CN211819237U - High strength stable form pile driver that building site used - Google Patents
High strength stable form pile driver that building site used Download PDFInfo
- Publication number
- CN211819237U CN211819237U CN202020458454.4U CN202020458454U CN211819237U CN 211819237 U CN211819237 U CN 211819237U CN 202020458454 U CN202020458454 U CN 202020458454U CN 211819237 U CN211819237 U CN 211819237U
- Authority
- CN
- China
- Prior art keywords
- pile
- pile driver
- servo motor
- fixedly provided
- rotating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a technical range of a pile driver, in particular to a high-strength stable pile driver for a construction site, which comprises a pile driver stabilizing support made of stainless steel, a tire body welded on the outer surface of the pile driver stabilizing support, a pile driver supporting rod welded on the front surface of the tire body, a servo motor generating set fixed on the upper surface of the pile driver supporting rod, a fixer fixed on the outer surface of the servo motor generating set, a motor generating rotary rod fixed on the right surface of the fixer and made of stainless steel, a motor generating rotary rod handle fixed on the outer surface of the motor generating rotary rod, the utility model can effectively meet the requirements of different positions for moving in the construction site according to different positions, and further can carry out pile driving on a plurality of positions, simultaneously, carry out effectual punching when building site punches through the pile hammer drill bit of design.
Description
Technical Field
The utility model relates to a pile driver technical scope specifically is a high strength stable form pile driver that building site used.
Background
The pile driver consists of a pile hammer, a pile frame, accessory equipment and the like. The pile hammer is attached between two parallel vertical guide rods at the front part of the pile frame and is hoisted by a hoisting hook. The pile frame is a steel structure tower frame, and a winch is arranged at the rear part of the pile frame and used for hoisting the pile and the pile hammer. The front of the pile frame is provided with a guide frame consisting of two guide rods for controlling the piling direction so that the pile can accurately penetrate into the stratum according to the designed direction. The basic technical parameters of the pile driver are the impact section weight, the impact kinetic energy and the impact frequency. The power source of the pile hammer can be divided into a drop hammer, a steam hammer, a diesel hammer and a hydraulic hammer.
The up-and-down reciprocating speed is high, the frequency is high, the pile vibrates when being penetrated into the stratum, the friction resistance can be reduced, and the piling effect is good. The differential air hammer with bidirectional unequal acting force has light hammer seat weight, relatively increased effective impact weight and better performance. The change-over of the steam inlet and outlet rotary valve of the steam hammer can be controlled manually or automatically by a flange operating lever which is arranged at one side of the hammer head and can lift along with the hammer head, and the impact stroke of the steam hammer can be adjusted by the two modes
There are some places that need to improve in the in-process that current building site pile driver used, at first just current building site pile driver generally adopts fixed structure at the in-process that carries out the pile, nevertheless need carry out the pile to the ground of different positions at building site, and current pile driver is not convenient for remove, and secondly current pile driver has not utilized the pile driver to carry out the condition of punching at the in-process of pile.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high strength stable form pile driver that building site used to propose current building site pile driver among the above-mentioned background art and generally adopt fixed structure carrying out the in-process of piling, nevertheless need carry out the pile to the ground of different positions at building site, current pile driver is not convenient for remove, secondly current pile driver has the problem that does not utilize the pile driver to punch at the in-process of pile.
In order to achieve the above object, the utility model provides a following technical scheme: a high-strength stable pile driver for a construction site comprises a pile driver stabilizing support, wherein the pile driver stabilizing support is made of stainless steel materials, a tire body is welded on the outer surface of the pile driver stabilizing support, a pile driver supporting rod is welded on the front surface of the tire body, a servo motor generating set is fixedly arranged on the upper surface of the pile driver supporting rod, and a fixer is arranged on the outer surface of the servo motor generating set through bolts;
the right fixed surface of fixer is provided with motor electricity generation swing arm just motor electricity generation swing arm adopts stainless steel material to make, the fixed surface of motor electricity generation swing arm is provided with motor electricity generation swing arm handle, the front surface welding of motor electricity generation swing arm handle is provided with servo motor, servo motor's fixed surface is provided with servo motor protecting groove just servo motor protecting groove ring type array is at servo motor's surface, the rear surface bolt of servo motor protecting groove is provided with the servo motor fixed plate.
As a further scheme of the utility model, the lower fixed surface of servo motor fixed plate is provided with servo motor rotating disc, servo motor rotating disc's external fixation is provided with the rotating equipment rack.
As a further scheme of the utility model, the fixed surface that rotates equipment rack is provided with the fixed tongue of rack, the last fixed surface of the fixed tongue of rack is provided with first rotating screw rod.
As a further aspect of the present invention, the lower surface fixing of the first rotating screw is provided with a first rotating shaft, and the right surface fixing of the first rotating shaft is provided with a second rotating screw.
As a further aspect of the present invention, the lower fixed surface of the second rotary screw is provided with a second axis of rotation, the lower fixed surface of the second axis of rotation is provided with a pile hammer drill sliding plate.
As a further aspect of the utility model, the external fixed surface of pile hammer drill sliding plate is provided with the spout, the fixed surface is provided with the pile hammer before the spout.
As the utility model discloses further scheme, the lower fixed surface of pile hammer is provided with the pile hammer drill bit just the pile hammer drill bit adopts alloy material to make, the last fixed surface of pile hammer drill bit is provided with just with reinforcement hole but reinforcement hole upper surface bolt fastening.
Compared with the prior art, the beneficial effects of the utility model are that: can effectively make through the tire body of design the utility model discloses need carry out the demand of the removal of different positions at building site according to the position of difference, and then can pile to a plurality of positions, simultaneously, carry out effectual punching when building site punches through the pile hammer drill bit of design.
Drawings
Fig. 1 is a schematic diagram of a high strength and stable pile driver for a construction site.
Fig. 2 is a partial schematic diagram of a high strength and stable pile driver for use in a construction site.
Figure 3 is a front view of a high strength stable pile driver for a construction site.
Fig. 4 is a left side view of a high strength stable pile driver for a construction site.
Figure 5 is a top view of a high strength stable pile driver for a construction site.
In the figure: 1-a pile driver stabilizing support, 2-a tire body, 3-a pile driver supporting rod, 4-a servo motor generating device, 5-a fixer, 6-a motor generating rotary rod, 7-a motor generating rotary rod handle, 8-a servo motor, 9-a servo motor protective groove, 10-a servo motor fixing plate, 11-a servo motor rotating disc, 12-a rotating equipment placing rack, 13 and a placing rack fixing convex groove; 14-first rotating screw, 15-first rotating shaft, 16-second rotating screw, 17-second rotating shaft, 18-pile hammer drill sliding plate, 19-chute, 20-pile driving pile hammer, 21-pile hammer drill and 22-reinforcing hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a high strength stable form pile driver that building site used as shown in fig. 1-5, pile driver stabilizing support 1 adopts stainless steel material to make, and pile driver stabilizing support 1's outer surface welding is provided with tire body 2, and tire body 2's front surface welding is provided with pile driver bracing piece 3, and pile driver bracing piece 3's last fixed surface is provided with servo motor power generation facility 4, and servo motor power generation facility 4's surface bolt is provided with fixer 5.
As shown in fig. 1, a motor power generation rotary rod 6 is fixedly arranged on the right surface of a fixer 5, the motor power generation rotary rod 6 is made of stainless steel materials, a motor power generation rotary rod handle 7 is fixedly arranged on the outer surface of the motor power generation rotary rod 6, a servo motor 8 is welded on the front surface of the motor power generation rotary rod handle 7, a servo motor protection groove 9 is fixedly arranged on the surface of the servo motor 8, a servo motor protection groove 9 is annularly arrayed on the outer surface of the servo motor 8, and a servo motor fixing plate 10 is arranged on the rear surface of the servo motor protection groove 9 through bolts.
Referring to fig. 2 and 3, a servo motor rotating disc 11 is fixedly arranged on the lower surface of a servo motor fixing plate 10, a rotating device placing frame 12 is fixedly arranged on the outer surface of the servo motor rotating disc 11, a placing frame fixing convex groove 13 is fixedly arranged on the outer surface of the rotating device placing frame 12, a first rotating screw 14 is fixedly arranged on the upper surface of the placing frame fixing convex groove 13, a first rotating shaft 15 is fixedly arranged on the lower surface of the first rotating screw 14, and a second rotating screw 16 is fixedly arranged on the right surface of the first rotating shaft 15.
Referring to fig. 3 and 4, a second rotating shaft 17 is fixedly disposed on a lower surface of the second rotating screw 16, a pile hammer drill sliding plate 18 is fixedly disposed on a lower surface of the second rotating shaft 17, a sliding chute 19 is fixedly disposed on an outer surface of the pile hammer drill sliding plate 18, a pile hammer 20 is fixedly disposed on a front surface of the sliding chute 19, a pile hammer drill 21 is fixedly disposed on a lower surface of the pile hammer 20, the pile hammer drill 21 is made of an alloy material, a reinforcing hole 22 is fixedly disposed on an upper surface of the pile hammer drill 21, and an upper surface of the reinforcing hole 22 can be bolt-reinforced.
The utility model discloses a theory of operation is: firstly, when a worker rotates the motor power generation rotary rod 6 through the designed motor power generation rotary rod handle 7, the servo motor power generation device 4 can generate power through the rotation of the rotary rod, so as to drive the servo motor 8 to work, the servo motor rotary disk 11 arranged on the lower surface of the servo motor 8 can be effectively driven to rotate through the work of the servo motor 8, the first rotary screw 14 is driven through the rotation of the servo motor rotary disk 11, the rotary shaft of the first rotary screw is in belt connection with the rotary shaft of the second rotary screw, the second screw 16 is driven through the rotation of the first screw 14, the rope tensioning 20 of the second rotary screw 16 is tensioned, so that the pile hammer 20 slides upwards in the pile hammer drill bit sliding plate 18, and when the highest point is reached, the pile hammer 20 slides downwards from the pile hammer drill bit sliding plate 18 to pile.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (7)
1. The high-strength stable pile driver for the construction site is characterized by comprising a pile driver stabilizing support (1), wherein the pile driver stabilizing support (1) is made of stainless steel materials, a tire body (2) is welded on the outer surface of the pile driver stabilizing support (1), a pile driver supporting rod (3) is welded on the front surface of the tire body (2), a servo motor generating set (4) is fixedly arranged on the upper surface of the pile driver supporting rod (3), and a fixer (5) is arranged on an outer surface bolt of the servo motor generating set (4);
the right side fixed surface of fixer (5) is provided with motor electricity generation swing arm (6) just motor electricity generation swing arm (6) adopt stainless steel material to make, the external fixed surface of motor electricity generation swing arm (6) is provided with motor electricity generation swing arm handle (7), the front surface welding of motor electricity generation swing arm handle (7) is provided with servo motor (8), the fixed surface of servo motor (8) is provided with servo motor protecting groove (9) just servo motor protecting groove (9) ring type array is at the surface of servo motor (8), the rear surface bolt of servo motor protecting groove (9) is provided with servo motor fixed plate (10).
2. The pile driver of high strength and stability for construction site according to claim 1, wherein the servo motor rotating disc (11) is fixedly arranged on the lower surface of the servo motor fixing plate (10), and the rotating equipment placing frame (12) is fixedly arranged on the outer surface of the servo motor rotating disc (11).
3. The high-strength stable type pile driver for the construction site as claimed in claim 2, wherein the outer surface of the rotating equipment placing frame (12) is fixedly provided with a placing frame fixing convex groove (13), and the upper surface of the placing frame fixing convex groove (13) is fixedly provided with a first rotating screw rod (14).
