CN211850823U - Building support frame and support column thereof - Google Patents

Building support frame and support column thereof Download PDF

Info

Publication number
CN211850823U
CN211850823U CN202020344684.8U CN202020344684U CN211850823U CN 211850823 U CN211850823 U CN 211850823U CN 202020344684 U CN202020344684 U CN 202020344684U CN 211850823 U CN211850823 U CN 211850823U
Authority
CN
China
Prior art keywords
connecting piece
fixed pipe
support column
tie
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020344684.8U
Other languages
Chinese (zh)
Inventor
李亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020344684.8U priority Critical patent/CN211850823U/en
Application granted granted Critical
Publication of CN211850823U publication Critical patent/CN211850823U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to a construction equipment field, concretely relates to building support frame and support column thereof. The utility model discloses a building support frame, including more than two support columns that extend along the upper and lower direction and the tie-beam of connection between the support column, the support column includes the fixed pipe that is used for supporting with ground and the upper and lower adjustable setting is in the inner chamber of fixed pipe, fixed pipe is last upper and lower interval is equipped with connecting piece and lower connecting piece, one of upper connecting piece and lower connecting piece with fixed pipe is sliding fit from top to bottom, the one end of tie-beam articulates on the upper connecting piece of one of them support column, the other end articulates on the lower connecting piece of another support column, because the both ends of tie-beam are articulated during the use, and one of upper connecting piece and lower connecting piece can slide, just so can direct activity when adjusting the interval between the supporting beam, need not set up it into the components of a whole that can function independently structure, avoid the tie-beam not hard up, the reliability is improved.

Description

Building support frame and support column thereof
Technical Field
The utility model relates to a construction equipment field, concretely relates to building support frame and support column thereof.
Background
In the building construction process, support frames are often needed to support components such as formworks. General support frame is lived by the support and the crossbeam constitutes, and wherein the support column can stretch out and draw back, passes through the buckle between crossbeam and the support column and connects, and this kind of use is got up the adjustment and is very inconvenient. In the prior art, there is also a support frame, such as a laminated slab support frame disclosed in chinese patent document with publication number CN210122814U, which includes a support rod and a connecting rod, wherein a top plate is disposed at the upper end of the support rod, a base is disposed at the lower end of the support rod, a connecting disc is disposed on the outer wall of the support rod, an annular groove with an inverted T-shaped cross section is disposed on the upper end surface of the connecting disc, a plurality of sliding bolts are slidably connected in the annular groove, nuts of the sliding bolts are clamped in the annular groove, and screws of the sliding bolts extend out of the; the connecting rod is cup jointed by outer tube and interior sleeve pipe and is formed, has seted up a plurality of through-holes on outer tube and the interior sleeve pipe respectively, passes a set of through-hole on outer tube and the interior sleeve pipe through the bolt and connects outer tube and interior sleeve pipe fixedly through the threaded connection nut, and the one end of outer tube has set firmly connecting plate one, and interior sheathed tube one end has set firmly connecting plate two, has seted up connecting hole one and connecting hole two on connecting plate one and the connecting plate two respectively.
The cross beam of the support frame, namely the connecting rod, is formed by sleeving the inner sleeve and the outer sleeve, is equivalent to a split structure, has poor reliability and is easy to loosen.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building support frame, which solves the problem of poor reliability caused by easy looseness of the crossbeam of the existing support frame; and simultaneously, the utility model also provides an architectural support post among the above-mentioned architectural support frame.
The utility model discloses a building support frame adopts following technical scheme:
building support frame, including the support column that extends and connect the tie-beam between the support column along upper and lower direction more than two, the support column is in including fixed pipe and the adjustable setting from top to bottom that are used for supporting with ground in the inner chamber of fixed pipe, fixed pipe is gone up the upper and lower interval and is equipped with connecting piece and lower connecting piece, go up in connecting piece and the lower connecting piece one with sliding fit about fixed pipe, the one end of tie-beam articulates on the last connecting piece of one of them support column, and the other end articulates on the lower connecting piece of another support column.
Two connecting beams are arranged between two adjacent supporting columns, and the crossed positions of the two connecting beams are hinged.
The upper connecting piece is fixedly connected to the fixed pipe, and the lower connecting piece is slidably sleeved on the fixed pipe.
Go up all to be equipped with the articulated column of horizontal outside overhang on connecting piece and the lower connecting piece, the tie-beam with articulated column connection, the outer end of articulated column is equipped with the locking piece.
The locking piece is the locking plate, locking plate movable assembly is in on the articulated post.
Four hinged columns are arranged on the upper connecting piece and the lower connecting piece at intervals in the circumferential direction.
And a universal traveling wheel is arranged below the fixed pipe.
The fixed pipe is provided with a contraction section for contracting and clamping the adjusting pipe, the periphery of the contraction section is of a conical structure with a small upper part and a large lower part, and the periphery of the contraction section is provided with a locking sleeve in a threaded manner.
The utility model discloses a building support column adopts following technical scheme:
the support column is in including being used for with the fixed pipe that ground supported and adjustable setting from top to bottom the regulating tube in the inner chamber of fixed pipe, fixed pipe is last upper and lower interval is equipped with connecting piece and lower connecting piece, go up one in connecting piece and the lower connecting piece with fixed pipe sliding fit from top to bottom, the one end of tie-beam articulates on the last connecting piece of one of them support column, the other end articulates on the lower connecting piece of another support column.
Two connecting beams are arranged between two adjacent supporting columns, and the crossed positions of the two connecting beams are hinged.
The upper connecting piece is fixedly connected to the fixed pipe, and the lower connecting piece is slidably sleeved on the fixed pipe.
Go up all to be equipped with the articulated column of horizontal outside overhang on connecting piece and the lower connecting piece, the tie-beam with articulated column connection, the outer end of articulated column is equipped with the locking piece.
The locking piece is the locking plate, locking plate movable assembly is in on the articulated post.
Four hinged columns are arranged on the upper connecting piece and the lower connecting piece at intervals in the circumferential direction.
And a universal traveling wheel is arranged below the fixed pipe.
The fixed pipe is provided with a contraction section for contracting and clamping the adjusting pipe, the periphery of the contraction section is of a conical structure with a small upper part and a large lower part, and the periphery of the contraction section is provided with a locking sleeve in a threaded manner.
The utility model has the advantages that: the utility model discloses a building support frame, including more than two support columns that extend along the upper and lower direction and the tie-beam of connection between the support column, the support column includes the fixed pipe that is used for supporting with ground and the upper and lower adjustable setting is in the inner chamber of fixed pipe, fixed pipe is last upper and lower interval is equipped with connecting piece and lower connecting piece, one of upper connecting piece and lower connecting piece with fixed pipe is sliding fit from top to bottom, the one end of tie-beam articulates on the upper connecting piece of one of them support column, the other end articulates on the lower connecting piece of another support column, because the both ends of tie-beam are articulated during the use, and one of upper connecting piece and lower connecting piece can slide, just so can direct activity when adjusting the interval between the supporting beam, need not set up it into the components of a whole that can function independently structure, avoid the tie-beam not hard up, the reliability is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a schematic structural view of an embodiment of the building support frame of the present invention;
FIG. 2 is a schematic structural view of the architectural support column of FIG. 1;
FIG. 3 is a schematic structural view of a cross beam;
FIG. 4 is a schematic view of the first and second connecting buckles;
in the figure: 1. a fixed tube; 2. a connecting beam; 3. an adjusting tube; 4. a lower connecting piece; 5. a locking sleeve; 6. installing a pipe; 7. an upper connecting piece; 11. universal traveling wheels; 41. a hinged column; 411. grooving; 412. a locking plate; 8. a cross beam; 81. a first connecting buckle; 82. a second connecting buckle; 811. a first card slot; 821. and a second card slot.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model discloses an embodiment of building support frame, as shown in fig. 1 to 4, building support frame, including the support column that extends along upper and lower direction more than two and connect tie-beam 2 between the support column, the support column is in including fixed pipe 1 and the adjustable setting from top to bottom that is used for supporting with ground adjusting pipe 3 in the inner chamber of fixed pipe 1, fixed pipe 1 is gone up the interval and is equipped with connecting piece 7 and lower connecting piece 4, go up in connecting piece 7 and the lower connecting piece 4 one with fixed pipe 1 about sliding fit, the one end of tie-beam 2 articulates on the last connecting piece of one of them support column, the other end articulates on the lower connecting piece 4 of another support column.
In this embodiment, be equipped with two tie-beams 2 between two adjacent support columns, two tie-beams 2 crossing position department articulated connection have improved the reliability like this.
In this embodiment, go up connecting piece fixed connection in on the fixed pipe, lower connecting piece sliding sleeve is in on the fixed pipe, specifically speaking, lower connecting piece and last connecting piece all include an installation cover, but the installation cover and the fixed pipe sliding connection of lower connecting piece, the installation cover and the fixed welding of pipe of last connecting piece.
Go up all to be equipped with the articulated post 41 of transversely outwards overhanging on connecting piece and the lower connecting piece, the tie-beam with articulated post 41 is connected, the outer end of articulated post is equipped with the lock piece, avoids the unexpected throw-off of tie-beam and articulated post through the lock piece. Specifically, the locking member is a locking plate 412, and the locking plate 412 is movably assembled on the hinge post. That is, the hinge post is provided with a transverse slot 411, a rotating shaft is arranged between the slot walls of the slot 411, the locking plate 412 is provided with a long slot extending along the length direction, the width of the long slot is larger than that of the rotating shaft, and under the action of gravity, the locking plate 412 is in a vertical state, so as to be blocked with the connecting beam.
Go up the connecting piece and be equipped with four articulated posts on the connecting piece down in the circumference interval, just so can realize the extension of a plurality of support columns, improve the adaptability.
The below of fixed pipe is equipped with universal traveling wheel 11, is convenient for remove, facilitates the use.
The fixed pipe is provided with a contraction section for contracting and clamping the adjusting pipe 3, the periphery of the contraction section is of a conical structure with a small upper part and a large lower part, the locking sleeve 5 is assembled on the periphery of the contraction section through threads, and when the locking sleeve 5 is rotated downwards, the contraction section contracts under the action of the conical structure, so that the adjusting pipe is clamped and adjustable locking is realized. And a mounting pipe 6 is arranged above the contraction section, and the upper connecting piece is welded on the mounting pipe 6.
In this embodiment, be equipped with crossbeam 8 between two support columns, the both ends of crossbeam 8 are equipped with first connector link 81, are equipped with first connector link 82 on the support column, are equipped with first draw-in groove 811 on the first connector link, are equipped with second draw-in groove 821 on the second connector link, and when connecting, the mutual lock of draw-in groove was buckled to two connections to realize reliable connection. The arrangement of the cross beam can be used for walking of workers and can also be used as a support beam.
In other embodiments of the utility model, the connecting piece can be arranged in a sliding way; the locking piece on the hinge column can be locked by a nut; the number of the hinge columns on the upper connecting piece and the lower connecting piece can be adjusted according to specific requirements.
The utility model discloses an embodiment of building support column, the structure of the support column in the embodiment of building support column and above-mentioned building support frame is the same, no longer gives unnecessary details.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. Building support frame includes the support column that extends along upper and lower direction more than two and connects the tie-beam between the support column, its characterized in that: the support column is in including being used for with the fixed pipe that ground supported and adjustable setting from top to bottom the regulating tube in the inner chamber of fixed pipe, fixed pipe is last upper and lower interval is equipped with connecting piece and lower connecting piece, go up one in connecting piece and the lower connecting piece with fixed pipe sliding fit from top to bottom, the one end of tie-beam articulates on the last connecting piece of one of them support column, the other end articulates on the lower connecting piece of another support column.
2. The construction support bracket of claim 1, wherein: two connecting beams are arranged between two adjacent supporting columns, and the crossed positions of the two connecting beams are hinged.
3. The construction support bracket of claim 2, wherein: the upper connecting piece is fixedly connected to the fixed pipe, and the lower connecting piece is slidably sleeved on the fixed pipe.
4. The construction support bracket of claim 3, wherein: go up all to be equipped with the articulated column of horizontal outside overhang on connecting piece and the lower connecting piece, the tie-beam with articulated column connection, the outer end of articulated column is equipped with the locking piece.
5. The construction support bracket of claim 4, wherein: the locking piece is the locking plate, locking plate movable assembly is in on the articulated post.
6. The construction support bracket of claim 4 or 5, wherein: four hinged columns are arranged on the upper connecting piece and the lower connecting piece at intervals in the circumferential direction.
7. A construction support bracket as claimed in any one of claims 1 to 5, in which: and a universal traveling wheel is arranged below the fixed pipe.
8. A construction support bracket as claimed in any one of claims 1 to 5, in which: the fixed pipe is provided with a contraction section for contracting and clamping the adjusting pipe, the periphery of the contraction section is of a conical structure with a small upper part and a large lower part, and the periphery of the contraction section is provided with a locking sleeve in a threaded manner.
9. Building support column, its characterized in that: the building support column is the support column in the building support frame of any one of claims 1-8.
CN202020344684.8U 2020-03-18 2020-03-18 Building support frame and support column thereof Expired - Fee Related CN211850823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020344684.8U CN211850823U (en) 2020-03-18 2020-03-18 Building support frame and support column thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020344684.8U CN211850823U (en) 2020-03-18 2020-03-18 Building support frame and support column thereof

