CN211864353U - Dust collector for construction - Google Patents
Dust collector for construction Download PDFInfo
- Publication number
- CN211864353U CN211864353U CN202020505230.4U CN202020505230U CN211864353U CN 211864353 U CN211864353 U CN 211864353U CN 202020505230 U CN202020505230 U CN 202020505230U CN 211864353 U CN211864353 U CN 211864353U
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- sewage
- box
- dust
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The utility model discloses a dust removing device for building construction, relating to the technical field of building construction equipment, which comprises a device box, the device box comprises a purified water box and a sewage box, the top of the device box is fixedly provided with a sedimentation cylinder, a recovery pipe is communicated between the bottom of the settling cylinder and the top of the sewage tank, a dust pumping component for pumping dust into the settling cylinder is arranged at the top of the device box, a spray component is arranged inside the sedimentation cylinder, a first water pipe is communicated and arranged between the water inlet end of the spray component and the purified water tank, a first valve is arranged on the first water pipe, a second water pipe is arranged between the sewage tank and the spraying component in a communicating way, the second valve is arranged on the second water pipe, the sewage tank is provided with a sewage discharging assembly for discharging sludge in the sewage tank, and the top of the purified water tank is provided with a water inlet. In the arrangement, water resources are saved by recycling the purified water and the sewage.
Description
Technical Field
The utility model relates to a construction equipment technical field, concretely relates to dust collector for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
As is well known, during building construction, a large amount of dust flies, which affects the surrounding environment and harms the physical and psychological health of constructors, in this case, water spraying equipment is used to spray water intensively to the dust to settle the dust, but this method requires a large amount of water resources for dust settling, and in the age of water resource shortage, this method is obviously not a good method, so it is necessary to design a dust removing device for building construction to solve this problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: for solving the problem that present dust collecting equipment consumes a large amount of water resources, the utility model provides a dust collector for construction.
The utility model discloses a realize above-mentioned purpose and specifically adopt following technical scheme:
the utility model provides a dust collector for construction, includes the device case, the device case includes water purification case and sewage case, the top fixed mounting of device case has the section of thick bamboo of subsiding, it is provided with the recovery tube to subside the intercommunication between bobbin base portion and the sewage roof portion, the top of device case is provided with the dust component of taking out of dust suction to subside the section of thick bamboo inside, the inside of subsiding the section of thick bamboo is provided with spray set, the intercommunication is provided with first water pipe between spray set's the end of intaking and the water purification case, be provided with first valve on the first water pipe, the intercommunication is provided with the second water pipe between sewage case and the spray set, be provided with the second valve on the second water pipe, be provided with the blowdown subassembly with the inside mud discharge of sewage case on the sewage case, the water inlet has been seted up at the top of water.
Furthermore, the dust extraction component comprises two support frames which are fixedly arranged at the top of the device box and are symmetrical to each other, a wind extraction barrel is movably arranged between the support frames, an air inlet end of the wind extraction barrel is provided with an air blower, an air outlet end of the wind extraction barrel and a sedimentation barrel are communicated with each other to form an elastic pipe, the elastic pipe is located below the spraying component, and an adjusting component used for adjusting the angle of the wind extraction barrel is arranged at the top of the device box.
Further, the spray assembly comprises an annular pipe which is arranged around the inner wall of the sedimentation barrel and is in a spring shape, the spray assembly further comprises a water suction pump fixedly installed on the device box, a water delivery pipe is communicated with the water outlet end of the water suction pump and one end of the annular pipe, one end, far away from the water suction pump, of the annular pipe is sealed, and drain holes are densely formed in the annular pipe.
Further, the bottom of second water pipe extends to the inside of sewage case, the bottom of second water pipe is one decimeter apart from the distance between the bottom of sewage incasement wall, the top of second water pipe and the end intercommunication of intaking of suction pump, the bottom of first water pipe extends to the bottom of water purification incasement wall, the top of first water pipe and the end intercommunication of intaking of suction pump.
Further, the blowdown subassembly is including setting up the sludge pump in the sewage case outside, the intercommunication has the blow off pipe between the input of sludge pump and the sewage case, the blow off pipe sets up the bottom at sewage incasement wall.
