CN211819411U - A subway tunnel reinforcement structure - Google Patents

A subway tunnel reinforcement structure Download PDF

Info

Publication number
CN211819411U
CN211819411U CN202020420141.XU CN202020420141U CN211819411U CN 211819411 U CN211819411 U CN 211819411U CN 202020420141 U CN202020420141 U CN 202020420141U CN 211819411 U CN211819411 U CN 211819411U
Authority
CN
China
Prior art keywords
plate
fixedly connected
reinforcement structure
casing
subway tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020420141.XU
Other languages
Chinese (zh)
Inventor
杨锦安
刘闯
刘峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020420141.XU priority Critical patent/CN211819411U/en
Application granted granted Critical
Publication of CN211819411U publication Critical patent/CN211819411U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型公开了一种地铁隧道加固结构,属于隧道工程技术领域,其包括壳体,所述壳体内设置有两个滑板,所述滑板设置在凹槽内,所述凹槽开设在支撑板的上表面,所述滑板的左侧面开设有卡槽,所述卡槽内设置有固定装置,所述固定装置卡接在支撑板的左侧面,所述支撑板的上表面固定连接有连接板,所述连接板分别搭接在壳体的下表面和滑板的右侧面,所述连接板的右侧面和壳体的上表面均固定连接有若干个伸缩装置。该地铁隧道加固结构,通过固定栓、壳体、滑板、滑块、螺杆和螺母之间的相互配合,从而使得本装置结构较为简单,且操作过程比较简捷和方便,降低了工作人员的工作量,从而给工作人员的工作带来了方便。

Figure 202020420141

The utility model discloses a subway tunnel reinforcement structure, which belongs to the technical field of tunnel engineering. The upper surface of the slide plate is provided with a card slot on the left side, and a fixing device is arranged in the card slot. The fixing device is clipped on the left side of the support plate, and the upper surface of the support plate is fixedly connected with The connecting plate is respectively overlapped on the lower surface of the casing and the right side of the slide plate, and several telescopic devices are fixedly connected to the right side of the connecting plate and the upper surface of the casing. In the subway tunnel reinforcement structure, through the mutual cooperation between the fixing bolt, the shell, the slide plate, the slider, the screw rod and the nut, the structure of the device is relatively simple, and the operation process is relatively simple and convenient, which reduces the workload of the staff. , thus bringing convenience to the work of the staff.

Figure 202020420141

Description

一种地铁隧道加固结构A subway tunnel reinforcement structure

技术领域technical field

本实用新型属于隧道工程技术领域,具体为一种地铁隧道加固结构。The utility model belongs to the technical field of tunnel engineering, in particular to a subway tunnel reinforcement structure.

背景技术Background technique

在隧道施工的过程中,通常会通过混泥土浇筑结构进行铺设,而其在长时间使用容易发生腐蚀风化,会有许多的水泥渣掉落,在市政隧道内部施工过程中或使用过程中,影响市政隧道的建设或使用,如申请号为CN201920255592.X的中国实用新型公开了一种市政隧道加固结构,其解决了上述所提出的问题,但是其在组装的过程中较为麻烦,且繁琐,增加了工作人员的工作量,从而不方便工作人员的工作。In the process of tunnel construction, it is usually laid by concrete pouring structure, and it is prone to corrosion and weathering during long-term use, and a lot of cement slag will fall. The construction or use of municipal tunnels, such as the Chinese utility model with the application number CN201920255592.X, discloses a municipal tunnel reinforcement structure, which solves the above-mentioned problems, but it is more troublesome in the assembly process, and cumbersome, increasing It increases the workload of the staff and makes it inconvenient for the staff to work.

实用新型内容Utility model content

(一)解决的技术问题(1) Technical problems solved

为了克服现有技术的上述缺陷,本实用新型提供了一种地铁隧道加固结构,解决了上述申请在组装的过程中较为麻烦,且繁琐,增加了工作人员的工作量,从而不方便工作人员的工作的问题。In order to overcome the above-mentioned defects of the prior art, the utility model provides a subway tunnel reinforcement structure, which solves the problem that the above-mentioned application is troublesome and cumbersome in the assembly process, increases the workload of the staff, and is inconvenient for the staff to assemble. work problem.

