CN211849862U - Environment-friendly stable inspection well structure - Google Patents

Environment-friendly stable inspection well structure Download PDF

Info

Publication number
CN211849862U
CN211849862U CN202020102684.7U CN202020102684U CN211849862U CN 211849862 U CN211849862 U CN 211849862U CN 202020102684 U CN202020102684 U CN 202020102684U CN 211849862 U CN211849862 U CN 211849862U
Authority
CN
China
Prior art keywords
well body
well
pipe
scraper
inlet tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020102684.7U
Other languages
Chinese (zh)
Inventor
周承加
杜广伟
周承康
姚宪法
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Fahai New Material Technology Co ltd
Original Assignee
Nanjing Fahai New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Fahai New Material Technology Co ltd filed Critical Nanjing Fahai New Material Technology Co ltd
Priority to CN202020102684.7U priority Critical patent/CN211849862U/en
Application granted granted Critical
Publication of CN211849862U publication Critical patent/CN211849862U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model belongs to the technical field of the inspection shaft, concretely relates to environmental protection stable form inspection shaft structure. It includes the well body, well body bottom is provided with inlet tube and drain pipe relatively, with set up the spout on the wall of a well of inlet tube and drain pipe looks vertically well body, scrape the device in advance and arrange in just can follow the spout and reciprocate in the spout, scrape the scraper external diameter of device and the cooperation of the inner wall diameter of the well body in advance, inlet tube and drain pipe run through the well body just is located respectively the both sides of the well body, set up the inclined groove that the bottom is the slope form on the well body, the radius of inlet tube is less than the radius of drain pipe. The utility model can rapidly flow from the water inlet pipe to the water outlet pipe, so that the impurities in the water are not easy to deposit, and the water outlet efficiency is improved; the pre-scraping device can timely remove sludge deposited on the inner wall of the well body, labor is saved, labor intensity is reduced, and working efficiency is obviously improved.