Further, the adjusting part comprises an air cylinder fixedly mounted at the top of the device box, the air cylinder is located below the air suction barrel, a limiting plate is arranged on one side, close to the air cylinder, of the air suction barrel, a T-shaped groove is formed in one side, close to the air cylinder, of the limiting plate, a T-shaped block is hinged to the top of an output shaft of the air cylinder, and the T-shaped block is slidably mounted inside the T-shaped groove.
Furthermore, four corner positions of the bottom of the device box are provided with universal wheels, and the top of the settling cylinder is provided with a discharge port for discharging clean air.
The utility model has the advantages as follows:
the utility model discloses an at the inside water purification that injects into of water purification case, open first valve, close first valve, start suction pump and air-blower, the air-blower is with the inside of dust suction to subside a section of thick bamboo, the suction pump is with the inside water purification suction of water purification incasement to the inside wash port blowout from the ring pipe, thereby subside the dust, the dust flows into the inside sewage incasement portion from the recovery tube, retrieve in the inside sewage incasement portion, after equipment work a period, close first valve, open the second valve, the upper clear liquid of sewage incasement portion can be pumped to the ring pipe inside by the suction pump, again from the wash port blowout, thereby dust fall once more, after dust removal operation is accomplished, start the sludge pump, get rid of the mud of sewage case bottom from the blow off pipe, in above-mentioned setting, through the cyclic utilization with water purification and sewage, thereby the water resource has been practiced.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is a cross-sectional view in the direction C-C of the present invention;
fig. 4 is a side view of the present invention;
FIG. 5 is a cross-sectional view taken along the direction B-B of the present invention;
fig. 6 is an enlarged schematic view of the structure a in fig. 3 according to the present invention;
fig. 7 is an enlarged schematic view of the structure D in fig. 5 according to the present invention.
Reference numerals: 1. a water purifying tank; 2. an adjustment assembly; 201. a limiting plate; 202. a T-shaped slot; 203. a T-shaped block; 204. a cylinder; 3. a support frame; 4. a blower; 5. a wind suction barrel; 6. a settling cylinder; 7. a discharge port; 8. a water delivery pipe; 9. a first water pipe; 10. a water pump; 11. a sludge pump; 12. a blow-off pipe; 13. a sewage tank; 14. a recovery pipe; 15. an elastic tube; 16. an annular tube; 17. a water inlet; 18. a second water pipe; 19. a drain hole; 20. a universal wheel.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures. Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
In the description of the embodiments of the present invention, it should be noted that the terms "inside", "outside", "up", and the like indicate the directions or positional relationships based on the directions or positional relationships shown in the drawings, or the directions or positional relationships that the products of the present invention are conventionally placed when used, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element to which the term refers must have a specific direction, be constructed and operated in a specific direction, and thus, should not be construed as limiting the present invention.
As shown in fig. 1-7, a dust removing device for building construction comprises a device box, the device box comprises a clean water tank 1 and a sewage tank 13, a sedimentation cylinder 6 is fixedly installed at the top of the device box, a recovery pipe 14 is communicated between the bottom of the sedimentation cylinder 6 and the top of the sewage tank 13, a dust extraction component for extracting dust into the sedimentation cylinder 6 is arranged at the top of the device box, a spray component is arranged inside the sedimentation cylinder 6, a first water pipe 9 is communicated between the water inlet end of the spray component and the clean water tank 1, a first valve is arranged on the first water pipe 9, a second water pipe 18 is communicated between the sewage tank 13 and the spray component, a second valve is arranged on the second water pipe 18, a sewage discharge component for discharging sludge in the sewage tank 13 is arranged on the sewage tank 13, and a water inlet 17 is formed in the top of the clean water tank 1.
In this embodiment, take out the dirt subassembly and include two mutual symmetrical support frames 3 of fixed mounting at device roof portion, the activity is provided with convulsions section of thick bamboo 5 between two support frames 3, and the air inlet end of convulsions section of thick bamboo 5 is provided with air-blower 4, and the air-out end of convulsions section of thick bamboo 5 and the elastic tube 15 of settling between the section of thick bamboo 6 intercommunication, elastic tube 15 are located spray assembly's below, and the top of device roof portion is provided with the adjusting part 2 that is used for adjusting convulsions section of thick bamboo 5 angles.
In this embodiment, the spray assembly includes a ring pipe 16 which is arranged around the inner wall of the sedimentation cylinder 6 and is in a spring shape, the spray assembly further includes a water pump 10 fixedly installed on the device box, a water outlet end of the water pump 10 is communicated with one end of the ring pipe 16 to be provided with a water delivery pipe 8, one end of the ring pipe 16, which is far away from the water pump 10, is arranged to be sealed, and the ring pipe 16 is densely provided with drain holes 19.
