CN211849676U - Grooving equipment for water conservancy construction during pipeline pre-embedding - Google Patents

Grooving equipment for water conservancy construction during pipeline pre-embedding Download PDF

Info

Publication number
CN211849676U
CN211849676U CN201922501321.0U CN201922501321U CN211849676U CN 211849676 U CN211849676 U CN 211849676U CN 201922501321 U CN201922501321 U CN 201922501321U CN 211849676 U CN211849676 U CN 211849676U
Authority
CN
China
Prior art keywords
base
water
supporting arm
hydraulic cylinder
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922501321.0U
Other languages
Chinese (zh)
Inventor
杨林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922501321.0U priority Critical patent/CN211849676U/en
Application granted granted Critical
Publication of CN211849676U publication Critical patent/CN211849676U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model belongs to the technical field of hydraulic engineering, especially a grooving equipment for water conservancy construction when pipeline is pre-buried, including the base and install first support arm and cask on the base, the bottom surface of base fixedly connected with universal wheel, the upper surface of base fixedly connected with shower nozzle support, the top of shower nozzle support is installed the water spray nozzle, the upper surface of base is handed over and is connected with first support arm and first pneumatic cylinder, and first support arm with the first pneumatic cylinder is articulated; through setting up two pneumatic cylinders, the height of cutting dish can be controlled in the flexible of first pneumatic cylinder to can control the depth of cut to ground, the angle between second support arm and the first support arm can be controlled in the flexible of second pneumatic cylinder, thereby control the cutting angle of cutting dish, make the cutting dish can be the tilt state and cut ground, the inclined groove of twice mutual symmetry makes things convenient for people to take out the earth between the groove more.