Description

Environment-friendly stable inspection well structure
Technical Field
The utility model belongs to the technical field of the inspection shaft, concretely relates to environmental protection stable form inspection shaft structure.
Background
The inspection well is used for rain sewage discharge pipelines, is a vertical well built at certain intervals on the underground pipeline position and is used for connecting pipelines with different pipe diameters, different directions and different heights, is mainly used for maintenance workers to regularly inspect and dredge the pipelines, clear away sludge foreign matters, prevent pipeline blockage and the like, and is one of the underground infrastructures of urban roads.
The prior Chinese patent with the publication number of CN207092230U discloses an inspection well, which comprises a well body and a branch pipe joint, wherein the well body is hollow inside, at least one well body branch pipe communicated with the outside and the inner cavity of the well body is arranged on the side surface of the well body, a bell socket is arranged at the end part of the well body branch pipe, a flange is arranged on the bell socket, one end of the bell socket, which is far away from the well body, is a conical port with a large bore diameter end, one end of the branch pipe joint is inserted in the conical port, a sealing ring is arranged between the branch pipe joint and the conical port, a flange is sleeved outside the branch pipe joint, a boss of the flange is pressed on the sealing ring, and a pressure plate of the flange is fixedly.
However, after the inspection well is used for a long time, the inner wall of the well body can push a lot of silt, and manpower is wasted by directly adopting manpower to clean.
SUMMERY OF THE UTILITY MODEL
In view of the above-mentioned defect of prior art, the technical purpose of the utility model is to provide a convenient clearance, use manpower sparingly, the environmental protection stable form inspection shaft structure of raising the efficiency.
In order to realize the technical purpose, the utility model provides a technical scheme as follows:
an environment-friendly stable inspection well structure comprises a well body, wherein the well body comprises a main body with a vertical cylindrical structure, the upper end of the main body extends upwards and the port shrinks inwards to form a conical well head, the bottom of the well body is provided with a water inlet pipe and a water outlet pipe oppositely, a chute is arranged on the well wall of the well body which is vertical to the water inlet pipe and the water discharge pipe, the pre-scraping device is arranged in the chute and can move up and down along the chute, the outer diameter of a scraper of the pre-scraping device is matched with the diameter of the inner wall of the well body, the water inlet pipe and the water discharge pipe penetrate through the well body and are respectively positioned at two sides of the well body, the well body is provided with an inclined groove with the bottom in an inclined shape, the higher end of the inclined groove is communicated with the water inlet pipe, the lower end of the inclined groove is communicated with the drain pipe, one side of the water inlet pipe close to the top of the well body and one side of the drain pipe close to the top of the well body are positioned on the same straight line, and the radius of the water inlet pipe is smaller than that of the drain pipe.
Foretell an environmental protection stable form inspection shaft structure, its scrape the device in advance and include hollow cylindric mount table, set up the scraper on the mount table, the scraper is the annular shape, the outer end diameter of scraper is greater than the link diameter, scraper outer end diameter matches with the diameter of well body inner wall, the both sides of mount table set up the slide rail, the slide rail top sets up the lift cylinder.
Foretell an environmental protection stable form inspection shaft structure, its well head upper end fixedly connected with places the ring, it has the apron to place the gomphosis on the ring.
Foretell an environmental protection stable form inspection shaft structure, its set up the transport hole that supplies the workman to carry on the apron.
Foretell stable form inspection shaft structure of environmental protection, its well body bottom with be close to be provided with former thick liquid layer between the ground of well body bottom, former thick liquid layer is the mortar coating and is in the well body bottom is kept away from the surface of well body one side forms.
Foretell an environmental protection stable form inspection shaft structure, its scrape the device in advance and be located inlet tube and outlet pipe top.
The utility model has the advantages that:
the utility model adopts the inclined groove arranged between the water inlet pipe and the water outlet pipe with different radiuses, so that water can rapidly flow from the water inlet pipe to the water outlet pipe, impurities in water are not easy to deposit, and the water discharging efficiency is improved; the pre-scraping device is arranged on the inner wall of the well body, so that sludge deposited on the inner wall of the well body can be removed in time, labor is saved, labor intensity is reduced, and working efficiency is obviously improved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a left side view of fig. 1.
Detailed Description
The conception, the specific structure and the technical effects of the present invention will be further described with reference to the accompanying drawings, so as to fully understand the objects, the features and the effects of the present invention.
Example 1
Referring to fig. 1 and 2, the utility model discloses a well body 1, well body 1 includes vertical tubular structure's main part, upwards extend and the port internal contraction of main part forms coniform well head 2, 2 upper end fixedly connected with of well head place ring 3, it has apron 4 to place the gomphosis on the ring 3, set up the porthole 14 that supplies the workman to carry on the apron 4, workman's accessible porthole 14 will lap 4 and put aside ring 3 from placing to enter into the inspection shaft. The bottom of the well body 1 is relatively provided with a water inlet pipe 5 and a water outlet pipe 6, and a chute 13 is arranged on the wall of the well body 1 which is vertical to the water inlet pipe 5 and the water outlet pipe 6. Scrape the device in advance and include hollow cylindric mount table 8, set up scraper 10 on the mount table 8, scraper 10 is the annular shape, the outer end diameter of scraper 10 is greater than the link diameter, the diameter of scraper 10 outer end diameter matches with the diameter of 1 inner wall of well body, the both sides of mount table 8 set up slide rail 11, slide rail 11 top sets up lift cylinder 12. The sliding rail 11 of the pre-scraping device is arranged in the sliding groove 13 and can move up and down along the sliding groove 13, and the pre-scraping device is positioned above the water inlet pipe 5 and the water outlet pipe 6. Scrape the cooperation of 10 external diameters of scraper of device and the inner wall diameter of the well body 1 in advance, inlet tube 5 and drain pipe 6 run through the well body 1 just is located respectively the both sides of the well body 1, set up the inclined groove 7 that the bottom is the slope form on the well body 1, the higher end of inclined groove 7 with inlet tube 5 communicates with each other, the lower end of inclined groove 7 with drain pipe 6 communicates with each other, inlet tube 5 is close to one side at the well body 1 top is close to with drain pipe 6 one side at the well body 1 top is in on the same straight line just the radius of inlet tube 5 is less than the radius of drain pipe 6, makes hydroenergy can be comparatively quick reach drain pipe 6 from inlet tube 5. A raw slurry layer 9 is arranged between the bottom of the well body and the ground close to the bottom of the well body, and the raw slurry layer 9 is formed by coating mortar on the surface of one side, far away from the well body 1, of the bottom of the well body. The stock layer 9 enhances the stability of the well body 1.
The worker takes the cover plate 4 out of the placing ring 3 by a tool. Water flows into the drain pipe 6 from the water inlet pipe 5, and the flow speed of the water on the inclined groove 7 is high due to the inclined groove 7, so that impurities in the water are not easy to deposit at the bottom of the well body 1. When the water yield is great, drain pipe 6 can't in time discharge water, and the water level in the inspection shaft rises, because the design that the closing-in section is big-end-up makes the inspection shaft can hold more water, has slowed down the speed that the water level rises, has reduced the probability that water will lap 4 and wash open.
The utility model adopts the inclined groove arranged between the water inlet pipe and the water outlet pipe with different radiuses, so that water can rapidly flow from the water inlet pipe to the water outlet pipe, impurities in water are not easy to deposit, and the water discharging efficiency is improved; the pre-scraping device is arranged on the inner wall of the well body, so that sludge deposited on the inner wall of the well body can be removed in time, labor is saved, labor intensity is reduced, and working efficiency is obviously improved.
The foregoing has described in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be devised by those skilled in the art in light of the teachings of the present invention without undue experimentation. Therefore, the technical solutions that can be obtained by a person skilled in the art through logic analysis, reasoning or limited experiments based on the prior art according to the concepts of the present invention should be within the scope of protection defined by the claims.

