CN211817845U - Steel structure climbing frame - Google Patents

Steel structure climbing frame Download PDF

Info

Publication number
CN211817845U
CN211817845U CN201922275079.XU CN201922275079U CN211817845U CN 211817845 U CN211817845 U CN 211817845U CN 201922275079 U CN201922275079 U CN 201922275079U CN 211817845 U CN211817845 U CN 211817845U
Authority
CN
China
Prior art keywords
support frame
climbing
rod
frame
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922275079.XU
Other languages
Chinese (zh)
Inventor
吴荣宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chen Yueming
Original Assignee
Quanzhou Benzhong Air Filter Net Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Benzhong Air Filter Net Co ltd filed Critical Quanzhou Benzhong Air Filter Net Co ltd
Priority to CN201922275079.XU priority Critical patent/CN211817845U/en
Application granted granted Critical
Publication of CN211817845U publication Critical patent/CN211817845U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a construction technical field discloses a steel construction climbing frame, including first support frame, second support frame, climbing rod and folding latch mechanism, one side swing joint of first support frame has the climbing rod, the one end swing joint of climbing rod has the second support frame, the one end of climbing rod is provided with folding latch mechanism, folding latch mechanism includes arc draw-in groove, arc elasticity card, first rotatory ring, joint dead lever, first bolt, first thread groove and second thread groove, the arc draw-in groove has been seted up to one side of first support frame, the inner chamber activity joint of arc draw-in groove has arc elasticity card, the one end fixedly connected with climbing rod of arc elasticity card. The utility model discloses the folding joint mechanism of application can carry out split and combination to climbing the pole and first bracing piece of connection on the second bracing piece, and the application is convenient for it is nimble quick detachable and the cost is little more between the structure of climbing the frame, practices thrift the cost, and application scope is wide.

Description

Steel structure climbing frame
Technical Field
The utility model relates to a construction technical field specifically is a steel construction climbing frame.
Background
The climbing frame is also called a lifting frame, and can be divided into several main types such as hydraulic type, electric type, manual pulling type and the like according to the power source, and is generally used for climbing from a low position to a high position. The frame is climbed to current steel construction mostly appears for fixed flexible ascending nature, and this kind of frame structure that climbs is complicated fixed, is difficult for dismantling it, and the cost is with high costs, and application scope is less, and general scene is hardly used this kind and is climbed the frame, and is difficult for putting, and occupation space is big.
SUMMERY OF THE UTILITY MODEL
The utility model provides a frame is climbed to steel construction, this steel construction climb the frame, the steel construction that has solved fixed flexible ascending nature climbs the frame structure complicacy fixed, non-detachability, the cost is with high costs, application scope is less, the problem that occupation space is big.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a steel structure climbing frame comprises a first support frame, a second support frame, a climbing rod and a folding clamping mechanism, wherein the climbing rod is movably connected to one side of the first support frame, the second support frame is movably connected to one end of the climbing rod, and the folding clamping mechanism is arranged at one end of the climbing rod;
folding latch mechanism includes arc draw-in groove, arc elasticity card, first rotatory ring, joint dead lever, first bolt, first thread groove and second thread groove, the arc draw-in groove has been seted up to one side of first support frame, the inner chamber activity joint of arc draw-in groove has arc elasticity card, the one end fixedly connected with climbing pole of arc elasticity card, the one end swing joint of climbing pole has first rotatory ring, the top surface swing joint of first rotatory ring has the joint dead lever, one side top through-hole department swing joint of joint dead lever has first bolt, the one end of first bolt has first support frame through first thread groove swing joint, the one end swing joint of first bolt has the second thread groove, the bottom at the climbing pole is seted up to the second thread groove.
Preferably, one side of joint dead lever and one side activity laminating of first support frame, one side and the pole-climbing activity laminating of joint dead lever.
Preferably, one end fixedly connected with second rotatory ring of pole climbing, the surface of second rotatory ring and one side swing joint of second support frame.
Preferably, hinge mechanisms are fixedly mounted at the middle parts of the first support frame and the second support frame respectively, each hinge mechanism comprises a leaf and a hinge rotating ring, the leaves are fixedly mounted on the front surfaces of the first support frame and the second support frame, and the through holes of the leaves are movably connected with the hinge rotating rings.
Preferably, the bottoms of the front sides of the first support frame and the second support frame are both provided with third thread grooves, and the inner walls of the third thread grooves are movably connected with second bolts.
Preferably, the outer surface of the second bolt is movably connected with a bottom fixing plate, and the back surface of the bottom fixing plate is movably attached to the front surfaces of the first support frame and the second support frame.
Borrow by above-mentioned technical scheme, the utility model provides a steel construction climbs frame. The method at least has the following beneficial effects:
(1) this steel construction climbing frame, the folding joint mechanism of application can carry out split and combination to the pole of climbing and the first bracing piece of connection on the second bracing piece, and the application is convenient for it is nimble quick detachable and cost little more to climb between the structure of frame, practices thrift the cost, and application scope is wide.
(2) This steel construction climbs the frame, application hinge mechanism can extend and fold first bracing piece and second bracing piece, has reduced and has climbed the holistic space that takes up an area of frame.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a portion A of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of a portion B of FIG. 1 according to the present invention;
FIG. 4 is a schematic view of a portion C of FIG. 1 according to the present invention;
fig. 5 is a schematic structural view of the bottom fixing plate portion in fig. 1 according to the present invention.
In the figure: 1, a first support frame, 2, a second support frame, 3, a climbing pole and 4, a bottom fixing plate;
5, a folding clamping mechanism, a 51 arc-shaped clamping groove, a 52 arc-shaped elastic clamping piece, a 53 first rotating ring, a 54 clamping fixing rod, a 55 first bolt, a 56 first thread groove and a 57 second thread groove;
6, a second rotating ring, 7 hinge mechanisms, 71 leaves and 72 hinge rotating rings;
8 third thread groove, 9 second bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, the present invention provides a technical solution: a steel structure climbing frame comprises a first support frame 1, a second support frame 2, a climbing rod 3 and a folding clamping mechanism 5, wherein the climbing rod 3 is movably connected to one side of the first support frame 1, the second support frame 2 is movably connected to one end of the climbing rod 3, and the folding clamping mechanism 5 is arranged at one end of the climbing rod 3;
folding latch mechanism 5 includes arc draw-in groove 51, arc elasticity card 52, first rotatory ring 53, joint dead lever 54, first bolt 55, first thread groove 56 and second thread groove 57, arc draw-in groove 51 has been seted up to one side of first support frame 1, the inner chamber activity joint of arc draw-in groove 51 has arc elasticity card 52, the one end fixedly connected with climbing rod 3 of arc elasticity card 52, the one end swing joint of climbing rod 3 has first rotatory ring 53, the top surface swing joint of first rotatory ring 53 has joint dead lever 54, one side top through-hole department swing joint of joint dead lever 54 has first bolt 55, the one end of first bolt 55 has first support frame 1 through first thread groove 56 swing joint, the one end swing joint of first bolt 55 has second thread groove 57, second thread groove 57 is seted up in the bottom of climbing rod 3.
One side of the clamping fixing rod 54 is movably attached to one side of the first support frame 1, and one side of the clamping fixing rod 54 is movably attached to the climbing rod 3 and used for fixing the climbing frame during splitting and combining.
The one end fixedly connected with second rotary ring 6 of pole-climbing 3, the surface of second rotary ring 6 and one side swing joint of second support frame 2, when the frame is made up to climbing, the rotatory effect through second rotary ring 6 rotates the split and the combination that are used for climbing the frame to pole-climbing 3.
Hinge mechanisms 7 are fixedly mounted at the middle parts of the first support frame 1 and the second support frame 2, each hinge mechanism 7 comprises a leaf 71 and a hinge rotating ring 72, the leaf 71 is fixedly mounted on the front surfaces of the first support frame 1 and the second support frame 2, through holes of the leaf 71 are movably connected with the hinge rotating ring 72, and the first support rod 1 and the second support rod 2 can be folded through the hinge mechanisms 7.
The bottoms of the front sides of the first support frame 1 and the second support frame 2 are both provided with a third thread groove 8, the inner wall of the third thread groove 8 is movably connected with a second bolt 9, and the bottom fixing plate 4 is fixed at the bottoms of the front sides of the first support frame 1 and the second support frame 2 through the connection of the second bolt 9 and the third thread groove 8.
The outer surface of the second bolt 9 is movably connected with a bottom fixing plate 4, and the back of the bottom fixing plate 4 and the front surfaces of the first support frame 1 and the second support frame 2 are movably attached to the bottom fixing plate 4 for fixing the connection between the first support rod 1 and the second support rod 2.
When in use, firstly, the climbing frame is combined, the first support frame 1 and the second support frame 2 are unfolded and extended to 180 degrees through the hinge mechanism 7 to be linearly and parallelly placed, then the climbing rod 3 is rotated by 90 degrees through the second rotating ring 6 to be vertical to the first support rod 1 and the second support rod 2, the arc elastic clamping piece 52 fixedly installed at one end of the climbing rod 3 is inserted into the arc clamping groove 51 to be connected to one side of the first support rod 1, then the first bolt 55 originally fixed at the through hole of the clamping fixing rod 54 at the top and the bottom of the climbing rod 3 is taken down from the second thread groove 57, the clamping fixing rod 54 rotates anticlockwise by 90 degrees to be attached to one side of the first support rod 1, the first bolt 55 is inserted into the first thread groove 56 on the first support rod 1 through the clamping fixing rod 54, the climbing rod 3 is fixed at one side of the first support rod, and finally the second bolt 9 is inserted into the third thread groove 8 through the bottom fixing plate 4, the first supporting rod 1, the second supporting rod 2 and the climbing rod 3 are fixedly connected through the bottom fixing plate 4, and when the climbing rod needs to be disassembled, the climbing rod can be disassembled through the reverse steps.
It is right above the utility model provides a steel construction climbs the frame and has introduced in detail. The utility model discloses it is right to have used specific individual example the utility model discloses a principle and implementation have been elucidated, and the explanation of above embodiment is only used for helping understanding the utility model discloses a method and core thought thereof. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (6)

1. The utility model provides a frame is climbed to steel construction, includes first support frame (1), second support frame (2), climbs pole (3) and folding latch mechanism (5), its characterized in that: one side of the first support frame (1) is movably connected with a climbing rod (3), one end of the climbing rod (3) is movably connected with a second support frame (2), and one end of the climbing rod (3) is provided with a folding clamping mechanism (5);
the folding clamping mechanism (5) comprises an arc-shaped clamping groove (51), an arc-shaped elastic card (52), a first rotary ring (53), a clamping fixing rod (54), a first bolt (55), a first thread groove (56) and a second thread groove (57), wherein the arc-shaped clamping groove (51) is formed in one side of the first support frame (1), the arc-shaped elastic card (52) is movably clamped in an inner cavity of the arc-shaped clamping groove (51), a climbing rod (3) is fixedly connected to one end of the arc-shaped elastic card (52), the first rotary ring (53) is movably connected to one end of the climbing rod (3), the clamping fixing rod (54) is movably connected to the outer surface of the top of the first rotary ring (53), the first bolt (55) is movably connected to a through hole in the top of one side of the clamping fixing rod (54), the first support frame (1) is movably connected to one end of the first bolt (55) through the first thread groove (56), one end of the first bolt (55) is movably connected with a second thread groove (57), and the second thread groove (57) is arranged at the bottom of the climbing rod (3).
2. The steel structure climbing frame according to claim 1, characterized in that: one side of joint dead lever (54) and one side activity laminating of first support frame (1), one side and the pole (3) activity laminating of joint dead lever (54).
3. The steel structure climbing frame according to claim 1, characterized in that: one end fixedly connected with second rotary ring (6) of pole-climbing (3), the surface of second rotary ring (6) and one side swing joint of second support frame (2).
4. The steel structure climbing frame according to claim 3, characterized in that: the hinge mechanism (7) is fixedly mounted at the middle parts of the first support frame (1) and the second support frame (2), the hinge mechanism (7) comprises a leaf (71) and a hinge rotating ring (72), the leaf (71) is fixedly mounted on the front surfaces of the first support frame (1) and the second support frame (2), and the through hole of the leaf (71) is movably connected with the hinge rotating ring (72).
5. The steel structure climbing frame according to claim 4, characterized in that: the front bottoms of the first support frame (1) and the second support frame (2) are respectively provided with a third thread groove (8), and the inner wall of each third thread groove (8) is movably connected with a second bolt (9).
6. The steel structure climbing frame according to claim 5, characterized in that: the outer surface of the second bolt (9) is movably connected with a bottom fixing plate (4), and the back surface of the bottom fixing plate (4) is movably attached to the front surfaces of the first support frame (1) and the second support frame (2).
CN201922275079.XU 2019-12-17 2019-12-17 Steel structure climbing frame Active CN211817845U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922275079.XU CN211817845U (en) 2019-12-17 2019-12-17 Steel structure climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922275079.XU CN211817845U (en) 2019-12-17 2019-12-17 Steel structure climbing frame

Publications (1)

Publication Number Publication Date
CN211817845U true CN211817845U (en) 2020-10-30

Family

ID=73141264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922275079.XU Active CN211817845U (en) 2019-12-17 2019-12-17 Steel structure climbing frame

Country Status (1)

Country Link
CN (1) CN211817845U (en)

Similar Documents

Publication Publication Date Title
CN211817845U (en) Steel structure climbing frame
CN206256735U (en) A kind of detachable high-voltage wire pole
CN211368730U (en) Novel support device based on old city foundation ditch
CN214942174U (en) Civil engineering construction support with adjustable
CN213119039U (en) Stable steel structure for boiler steel frame
CN209891467U (en) Novel wall building board
CN210857536U (en) Connecting structure of building frame
CN211230202U (en) Foldable cat ladder is used in waterproof construction of green building
CN211548691U (en) Assembled steel structure support
CN219808762U (en) Steel structure bracket
CN211547296U (en) Novel pier structure for bridge support
CN216380321U (en) Modular assembly type building
CN218541428U (en) Civil engineering construction support that practicality is good
CN213329972U (en) Fixing base for building scaffold
CN210219125U (en) Foldable display screen fixing support
CN211298946U (en) Detachable wardrobe
CN215253756U (en) Curtain wall reinforcing device for constructional engineering
CN215979123U (en) A novel sealed roof beam hoist mechanism for people's air defense door
CN212271542U (en) Construction hoisting construction scaffold
CN215521522U (en) Connecting assembly for assembling furniture
CN210735191U (en) Civil engineering pipeline placing frame
CN213262802U (en) Quick assembling and disassembling structure for vehicle frame
CN218116476U (en) Combined type recyclable foundation pit supporting inner supporting stand column
CN210460160U (en) Drum device special for net rack tent
CN216866065U (en) Interim escape way of architectural design construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A steel structure climbing frame

Effective date of registration: 20201224

Granted publication date: 20201030

Pledgee: QUANZHOU LISONG FIRE TECHNOLOGY Co.,Ltd.

Pledgor: QUANZHOU BENZHONG AIR FILTER NET Co.,Ltd.

Registration number: Y2020980009878

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210721

Granted publication date: 20201030

Pledgee: QUANZHOU LISONG FIRE TECHNOLOGY Co.,Ltd.

Pledgor: QUANZHOU BENZHONG AIR FILTER NET Co.,Ltd.

Registration number: Y2020980009878

PC01 Cancellation of the registration of the contract for pledge of patent right
TR01 Transfer of patent right

Effective date of registration: 20230407

Address after: No. 210, Building 1, Beichen Building, Beicang Town, Beichen District, Tianjin, 300499

Patentee after: Chen Yueming

Address before: 362000 Wanshun mansion, pre Town Village, Huian Town, Huian, Quanzhou, Fujian

Patentee before: QUANZHOU BENZHONG AIR FILTER NET CO.,LTD.

TR01 Transfer of patent right