In this embodiment, the bottom of the second water pipe 18 extends to the inside of the waste water tank 13, the distance between the bottom of the second water pipe 18 and the bottom of the inner wall of the waste water tank 13 is one decimeter, the top of the second water pipe 18 is communicated with the water inlet end of the water pump 10, the bottom of the first water pipe 9 extends to the bottom of the inner wall of the fresh water tank 1, and the top of the first water pipe 9 is communicated with the water inlet end of the water pump 10.
In this embodiment, the blowdown subassembly is including setting up the sludge pump 11 in the outside of sewage case 13, and the intercommunication has blow off pipe 12 between the input of sludge pump 11 and the sewage case 13, and blow off pipe 12 sets up the bottom at sewage case 13 inner wall.
In this embodiment, adjusting part 2 includes cylinder 204 at the device case top of fixed mounting, and cylinder 204 is located the below of dryer tube 5, and one side that is close to cylinder 204 on the dryer tube 5 is provided with limiting plate 201, and the T-slot 202 has been seted up to one side that is close to cylinder 204 on the limiting plate 201, and the top of cylinder 204 output shaft articulates there is T-shaped piece 203, and T-shaped piece 203 slidable mounting is in the inside in T-slot 202.
In this embodiment, four corner positions at the bottom of the device box are all provided with universal wheels 20, and the top of the settling cylinder 6 is provided with a discharge port 7 for discharging clean air.
The working principle is as follows: clean water is injected into the clean water tank 1, the first valve is opened, the first valve is closed, the suction pump 10 and the blower 4 are started, the blower 4 pumps dust into the settling cylinder 6, the suction pump 10 pumps the clean water in the clean water tank 1 into the annular pipe 16 and sprays the clean water out of the drain hole 19, thereby settling the dust, the dust flows into the sewage tank 13 from the recovery pipe 14, the recovery is performed in the sewage tank 13, when the equipment works for a period of time, the first valve is closed, the second valve is opened, the supernatant in the sewage tank 13 is pumped into the annular pipe 16 by the water pump 10 and then is ejected from the water discharge hole 19, thereby reducing dust again, when the dust removal operation is finished, the sludge pump 11 is started to discharge the sludge at the bottom layer of the sewage tank 13 from the sewage discharge pipe 12, in the arrangement, water resources are saved by recycling the purified water and the sewage.
Claims (7)
1. The dust removal device for building construction comprises a device box and is characterized in that the device box comprises a water purification box (1) and a sewage box (13), a sedimentation cylinder (6) is fixedly installed at the top of the device box, a recovery pipe (14) is communicated between the bottom of the sedimentation cylinder (6) and the top of the sewage box (13), a dust pumping component for pumping dust into the sedimentation cylinder (6) is arranged at the top of the device box, a spray component is arranged inside the sedimentation cylinder (6), a first water pipe (9) is communicated between the water inlet end of the spray component and the water purification box (1), a first valve is arranged on the first water pipe (9), a second water pipe (18) is communicated between the sewage box (13) and the spray component, a second valve is arranged on the second water pipe (18), and a sewage discharge component for discharging sludge inside the sewage box (13) is arranged on the sewage box (13), the top of the water purifying tank (1) is provided with a water inlet (17).
2. The dust removal device for building construction according to claim 1, wherein the dust extraction assembly comprises two symmetrical support frames (3) fixedly mounted at the top of the device box, a wind extraction barrel (5) is movably arranged between the two support frames (3), an air blower (4) is arranged at the air inlet end of the wind extraction barrel (5), an elastic pipe (15) is communicated between the air outlet end of the wind extraction barrel (5) and the sedimentation barrel (6), the elastic pipe (15) is located below the spray assembly, and an adjusting assembly (2) for adjusting the angle of the wind extraction barrel (5) is arranged at the top of the device box.
3. The dust removal device for building construction according to claim 1, wherein the spray assembly comprises an annular pipe (16) which is arranged around the inner wall of the sedimentation cylinder (6) and is in a spring shape, the spray assembly further comprises a water suction pump (10) fixedly installed on the device box, a water delivery pipe (8) is arranged at the water outlet end of the water suction pump (10) and one end of the annular pipe (16) in a communicating mode, one end, far away from the water suction pump (10), of the annular pipe (16) is sealed, and drain holes (19) are densely formed in the annular pipe (16).