Claims (6)

1. The utility model provides an environmental protection stable form inspection shaft structure, its characterized in that includes the well body (1), the well body (1) includes the main part of vertical tubular structure, upwards extend and port internal contraction of the upper end of main part forms coniform well head (2), well body (1) bottom is provided with inlet tube (5) and drain pipe (6) relatively, with set up spout (13) on the wall of a well of inlet tube (5) and drain pipe (6) looks vertically well body (1), scrape the device in advance and arrange in just can follow spout (13) and reciprocate in spout (13), scrape the inner wall diameter cooperation of the scraper (10) external diameter of device and well body (1) in advance, inlet tube (5) and drain pipe (6) run through well body (1) just are located respectively the both sides of well body (1), set up on well body (1) and have the bottom be the inclined groove (7) of slope form, the higher end of the inclined groove (7) is communicated with the water inlet pipe (5), the lower end of the inclined groove (7) is communicated with the water outlet pipe (6), one side of the water inlet pipe (5) close to the top of the well body (1) and one side of the water outlet pipe (6) close to the top of the well body (1) are positioned on the same straight line, and the radius of the water inlet pipe (5) is smaller than that of the water outlet pipe (6).
2. The environment-friendly and stable inspection well structure according to claim 1, wherein the pre-scraping device comprises a hollow cylindrical mounting table (8), a scraper (10) is arranged on the mounting table (8), the scraper (10) is in a ring shape, the diameter of the outer end of the scraper (10) is larger than that of the connecting end, the diameter of the outer end of the scraper (10) is equal to that of the inner wall of the well body, slide rails (11) are arranged on two sides of the mounting table (8), and a lifting cylinder (12) is arranged at the top ends of the slide rails.
3. The environment-friendly and stable inspection well structure as claimed in claim 1, wherein a placing ring (3) is fixedly connected to the upper end of the well body (1), and a cover plate (4) is embedded on the placing ring (3).
4. The environment-friendly and stable inspection well structure as claimed in claim 3, wherein the cover plate (4) is provided with a carrying hole (14) for workers to carry.
5. The environment-friendly and stable inspection well structure as claimed in claim 1, wherein a raw slurry layer (9) is arranged between the bottom of the well body (1) and the ground close to the bottom of the well body (1), and the raw slurry layer (9) is formed by coating mortar on the surface of the bottom of the well body (1) far away from the well body (1).
6. An environmentally stable manhole structure according to claim 1, wherein the pre-scraping means is located above the water inlet pipe (5) and the water outlet pipe (6).
CN202020102684.7U 2020-01-17 2020-01-17 Environment-friendly stable inspection well structure Expired - Fee Related CN211849862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020102684.7U CN211849862U (en) 2020-01-17 2020-01-17 Environment-friendly stable inspection well structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020102684.7U CN211849862U (en) 2020-01-17 2020-01-17 Environment-friendly stable inspection well structure

Publications (1)

Publication Number Publication Date
CN211849862U true CN211849862U (en) 2020-11-03

Family

ID=73233528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020102684.7U Expired - Fee Related CN211849862U (en) 2020-01-17 2020-01-17 Environment-friendly stable inspection well structure

Country Status (1)

Country Link
CN (1) CN211849862U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293590A (en) * 2021-11-24 2022-04-08 浙江瑞美生态建设股份有限公司 Inspection well device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293590A (en) * 2021-11-24 2022-04-08 浙江瑞美生态建设股份有限公司 Inspection well device

Similar Documents

Publication Publication Date Title
CN214034031U (en) Municipal administration pipeline mediation structure
CN211849862U (en) Environment-friendly stable inspection well structure
CN103706152B (en) Waste kieselguhr collecting equipment and method for treating waste kieselguhr by using same
CN104961252A (en) Environment-friendly and energy-saving type foul solution storage body mechanical cleaning system
CN109488253B (en) Pollution-free high-temperature nitrogen cleaning operation method and device for pumping well
CN201810345U (en) Sludge discharging system of mine sump
CN112095556B (en) Hydropower station water collecting well drainage system with functions of preventing silt and dredging
CN215085043U (en) Be applied to coke-oven plant's clarification tank
CN212376637U (en) Eccentric adjustable oil pipe on-line wax scraping device
CN208981484U (en) A kind of plumbing desilting equipment
CN211057991U (en) Prefabricated pump station with self-cleaning function
CN210216635U (en) Double-cylinder drainage system of gas power plant
CN204312028U (en) Underground coal mine horizontal orientation km rig water treatment facilities
CN209307932U (en) A kind of road mark line removing vehicle
CN104370008A (en) Tank bottom online mud discharging device
CN209585234U (en) Check well construction
CN105464195A (en) Rainwater inspection well
CN206396876U (en) A kind of heavy mud cleaning plant of inspection shaft
CN204689767U (en) Environment-friendly and energy-efficient soiling solution stores body mechanical cleaning system
CN203742496U (en) Well drilling waste liquid zero-discharge system
CN221823783U (en) Main pipeline water draining slag remover
CN109441402A (en) Can Operating Pressure clean method and device
CN218757862U (en) Recovery unit of test oil gas operation raffinate
CN213512013U (en) Opencut coal mine speed reducer oil drain hole auxiliary device
CN219060100U (en) Backflushing device for dewatering well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201103

CF01 Termination of patent right due to non-payment of annual fee