CN211818635U CN202020260858.2U CN202020260858U CN211818635U CN 211818635 U CN211818635 U CN 211818635U CN 202020260858 U CN202020260858 U CN 202020260858U CN 211818635 U CN211818635 U CN 211818635U
Authority
CN
China
Prior art keywords
stand
fixedly connected
installation
pull rod
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020260858.2U
Other languages
Chinese (zh)
Inventor
辛淑臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020260858.2U priority Critical patent/CN211818635U/en
Application granted granted Critical
Publication of CN211818635U publication Critical patent/CN211818635U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building construction protective equipment, including the rail guard body, the equal swing joint in left side and the right side of rail guard body has the stand, the left side and the equal fixedly connected with fixed block in right side of rail guard body front side, two limiting plates of the front side fixedly connected with of stand. The utility model discloses a set up the stand, the locating plate, the constant head tank, limiting plate and stop gear's cooperation is used, use through stop gear, can fix the position of limiting plate, thereby realized the installation and the fixing to the stand, insert the constant head tank through the locating plate, the purpose of location installation stand has been realized, the speed of installation has been accelerated, solved current rail guard for house construction and before using, need install stand and rail guard, adopt a plurality of bolts and nut to cooperate the installation usually, installation time is long, the slow problem of speed, this house construction protective equipment, possess the advantage of the installation stand of being convenient for, be worth promoting.

Description

House construction protective equipment
Technical Field
The utility model belongs to the technical field of the house construction, especially, relate to a house construction protective equipment.
Background
The house construction is a general name of reconnaissance, planning, design, construction and equipment debugging work for building a house, and the house classification is divided into the following parts according to the use properties: a residence; public buildings: such as halls, exhibition halls, movie theaters, gymnasiums, etc.; hotels, travel hotels, rest houses and the like; market buildings; cultural and educational sanitary building: such as schools, hospitals, etc.; stations for traffic, terminal buildings, telecommunications buildings, and the like; various industrial buildings; various agricultural and animal husbandry buildings.
The in-process of house construction need use the rail guard to protect workman and pedestrian, and the problem that prior art exists is: the guard rail for house construction needs to be installed on the stand column and the guard rail before being used, usually, a plurality of bolts and nuts are adopted for matching installation, the installation time is long, the speed is low, the practicability of the guard rail for house construction is reduced, and the guard rail is not convenient for a user to use.
SUMMERY OF THE UTILITY MODEL
Problem to prior art existence, the utility model provides a building construction protective equipment possesses the advantage of the installation stand of being convenient for, has solved current protective guard for the building construction before using, need install stand and protective guard, adopts a plurality of bolts and nut to cooperate the installation usually, and installation time is long, the slow problem of speed.
The utility model discloses a realize like this, a building construction protective equipment, including the rail guard body, the equal swing joint in left side and the right side of rail guard body has the stand, the left side and the equal fixedly connected with fixed block in right side of rail guard body front side, two limiting plates of the front side fixedly connected with of stand, the fixed block is close to one side of stand and has seted up the draw-in groove that uses with the limiting plate cooperation, movable chamber has been seted up to the inside of fixed block, the inner chamber swing joint in movable chamber has stop gear.
As the utility model discloses it is preferred, stop gear includes the pull rod, one side that the pull rod is close to the activity chamber extends to the inner chamber and the fixedly connected with fly leaf in activity chamber, fixedly connected with spring between the relative one side of two fly leaves, one side fixedly connected with gag lever post of spring is kept away from to the fly leaf.
As the utility model discloses it is preferred, the spacing hole that uses with the gag lever post cooperation is all seted up to the top and the bottom of activity intracavity wall, and the spacing groove that uses with the gag lever post cooperation is all seted up to one side that two limiting plates are relative.
As the utility model discloses it is preferred, one side fixedly connected with slider of pull rod is kept away from to the fly leaf, the spout that uses with the slider cooperation is seted up to the inner wall in activity chamber.
As the utility model discloses preferred, the slide opening that uses with the pull rod cooperation has been seted up to the inner wall in activity chamber, the pull rod is close to one side of fly leaf and passes the slide opening and with fly leaf fixed connection.
As the utility model discloses preferred, the equal fixedly connected with locating plate in top and the bottom of the relative one side of two stands, the constant head tank that uses with the locating plate cooperation is all seted up on the left side and the right side of rail guard body.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the stand, the locating plate, the constant head tank, limiting plate and stop gear's cooperation is used, use through stop gear, can fix the position of limiting plate, thereby realized the installation and the fixing to the stand, insert the constant head tank through the locating plate, the purpose of location installation stand has been realized, the speed of installation has been accelerated, solved current rail guard for house construction and before using, need install stand and rail guard, adopt a plurality of bolts and nut to cooperate the installation usually, installation time is long, the slow problem of speed, this house construction protective equipment, possess the advantage of the installation stand of being convenient for, be worth promoting.
2. The utility model discloses a set up stop gear, can carry out effectual fixed mounting to the stand, avoided the stand to take place the phenomenon of rocking after the installation, improved the stability of stand after the installation.
3. The utility model discloses a set up spacing hole and spacing groove, can make the gag lever post pass spacing hole and insert the spacing groove and fix the position of limiting plate to the installation and the fixing of stand have been realized.
4. The utility model discloses a set up slider and spout, can make the fly leaf drive the slider and remove at the inner chamber of spout, improved the stability of fly leaf at the removal in-process, also increased the steadiness behind the gag lever post inserts the spacing groove simultaneously.
5. The utility model discloses a set up the slide opening, the user stimulates the pull rod and passes the slide opening and drive the fly leaf and remove, has injectd the position that the pull rod removed, has also reduced the frictional force that pull rod and fixed block produced simultaneously, user promotes pull rod labour saving and time saving.
6. The utility model discloses a set up locating plate and constant head tank, can make the locating plate insert the constant head tank and fix a position the installation, speed when having improved the installation stand need not to rectify the position of installation repeatedly, and convenient to use person uses.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a front cross-sectional view provided by an embodiment of the present invention;
fig. 3 is a partial enlarged view of a according to an embodiment of the present invention;
fig. 4 is a partial enlarged view of the embodiment B of the present invention.
In the figure: 1. a guard rail body; 2. a column; 3. a fixed block; 4. a limiting plate; 5. a card slot; 6. a movable cavity; 7. a limiting mechanism; 701. a pull rod; 702. a movable plate; 703. a spring; 704. a limiting rod; 8. a limiting hole; 9. a limiting groove; 10. a slider; 11. a chute; 12. a slide hole; 13. positioning a plate; 14. and (6) positioning a groove.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 4, the embodiment of the utility model provides a pair of building construction protective equipment, including rail guard body 1, the equal swing joint in left side and the right side of rail guard body 1 has stand 2, the equal fixedly connected with fixed block 3 in left side and the right side of 1 front side of rail guard body, two limiting plates 4 of the front side fixedly connected with of stand 2, fixed block 3 is close to one side of stand 2 and has seted up draw-in groove 5 with the cooperation of limiting plate 4 use, movable chamber 6 has been seted up to the inside of fixed block 3, the inner chamber swing joint in movable chamber 6 has stop gear 7.
Referring to fig. 3, the limiting mechanism 7 includes a pull rod 701, one side of the pull rod 701 close to the movable cavity 6 extends to an inner cavity of the movable cavity 6 and is fixedly connected with a movable plate 702, a spring 703 is fixedly connected between opposite sides of the two movable plates 702, and one side of the movable plate 702 far from the spring 703 is fixedly connected with a limiting rod 704.
Adopt above-mentioned scheme: through setting up stop gear 7, can carry out effectual fixed mounting to stand 2, avoid stand 2 to take place the phenomenon of rocking after the installation, improved the stability of stand 2 after the installation.
Referring to fig. 3, the top and the bottom of the inner wall of the movable cavity 6 are both provided with a limiting hole 8 used in cooperation with the limiting rod 704, and one side of each of the two limiting plates 4 opposite to each other is provided with a limiting groove 9 used in cooperation with the limiting rod 704.
Adopt above-mentioned scheme: through setting up spacing hole 8 and spacing groove 9, can make the gag lever post 704 pass spacing hole 8 and insert spacing groove 9 and fix the position of limiting plate 4 to the installation and the fixing of stand 2 have been realized.
Referring to fig. 3, a slider 10 is fixedly connected to one side of the movable plate 702 away from the pull rod 701, and a sliding groove 11 matched with the slider 10 is formed on the inner wall of the movable cavity 6.
Adopt above-mentioned scheme: through setting up slider 10 and spout 11, can make the movable plate 702 drive the inner chamber removal of slider 10 at spout 11, improved the stability of movable plate 702 in the removal process, also increased the steadiness behind the gag lever post 704 inserts spacing groove 9 simultaneously.
Referring to fig. 3, the inner wall of the movable cavity 6 is provided with a sliding hole 12 used in cooperation with the pull rod 701, and one side of the pull rod 701 close to the movable plate 702 penetrates through the sliding hole 12 and is fixedly connected with the movable plate 702.
Adopt above-mentioned scheme: through the arrangement of the sliding hole 12, a user pulls the pull rod 701 to penetrate through the sliding hole 12 and drive the movable plate 702 to move, the moving position of the pull rod 701 is limited, meanwhile, the friction force generated by the pull rod 701 and the fixed block 3 is reduced, and the time and labor are saved when the user pulls the pull rod 701.
Referring to fig. 4, the top and the bottom of the opposite sides of the two columns 2 are fixedly connected with positioning plates 13, and the left side and the right side of the guard rail body 1 are provided with positioning grooves 14 matched with the positioning plates 13.
Adopt above-mentioned scheme: through setting up locating plate 13 and constant head tank 14, can make locating plate 13 insert constant head tank 14 and fix a position the installation, speed when having improved installation stand 2 need not to rectify the position of installation repeatedly, and convenient to use person uses.
The utility model discloses a theory of operation:
when the vertical column fixing device is used, when a user needs to fixedly install the vertical column 2, the pull rod 701 is pulled, the pull rod 701 drives the movable plate 702 to move, the movable plate 702 drives the sliding block 10 to move in the inner cavity of the sliding groove 11, the movable plate 702 drives the spring 703 to elastically deform, the movable plate 702 drives the limiting rod 704 to enter the movable cavity 6, the positioning plate 13 is inserted into the positioning groove 14, the limiting plate 4 is inserted into the clamping groove 5 until the limiting plate 4 is in contact with the inner wall of the clamping groove 5, the pull rod 701 is loosened, the spring 703 drives the movable plate 702 to move, the movable plate 702 drives the limiting rod 704 to penetrate through the limiting hole 8 and to be inserted into the limiting groove 9 to fix the position of the limiting plate 4.
In summary, the following steps: this protective equipment for house construction, through setting up stand 2, locating plate 13, the constant head tank 14, the cooperation of limiting plate 4 and stop gear 7 is used, use through stop gear 7, can fix limiting plate 4's position, thereby realized the installation and the fixing to stand 2, insert constant head tank 14 through locating plate 13, the purpose of location installation stand 2 has been realized, the speed of installation has been accelerated, it uses before to have solved current guard rail for the house construction, need install stand and guard rail, adopt a plurality of bolts and nut to cooperate the installation usually, installation time is long, the slow problem of speed, this protective equipment for house construction, possess the advantage of the installation stand of being convenient for, be worth promoting.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building construction protective equipment, includes rail guard body (1), its characterized in that: the utility model discloses a safety guard for vehicle, including rail guard body (1), two limiting plates (4) of front side fixedly connected with of stand (2), draw-in groove (5) that use with limiting plate (4) cooperation are seted up to one side that fixed block (3) are close to stand (2), movable chamber (6) have been seted up to the inside of fixed block (3), the inner chamber swing joint in movable chamber (6) has stop gear (7).
2. The building construction protection device of claim 1, wherein: limiting mechanism (7) include pull rod (701), one side that pull rod (701) are close to activity chamber (6) extends to the inner chamber and the fixedly connected with fly leaf (702) in activity chamber (6), fixedly connected with spring (703) between the relative one side of two fly leaves (702), one side fixedly connected with gag lever post (704) of spring (703) are kept away from in fly leaf (702).
3. The building construction protection device of claim 2, wherein: spacing hole (8) that use with gag lever post (704) cooperation are all seted up to the top and the bottom of activity chamber (6) inner wall, and spacing groove (9) that use with gag lever post (704) cooperation are all seted up to one side that two limiting plates (4) are relative.
4. The building construction protection device of claim 2, wherein: one side of the movable plate (702) far away from the pull rod (701) is fixedly connected with a sliding block (10), and the inner wall of the movable cavity (6) is provided with a sliding groove (11) matched with the sliding block (10).
5. The building construction protection device of claim 2, wherein: the inner wall of the movable cavity (6) is provided with a sliding hole (12) matched with the pull rod (701) for use, and one side of the pull rod (701) close to the movable plate (702) penetrates through the sliding hole (12) and is fixedly connected with the movable plate (702).
6. The building construction protection device of claim 1, wherein: the top and the bottom of the opposite side of the two upright posts (2) are fixedly connected with positioning plates (13), and the left side and the right side of the guard rail body (1) are provided with positioning grooves (14) matched with the positioning plates (13).
CN202020260858.2U 2020-03-05 2020-03-05 House construction protective equipment Expired - Fee Related CN211818635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020260858.2U CN211818635U (en) 2020-03-05 2020-03-05 House construction protective equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020260858.2U CN211818635U (en) 2020-03-05 2020-03-05 House construction protective equipment