4. A pile driver of high strength and stability for construction site according to claim 3, wherein the first rotary screw (14) is fixedly provided with a first rotary shaft (15) on the lower surface thereof, and the second rotary screw (16) is fixedly provided on the right surface of the first rotary shaft (15).
5. The pile driver of claim 4, wherein the second rotating screw (16) is fixedly provided with a second rotating shaft (17) on the lower surface thereof, and the second rotating shaft (17) is fixedly provided with a pile hammer drill sliding plate (18) on the lower surface thereof.
6. The pile driver of claim 5, wherein the sliding plate (18) of the pile hammer bit is fixedly provided with a sliding groove (19) on the outer surface, and the pile hammer (20) is fixedly arranged on the front surface of the sliding groove (19).
7. The pile driver of claim 6, wherein the pile hammer (20) is fixedly provided with a pile hammer bit (21) on the lower surface thereof, the pile hammer bit (21) is made of alloy material, the pile hammer bit (21) is fixedly provided with a reinforcement hole (22) on the upper surface thereof, the reinforcement hole (22) is bolt-reinforced on the upper surface thereof, and the pile hammer bit (21) is detachable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020458454.4U CN211819237U (en) | 2020-04-01 | 2020-04-01 | High strength stable form pile driver that building site used |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020458454.4U CN211819237U (en) | 2020-04-01 | 2020-04-01 | High strength stable form pile driver that building site used |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211819237U true CN211819237U (en) | 2020-10-30 |
Family
ID=73149403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020458454.4U Active CN211819237U (en) | 2020-04-01 | 2020-04-01 | High strength stable form pile driver that building site used |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211819237U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117072076A (en) * | 2023-10-16 | 2023-11-17 | 起航(山东)投资建设集团有限公司 | Piling equipment for building site |
-
2020
- 2020-04-01 CN CN202020458454.4U patent/CN211819237U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117072076A (en) * | 2023-10-16 | 2023-11-17 | 起航(山东)投资建设集团有限公司 | Piling equipment for building site |
CN117072076B (en) * | 2023-10-16 | 2023-12-22 | 起航(山东)投资建设集团有限公司 | Piling equipment for building site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211819237U (en) | High strength stable form pile driver that building site used | |
CN211773639U (en) | Civil engineering is with pile driver that has guide structure | |
CN219992446U (en) | Pile driver running gear | |
CN215977263U (en) | Pile driver for water conservancy construction | |
CN215518759U (en) | Flood prevention emergency device for hydraulic engineering | |
CN212336021U (en) | Portable pile driver for constructional engineering | |
CN211397444U (en) | Split backpack pile driver | |
CN215857693U (en) | Improved pile driver | |
CN211241141U (en) | Tree pile pulling equipment convenient to carry | |
CN213173716U (en) | Civil engineering uses high-efficient pile driver | |
CN213173715U (en) | Pile driver for water conservancy construction | |
CN212175770U (en) | Pile driver for construction | |
CN212388546U (en) | Continuous type building construction concrete ground stake tamping mechanism | |
CN210263048U (en) | Novel pile driver for housing construction | |
CN201033873Y (en) | Waterborne light pile driver | |
CN211773637U (en) | Pile driver for highway engineering | |
CN219604342U (en) | Pile driver with soil cleaning structure | |
CN209958357U (en) | Pile driver for building with high strength | |
CN208040296U (en) | A kind of civil engineering piling machine | |
CN213741056U (en) | High-efficient pile equipment is used in road construction | |
CN214363469U (en) | Piling device for building construction | |
CN218843088U (en) | Piling equipment for water conservancy construction | |
CN219772965U (en) | Construction engineering pile driving device | |
CN214301725U (en) | Prevent portable follow-up of inclined to one side hole and protect a section of thick bamboo | |
CN211368705U (en) | Portable pile driver on water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |