CN211817406U - Insulation structure of factory building steel member - Google Patents

Insulation structure of factory building steel member Download PDF

Info

Publication number
CN211817406U
CN211817406U CN201922329719.0U CN201922329719U CN211817406U CN 211817406 U CN211817406 U CN 211817406U CN 201922329719 U CN201922329719 U CN 201922329719U CN 211817406 U CN211817406 U CN 211817406U
Authority
CN
China
Prior art keywords
arc
wall
groove
shaped
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922329719.0U
Other languages
Chinese (zh)
Inventor
鲍琪琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xingyicheng Building Materials Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922329719.0U priority Critical patent/CN211817406U/en
Application granted granted Critical
Publication of CN211817406U publication Critical patent/CN211817406U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an insulation system of factory building steel member, including the steel column, the outer wall activity laminating of steel column has the interior bushing pipe of one deck, interior bushing pipe is formed by the concatenation of bushing plate in first arc and the bushing plate in the second arc, and the outer wall of interior bushing pipe is fixed to have cup jointed the one deck insulating tube, the outer surface coating of insulating tube has one deck insulating coating, and insulating tube includes arc mainboard and arc subplate, movable mounting between arc mainboard and the arc subplate, and the inner wall of arc mainboard and the interior bushing plate fixed connection of first arc, the inner wall and the interior bushing plate fixed connection of second arc of arc subplate, the utility model discloses utilize this kind of insulating elements, can assemble fast, realize the parcel to the steel column, and then realize the insulation of steel column, not only the installation of early stage is simple, quick, and the later stage still can realize quick dismantlement change.