Publications (1)

Publication Number Publication Date
CN211818635U true CN211818635U (en) 2020-10-30

Family

ID=72996742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020260858.2U Expired - Fee Related CN211818635U (en) 2020-03-05 2020-03-05 House construction protective equipment

Country Status (1)

Country Link
CN (1) CN211818635U (en)

Similar Documents

Publication Publication Date Title
ATE148931T1 (en) MODULAR UNIT FOR A DOOR FRAME OF A PET ENTRANCE
CN211818635U (en) House construction protective equipment
CN213394514U (en) Security protection alarm equipment fixing device
CN211736460U (en) Safety protective guard that construction used
CN211736851U (en) Reinforced concrete single-leaf movable threshold civil air defense door
CN216949805U (en) Safety protection rail for highway maintenance
CN213690745U (en) Entrance guard convenient to installation
CN216043033U (en) Be used for building engineering assembled guardrail of maintaining
CN220851448U (en) Unmanned grid real-time monitoring equipment
CN211900052U (en) Installation mechanism of rail guard for building engineering
CN216766994U (en) Safety protection device for electronic information engineering signal tower
CN220301931U (en) Protective net for building engineering
CN217925267U (en) Rail guard for housing construction engineering
CN216617111U (en) Rail guard for hydraulic engineering
CN219712848U (en) Projector
CN218626257U (en) Community doorway face recognition machine adjusted according to height
CN210858521U (en) Movable type protective railing in high-rise inward casement window
CN212642956U (en) Multi-angle is transferred to wind power generation set convenient to dismantle
CN220218791U (en) Punching equipment for plastic product processing
CN213424050U (en) Community face recognition entrance guard security device
CN213545342U (en) Face recognition attendance machine
CN216406670U (en) New access control system suitable for smart life unmanned supermarket
CN213626543U (en) Scaffold for civil engineering
CN219118954U (en) Rail guard for building engineering with prevent structure of inclining
CN210295228U (en) Entrance guard's device based on real room of instructing of intelligence

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

Termination date: 20210305