Description

Grooving equipment for water conservancy construction during pipeline pre-embedding
Technical Field
The utility model relates to the technical field, especially, relate to a water conservancy construction is with pre-buried time slotting device of pipeline.
Background
The water conservancy project is a project built for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting, is also called water project, water is a valuable resource essential for human production and life, but the naturally existing state of the water conservancy project does not completely meet the requirements of human beings, and when a water conservancy pipeline is arranged, the bottom surface needs to be grooved firstly, and then the pipeline is buried in the groove.
The existing grooving machine is often used for forming two grooves which are horizontal to the ground, then soil between the two grooves is taken out, and inclined grooving cannot be carried out, so that the soil between the two grooves is inconvenient to take out;
when the groover is carrying out the fluting to ground, because there is the hard stone in the outdoor earth, when the water content in soil was lower moreover, the blade wearing and tearing of groover were very fast, and the produced noise of fluting is also great.
In order to solve the problem, the application provides a grooving equipment for water conservancy construction when pipeline is pre-buried.
SUMMERY OF THE UTILITY MODEL
Objects of the invention
For the technical problem who exists among the solution background art, the utility model provides a water conservancy construction is with pipeline slotting device when pre-buried, the characteristics of the adjustable and little and silence of blade wearing and tearing of fluting angle that have.
(II) technical scheme
In order to solve the problems, the utility model provides a slotting device for pre-burying a pipeline for water conservancy construction, which comprises a base, a first supporting arm and a bucket, wherein the first supporting arm and the bucket are arranged on the base;
the bottom surface of the base is fixedly connected with universal wheels, the upper surface of the base is fixedly connected with a spray head support, and the top end of the spray head support is provided with a water spray head;
the upper surface of the base is in cross connection with a first supporting arm and a first hydraulic cylinder, the first supporting arm is hinged to the first hydraulic cylinder, the top end of the first supporting arm is in cross connection with a second supporting arm, a second hydraulic cylinder is installed in the middle of the first supporting arm, the telescopic end of the second hydraulic cylinder is connected with the second supporting arm, the bottom end of the second supporting arm is provided with a motor, and an output shaft of the motor is fixedly connected with a cutting disc;
the water barrel is fixedly connected to the upper surface of the base, a submersible pump is mounted on the bottom surface of the inner wall of the water barrel, the output end of the submersible pump is fixedly connected with a water pipe, and one end, far away from the submersible pump, of the water pipe penetrates through an opening in the upper surface of the water barrel and is connected with the water spray nozzle;
the first hydraulic cylinder, the second hydraulic cylinder, the motor and the submersible pump are all electrically connected with an external power supply.
Preferably, the number of universal wheels is four, and four the universal wheels symmetry sets up four edges of base bottom surface.
Preferably, the water bucket is of a cylindrical barrel-shaped structure, and the top end of the water bucket is provided with an opening.
Preferably, a sliding groove is formed in one side, close to the first supporting arm, of the second supporting arm, a sliding block is connected in the sliding groove in a sliding mode, and the sliding block is fixedly connected with the telescopic end of the second hydraulic cylinder.
Preferably, the cutting disc is of a disc-shaped structure, and the number of the blades on the cutting disc is eight.
Preferably, one side of the base is fixedly connected with a vehicle body connecting lug.
The above technical scheme of the utility model has following profitable technological effect:
by arranging the two hydraulic cylinders, the height of the cutting disc can be controlled by the extension and retraction of the first hydraulic cylinder, so that the cutting depth of the ground can be controlled, the angle between the second supporting arm and the first supporting arm can be controlled by the extension and retraction of the second hydraulic cylinder, so that the cutting angle of the cutting disc can be controlled, the ground can be cut by the cutting disc in an inclined state, and the two mutually symmetrical inclined grooves facilitate people to take out soil between the grooves;
when the ground water content is lower, and the rubble is more, the immersible pump is carried the water that adds in advance in with the cask to water sprayjet, carries out the humidification to the bottom surface that does not cut, has moisture in the earth of ensureing the cutting dish cutting when the base along linear motion to reduce the wearing and tearing volume of cutting dish, the water content is great in the earth simultaneously, and the produced noise of fluting in-process is less more
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic structural view of the position A of the present invention;
reference numerals:
1. a base; 11. a universal wheel; 12. a spray head holder; 13. a water spray nozzle; 14. a vehicle body coupling lug; 2. a first support arm; 21. a first hydraulic cylinder; 22. a second support arm; 23. a second hydraulic cylinder; 24. a chute; 25. a slider; 26. a motor; 27. Cutting the disc; 3. a water bucket; 31. a submersible pump; 32. a water pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
As shown in fig. 1-3, the utility model provides a grooving device for water conservancy construction when a pipeline is pre-buried, which comprises a base 1, a first supporting arm 2 and a bucket 3, wherein the first supporting arm 2 and the bucket 3 are arranged on the base 1;
the bottom surface of the base 1 is fixedly connected with a universal wheel 11, the upper surface of the base 1 is fixedly connected with a spray head support 12, and the top end of the spray head support 12 is provided with a water spray head 13;
the upper surface of the base 1 is in cross connection with a first supporting arm 2 and a first hydraulic cylinder 21, the first supporting arm 2 is hinged to the first hydraulic cylinder 21, the top end of the first supporting arm 2 is in cross connection with a second supporting arm 22, a second hydraulic cylinder 23 is installed in the middle of the first supporting arm 2, the telescopic end of the second hydraulic cylinder 23 is connected with the second supporting arm 22, the bottom end of the second supporting arm 22 is provided with a motor 26, and the output shaft of the motor 26 is fixedly connected with a cutting disc 27;
the water barrel 3 is fixedly connected to the upper surface of the base 1, a submersible pump 31 is mounted on the bottom surface of the inner wall of the water barrel 3, an output end of the submersible pump 31 is fixedly connected with a water pipe 32, and one end, far away from the submersible pump 31, of the water pipe 32 penetrates through an opening in the upper surface of the water barrel 3 and then is connected with the water spray nozzle 13;
the first hydraulic cylinder 21, the second hydraulic cylinder 23, the motor 26 and the submersible pump 31 are all electrically connected with an external power source.
In this embodiment, the first hydraulic cylinder 21 and the second hydraulic cylinder 23 are both QFYG006, and the cutting angle of the cutting disk 27 can be controlled by adjusting the extension and retraction of the first hydraulic cylinder 21 and the second hydraulic cylinder 23;
in this embodiment, the motor 26 is of a type such that the motor 26 can drive the cutting disc 27 to rotate to slot the ground.
In this embodiment, the submersible pump 31 is of a type such that the submersible pump 31 can pressurize the water in the water tub 3 and then deliver the water to the water jet 13 through the water pipe 32.
In the utility model, before using the device, need first pneumatic cylinder 21, second pneumatic cylinder 23, motor 26 and immersible pump 31 switch on external power supply earlier, in the use, motor 26 drives cutting disc 27 and rotates and can slot to ground, and the flexible height that can control cutting disc 27 of first pneumatic cylinder 21, thereby can control the depth of cut to ground, the flexible angle that can control between second support arm 22 and the first support arm 2 of second pneumatic cylinder 23, thereby control cutting disc 27's cutting angle, make cutting disc 27 cut ground in the tilt state, the mutual symmetrical inclined groove of two, make things convenient for people to take out the earth between the groove more;
when ground water content is lower, and the rubble is more, immersible pump 31 carries the water that adds in advance to water sprayhead 13 in with cask 3, humidifies the bottom surface that does not cut, ensures to have moisture in the earth of cutting dish 27 cutting when base 1 along linear motion to reduce the wearing and tearing volume of cutting dish 27, the water content is great in the earth simultaneously, and the produced noise of fluting in-process is less.
Preferably, the number of the universal wheels 11 is four, and the four universal wheels 11 are symmetrically arranged at four corners of the bottom surface of the base 1.
It should be noted that four universal wheels 11 are provided, so that the base 1 can move freely on the ground.
Preferably, the water tub 3 is a cylindrical structure, and the top end of the water tub 3 has an opening.
It should be noted that the water tank 3 serves to store water and can store a large amount of water.
Preferably, a sliding groove 24 is formed in one side of the second support arm 22 close to the first support arm 2, a sliding block 25 is connected in the sliding groove in a sliding manner, and the sliding block 25 is fixedly connected with the telescopic end of the second hydraulic cylinder 23.
It should be noted that, by providing the sliding groove 24 and the sliding block 25 capable of sliding in the sliding groove 24, the second hydraulic cylinder 23 does not deform during the process of extending and retracting, and meanwhile, the second hydraulic cylinder 23 can provide support for the second support arm 22.
Preferably, the cutting disc 27 has a disc-shaped configuration, and the number of blades on the cutting disc 27 is eight.
It should be noted that the plurality of blades on the cutting disc 27 can cut the ground soil.
Preferably, a vehicle body coupling lug 14 is fixedly connected to one side of the base 1.
It should be noted that, by providing the vehicle body engaging lug 14, it is more convenient for the worker to connect the special vehicle with the base 1.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.

Claims (6)

1. A slotting device for pre-burying of a pipeline for water conservancy construction is characterized by comprising a base (1), a first supporting arm (2) and a water barrel (3), wherein the first supporting arm and the water barrel are installed on the base (1);
the bottom surface of the base (1) is fixedly connected with a universal wheel (11), the upper surface of the base (1) is fixedly connected with a spray head support (12), and the top end of the spray head support (12) is provided with a water spray nozzle (13);
the upper surface of the base (1) is connected with a first supporting arm (2) and a first hydraulic cylinder (21) in an intersecting manner, the first supporting arm (2) is hinged to the first hydraulic cylinder (21), the top end of the first supporting arm (2) is connected with a second supporting arm (22) in an intersecting manner, a second hydraulic cylinder (23) is installed in the middle of the first supporting arm (2), the telescopic end of the second hydraulic cylinder (23) is connected with the second supporting arm (22), a motor (26) is installed at the bottom end of the second supporting arm (22), and an output shaft of the motor (26) is fixedly connected with a cutting disc (27);
the water barrel (3) is fixedly connected to the upper surface of the base (1), a submersible pump (31) is installed on the bottom surface of the inner wall of the water barrel (3), the output end of the submersible pump (31) is fixedly connected with a water pipe (32), and one end, far away from the submersible pump (31), of the water pipe (32) penetrates through an opening in the upper surface of the water barrel (3) and then is connected with the water spray nozzle (13);
the first hydraulic cylinder (21), the second hydraulic cylinder (23), the motor (26) and the submersible pump (31) are all electrically connected with an external power supply.
2. The water conservancy construction is with slotting device when pipeline is pre-buried of claim 1, characterized in that, the quantity of universal wheel (11) is four, and four universal wheel (11) symmetry sets up in four edges of base (1) bottom surface.
3. The water conservancy construction is with slotting device when pipeline is pre-buried of claim 1, characterized in that, the cask (3) is cylindrical tubular structure, and the top of cask (3) has the opening.
4. The water conservancy construction is with slotting device when pipeline is pre-buried of claim 1, characterized in that, the second support arm (22) is close to one side of first support arm (2) has seted up spout (24), and sliding connection has slider (25) in the spout, slider (25) with the flexible end fixed connection of second pneumatic cylinder (23).
5. The water conservancy construction is with slotting device when pipeline is pre-buried of claim 1, characterized in that, the cutting disc (27) is disc-shaped structure, and the quantity of blade on the cutting disc (27) is eight.
6. The grooving equipment for water conservancy construction during pipe embedding according to claim 1 or 2, wherein one side of the base (1) is fixedly connected with a vehicle body connecting lug (14).
CN201922501321.0U 2019-12-31 2019-12-31 Grooving equipment for water conservancy construction during pipeline pre-embedding Expired - Fee Related CN211849676U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922501321.0U CN211849676U (en) 2019-12-31 2019-12-31 Grooving equipment for water conservancy construction during pipeline pre-embedding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922501321.0U CN211849676U (en) 2019-12-31 2019-12-31 Grooving equipment for water conservancy construction during pipeline pre-embedding

Publications (1)

Publication Number Publication Date
CN211849676U true CN211849676U (en) 2020-11-03

Family

ID=73209185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922501321.0U Expired - Fee Related CN211849676U (en) 2019-12-31 2019-12-31 Grooving equipment for water conservancy construction during pipeline pre-embedding

Country Status (1)

Country Link
CN (1) CN211849676U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113751785A (en) * 2021-09-17 2021-12-07 烟台杰瑞石油装备技术有限公司 Underwater cutting apparatus and method of cutting underwater pipeline using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113751785A (en) * 2021-09-17 2021-12-07 烟台杰瑞石油装备技术有限公司 Underwater cutting apparatus and method of cutting underwater pipeline using the same
WO2023039986A1 (en) * 2021-09-17 2023-03-23 烟台杰瑞石油装备技术有限公司 Underwater cutting apparatus, and method for cutting underwater pipeline by using underwater cutting apparatus

Similar Documents

Publication Publication Date Title
CN211849676U (en) Grooving equipment for water conservancy construction during pipeline pre-embedding
CN209839331U (en) Hydraulic pipeline supports fixing device for hydraulic engineering
CN207888416U (en) A kind of floor tile polissoir
CN212722112U (en) Combined road drilling and core-drilling machine
CN211909988U (en) A device that waters for afforestation
CN209831159U (en) Plastering device for building wall surface
CN213653734U (en) Multifunctional pipeline dredging vehicle
CN209838296U (en) Civil engineering survey device convenient to wash
CN212468533U (en) All-round atomizing water sprinkler of tunnel dust suppression
CN208438955U (en) A kind of environment-friendly type engraving equipment
CN217139767U (en) Hand propelled for building engineering watering dust suppression equipment
CN216621873U (en) Asphalt concrete way sampling device
CN207531550U (en) A kind of Internet of Things automatic watering device of vertical planting
CN218072816U (en) Water-saving irrigation system for garden engineering
CN217923567U (en) Pile head chiseling device for pile foundation construction
CN209875050U (en) Novel street lamp installation construction tool
CN214597968U (en) Municipal building engineering foundation pit dust device
CN214508022U (en) Assembled hydraulic engineering uses multi-functional irrigation equipment
CN212054487U (en) Drilling equipment device for hydraulic engineering
CN215782370U (en) Construction site administers spray set with raise dust
CN214170452U (en) Orientation device for adjusting and controlling pipeline
CN211256833U (en) Watering device is used in foundation ditch construction
CN212632154U (en) Multifunctional dust removal protection device for civil construction site
CN212877029U (en) Self-propelled lifting spraying equipment for landscape architecture
CN202810158U (en) Wall whitewashing machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 233000 Huaihe Water Conservancy Commission, Ministry of water resources, 3055 Donghai Road, bengshan, Bengbu, Anhui

Patentee after: Yang Lin

Address before: 233000 Huaihe Water Conservancy Commission, Ministry of water resources, 3055 Donghai Road, bengshan, Fuyang, Anhui

Patentee before: Yang Lin

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201103

Termination date: 20211231

CF01 Termination of patent right due to non-payment of annual fee