Description

Insulation structure of factory building steel member
Technical Field
The utility model relates to a parcel insulation technical field of steel member specifically is an insulation system of factory building steel member.
Background
In industrial production, some steel structure factory building process production technical rules require that steel structure conduction is safely insulated, particularly the insulation of the outer surfaces of steel members such as steel columns and inter-column supports on the flue side of an operation layer of an aluminum electrolysis workshop.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an insulation system of factory building steel member to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an insulation system of factory building steel member, includes the steel column, the outer wall activity laminating of steel column has the interior bushing pipe of one deck, interior bushing pipe is formed by the concatenation of the interior bushing plate of first arc and the interior bushing plate of second arc, and the outer wall of interior bushing pipe is fixed to have cup jointed the one deck insulating tube, the exterior surface of insulating tube has the one deck insulating coating to brush, and the insulating tube includes arc mainboard and arc subplate, movable mounting between arc mainboard and the arc subplate, and the inner wall and the interior bushing plate fixed connection of second arc of the inner wall of arc mainboard and first arc interior bushing plate fixed connection, arc subplate.
The middle positions of the inner walls of the first arc-shaped inner lining plate and the second arc-shaped inner lining plate are respectively fixedly provided with an inserted bar, and the outer wall of the steel column is matched with the inserted bars to be provided with jacks.
As a preferred technical scheme of the utility model, the both ends terminal surface of arc mainboard is equipped with the draw-in groove, be equipped with the fixture block with the draw-in groove cooperation on the terminal surface of arc subplate, and fixture block sliding clamping connects in the draw-in groove, top surface intercommunication is equipped with the groove of accomodating in the draw-in groove, accomodate the both ends internal top surface fixedly connected with spring in groove, the free end fixed connection of spring is at the top of slider, slider sliding clamping connects in accomodating the inslot, and the fixed locating piece that is equipped with in bottom of slider, the locating piece extends to the draw-in groove in the constant head tank activity joint that is equipped with.
As an optimal technical scheme of the utility model, the fixed handle that is equipped with in one side of slider, the groove is accomodate to fluting extension department that the handle passes through on the arc mainboard lateral wall, and the outer wall of handle is equipped with the one deck skid resistant course.
As an optimized technical scheme of the utility model, the handle of arc mainboard both sides passes through arc pole fixed connection.
As a preferred technical scheme of the utility model, the fixed guide block that is equipped with of both ends lateral wall of slider, the inner wall of accomodating the groove is equipped with the guide way with the guide block cooperation, sliding joint has the guide block in the guide way.
As an optimal technical scheme of the utility model, the seam crossing of the interior welt of first arc and the interior welt of second arc and the crisscross distribution of seam crossing of arc mainboard and arc subplate.
Compared with the prior art, the beneficial effects of the utility model are that:
this kind of insulating member can assemble fast, realizes the parcel to the steel column, and then realizes the insulation of steel column, and not only the installation in earlier stage is simple, quick, and the later stage still can realize dismantling the change fast.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection structure of the arc-shaped main board and the arc-shaped auxiliary board of the present invention;
fig. 3 is a top view of the present invention shown in fig. 1.
In the figure: the device comprises a steel column 1, an insertion hole 11, a lining tube 2, a first arc-shaped lining plate 21, a second arc-shaped lining plate 22, an insertion rod 23, an insulating tube 3, an arc-shaped main plate 31, an arc-shaped auxiliary plate 32, a clamping groove 33, a clamping block 34, a containing groove 35, a spring 36, a sliding block 37, a positioning block 38, a positioning groove 39, a handle 310, a slot 311, a guide block 312, a guide groove 313 and an arc-shaped rod 314.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: an insulation structure of a steel member of a factory building comprises a steel column 1, a layer of inner lining pipe 2 is movably attached to the outer wall of the steel column 1, the inner lining pipe 2 is formed by splicing a first arc-shaped inner lining plate 21 and a second arc-shaped inner lining plate 22, insertion rods 23 are fixedly arranged at the middle positions of the inner walls of the first arc-shaped inner lining plate 21 and the second arc-shaped inner lining plate 22, jacks 11 are arranged on the outer wall of the steel column 1 and matched with the insertion rods 23, a layer of insulation pipe 3 is fixedly sleeved on the outer wall of the inner lining pipe 2, a layer of insulation coating is coated on the outer surface of the insulation pipe 3, the insulation pipe 3 comprises an arc-shaped main plate 31 and an arc-shaped auxiliary plate 32, the arc-shaped main plate 31 and the arc-shaped auxiliary plate 32 are movably installed, the inner wall of the arc-shaped main plate 31 is fixedly connected with the first arc-shaped inner lining plate 21, the inner wall of the arc-shaped auxiliary plate 32 is fixedly connected with the second arc, the clamping block 34 is slidably clamped in the clamping groove 33, the inner top surface of the clamping groove 33 is provided with a receiving groove 35 in a communicating manner, the inner top surfaces of two ends of the receiving groove 35 are fixedly connected with a spring 36, the free end of the spring 36 is fixedly connected to the top of a sliding block 37, the sliding block 37 is slidably clamped in the receiving groove 35, the bottom of the sliding block 37 is fixedly provided with a positioning block 38, the positioning block 38 extends into the clamping groove 33 and is movably clamped with a positioning groove 39 arranged at the top of the clamping block 34, one side of the sliding block 37 is fixedly provided with a handle 310, the handle 310 receives the receiving groove 35 through an extending part of a slotted groove 311 on the side wall of the arc-shaped main plate 31, the outer wall of the handle 310 is provided with an anti-slip layer, the handles 310 at two sides of the arc-shaped main plate 31 are fixedly connected through an arc-shaped rod 314, when in daily use, a worker holds the handle 310 to drive the sliding, therefore, the positioning block 38 on the other side of the arc-shaped main plate 31 is also retracted into the accommodating groove 35 together to maintain this state, under the assistance of other workers, the arc-shaped main plate 31 and the arc-shaped secondary plate 32 respectively drive the first arc-shaped lining plate 21 and the second arc-shaped lining plate 22 to approach the steel column 1, so that the insertion rods 23 on the first arc-shaped lining plate 21 and the second arc-shaped lining plate 22 are inserted into the insertion holes 11 on the outer wall of the steel column 1 to prevent the arc-shaped main plate 31 and the arc-shaped secondary plate 32 from sliding up and down on the outer wall of the steel column 1 to limit, meanwhile, the clamping blocks 34 are also clamped into the clamping grooves 33, after complete clamping, the positioning block 38 is aligned with the positioning groove 39, the handle 310 is released, the positioning block 38 is automatically clamped into the positioning groove 39 under the elastic force of the spring 36, so as to achieve the installation and fixation of the arc-shaped main plate 31 and the arc-shaped secondary plate, thereby realize the insulation of steel column 1, not only the installation in earlier stage is simple, it is quick, and the later stage still can realize dismantling the change fast, slider 37's both ends lateral wall is fixed and is equipped with guide block 312, the inner wall of accomodating groove 35 is equipped with guide way 313 with the cooperation of guide block 312, sliding joint has guide block 312 in the guide way 313, guarantee slider 37's stable slip, the seam crossing distribution of seam crossing of the interior welt of first arc 21 and the interior welt of second arc 22 and arc mainboard 31 and arc subplate 32, it is tighter to make the parcel.
The working principle is as follows: when the utility model is used in daily life, the worker holds the handle 310 to drive the slider 37 to compress the spring 36, so that the positioning block 38 is retracted into the accommodating groove 35, because the handles 310 at the two sides of the arc-shaped main board 31 are fixedly connected through the arc-shaped rod 314, the positioning block 38 at the other side of the arc-shaped main board 31 is also retracted into the accommodating groove 35, and this state is maintained, under the assistance of other workers, the arc-shaped main board 31 and the arc-shaped subplate 32 respectively drive the first arc-shaped inner lining board 21 and the second arc-shaped inner lining board 22 to approach the steel column 1, so that the insertion rods 23 on the first arc-shaped inner lining board 21 and the second arc-shaped inner lining board 22 are inserted into the insertion holes 11 on the outer wall of the steel column 1, so as to prevent the arc-shaped main board 31 and the arc-shaped subplate 32 from sliding up and down on the outer wall of the steel column 1 for limiting, loosen handle 310, locating piece 38 is under spring 36's elasticity effect, in automatic card goes into constant head tank 39, realizes that the installation of arc mainboard 31 and arc subplate 32 is fixed, and then realizes interior bushing pipe 2 and with the equipment concatenation of insulating tube 3, through the parcel of insulating tube 3 to steel column 1 to realize the insulation of steel column 1, the installation of not only early stage is simple, quick, and the later stage still can realize quick dismantlement change.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an insulation system of factory building steel member, includes steel column (1), its characterized in that: the outer wall activity laminating of steel column (1) has interior bushing pipe of one deck (2), interior bushing pipe (2) is formed by the concatenation of bushing plate (21) in first arc and bushing plate (22) in the second arc, and the outer wall of interior bushing pipe (2) is fixed to have cup jointed one deck insulating tube (3), the exterior surface coating of insulating tube (3) has one deck insulating coating, and insulating tube (3) include arc mainboard (31) and arc subplate (32), movable mounting between arc mainboard (31) and the arc subplate (32), and the inner wall of arc mainboard (31) and first arc interior bushing plate (21) fixed connection, the inner wall and second arc interior bushing plate (22) fixed connection of arc subplate (32).
2. The insulation structure of the plant steel member according to claim 1, wherein: and inserting rods (23) are fixedly arranged in the middle positions of the inner walls of the first arc-shaped inner lining plate (21) and the second arc-shaped inner lining plate (22), and inserting holes (11) are formed in the outer wall of the steel column (1) and matched with the inserting rods (23).
3. The insulation structure of the plant steel member according to claim 1, wherein: the both ends terminal surface of arc mainboard (31) is equipped with draw-in groove (33), be equipped with fixture block (34) with draw-in groove (33) cooperation on the terminal surface of arc subplate (32), and fixture block (34) slip joint is in draw-in groove (33), top surface intercommunication is equipped with accomodates groove (35) in draw-in groove (33), accomodate top surface fixedly connected with spring (36) in the both ends of groove (35), the free end fixed connection of spring (36) is at the top of slider (37), slider (37) slip joint is in accomodating groove (35), and the fixed locating piece (38) that are equipped with in bottom of slider (37), locating piece (38) extend to draw-in groove (33) and constant head tank (39) activity joint that fixture block (34) top was equipped with.
4. The insulation structure of the plant steel member according to claim 3, wherein: the fixed handle (310) that is equipped with in one side of slider (37), slot (35) are accomodate in fluting (311) extension department on handle (310) through arc mainboard (31) lateral wall, and the outer wall of handle (310) is equipped with the one deck skid resistant course.
5. The insulation structure of the plant steel member according to claim 1, wherein: the handles (310) on the two sides of the arc-shaped main plate (31) are fixedly connected through arc-shaped rods (314).
6. The insulation structure of the plant steel member according to claim 3, wherein: the both ends lateral wall of slider (37) is fixed and is equipped with guide block (312), the inner wall of accomodating groove (35) is equipped with guide way (313) with guide block (312) cooperation, sliding joint has guide block (312) in guide way (313).
7. The insulation structure of the plant steel member according to claim 1, wherein: the joint of the first arc-shaped inner lining plate (21) and the second arc-shaped inner lining plate (22) and the joint of the arc-shaped main plate (31) and the arc-shaped auxiliary plate (32) are distributed in a staggered mode.
CN201922329719.0U 2019-12-23 2019-12-23 Insulation structure of factory building steel member Active CN211817406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922329719.0U CN211817406U (en) 2019-12-23 2019-12-23 Insulation structure of factory building steel member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922329719.0U CN211817406U (en) 2019-12-23 2019-12-23 Insulation structure of factory building steel member

Publications (1)

Publication Number Publication Date
CN211817406U true CN211817406U (en) 2020-10-30

Family

ID=73033945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922329719.0U Active CN211817406U (en) 2019-12-23 2019-12-23 Insulation structure of factory building steel member

Country Status (1)

Country Link
CN (1) CN211817406U (en)

Similar Documents

Publication Publication Date Title
CN213174316U (en) Steel construction assembly type fast-assembling wallboard for building
CN211817406U (en) Insulation structure of factory building steel member
CN210899986U (en) Electric appliance cabinet easy to install
CN107911971B (en) Cabinet base system
CN209823999U (en) Square blank holder
CN210025180U (en) Plane fixing clamp for electric hammer drilling tool
CN217240181U (en) Accurate coupling assembling of crane span structure for circuit cable extends
CN104874885A (en) 2M cable soldering device
CN207331989U (en) A kind of high duty metal splice
CN220686436U (en) Aluminum veneer with reinforcing mechanism
CN103618236A (en) Secondary wire leveling device
CN217508224U (en) Copper bar bus duct
CN210622089U (en) Solid ceramsite brick
CN204270797U (en) A kind of transformer oil storage supporting construction
CN204108963U (en) A kind of electric hammer clamp structure
CN107701085A (en) The cat ladder of electric power operation
CN104376979B (en) Supporting structure for transformer oil conservator
CN211427975U (en) Vibration isolation structure of dry type transformer
CN216030678U (en) Punching assistor for electric power fitting
CN203466498U (en) Single-person power operation auxiliary tool
CN215661111U (en) Civil engineering wall body drilling equipment
CN213809203U (en) Pipeline bracket suitable for large machine room assembly type construction
CN212653341U (en) Inductor assembly fixture
CN219863530U (en) Heat-insulating fireproof building curtain wall structure convenient to install
CN210693020U (en) Fixed mounting structure for power equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221206

Address after: 213100 No. 6705, the third floor, Building 4, No. 199, Hongxi Road, Niutang Town, Wujin District, Changzhou City, Jiangsu Province (Lvjian District)

Patentee after: Jiangsu Xingyicheng Building Materials Co.,Ltd.

Address before: No. 61, zhoufangdi, jiang'ao village, Lubu Town, Yuyao City, Ningbo City, Zhejiang Province, 315400

Patentee before: Bao Qiqi

TR01 Transfer of patent right