Publications (1)

Publication Number Publication Date
CN211850823U true CN211850823U (en) 2020-11-03

Family

ID=73135261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020344684.8U Expired - Fee Related CN211850823U (en) 2020-03-18 2020-03-18 Building support frame and support column thereof

Country Status (1)

Country Link
CN (1) CN211850823U (en)

Similar Documents

Publication Publication Date Title
CN211850823U (en) Building support frame and support column thereof
CN213418284U (en) Vertical stand bottom fixed knot of building engineering stair railing constructs
CN214034916U (en) Protection canopy fixing device for building engineering
CN211081084U (en) Tool type pole holding safety protection device
CN210316624U (en) Precast beam bracing structure
CN210947143U (en) Steel structure for building
CN114193386A (en) Track mounting and adjusting mechanism
CN108086660B (en) Annular steel structure supporting platform
CN209850215U (en) Auxiliary welding clamp for connecting lug parts of large-sized steel members
CN220301589U (en) Novel curved curtain wall
CN214786551U (en) Regulation formula building safety rail guard
CN219753925U (en) Auxiliary tool for scaffold installation
CN213569180U (en) Levelness-adjustable movable portal frame
CN217949122U (en) Tool type steel platform for tower crane foundation construction
CN210976272U (en) Steel construction furred ceiling structure
CN216336029U (en) Elevator car that stretches out and draws back
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN215564583U (en) Novel basic cage with regulatory function
CN211974279U (en) Scaffold base for building
CN216634191U (en) Track mounting adjusting mechanism
CN220953835U (en) Building steel structure convenient to assemble
CN219060856U (en) Adjustable buckle disc type scaffold
CN211143309U (en) Steel structure support
CN214329791U (en) Construction safety scaffold with good stability
CN214393970U (en) Large-scale sealed box indoor portion supports frock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201103

Termination date: 20210318

CF01 Termination of patent right due to non-payment of annual fee