4. The dust removing apparatus for building construction according to claim 3, wherein the bottom of the second water pipe (18) extends to the inside of the foul water tank (13), the distance between the bottom of the second water pipe (18) and the bottom of the inner wall of the foul water tank (13) is one decimeter, the top of the second water pipe (18) is communicated with the water inlet end of the suction pump (10), the bottom of the first water pipe (9) extends to the bottom of the inner wall of the foul water tank (1), and the top of the first water pipe (9) is communicated with the water inlet end of the suction pump (10).
5. The dust removal device for building construction according to claim 1, wherein the sewage discharge assembly comprises a sludge pump (11) arranged outside the sewage tank (13), a sewage discharge pipe (12) is communicated between the input end of the sludge pump (11) and the sewage tank (13), and the sewage discharge pipe (12) is arranged at the bottom of the inner wall of the sewage tank (13).
6. The dust removal device for building construction according to claim 2, wherein the adjusting assembly (2) comprises an air cylinder (204) fixedly mounted at the top of the device box, the air cylinder (204) is located below the air draft tube (5), a limiting plate (201) is arranged on one side, close to the air cylinder (204), of the air draft tube (5), a T-shaped groove (202) is formed in one side, close to the air cylinder (204), of the limiting plate (201), a T-shaped block (203) is hinged to the top of an output shaft of the air cylinder (204), and the T-shaped block (203) is slidably mounted inside the T-shaped groove (202).
7. The dust removing device for building construction according to claim 1, wherein universal wheels (20) are arranged at four corners of the bottom of the device box, and a discharge port (7) for discharging clean air is formed at the top of the settling cylinder (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020505230.4U CN211864353U (en) | 2020-04-08 | 2020-04-08 | Dust collector for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020505230.4U CN211864353U (en) | 2020-04-08 | 2020-04-08 | Dust collector for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211864353U true CN211864353U (en) | 2020-11-06 |
Family
ID=73251313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020505230.4U Expired - Fee Related CN211864353U (en) | 2020-04-08 | 2020-04-08 | Dust collector for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211864353U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112827291A (en) * | 2021-01-19 | 2021-05-25 | 中国建筑第五工程局有限公司 | Construction raise dust administers device |
-
2020
- 2020-04-08 CN CN202020505230.4U patent/CN211864353U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112827291A (en) * | 2021-01-19 | 2021-05-25 | 中国建筑第五工程局有限公司 | Construction raise dust administers device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111054108A (en) | Environment-friendly sewage treatment plant | |
CN211864353U (en) | Dust collector for construction | |
CN111350532A (en) | Movable dust removal equipment for coal mining | |
CN213885523U (en) | Dust collector for assembly type building construction | |
CN210010244U (en) | Construction site dust collecting equipment with circulating water system | |
CN109384324B (en) | Washing and sweeping vehicle washs water cyclic utilization processing system | |
CN213853749U (en) | Glass dust collection device for glass production | |
CN213610497U (en) | Putty powder workshop dust collecting equipment | |
CN212141892U (en) | Environmental protection dust collecting equipment of building engineering construction | |
CN212187913U (en) | Building site environmental protection water conservation cyclic utilization device | |
CN210674364U (en) | Novel high-efficient water treatment solid-liquid separation device | |
CN213873024U (en) | Building energy-saving ventilation dust removal equipment | |
CN211445166U (en) | Double-row sewage electrochemical water treatment scale collection barrel | |
CN206103596U (en) | Exhaust gas purification device in chemical plant | |
CN211988038U (en) | Reclaimed water recycling device for construction chemical industry | |
CN220386056U (en) | Green construction land dust treatment device | |
CN217500486U (en) | Building construction rainwater is discharged and cyclic utilization structure | |
CN221605771U (en) | Dust fall device for building site vehicle | |
CN216689689U (en) | Non-point source pollution processor box | |
CN221085042U (en) | Dust collector for building construction | |
CN219860993U (en) | Mud cleaning device for sewage treatment | |
CN212828280U (en) | Portable service rack | |
CN217202277U (en) | Effluent treatment plant for building engineering | |
CN215507447U (en) | Paint-floating discharging device for water tank of paint spraying chamber | |
CN217449287U (en) | Sewage treatment system based on ecological restoration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201106 |