-10 A piping lane bottom plate for piping lane construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020283020.5U CN211873085U (en) 2020-03-10 2020-03-10 A piping lane bottom plate for piping lane construction

Publications (1)

Publication Number Publication Date
CN211873085U true CN211873085U (en) 2020-11-06

Family

ID=73254964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020283020.5U Active CN211873085U (en) 2020-03-10 2020-03-10 A piping lane bottom plate for piping lane construction

Country Status (1)

Country Link
CN (1) CN211873085U (en)

Similar Documents

Publication Publication Date Title
CN105544814A (en) Modular integrated building system
CN110984224A (en) Prefabricated rail top air duct of subway station and lifting installation method thereof
CN217000873U (en) Bay window assembly
CN211873085U (en) A piping lane bottom plate for piping lane construction
CN205530846U (en) Integrated building system of modularization
CN202500323U (en) Novel splicing structure
CN111364518A (en) Fixing device for embedded part on side wall of concrete pipe gallery
CN104583496B (en) Without chord member purlin unit's method and built-up type node bridge
CN217870407U (en) Wall is led to concatenation formula
CN210194965U (en) Connecting device of precast concrete externally-hung wallboard
CN216110754U (en) Assembled inverted arch curved surface attaching template for highway tunnel
CN209686855U (en) A kind of shear wall exempts from aperture support template structure
CN209478465U (en) The production mould of Prefabricated stacking floor
CN209509014U (en) A kind of Prefabricated composite guide wall of underground continuous wall structure
CN211257038U (en) Assembly type foundation with double-side beam and end beam reinforcing structure
CN110593554A (en) Be applied to super thick vertical concrete structure template system interior angle reinforced structure
CN217460950U (en) Auxiliary positioning device for concrete structure surface layer overhanging steel structure
CN212175859U (en) Fixing device for embedded part on side wall of concrete pipe gallery
CN218714131U (en) Pre-buried reinforcement member of light partition wall
CN215522272U (en) Engineering building installing support easy to operate
CN215172761U (en) Pipeline comprehensive fixing assembly based on BIM technology
CN210658446U (en) Coincide assembled utility tunnel attaches wall formula coincide roof support piece
CN211898544U (en) Prefabricated rail top air duct of subway station
CN218990216U (en) Slope grid framework protection template structure
CN209837518U (en) Concrete prefabricated staircase

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant