CN211821308U - Portable arched pier bearing device - Google Patents

Portable arched pier bearing device Download PDF

Info

Publication number
CN211821308U
CN211821308U CN201922428531.1U CN201922428531U CN211821308U CN 211821308 U CN211821308 U CN 211821308U CN 201922428531 U CN201922428531 U CN 201922428531U CN 211821308 U CN211821308 U CN 211821308U
Authority
CN
China
Prior art keywords
steel plate
arched
steel
portable
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922428531.1U
Other languages
Chinese (zh)
Inventor
陈帅
张哲斐
刘旭阳
樊厚子威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences Wuhan
Original Assignee
China University of Geosciences Wuhan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences Wuhan filed Critical China University of Geosciences Wuhan
Priority to CN201922428531.1U priority Critical patent/CN211821308U/en
Application granted granted Critical
Publication of CN211821308U publication Critical patent/CN211821308U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型提供一种便携式拱形墩承载装置,包括由钢结构骨架和混凝土构成的拱形结构、分别固连在钢结构骨架两端的第一钢板、带有PU脚轮的第二钢板、以及三脚支撑架,其中:混凝土均匀浇筑在钢结构骨架以及第一钢板上,并将所述钢结构骨架完全覆盖形成拱形墩身;第一钢板以及第二钢板上均分布有若干个螺栓孔,所述混凝土上在所述第一钢板上的螺栓孔对应的位置开有螺栓洞,所述第一钢板与第二钢板转动连接;所述三脚支撑架用于防止拱形墩抬起过程中发生侧翻。本实用新型的有益效果:不妨碍基坑边道路的正常使用,避免因基坑降水方案的实施造成工期推迟;操作简便,灵活性增加便于运输;采用钢筋和混凝土制作,材料环保、价格低廉。

Figure 201922428531

The utility model provides a portable arched pier bearing device, which comprises an arched structure composed of a steel structure skeleton and concrete, a first steel plate respectively fixed on both ends of the steel structure skeleton, a second steel plate with PU casters, and a tripod. The support frame, wherein: the concrete is evenly poured on the steel structure skeleton and the first steel plate, and the steel structure skeleton is completely covered to form an arched pier body; the first steel plate and the second steel plate are distributed with several bolt holes, so The concrete is provided with bolt holes at the positions corresponding to the bolt holes on the first steel plate, and the first steel plate and the second steel plate are rotatably connected; turn. The beneficial effects of the utility model are as follows: the normal use of the road beside the foundation pit is not hindered, and the delay of the construction period due to the implementation of the foundation pit dewatering scheme is avoided; the operation is simple, the flexibility is increased, and the transportation is convenient;

Figure 201922428531

Description

一种便携式拱形墩承载装置A portable arched pier bearing device

技术领域technical field

本实用新型涉及一种承载装置,尤其涉及一种便携式拱形墩承载装置。The utility model relates to a bearing device, in particular to a portable arched pier bearing device.

背景技术Background technique

针对地下水含量丰富的深基坑工程,往往必须采取基坑降水措施,用来保证开挖作业面的干燥性以及后期施工的安全顺利进行。实际工程中较常见的基坑降水方法为明排法和井管法,明排法是指将地表水通过截排水沟直接排出,而井管法是指在基坑内设置若干抽水井,利用抽水井不断抽水将基坑内地下水位降到不影响正常施工的设计水位,但因为降水是持续性过程,往往时间久抽水量大,排水顺畅与否直接影响施工工期,故需要铺设大量排水管将水排出基坑外。For deep foundation pit projects with rich groundwater content, it is often necessary to take foundation pit dewatering measures to ensure the dryness of the excavation surface and the safe and smooth progress of the later construction. The more common foundation pit dewatering methods in practical engineering are the open-draining method and the well-pipe method. The open-drainage method refers to the direct discharge of surface water through the interception and drainage ditch, while the well-pipe method refers to setting up several pumping wells in the foundation pit and using the pumping wells. The wells pump water continuously to reduce the groundwater level in the foundation pit to the design water level that does not affect the normal construction. However, because precipitation is a continuous process, the amount of water pumped is often large over time, and the smooth drainage directly affects the construction period. out of the foundation pit.