(二)技术方案(2) Technical solutions

为实现上述目的,本实用新型提供如下技术方案:一种地铁隧道加固结构,包括壳体,所述壳体内设置有两个滑板,所述滑板设置在凹槽内,所述凹槽开设在支撑板的上表面,所述滑板的左侧面开设有卡槽,所述卡槽内设置有固定装置,所述固定装置卡接在支撑板的左侧面。In order to achieve the above purpose, the present utility model provides the following technical solutions: a subway tunnel reinforcement structure, comprising a casing, two sliding plates are arranged in the casing, the sliding plates are arranged in a groove, and the groove is opened in a support. On the upper surface of the board, the left side of the slide plate is provided with a clamping slot, and a fixing device is arranged in the clamping slot, and the fixing device is clamped on the left side of the support plate.

所述支撑板的上表面固定连接有连接板,所述连接板分别搭接在壳体的下表面和滑板的右侧面,所述连接板的右侧面和壳体的上表面均固定连接有若干个伸缩装置,若干个所述伸缩装置远离壳体和连接板的一端固定连接有三个固定板。The upper surface of the support plate is fixedly connected with a connecting plate, the connecting plate overlaps the lower surface of the casing and the right side of the slide plate respectively, and the right side of the connecting plate and the upper surface of the casing are both fixedly connected There are several telescopic devices, and three fixing plates are fixedly connected to one end of the several telescopic devices away from the casing and the connecting plate.

作为本实用新型的进一步方案:所述固定装置包括螺母,所述螺母卡接在支撑板的左侧面,所述螺母内螺纹连接有螺杆,所述螺杆设置在卡槽内。As a further solution of the present invention, the fixing device includes a nut, the nut is clamped on the left side of the support plate, the nut is internally threaded with a screw rod, and the screw rod is arranged in the clamping groove.

作为本实用新型的进一步方案:所述支撑板的下表面固定连接有安装板,所述安装板的上表面开设有安装孔,所述安装孔内设置有固定栓。As a further solution of the present invention, an installation plate is fixedly connected to the lower surface of the support plate, an installation hole is opened on the upper surface of the installation plate, and a fixing bolt is arranged in the installation hole.

作为本实用新型的进一步方案:所述伸缩装置包括伸缩杆,所述伸缩杆的外表面套接有弹簧,所述弹簧和伸缩杆的两端分别与滑板的右侧面和固定板的左侧面固定连接。As a further solution of the present invention: the telescopic device includes a telescopic rod, the outer surface of the telescopic rod is sleeved with a spring, and the two ends of the spring and the telescopic rod are respectively connected with the right side of the slide plate and the left side of the fixed plate surface fixed connection.

作为本实用新型的进一步方案:所述壳体内壁的下表面开设有滑槽,所述滑槽内滑动连接有两个滑块,所述滑块固定连接在滑板的左侧面。As a further solution of the present invention, the lower surface of the inner wall of the casing is provided with a chute, and two sliders are slidably connected in the chute, and the sliders are fixedly connected to the left side of the slider.

(三)有益效果(3) Beneficial effects

与现有技术相比,本实用新型的有益效果在于:Compared with the prior art, the beneficial effects of the present utility model are:

1、该地铁隧道加固结构,通过固定栓、壳体、滑板、滑块、螺杆和螺母之间的相互配合,通过固定栓将安装板进行安装,然后将滑板从壳体内抽出,并置入凹槽内,再将螺杆旋入卡槽对滑板进行固定,从而使得本装置结构较为简单,且操作过程比较简捷和方便,降低了工作人员的工作量,从而给工作人员的工作带来了方便。1. The reinforcement structure of the subway tunnel, through the mutual cooperation between the fixing bolt, the shell, the slide plate, the slider, the screw and the nut, the mounting plate is installed through the fixing bolt, and then the sliding plate is pulled out from the casing and placed in the concave. The screw is screwed into the slot to fix the slide plate, so that the structure of the device is relatively simple, and the operation process is relatively simple and convenient, which reduces the workload of the staff and brings convenience to the work of the staff.

