CN211851025U - Building engineering mends hole ware - Google Patents

Building engineering mends hole ware Download PDF

Info

Publication number
CN211851025U
CN211851025U CN202020360525.7U CN202020360525U CN211851025U CN 211851025 U CN211851025 U CN 211851025U CN 202020360525 U CN202020360525 U CN 202020360525U CN 211851025 U CN211851025 U CN 211851025U
Authority
CN
China
Prior art keywords
support
block
fixture block
fixed block
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020360525.7U
Other languages
Chinese (zh)
Inventor
俞锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020360525.7U priority Critical patent/CN211851025U/en
Application granted granted Critical
Publication of CN211851025U publication Critical patent/CN211851025U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a building engineering hole patching device, including first support, the second support, first piece and second piece, the left downside and the right downside of first support front end all are provided with first fixed block, the upper left side and the upper right side of second support front end all are provided with the second fixed block that corresponds with first fixed block, the second fixed block is connected with first fixed block through first bolt, the middle part that first support and second support are connected forms the square groove that runs through, the left side and the right side of the bottom of first piece all are provided with the forked tail slider, the left side and the right side of the top of second piece all are provided with the forked tail spout that corresponds with the forked tail slider, first piece is connected with second piece through the cooperation of forked tail slider and forked tail spout; the utility model discloses a simple structure can carry out the shutoff to one side of running through the hole that has not unidimensional pipeline, and easy operation is convenient, and the steadiness is strong, has improved the progress and the speed of filling, has improved the practicality of its use.

Description

Building engineering mends hole ware
Technical Field
The utility model particularly relates to a building engineering mends hole ware technical field, especially relates to a building engineering mends hole ware.
Background
The building engineering is the engineering entity which is formed by the construction of various house buildings and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with the house buildings, wherein the house buildings are the engineering entities which have top covers, beams and columns, walls and foundations and can form internal spaces and meet the requirements of production, living, study and public activities of people, the building engineering is the engineering entity which is designed, surveyed, designed, constructed, completed and the like for newly building, reconstructing or expanding the house buildings and the auxiliary structure facilities and the installation engineering of the lines, pipelines and equipment matched with the engineering entities, also refers to the construction engineering of various houses and buildings, also called the construction workload, and the investment amount of the engineering entity can be realized only by the construction activities.
Through retrieval, chinese patent publication No. CN209686921U discloses a hole patching device for construction engineering, which roughly comprises a fixing plate, a baffle structure is arranged in the middle of one side of the fixing plate, four corners of the fixing plate are connected with movable mechanisms, and handles are connected to two sides of the fixing plate away from each other; when the device is used, the device can not seal the hole when a pipeline is inserted in the hole, so that the hole can not be filled.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a hole patching device for building engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a hole patching device for building engineering comprises a first support, a second support, a first supporting block and a second supporting block, wherein the left lower side and the right lower side of the front end of the first support are respectively provided with a first fixed block, the left upper side and the right upper side of the front end of the second support are respectively provided with a second fixed block corresponding to the first fixed block, the second fixed block is connected with the first fixed block through a first bolt, a through square groove is formed in the middle part of the connection of the first support and the second support, dovetail slide blocks are respectively arranged on the left side and the right side of the bottom end of the first supporting block, dovetail slide grooves corresponding to the dovetail slide blocks are respectively arranged on the left side and the right side of the top end of the second supporting block, the first supporting block is matched with the second supporting block through the dovetail slide blocks, a through circular groove is arranged in the middle part of the connection of the first supporting block and the second supporting block, and a cushion pad is arranged on the inner side wall of the circular groove, the inboard of blotter is provided with the pipeline, and the lateral wall of first piece and second piece contacts with the inside wall of circular slot respectively.
Preferably, the left side of first support and second support is provided with left U type fixture block, and the right side on the top of left U type fixture block and the right side of bottom all are provided with the third fixed block, and the right side of first support and second support is provided with right U type fixture block, and the left side on the top of right U type fixture block and the left side of bottom are provided with the fourth fixed block, and the fourth fixed block passes through the second bolt and is connected with the third fixed block.
Preferably, the inboard of the right-hand member of left side U type fixture block and the inboard of the left end of right side U type fixture block all are provided with the cardboard, the upside and the downside of the rear end of cardboard respectively with the top contact of first support and second support.
Preferably, the rear side of the left end of the left U-shaped fixture block and the rear side of the right end of the right U-shaped fixture block are both provided with a fixing plate, and the upper end and the lower end of the fixing plate are respectively connected with the first support and the second support through screws.
Preferably, the left end of left side U type fixture block and the right-hand member of right U type fixture block all have a screw rod at the front side of cardboard through threaded connection, and the screw rod rotates in the one end of the inboard of left U type fixture block and right U type fixture block and is connected with splint, and the inboard of splint supports tightly with the lateral wall of pipeline.
Preferably, a rotating handle is arranged at one end of the screw rod, which is positioned at the outer side of the left U-shaped fixture block and the outer side of the right U-shaped fixture block.
Preferably, the upper side of the front end of the first support and the lower side of the front end of the second support are both provided with two wall nails in a penetrating mode.
Preferably, the bottom ends of the first supporting block and the second supporting block are in the same plane with the bottom ends of the first support and the second support.
The utility model has the advantages that:
1. when a pipeline is inserted in a hole of a wall body, a first support block and a second support block which are provided with circular grooves with corresponding diameters are installed according to the outer diameter of the pipeline, the first support block and the second support block are sleeved on the outer side of the pipeline, a first support seat and a second support seat are installed on the outer sides of the first support block and the second support block respectively, the rear ends of the first support seat and the second support seat are contacted with the wall surface, a first screw is tightly screwed on the first support seat and the second support seat to fix the first support block and the second support block, the pipeline is clamped tightly through a cushion pad, then a left U-shaped fixture block and a right U-shaped fixture block are installed to screw on a second screw to be connected and fixed, a left U-shaped fixture block and a right U-shaped fixture block are fixedly connected with the first support seat and the second support seat through a second screw, when the pipeline is fixed, the clamping block is fixed tightly screwed on the pipeline only through rotating a rotating handle, the clamping block is fixed on the pipeline, and the hole repairing, the pipeline can be fixed while the hole is plugged, the pipeline is prevented from being damaged by moving in the filling process, and the use practicability of the pipeline is improved.
2. When there is not the pipeline in the hole, only need in the square groove installation do not have first piece and the second piece of circular slot to fix the mend hole ware on the wall body through the wall nail can, easy operation is convenient, and the steadiness is strong, has improved the progress and the speed of filling.
Drawings
Fig. 1 is a schematic structural view of a hole patching device for construction engineering provided by the present invention;
fig. 2 is a schematic front view structure diagram of structural connections of a first support, a second support, a first support block, a second support block and the like of the hole patching device for building engineering provided by the utility model;
fig. 3 is a schematic view of a bottom-view cross-sectional structure of the hole patching device for construction engineering.
In the figure: 1-first support, 2-second support, 3-first support, 4-second support, 5-first fixed block, 6-second fixed block, 7-first bolt, 8-square groove, 9-dovetail slide block, 10-dovetail slide groove, 11-round groove, 12-cushion pad, 13-pipeline, 14-left U-shaped fixture block, 15-third fixed block, 16-right U-shaped fixture block, 17-fourth fixed block, 18-second bolt, 19-clamping plate, 20-fixed plate, 21-screw, 22-screw, 23-clamping plate, 24-rotating handle and 25-wall nail.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Referring to fig. 1-3, a hole patching device for building engineering comprises a first support 1, a second support 2, a first supporting block 3 and a second supporting block 4, wherein a first fixing block 5 is arranged on the left lower side and the right lower side of the front end of the first support 1, a second fixing block 6 corresponding to the first fixing block 5 is arranged on the left upper side and the right upper side of the front end of the second support 2, the second fixing block 6 is connected with the first fixing block 5 through a first bolt 7, a through square groove 8 is formed in the middle part of the connection of the first support 1 and the second support 2, dovetail sliding blocks 9 are arranged on the left side and the right side of the bottom end of the first supporting block 3, dovetail sliding grooves 10 corresponding to the dovetail sliding blocks 9 are arranged on the left side and the right side of the top end of the second supporting block 4, the first supporting block 3 is connected with the second supporting block 4 through the cooperation of the dovetail sliding blocks 9 and the sliding grooves 10, a through circular groove 11 is arranged in the middle part of the connection of the first supporting block 3 and the second supporting block 4, first piece 3 and second support 4 quantity are a plurality of, and first piece 3 and second support 4 in the middle of the internal diameter diverse of the circular slot 11 that sets up, can establish the outside at unidimensional pipeline 13, be provided with blotter 12 on the inside wall of circular slot 11, the inboard of blotter 12 is provided with pipeline 13, play the effect of buffering to pipeline 13 through blotter 12, the lateral wall of first piece 3 and second support 4 contacts with the inside wall of circular slot 11 respectively, it is fixed to press from both sides tightly first support 1 and second support 2 to first piece 3 and second support 4 through the tight first bolt 7 of spiral shell.
It should be further noted that left U-shaped fixture blocks 14 are arranged on the left sides of the first support 1 and the second support 2, third fixing blocks 15 are arranged on the right sides of the top end and the right side of the bottom end of each left U-shaped fixture block 14, right U-shaped fixture blocks 16 are arranged on the right sides of the first support 1 and the second support 2, fourth fixing blocks 17 are arranged on the left sides of the top end and the left side of the bottom end of each right U-shaped fixture block 16, the fourth fixing blocks 17 are connected with the third fixing blocks 15 through second bolts 18, clamping plates 19 are arranged on the inner sides of the right end of the left U-shaped fixture block 14 and the inner sides of the left end of the right U-shaped fixture block 16, the upper sides and the lower sides of the rear ends of the clamping plates 19 are respectively contacted with the top ends of the first support 1 and the second support 2, the bottom ends of the first support 3 and the second support 4 are in the same plane with the bottom ends of the first support 1 and the second support 2 through the clamping plates 19, fixing plates 20 are arranged on the rear sides of the rear ends, the upper end and the lower end of the fixing plate 20 are respectively connected with the first support 1 and the second support 2 through screws 21, the left U-shaped fixture block 14 and the right U-shaped fixture block 16 are fixed with the first support 1 and the second support 2 through the screws 21, the left end of the left U-shaped fixture block 14 and the right end of the right U-shaped fixture block 16 are both connected with a screw 22 at the front side of the clamping plate 19 through threads, one ends of the screws 22 at the inner sides of the left U-shaped fixture block 14 and the right U-shaped fixture block 16 are rotatably connected with a clamping plate 23, the inner side of the clamping plate 23 is tightly abutted against the outer side wall of the pipeline 13, the hole patching device is fixed with the pipeline 13 through the clamping plate 23, one end of the screws 22 at the outer sides of the left U-shaped fixture block 14 and the right U-shaped fixture block 16 is provided with a rotating handle 24, the screws 22 are rotated through the rotating handle 24, labor force is saved, the labor intensity is reduced, two wall nails are respectively arranged on the upper, the hole patching device is fixed with the wall body through wall nails.
The working principle of the embodiment is as follows: when a pipeline 13 is inserted into a hole of a wall body, a first supporting block 3 and a second supporting block 4 which are provided with circular grooves 11 with corresponding diameters are installed according to the outer diameter of the pipeline 13 and are sleeved on the outer side of the pipeline 13, a first support 1 and a second support 2 are installed on the outer sides of the first supporting block 3 and the second supporting block 4 respectively, the rear ends of the first support 1 and the second support 2 are in contact with the wall surface, a first bolt 7 is screwed tightly to fix the first support 1 and the second support 2, the first supporting block 3 and the second supporting block 4 are clamped to the pipeline 13 through a cushion 12, then a left U-shaped clamping block 14 and a right U-shaped clamping block 16 are installed to be screwed tightly to a second bolt 18 for connection and fixation, a second screw 21 is screwed tightly to enable the left U-shaped clamping block 14 and the right U-shaped clamping block to be fixedly connected with the first support 1 and the second support 2, when the pipeline 13 is fixed, a knob is rotated to clamp the pipeline 13 tightly, rotatory rotating makes clamp splice clamp pipe 13 fix to fix the hole patching device on the wall through the wall nail, also can fix pipeline 13 when plugging up the entrance to a cave, prevent to remove damage pipeline 13 filling process pipeline 13, when not having pipeline 13 in the hole, only need the installation not have first piece 3 and second piece 4 of circular slot 11 in square groove 8, and fix the hole patching device on the wall through the wall nail can.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (8)

1. A building engineering mends hole ware which characterized in that: comprises a first support (1), a second support (2), a first supporting block (3) and a second supporting block (4), wherein the left lower side and the right lower side of the front end of the first support (1) are respectively provided with a first fixed block (5), the left upper side and the right upper side of the front end of the second support (2) are respectively provided with a second fixed block (6) corresponding to the first fixed block (5), the second fixed block (6) is connected with the first fixed block (5) through a first bolt (7), the middle part of the connection of the first support (1) and the second support (2) forms a through square groove (8), the left side and the right side of the bottom end of the first supporting block (3) are respectively provided with a dovetail sliding block (9), the left side and the right side of the top end of the second supporting block (4) are respectively provided with a dovetail sliding groove (10) corresponding to the sliding block (9), the first supporting block (3) is matched with the dovetail sliding groove (10) through the sliding block (9) to be connected with the second supporting block (4), the middle part that first piece (3) and second piece (4) are connected is provided with circular slot (11) that run through, is provided with blotter (12) on the inside wall of circular slot (11), and the inboard of blotter (12) is provided with pipeline (13), and the lateral wall of first piece (3) and second piece (4) contacts with the inside wall of circular slot (11) respectively.
2. A hole patching device for constructional engineering as claimed in claim 1, characterized in that: the left side of first support (1) and second support (2) is provided with left U type fixture block (14), and the right side on the top of left U type fixture block (14) and the right side of bottom all are provided with third fixed block (15), and the right side of first support (1) and second support (2) is provided with right U type fixture block (16), and the left side on the top of right U type fixture block (16) and the left side of bottom are provided with fourth fixed block (17), and fourth fixed block (17) are connected with third fixed block (15) through second bolt (18).
3. A hole patching device for constructional engineering as claimed in claim 2, characterized in that: the inboard of the right-hand member of left side U type fixture block (14) and the inboard of the left end of right side U type fixture block (16) all are provided with cardboard (19), the upside and the downside of the rear end of cardboard (19) contact with the top of first support (1) and second support (2) respectively.
4. A hole patching device for constructional engineering as claimed in claim 2, characterized in that: the rear side of the left end of the left U-shaped fixture block (14) and the rear side of the right end of the right U-shaped fixture block (16) are both provided with a fixing plate (20), and the upper end and the lower end of the fixing plate (20) are connected with the first support (1) and the second support (2) through screws (21) respectively.
5. A hole patching device for constructional engineering as claimed in claim 2, characterized in that: the left end of the left U-shaped clamping block (14) and the right end of the right U-shaped clamping block (16) are both connected with a screw rod (22) in the front side of the clamping plate (19) through threads, the screw rod (22) is rotatably connected with a clamping plate (23) at one end of the inner sides of the left U-shaped clamping block (14) and the right U-shaped clamping block (16), and the inner side of the clamping plate (23) is tightly abutted to the outer side wall of the pipeline (13).
6. A hole patching device for building engineering as claimed in claim 5, characterized in that: and a rotating handle (24) is arranged at one end of the screw rod (22) on the outer side of the left U-shaped fixture block (14) and the right U-shaped fixture block (16).
7. A hole patching device for constructional engineering as claimed in claim 1, characterized in that: the upside of the front end of first support (1) and the downside of the front end of second support (2) all run through and are provided with two wall nails.
8. A hole patching device for constructional engineering as claimed in claim 1, characterized in that: the bottom ends of the first supporting block (3) and the second supporting block (4) are in the same plane with the bottom ends of the first support (1) and the second support (2).
CN202020360525.7U 2020-03-20 2020-03-20 Building engineering mends hole ware Expired - Fee Related CN211851025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020360525.7U CN211851025U (en) 2020-03-20 2020-03-20 Building engineering mends hole ware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020360525.7U CN211851025U (en) 2020-03-20 2020-03-20 Building engineering mends hole ware

Publications (1)

Publication Number Publication Date
CN211851025U true CN211851025U (en) 2020-11-03

Family

ID=73135272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020360525.7U Expired - Fee Related CN211851025U (en) 2020-03-20 2020-03-20 Building engineering mends hole ware

Country Status (1)

Country Link
CN (1) CN211851025U (en)

Similar Documents

Publication Publication Date Title
CN211851025U (en) Building engineering mends hole ware
CN213898119U (en) Keel is consolidated to template
CN211248427U (en) Butterfly valve flange drilling equipment
CN210849262U (en) Auxiliary tool for pipeline cutting
CN214365175U (en) Structure is built in quick detachable interim room
CN210885006U (en) Pipeline fixing device for construction
CN210459950U (en) Fastener type steel pipe scaffold connecting structure
CN220319043U (en) Novel wall mortar efficient paving device with adjustable
CN221702954U (en) Clean wallboard for clean workshop convenient to installation
CN221255541U (en) Comprehensive pipe rack
CN220644827U (en) Assembled furred ceiling connecting piece
CN221194279U (en) Template reinforcing apparatus is used in building engineering specialty
CN219764392U (en) Fire hydrant case is scratched to big hand convenient to use
CN215802260U (en) Steel house assembling connecting part
CN214658997U (en) Safety protection device for house construction project
CN216520111U (en) Kitchen water pipe overhauls uses pipe connector
CN211776060U (en) Aluminum diaphragm plate single-top supporting device for transformer substation construction
CN214618205U (en) Pipeline fixing device for building structure design
CN213081235U (en) Cut dirty nanotube convenient to butt joint
CN212666029U (en) Water conservancy construction maintenance equipment
CN221523919U (en) Building curtain wall facilitating rapid installation
CN221823457U (en) Building engineering bearing structure
CN216810978U (en) Building turnover board convenient to use
CN221837958U (en) Connection structure for building templates
CN220888878U (en) Seepage-proofing plugging structure for rain sewage inspection well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201103

Termination date: 20210320

CF01 Termination of patent right due to non-payment of annual fee