在进行基坑降水时,相互搭接的排水管会铺设在基坑周边运输道路上,且要保证基坑稳定的降水效果往往需长期抽水,而基坑的运输道路会有许多重型机械设备如吊车、挖机等正常通过,长距离的排水管带占据大量地面空间,轻则直接碾压重则只能怠工等待抽水完成后通行。现有的排水管分为刚性和柔性,即钢材料制成钢丝支管和橡胶内衬外裹亚麻编织物的消防水带,两者均需要相互密闭搭接呈串联排列,以防接口处漏水;且两者均不能承受较大荷载,直接碾压将导致排水管带破裂,抽水量过大时到处喷溅,严重影响降水进度。另外,基坑周边运输道路与排水管的布置相互冲突,给现场走车、供应材料增加许多困难。When dewatering the foundation pit, the overlapping drainage pipes will be laid on the transportation road around the foundation pit, and long-term water pumping is often required to ensure the stable dewatering effect of the foundation pit. Cranes, excavators, etc. pass normally. The long-distance drainage pipe belt occupies a lot of ground space. If it is directly rolled and heavy, it can only be slow to pass after the pumping is completed. The existing drainage pipes are divided into rigid and flexible, that is, steel wire branch pipes and fire hoses with rubber lining and flax braided outside, both of which need to be sealed and overlapped with each other in series to prevent water leakage at the interface; And neither of them can bear a large load, and direct rolling will cause the drainage pipe belt to rupture. In addition, the arrangement of transportation roads and drainage pipes around the foundation pit conflicted with each other, which added many difficulties to the on-site transportation and supply of materials.

实用新型内容Utility model content

有鉴于此,本实用新型提供了一种用于跨越刚性、柔性管带或不能承受压力材料的拱形墩承载装置,便于在基坑降水时,不影响基坑边运输道路的正常使用。In view of this, the utility model provides an arched pier bearing device for spanning rigid, flexible pipe belts or materials that cannot withstand pressure, so as to facilitate the normal use of the transportation road beside the foundation pit when the foundation pit is dewatered.

本实用新型提供一种便携式拱形墩承载装置,包括由钢结构骨架(1)和混凝土(2)构成的拱形结构、分别固连在钢结构骨架(1)两端的第一钢板(3)、带有PU脚轮(19)的第二钢板(10)、以及配合拱形墩使用的三脚支撑架,其中:The utility model provides a portable arched pier bearing device, comprising an arched structure composed of a steel structure skeleton (1) and concrete (2), and first steel plates (3) respectively fixed on both ends of the steel structure skeleton (1) , a second steel plate (10) with PU casters (19), and a tripod support for use with arched piers, wherein:

所述钢结构骨架(1)为三角形桁架结构,所述混凝土(2)均匀浇筑在所述钢结构骨架(1)以及所述第一钢板(3)上,并将所述钢结构骨架(1)完全覆盖形成拱形墩身;所述第一钢板(3)以及所述第二钢板(10)上均分布有若干个螺栓孔(4),所述混凝土(2)上在所述第一钢板(3)上的螺栓孔(4)对应的位置开有螺栓洞,所述第一钢板(3)与第二钢板(10)转动连接。The steel structure skeleton (1) is a triangular truss structure, the concrete (2) is evenly poured on the steel structure skeleton (1) and the first steel plate (3), and the steel structure skeleton (1) ) is completely covered to form an arched pier body; several bolt holes (4) are distributed on the first steel plate (3) and the second steel plate (10), and the first steel plate (3) and the second steel plate (10) are distributed on the Bolt holes are provided at positions corresponding to the bolt holes (4) on the steel plate (3), and the first steel plate (3) is rotatably connected with the second steel plate (10).