2、该地铁隧道加固结构,通过设置滑块和滑槽,且滑块可以在滑槽内滑动的更加平稳,从而可以保证滑板滑动的平稳性,且滑板滑出至最长长度时,使其可以通过滑块进行限位,避免其脱离壳体,方便了使用的工作。2. The reinforced structure of the subway tunnel, by setting the slider and the chute, and the slider can slide more smoothly in the chute, so as to ensure the smoothness of the sliding of the sliding plate, and when the sliding plate slides out to the longest length, it can be The slider can be used to limit the position to prevent it from being separated from the casing, which is convenient for use.

3、该地铁隧道加固结构,通过设置弹簧和固定板,当本装置受到力时,使得弹簧可以通过固定板进行弹性复位,从而可以达到缓冲的目的,进一步提高本装置的使用寿命。3. The subway tunnel reinforcement structure is provided with a spring and a fixed plate, when the device is subjected to force, the spring can be elastically reset through the fixed plate, so as to achieve the purpose of buffering and further improve the service life of the device.

附图说明Description of drawings

图1为本实用新型正视的剖面结构示意图;Fig. 1 is the sectional structure schematic diagram of the front view of the utility model;

图2为本实用新型A处放大的结构示意图;Fig. 2 is the enlarged structural representation at the utility model A;

图3为本实用新型B处放大的结构示意图;Fig. 3 is the enlarged structural representation of the utility model B;

图中:1壳体、2滑板、3凹槽、4支撑板、5卡槽、6固定装置、61螺母、62螺杆、7连接板、8伸缩装置、81伸缩杆、82弹簧、9固定板、10、11安装孔、12固定栓、13滑槽、14滑块。In the picture: 1 shell, 2 slide plate, 3 groove, 4 support plate, 5 card slot, 6 fixing device, 61 nut, 62 screw rod, 7 connecting plate, 8 telescopic device, 81 telescopic rod, 82 spring, 9 fixing plate , 10, 11 mounting holes, 12 fixing bolts, 13 sliding grooves, 14 sliding blocks.

具体实施方式Detailed ways

下面结合具体实施方式对本专利的技术方案作进一步详细地说明。The technical solution of the present patent will be described in further detail below in conjunction with specific embodiments.

如图1-3所示,本实用新型提供一种技术方案:一种地铁隧道加固结构,包括壳体1,壳体1内壁的下表面开设有滑槽13,滑槽13内滑动连接有两个滑块14,滑块14固定连接在滑板2的左侧面,通过设置滑块14和滑槽13,且滑块14可以在滑槽13内滑动的更加平稳,从而可以保证滑板2滑动的平稳性,且滑板2滑出至最长长度时,使其可以通过滑块14进行限位,避免其脱离壳体1,方便了使用的工作,壳体1内设置有两个滑板2,滑板2设置在凹槽3内,凹槽3开设在支撑板4的上表面,支撑板4的下表面固定连接有安装板10,安装板10的上表面开设有安装孔11,通过设置安装孔11和安装板10,从而便于固定栓12固定的工作,安装孔11内设置有固定栓12,通过设置固定栓12,且固定栓12可以插入地基内对安装板10的位置进行固定,从而可以保证本装置固定的牢固性,滑板2的左侧面开设有卡槽5,卡槽5内设置有固定装置6,固定装置6包括螺母61,螺母61卡接在支撑板4的左侧面,螺母61内螺纹连接有螺杆62,通过设置螺杆62,且通过将螺杆62旋入卡槽5内,从而可以对滑板2的位置进行固定,保证稳固性,螺杆62设置在卡槽5内,通过设置卡槽5,从而便于为螺杆62提供固定点,固定装置6卡接在支撑板4的左侧面。As shown in Figures 1-3, the present utility model provides a technical solution: a subway tunnel reinforcement structure, comprising a casing 1, a chute 13 is opened on the lower surface of the inner wall of the casing 1, and two sliding grooves are slidably connected in the chute 13. The slider 14 is fixedly connected to the left side of the slider 2. By arranging the slider 14 and the chute 13, the slider 14 can slide more smoothly in the chute 13, thereby ensuring the sliding of the slider 2. Stability, and when the sliding plate 2 slides out to the longest length, it can be limited by the slider 14 to prevent it from being separated from the shell 1, which is convenient for use. There are two sliding plates 2 in the shell 1. 2 is arranged in the groove 3, the groove 3 is opened on the upper surface of the support plate 4, the lower surface of the support plate 4 is fixedly connected with the mounting plate 10, and the upper surface of the mounting plate 10 is provided with a mounting hole 11, by setting the mounting hole 11 and the mounting plate 10, so as to facilitate the work of fixing the fixing bolts 12. The fixing bolts 12 are arranged in the mounting holes 11. By setting the fixing bolts 12, and the fixing bolts 12 can be inserted into the foundation, the position of the mounting plate 10 can be fixed, thereby ensuring that the position of the mounting plate 10 is fixed. The firmness of the device is fixed. The left side of the slide plate 2 is provided with a card slot 5, and the card slot 5 is provided with a fixing device 6. The fixing device 6 includes a nut 61. The nut 61 is clamped on the left side of the support plate 4. The nut The screw 62 is connected with the internal thread of 61. By setting the screw 62 and screwing the screw 62 into the slot 5, the position of the slide plate 2 can be fixed to ensure the stability. The screw 62 is arranged in the slot 5. The clamping slot 5 is convenient to provide a fixing point for the screw rod 62 , and the fixing device 6 is clamped on the left side of the support plate 4 .

支撑板4的上表面固定连接有连接板7,连接板7分别搭接在壳体1的下表面和滑板2的右侧面,通过设置连接板7,从而便于为伸缩装置8提供支撑点,连接板7的右侧面和壳体1的上表面均固定连接有若干个伸缩装置8,伸缩装置8包括伸缩杆81,通过设置伸缩杆81,从而可以保证弹簧82伸缩的稳定性,伸缩杆81的外表面套接有弹簧82,通过设置弹簧82和固定板9,当本装置受到力时,使得弹簧82可以通过固定板9进行弹性复位,从而可以达到缓冲的目的,进一步提高本装置的使用寿命,弹簧82和伸缩杆81的两端分别与滑板2的右侧面和固定板9的左侧面固定连接,若干个伸缩装置8远离壳体1和连接板7的一端固定连接有三个固定板9。The upper surface of the support plate 4 is fixedly connected with a connecting plate 7, and the connecting plate 7 is overlapped on the lower surface of the housing 1 and the right side of the slide plate 2 respectively. By setting the connecting plate 7, it is convenient to provide a support point for the telescopic device 8, Several telescopic devices 8 are fixedly connected to the right side of the connecting plate 7 and the upper surface of the housing 1. The telescopic device 8 includes a telescopic rod 81. By setting the telescopic rod 81, the stability of the spring 82 can be ensured. The outer surface of 81 is sleeved with a spring 82. By setting the spring 82 and the fixing plate 9, when the device is subjected to force, the spring 82 can be elastically reset through the fixing plate 9, so as to achieve the purpose of buffering and further improve the performance of the device. Service life, the two ends of the spring 82 and the telescopic rod 81 are fixedly connected to the right side of the slide plate 2 and the left side of the fixed plate 9 respectively, and one end of the several telescopic devices 8 away from the shell 1 and the connecting plate 7 is fixedly connected with three Fixed plate 9.

本实用新型的工作原理为:The working principle of the utility model is:

S1、当需要使用时,工作人员通过将固定栓12固定在地基中,使得安装板10的位置固定;S1. When it needs to be used, the worker fixes the position of the mounting plate 10 by fixing the fixing bolt 12 in the foundation;

S2、然后再将滑板2从壳体1内抽出,达到最大长度,此时再将滑板2对准凹槽3并置入其内部;S2, then pull out the slide plate 2 from the housing 1 to reach the maximum length, and then align the slide plate 2 with the groove 3 and put it into its interior;

S3、然后工作人员再将螺杆62旋入卡槽5内,使其对滑板2的位置进行牢固固定。S3, the staff then screw the screw 62 into the slot 5 to firmly fix the position of the slide plate 2 .

在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should be noted that, unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection or a connectable connection. Detachable connection, or integral connection; may be mechanical connection or electrical connection; may be direct connection, or indirect connection through an intermediate medium, or internal communication between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood through specific situations.

上面对本专利的较佳实施方式作了详细说明,但是本专利并不限于上述实施方式,在本领域的普通技术人员所具备的知识范围内,还可以在不脱离本专利宗旨的前提下作出各种变化。The preferred embodiments of the present patent have been described in detail above, but the present patent is not limited to the above-mentioned embodiments. Within the scope of knowledge possessed by those of ordinary skill in the art, various modifications can be made without departing from the purpose of the present patent. kind of change.

Claims (5)

1.一种地铁隧道加固结构,包括壳体(1),其特征在于:所述壳体(1)内设置有两个滑板(2),所述滑板(2)设置在凹槽(3)内,所述凹槽(3)开设在支撑板(4)的上表面,所述滑板(2)的左侧面开设有卡槽(5),所述卡槽(5)内设置有固定装置(6),所述固定装置(6)卡接在支撑板(4)的左侧面;1. A subway tunnel reinforcement structure, comprising a casing (1), characterized in that: the casing (1) is provided with two sliding plates (2), and the sliding plates (2) are arranged in a groove (3) Inside, the groove (3) is opened on the upper surface of the support plate (4), the left side of the slide plate (2) is provided with a card slot (5), and a fixing device is arranged in the card slot (5) (6), the fixing device (6) is clamped on the left side of the support plate (4); 所述支撑板(4)的上表面固定连接有连接板(7),所述连接板(7)分别搭接在壳体(1)的下表面和滑板(2)的右侧面,所述连接板(7)的右侧面和壳体(1)的上表面均固定连接有若干个伸缩装置(8),若干个所述伸缩装置(8)远离壳体(1)和连接板(7)的一端固定连接有三个固定板(9)。The upper surface of the support plate (4) is fixedly connected with a connecting plate (7), and the connecting plate (7) is respectively overlapped on the lower surface of the housing (1) and the right side of the slide plate (2). A plurality of telescopic devices (8) are fixedly connected to the right side of the connecting plate (7) and the upper surface of the casing (1), and the plurality of telescopic devices (8) are far away from the casing (1) and the connecting plate (7). ) is fixedly connected with three fixing plates (9). 2.根据权利要求1所述的一种地铁隧道加固结构,其特征在于:所述固定装置(6)包括螺母(61),所述螺母(61)卡接在支撑板(4)的左侧面,所述螺母(61)内螺纹连接有螺杆(62),所述螺杆(62)设置在卡槽(5)内。2 . A subway tunnel reinforcement structure according to claim 1 , wherein the fixing device ( 6 ) comprises a nut ( 61 ), and the nut ( 61 ) is clamped on the left side of the support plate ( 4 ). 3 . On the surface, the nut (61) is internally threaded with a screw rod (62), and the screw rod (62) is arranged in the clamping groove (5). 3.根据权利要求1所述的一种地铁隧道加固结构,其特征在于:所述支撑板(4)的下表面固定连接有安装板(10),所述安装板(10)的上表面开设有安装孔(11),所述安装孔(11)内设置有固定栓(12)。3. A subway tunnel reinforcement structure according to claim 1, characterized in that: the lower surface of the support plate (4) is fixedly connected with a mounting plate (10), and the upper surface of the mounting plate (10) is provided with A mounting hole (11) is provided, and a fixing bolt (12) is arranged in the mounting hole (11). 4.根据权利要求1所述的一种地铁隧道加固结构,其特征在于:所述伸缩装置(8)包括伸缩杆(81),所述伸缩杆(81)的外表面套接有弹簧(82),所述弹簧(82)和伸缩杆(81)的两端分别与滑板(2)的右侧面和固定板(9)的左侧面固定连接。4. A subway tunnel reinforcement structure according to claim 1, wherein the telescopic device (8) comprises a telescopic rod (81), and a spring (82) is sleeved on the outer surface of the telescopic rod (81). ), the two ends of the spring (82) and the telescopic rod (81) are respectively fixedly connected with the right side of the slide plate (2) and the left side of the fixing plate (9). 5.根据权利要求1所述的一种地铁隧道加固结构,其特征在于:所述壳体(1)内壁的下表面开设有滑槽(13),所述滑槽(13)内滑动连接有两个滑块(14),所述滑块(14)固定连接在滑板(2)的左侧面。5. A subway tunnel reinforcement structure according to claim 1, characterized in that: the lower surface of the inner wall of the casing (1) is provided with a chute (13), and the chute (13) is slidably connected with Two sliding blocks (14) are fixedly connected to the left side of the sliding plate (2).
CN202020420141.XU 2020-03-27 2020-03-27 A subway tunnel reinforcement structure Expired - Fee Related CN211819411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020420141.XU CN211819411U (en) 2020-03-27 2020-03-27 A subway tunnel reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020420141.XU CN211819411U (en) 2020-03-27 2020-03-27 A subway tunnel reinforcement structure

Publications (1)

Publication Number Publication Date
CN211819411U true CN211819411U (en) 2020-10-30

Family

ID=73148421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020420141.XU Expired - Fee Related CN211819411U (en) 2020-03-27 2020-03-27 A subway tunnel reinforcement structure

Country Status (1)

Country Link
CN (1) CN211819411U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876524A (en) * 2022-05-27 2022-08-09 海峡建工集团有限公司 Supporting device and method for large karst cave tunnel under complex weak surrounding rock bottom plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876524A (en) * 2022-05-27 2022-08-09 海峡建工集团有限公司 Supporting device and method for large karst cave tunnel under complex weak surrounding rock bottom plate

Similar Documents

Publication Publication Date Title
CN210685093U (en) Quick installation mechanism of curtain
CN211058020U (en) A connecting device for building external hanging and building main body
CN216560643U (en) Water velocity measuring instrument water velocity measuring fixing equipment for hydraulic engineering
CN211899759U (en) Diagonal bracing piece of prefabricated wallboard
CN112112289A (en) Pre-installation structure of assembled wallboard
CN219387167U (en) Constructional column supporting template
CN115613807A (en) A construction device for reserved holes for water, electricity and heating in housing construction
CN213685594U (en) An indoor water pipe assembled fixed installation structure
CN220226478U (en) Quick assembly type enclosure
CN219060886U (en) Template clamp
CN212512071U (en) Cooling device is used in polycarboxylate water reducing agent processing
CN212053774U (en) Building templates connecting device for civil engineering
CN223723888U (en) A new type of building component
CN216566648U (en) Construction hydraulic template climbing device
CN112144651A (en) A combined positioning device for prefabricated buildings
CN211736641U (en) Protective net convenient to install for construction
CN221910655U (en) A sleeve pulling and withdrawing mechanism
CN218176666U (en) Building engineering template fixing device
CN217602207U (en) A kind of prefabricated building prefabricated construction template
CN221956949U (en) Wall post foot connecting device
CN222731077U (en) Building pouring template fixing device
CN219606254U (en) Installation hanger plate convenient to adjust distance
CN221481381U (en) Template for pouring mass concrete
CN219569582U (en) Template supporting device convenient for disassembling template
CN219219804U (en) Template fastening device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

CF01 Termination of patent right due to non-payment of annual fee