进一步地,所述第一钢板(3)靠近所述装置内侧的一端设置有销钉孔(21),所述第二钢板(10)的一端设有两个较短的销钉孔与所述销钉孔(21)契合,所述第一钢板(3)通过圆销钉(20)与所述第二钢板(10)活动连接;所述第二钢板(10)绕所述圆销钉(20)转动后,所述第二钢板(10)未带有PU脚轮(19)的一面与所述第一钢板(3)朝下的一面贴合,且所述第二钢板(10)上的螺栓孔(4)与所述第一钢板(3)上的螺栓孔(4)一一对应。Further, one end of the first steel plate (3) close to the inner side of the device is provided with a pin hole (21), and one end of the second steel plate (10) is provided with two shorter pin holes and the pin holes (21) Fitting, the first steel plate (3) is movably connected with the second steel plate (10) through a round pin (20); after the second steel plate (10) is rotated around the round pin (20), The side of the second steel plate (10) without the PU casters (19) is attached to the downward facing side of the first steel plate (3), and the bolt holes (4) on the second steel plate (10) One-to-one correspondence with the bolt holes (4) on the first steel plate (3).

进一步地,所述混凝土(2)的上表面均匀分布有若干尺寸相同的横槽(7),用于增加大型机械设备的车胎与拱形墩的摩擦力。Further, a plurality of transverse grooves (7) of the same size are evenly distributed on the upper surface of the concrete (2), which are used to increase the friction between the tires of the large mechanical equipment and the arched piers.

进一步地,所述混凝土(2)的下表面设有一千斤顶卡槽(5)以及两凹槽(6),所述千斤顶卡槽(5)位于所述混凝土(2)下表面的正中间,两个所述凹槽(6)对称分布在拱形墩内壁的两侧,且位于所述千斤顶卡槽(5)下方。Further, the lower surface of the concrete (2) is provided with a jack slot (5) and two grooves (6), and the jack slot (5) is located in the middle of the lower surface of the concrete (2). The grooves (6) are symmetrically distributed on both sides of the inner wall of the arched pier, and are located below the jack clamping grooves (5).

进一步地,所述三脚支撑架包括收敛环(12)、支撑环(13)、以及三条支撑腿(11),其中:Further, the tripod support frame comprises a converging ring (12), a supporting ring (13), and three supporting legs (11), wherein:

每条所述支撑腿(11)均由两根支撑杆(14)以及被支撑杆(14)贯穿的滑块(15)组成,所述滑块(15)上设有定位螺栓(18),所述定位螺栓(18)用于固定所述滑块(15)和所述滑块(15)上的其中一根支撑杆(14);所述收敛环(12)包括三个弧形连接杆,每一弧形连接杆均连接两个相邻滑块(15);所述支撑环(13)的下表面设有可与所述支撑杆(14)活动连接的连接装置,所述连接装置活动连接到每一支撑杆(14)的上端,所述支撑环(13)的上表面对称设有两个与所述凹槽(6)适配的支撑环凸起(8)。Each of the supporting legs (11) is composed of two supporting rods (14) and a sliding block (15) penetrated by the supporting rods (14). The sliding block (15) is provided with a positioning bolt (18), The positioning bolt (18) is used to fix the slider (15) and one of the support rods (14) on the slider (15); the convergence ring (12) includes three arc-shaped connecting rods , each arc-shaped connecting rod is connected to two adjacent sliders (15); the lower surface of the support ring (13) is provided with a connecting device that can be movably connected to the support rod (14), the connecting device It is movably connected to the upper end of each support rod (14), and the upper surface of the support ring (13) is symmetrically provided with two support ring protrusions (8) adapted to the groove (6).

进一步地,每一所述弧形连接杆均由螺纹连接的第一弧形连接杆(16)以及第二弧形连接杆(17)组成,所述第一弧形连接杆(16)螺纹连接一滑块(15),所述第二弧形连接杆(17)螺纹连接另一相邻滑块(15)。Further, each of the arc-shaped connecting rods is composed of a threaded first arc-shaped connecting rod (16) and a second arc-shaped connecting rod (17), and the first arc-shaped connecting rod (16) is threadedly connected A sliding block (15), and the second arc-shaped connecting rod (17) is threadedly connected to another adjacent sliding block (15).

本实用新型提供的技术方案带来的有益效果是:The beneficial effects brought by the technical scheme provided by the utility model are:

(1)本实用新型提供的便携式拱形墩承载装置设置在排水管上,不妨碍基坑边道路的正常使用,避免因基坑降水方案的实施而影响基坑开挖的工期、造成工期推迟;(1) The portable arched pier bearing device provided by the utility model is arranged on the drain pipe, which does not hinder the normal use of the road beside the foundation pit, and avoids the construction period of the foundation pit excavation being affected by the implementation of the foundation pit dewatering scheme, and the construction period is delayed. ;

(2)本实用新型提供的便携式拱形墩承载装置操作简便,适用于现场施工中各级别工人,且装置设置PU脚轮,灵活性增加便于运输;(2) The portable arched pier bearing device provided by the utility model is easy to operate, suitable for workers of all levels in on-site construction, and the device is provided with PU casters, which increases flexibility and facilitates transportation;

(3)本实用新型提供的便携式拱形墩承载装置采用钢筋和混凝土制作,材料环保、易于购买且价格低廉,也可重复使用;(3) The portable arched pier bearing device provided by the utility model is made of steel bars and concrete, and the materials are environmentally friendly, easy to buy, low in price, and can be reused;

(4)本实用新型提供的便携式拱形墩承载装置具有极高承载力,避免排水管被大型机械车辆碾压而损坏,节约了排水管费用,经济适用性高。(4) The portable arched pier bearing device provided by the present utility model has extremely high bearing capacity, avoids the drain pipe from being crushed and damaged by large mechanical vehicles, saves the cost of the drain pipe, and has high economical applicability.

附图说明Description of drawings

图1是本实用新型实施例提供的便携式拱形墩承载装置的结构示意图;1 is a schematic structural diagram of a portable arched pier bearing device provided by an embodiment of the present invention;

图2是本实用新型实施例提供的第一钢板3与第二钢板10的结构示意图;FIG. 2 is a schematic structural diagram of the first steel plate 3 and the second steel plate 10 provided by the embodiment of the present invention;

图3是本实用新型实施例提供的便携式拱形墩承载装置的部分结构图;3 is a partial structural diagram of a portable arched pier bearing device provided by an embodiment of the present invention;

图4是本实用新型实施例提供的三脚支撑架的结构示意图;4 is a schematic structural diagram of a tripod support frame provided by an embodiment of the present invention;

图5是本实用新型实施例提供的收敛环12的结构示意图;5 is a schematic structural diagram of a convergence ring 12 provided by an embodiment of the present invention;

图6是本实用新型实施例提供的便携式拱形墩承载装置的移动状态图。6 is a moving state diagram of the portable arched pier carrying device provided by the embodiment of the present invention.

附图说明:1-钢结构骨架、2-混凝土、3-第一钢板、4-螺栓孔、5-千斤顶卡槽、6-凹槽、7-横槽、8-支撑环凸起、9-销钉、10-第二钢板、11-支撑腿、12-收敛环、13-支撑环、14-支撑杆、15-滑块、16-第一弧形连接杆、17-第二弧形连接杆、18-定位螺栓、19-PU脚轮、20-圆销钉、21-销钉孔、22-螺栓、23-水管、24-地面。Description of drawings: 1-steel structure skeleton, 2-concrete, 3-first steel plate, 4-bolt hole, 5-jack slot, 6-groove, 7-transverse groove, 8-support ring protrusion, 9- Pin, 10-second steel plate, 11-support leg, 12-convergence ring, 13-support ring, 14-support rod, 15-slide block, 16-first arc connecting rod, 17-second arc connecting rod , 18-Locating bolts, 19-PU casters, 20-round pins, 21-pin holes, 22-bolts, 23-water pipes, 24-ground.

具体实施方式Detailed ways

为使本实用新型的目的、技术方案和优点更加清楚,下面将结合附图对本实用新型实施方式作进一步地描述。In order to make the objectives, technical solutions and advantages of the present utility model clearer, the embodiments of the present utility model will be further described below with reference to the accompanying drawings.

请参考图1和图4,本实用新型的实施例提供了一种便携式拱形墩承载装置,包括由钢结构骨架1和混凝土2构成的拱形结构、分别固连在钢结构骨架1两端的第一钢板3、带有PU脚轮19的第二钢板10、以及三脚支撑架,其中,钢结构骨架1为三角形桁架结构,混凝土2均匀浇筑在钢结构骨架1以及第一钢板3上,并将所述钢结构骨架1完全覆盖形成拱形墩身,所述混凝土2采用建筑施工中常用的浇筑混凝土;第一钢板3上分布有四个螺栓孔4,混凝土2上与所述螺栓孔4对应的位置开有螺栓洞,第二钢板10通过圆销钉20连接所述第一钢板3;所述三脚支撑架作为辅助工具,用于防止拱形墩在抬起过程中发生侧翻。Please refer to FIG. 1 and FIG. 4 , an embodiment of the present invention provides a portable arched pier bearing device, including an arched structure composed of a steel structure skeleton 1 and a concrete 2 , a The first steel plate 3, the second steel plate 10 with PU casters 19, and the tripod support frame, wherein the steel structure skeleton 1 is a triangular truss structure, the concrete 2 is evenly poured on the steel structure skeleton 1 and the first steel plate 3, and the The steel structure skeleton 1 is completely covered to form an arched pier body, and the concrete 2 adopts the pouring concrete commonly used in construction; the first steel plate 3 is distributed with four bolt holes 4, and the concrete 2 corresponds to the bolt holes 4 There are bolt holes in the position of the pier, and the second steel plate 10 is connected to the first steel plate 3 through the round dowel 20; the tripod support is used as an auxiliary tool to prevent the arched pier from rolling over during the lifting process.

具体地,请参考图2,所述第一钢板3靠近拱形墩内侧的一端设置有一个销钉孔21,第二钢板10的一端同样设有两个较短的销钉孔与所述销钉孔21契合,第一钢板3通过圆销钉20与第二钢板10活动连接;所述第二钢板10的其中一面带有两对并排PU脚轮19,第二钢板10的另一面绕圆销钉20转动后可与第一钢板3朝下的一面贴合;所述第二钢板10上设有四个螺栓孔4,所述螺栓孔4与第一钢板3上设有的螺栓孔的孔径相同,且在转动第二钢板10后,两个钢板上的螺栓孔4一一对应。Specifically, please refer to FIG. 2 , one end of the first steel plate 3 close to the inner side of the arched pier is provided with a pin hole 21 , and one end of the second steel plate 10 is also provided with two shorter pin holes and the pin holes 21 Fittingly, the first steel plate 3 is movably connected with the second steel plate 10 through the round pin 20; one side of the second steel plate 10 has two pairs of side-by-side PU casters 19, and the other side of the second steel plate 10 can be rotated around the round pin 20. Fitted with the downward side of the first steel plate 3; the second steel plate 10 is provided with four bolt holes 4, and the bolt holes 4 have the same diameter as the bolt holes provided on the first steel plate 3, and are rotated After the second steel plate 10, the bolt holes 4 on the two steel plates are in one-to-one correspondence.

请参考图1和图3,混凝土2的上表面均匀分布有若干尺寸相同的横槽7,所述横槽7用于增加大型机械设备的车胎与所述承载装置的摩擦力;混凝土2的下表面设有一千斤顶卡槽5以及两凹槽6,千斤顶卡槽5位于混凝土2下表面的正中间,以便于千斤顶抬起所述拱形墩,所述千斤顶卡槽5为圆形孔洞,孔洞大小与市面上常见的千斤顶适配;两个凹槽6对称分布在拱形墩身的两侧,且位于千斤顶卡槽5下方,所述凹槽6与三脚支撑架配合使用,用于避免在千斤顶抬起拱形墩的过程中,由于受力不均造成拱形墩发生倾斜、侧翻。Please refer to FIGS. 1 and 3 , a plurality of transverse grooves 7 of the same size are evenly distributed on the upper surface of the concrete 2 . The surface is provided with a jack slot 5 and two grooves 6, the jack slot 5 is located in the middle of the lower surface of the concrete 2, so that the jack can lift the arched pier, the jack slot 5 is a circular hole, the size of the hole Compatible with common jacks on the market; two grooves 6 are symmetrically distributed on both sides of the arched pier body, and are located below the jack slot 5. The grooves 6 are used in conjunction with the tripod support frame to avoid the jack In the process of lifting the arched pier, the arched pier is inclined and rolled over due to the uneven force.

请参考图4和图5,所述三脚支撑架包括收敛环12、支撑环13、以及三条支撑腿11,其中,每条支撑腿11均由两根支撑杆14以及被两根支撑杆14贯穿的滑块15组成,滑块15上设有定位螺栓18,所述滑块15可沿两支撑杆14滑动,所述定位螺栓18用于固定滑块15和其中一根支撑杆14;收敛环12包括三个弧形连接杆,每一弧形连接杆均由螺纹连接的第一弧形连接杆16以及第二弧形连接杆17组成,所述第一弧形连接杆16螺纹连接一滑块15,第二弧形连接杆17螺纹连接另一相邻滑块15;支撑环13的下表面设有可与所述支撑杆14活动连接的连接装置,所述连接装置活动连接到每一个支撑杆14的上端,所述支撑环13的上表面对称设有两个与拱形墩上的凹槽6适配的支撑环凸起8。当拱形墩使用完需移动时,调节所述三脚支撑架的高度并利用千斤顶顶起所述拱形墩,所述三脚支撑架的调节过程为:拧松定位螺栓18,将支撑环凸起8放置在凹槽6中,滑动滑块15调整至适宜高度,再拧紧定位螺栓18。Please refer to FIG. 4 and FIG. 5 , the tripod support frame includes a converging ring 12 , a support ring 13 , and three support legs 11 , wherein each support leg 11 is composed of two support rods 14 and penetrated by the two support rods 14 The sliding block 15 is composed of the sliding block 15, the sliding block 15 is provided with a positioning bolt 18, the sliding block 15 can slide along the two supporting rods 14, and the positioning bolt 18 is used to fix the sliding block 15 and one of the supporting rods 14; the convergence ring 12 includes three arc-shaped connecting rods, each arc-shaped connecting rod is composed of a threaded first arc-shaped connecting rod 16 and a second arc-shaped connecting rod 17, the first arc-shaped connecting rod 16 is threadedly connected with a sliding Block 15, the second arc-shaped connecting rod 17 is threadedly connected to another adjacent slider 15; the lower surface of the support ring 13 is provided with a connecting device that can be movably connected to the support rod 14, and the connecting device is movably connected to each The upper end of the support rod 14 and the upper surface of the support ring 13 are symmetrically provided with two support ring protrusions 8 which are matched with the grooves 6 on the arched pier. When the arched pier is used up and needs to be moved, adjust the height of the tripod support frame and use a jack to lift the arched pier. The adjustment process of the tripod support frame is: loosen the positioning bolt 18 and raise the support ring 8 is placed in the groove 6, the sliding block 15 is adjusted to a suitable height, and then the positioning bolt 18 is tightened.

本装置的使用过程为:进行基坑降水时,若有大型机械车辆需从基坑周边运输道路上通行,先在道路上进行测距确定拱形墩放置的位置,其中,两个拱形墩之间的距离依据大型机械轮胎间距确定;请参考图1,在确定位置的地面24上利用钻机钻出螺栓洞,通过螺栓22以及第二钢板10上的螺栓孔4将拱形墩与地面24闭锁固定;将排水管23布置在拱形墩内,大型机械车辆行驶至排水管23处时沿着拱形墩通过,既有效避免了排水管被碾压损坏,也保证了机械设备正常运行。The use process of the device is as follows: when dewatering the foundation pit, if there are large mechanical vehicles that need to pass on the transportation road around the foundation pit, first perform distance measurement on the road to determine the location of the arched piers. Among them, the two arched piers The distance between them is determined according to the distance between the large mechanical tires; please refer to FIG. 1 , use a drilling rig to drill bolt holes on the ground 24 at the determined position, and connect the arched pier to the ground 24 through the bolts 22 and the bolt holes 4 on the second steel plate 10 Locking and fixing; the drain pipe 23 is arranged in the arched pier, and the large mechanical vehicle passes along the arched pier when driving to the drain pipe 23, which not only effectively prevents the drain pipe from being crushed and damaged, but also ensures the normal operation of the mechanical equipment.

当基坑降水完成后,抽水井关泵停止抽水,排水管23不再饱满充水,先撤去排水管23并卸掉第二钢板10与地面24连接的螺栓22;然后将千斤顶放入所述千斤顶卡槽5内,并在下方凹槽6内安置好三脚支撑架,利用千斤顶托起拱形墩;随着拱形墩高度的提升,通过与收敛环12连接的滑块15来调节所述三脚支撑架的高度,防止拱形墩在被托起时出现侧翻现象;请参考图6,将拱形墩升至适宜高度后,转动第二钢板10使其与第一钢板3贴合,利用螺栓22固定第一钢板3与第二钢板10,降下拱形墩推出道路外。When the foundation pit dewatering is completed, the pumping well is turned off to stop pumping, and the drain pipe 23 is no longer full of water. First remove the drain pipe 23 and remove the bolt 22 connecting the second steel plate 10 to the ground 24; then put the jack into the A tripod support frame is installed in the jack slot 5, and the tripod support frame is placed in the lower groove 6, and the arched pier is held up by the jack; The height of the tripod support frame prevents the arched pier from turning over when it is lifted; please refer to Figure 6, after raising the arched pier to a suitable height, turn the second steel plate 10 to fit the first steel plate 3, The first steel plate 3 and the second steel plate 10 are fixed by bolts 22, and the arched pier is lowered to push out of the road.

在本文中,所涉及的前、后、上、下等方位词是以附图中零部件位于图中以及零部件相互之间的位置来定义的,只是为了表达技术方案的清楚及方便。应当理解,所述方位词的使用不应限制本申请请求保护的范围。In this document, the related terms such as front, rear, upper and lower are defined by the positions of the components in the drawings and the positions between the components, which are only for the clarity and convenience of expressing the technical solution. It should be understood that the use of the locative words should not limit the scope of protection claimed in this application.

在不冲突的情况下,本文中上述实施例及实施例中的特征可以相互结合。The above-described embodiments and features of the embodiments herein may be combined with each other without conflict.

以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the present invention. within the scope of protection of the utility model.

Claims (7)

1. The utility model provides a portable arch mound bears device, its characterized in that includes by steel skeleton (1) and concrete (2) constitute the arch structure, link firmly first steel sheet (3) at steel skeleton (1) both ends respectively, have second steel sheet (10) of PU truckle (19) and the tripod support frame that cooperation arch mound used, wherein:
the steel structure framework (1) is of a triangular truss structure, the concrete (2) is uniformly poured on the steel structure framework (1) and the first steel plate (3), and the steel structure framework (1) is completely covered to form an arched pier body; first steel sheet (3) and it has a plurality of bolt hole (4) to equally divide on second steel sheet (10), concrete (2) are gone up bolt hole has been opened to the position that bolt hole (4) on first steel sheet (3) correspond, first steel sheet (3) rotate with second steel sheet (10) and are connected.
2. The portable arched pier carrying device according to claim 1, characterized in that the first steel plate (3) is provided with two pin holes (21) at one end near the inside of the device, the second steel plate (10) is provided with two shorter pin holes at one end to fit the pin holes (21), and the first steel plate (3) is movably connected with the second steel plate (10) through round pins (20); second steel sheet (10) wind round pin (20) rotate the back, second steel sheet (10) do not have the one side of PU truckle (19) with first steel sheet (3) one side laminating down.
3. The portable arched pier carrying device according to claim 2, characterized in that after the second steel plate (10) is rotated around the round pin (20), the bolt holes (4) on the second steel plate (10) correspond one-to-one with the bolt holes (4) on the first steel plate (3).
4. Portable arched pier load-carrying device according to claim 1, characterized in that the upper surface of the concrete (2) is evenly distributed with several transverse grooves (7) of the same size.
5. The portable arched pier bearing device according to claim 1, wherein the lower surface of the concrete (2) is provided with a jack clamping groove (5) and two grooves (6), the jack clamping groove (5) is located in the middle of the lower surface of the concrete (2), and the two grooves (6) are symmetrically distributed on two sides of the inner wall of the arched pier and located below the jack clamping groove (5).
6. The portable arched pier carrier according to claim 5, wherein the tripod comprises a convergent ring (12), a support ring (13), and three support legs (11), wherein:
each supporting leg (11) consists of two supporting rods (14) and a sliding block (15) penetrated by the supporting rods (14), a positioning bolt (18) is arranged on the sliding block (15), and the positioning bolt (18) is used for fixing the sliding block (15) and one of the supporting rods (14) on the sliding block (15); the convergence ring (12) comprises three arc-shaped connecting rods, and each arc-shaped connecting rod is connected with two adjacent sliding blocks (15); the lower surface of support ring (13) be equipped with can with bracing piece (14) swing joint's connecting device, connecting device swing joint is to the upper end of each bracing piece (14), the upper surface symmetry of support ring (13) be equipped with two with support ring arch (8) of recess (6) adaptation.
7. A portable arched pier carrying apparatus according to claim 6, characterized in that each of the arched connecting rods consists of a first arched connecting rod (16) and a second arched connecting rod (17) which are screwed together, the first arched connecting rod (16) being screwed to one slide (15) and the second arched connecting rod (17) being screwed to another adjacent slide (15).
CN201922428531.1U 2019-12-27 2019-12-27 Portable arched pier bearing device Expired - Fee Related CN211821308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922428531.1U CN211821308U (en) 2019-12-27 2019-12-27 Portable arched pier bearing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922428531.1U CN211821308U (en) 2019-12-27 2019-12-27 Portable arched pier bearing device

Publications (1)

Publication Number Publication Date
CN211821308U true CN211821308U (en) 2020-10-30

Family

ID=73036514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922428531.1U Expired - Fee Related CN211821308U (en) 2019-12-27 2019-12-27 Portable arched pier bearing device

Country Status (1)

Country Link
CN (1) CN211821308U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111089221A (en) * 2019-12-27 2020-05-01 中国地质大学(武汉) Portable arched pier bearing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111089221A (en) * 2019-12-27 2020-05-01 中国地质大学(武汉) Portable arched pier bearing device
CN111089221B (en) * 2019-12-27 2024-10-22 中国地质大学(武汉) A portable arch pier bearing device

Similar Documents

Publication Publication Date Title
CN203296780U (en) Supporting and protecting lining device used for preventing surrounding rock from large deformation in underground cavern construction
CN207685833U (en) A kind of quick inner support bracing means
CN110311343A (en) A prefabricated steel cylinder concrete circular power pipe gallery with pipe seat
CN211816278U (en) Removable supporting is used in building engineering construction
CN112431998A (en) Pipeline dislocation repairing method
CN211821308U (en) Portable arched pier bearing device
CN220078335U (en) Fixing device of water conservancy water and electricity buried pipe
CN206635599U (en) A kind of road surface for caving in road, which is speedily carried out rescue work, fixes device
CN216973156U (en) A high-level drop beam structure based on a treadmill
CN112431997A (en) Pipeline dislocation prosthetic devices
CN216692413U (en) Jacking method construction method jacking pipe convenient to assemble
CN108342984A (en) A kind of beach soft foundation trestle and its installation sedimentation method
CN219840086U (en) A kind of high-strength pipe pile foundation pit support
CN210684727U (en) Construction safety supporting construction
CN111089221B (en) A portable arch pier bearing device
CN220284876U (en) Large-diameter pipeline crossing subway station foundation pit and box culvert suspension structure
CN204738299U (en) Device for quickly forming slag collecting platform on high and steep slope
CN211171994U (en) Occlusive pile and diaphragm wall combined foundation pit supporting structure
CN218508448U (en) A center island formula side slope supporting construction for protecting close subway station
CN210315607U (en) Concrete cofferdam construction template
CN117366338A (en) Water conservancy pipeline lays auxiliary device
CN116043893A (en) Anti-burst sinking device for open caisson
CN203213121U (en) Steel support structure
CN207862714U (en) A kind of structural adjustment system of the reply backfilled roadbed supported sedimentation of super thick
CN202519690U (en) Device is transferred to no end double-walled steel boxed cofferdam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

Termination date: 20211227

CF01 Termination of patent right due to non-payment of annual fee