CN211816904U - Steel construction that concatenation is stable - Google Patents

Steel construction that concatenation is stable Download PDF

Info

Publication number
CN211816904U
CN211816904U CN201922144666.5U CN201922144666U CN211816904U CN 211816904 U CN211816904 U CN 211816904U CN 201922144666 U CN201922144666 U CN 201922144666U CN 211816904 U CN211816904 U CN 211816904U
Authority
CN
China
Prior art keywords
threaded rod
plate
nut
connecting block
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922144666.5U
Other languages
Chinese (zh)
Inventor
李毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henghang Shanghai Supply Chain Management Co ltd
Original Assignee
Putian Chaoyi Trading Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Putian Chaoyi Trading Co ltd filed Critical Putian Chaoyi Trading Co ltd
Priority to CN201922144666.5U priority Critical patent/CN211816904U/en
Application granted granted Critical
Publication of CN211816904U publication Critical patent/CN211816904U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a stable steel construction of concatenation, including the riser, the top and the equal fixedly connected with backing plate in bottom of the relative one side of riser, the backing plate is provided with the diaphragm to one side on the back, the draw-in groove has all been seted up to the top and the bottom of riser, one side that the backing plate was kept away from to the diaphragm is provided with the connecting block, the connecting block is close to the first threaded rod of one side fixedly connected with of draw-in groove, the one end that the connecting block was kept away from to first threaded rod runs through the draw-in groove and extends to the outside of draw-in groove, a pot head that first threaded. The utility model discloses possess and connect firmly, the high advantage of security has solved current steel sheet part and has mostly passed through screw fixed connection, and stability is relatively poor, when suffering factors such as collision in long-time use, can make the screw produce not hard up to can the stability of greatly reduced steel construction, there is the problem of certain potential safety hazard.

Description

Steel construction that concatenation is stable
Technical Field
The utility model relates to a steel construction technical field specifically is a stable steel construction of concatenation.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, adopts rust removal and prevention processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like, and is widely applied to the fields of large-scale factory buildings, venues, super-high buildings and the like because the components or parts are usually connected by welding seams, bolts or rivets due to light dead weight and simple and convenient construction.
The existing steel plate components are mostly fixedly connected through screws, the stability is poor, and when the steel plate components are subjected to factors such as collision in the long-time use process, the screws can be loosened, so that the stability of a steel structure can be greatly reduced, and certain potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a stable steel construction of concatenation possesses to connect firmly, and the high advantage of security has solved current steel sheet part and has mostly passed through screw fixed connection, and stability is relatively poor, when suffering factors such as collision in long-time use, can make the screw produce not hard up to can the stability of greatly reduced steel construction, there is the problem of certain potential safety hazard.
In order to achieve the above object, the utility model provides a following technical scheme: a steel structure with stable splicing comprises a vertical plate, wherein the top and the bottom of one side, opposite to the vertical plate, of the vertical plate are fixedly connected with a base plate, a transverse plate is arranged on one side, facing back, of the base plate, clamping grooves are formed in the top and the bottom of the vertical plate, a connecting block is arranged on one side, away from the base plate, of the transverse plate, one side, close to the clamping grooves, of the connecting block is fixedly connected with a first threaded rod, one end, away from the connecting block, of the first threaded rod penetrates through the clamping grooves and extends to the outside of the clamping grooves, a first nut is sleeved on one end, located outside the clamping grooves, of the first threaded rod, a second threaded rod is fixedly connected to one side, close to the transverse plate, of the connecting block, one end, away from the connecting block, of the second threaded rod sequentially penetrates through the transverse plate, the bottom of the positioning insertion plate penetrates through the inner cavity of the positioning sleeve plate.
Preferably, the guide way has all been seted up to the both sides of location lagging, the equal fixedly connected with third threaded rod in bottom of location picture peg both sides, the one end that the location picture peg was kept away from to the third threaded rod runs through the guide way, the surface cover of third threaded rod is equipped with the third nut, third threaded rod and third nut threaded connection, one side and the contact of location lagging of third nut.
Preferably, the front of the positioning insertion plate is provided with a long hole, the back of the positioning sleeve plate is provided with a threaded hole, the front of the positioning sleeve plate is provided with a bolt in a penetrating mode, the rear end of the bolt sequentially penetrates through the positioning sleeve plate, the long hole and the threaded hole, and the bolt is in threaded connection with the threaded hole.
Preferably, the first threaded rod is in threaded connection with a first nut, one side of the first nut is in contact with the vertical plate, the second threaded rod is in threaded connection with a second nut, and a base plate on one side of the second nut is in contact with the base plate.
Preferably, one side of the transverse plate close to the base plate is in contact with the base plate, the two sides of the transverse plate are in contact with the vertical plate, and one side of the connecting block close to the transverse plate is in contact with the transverse plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a riser, backing plate, diaphragm, draw-in groove, connecting block, first threaded rod, first nut, second threaded rod and second nut cooperate, possess to connect firmly, the high advantage of security has solved current steel sheet part and has mostly passed through screw fixed connection, and stability is relatively poor, when suffering factors such as collision in long-time use, can make the screw produce not hard up to can the stability of greatly reduced steel construction, there is the problem of certain potential safety hazard.
2. The utility model discloses a location lagging and location picture peg can fix a position the diaphragm, through screw hole and bolt, can be in the same place location picture peg and the firm link of location lagging, has improved the stability that two diaphragms are connected, through setting up third threaded rod and third nut, can consolidate location picture peg and location lagging.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a sectional view of the positioning sleeve plate structure of the present invention;
fig. 3 is a top cross-sectional view of the positioning sleeve plate structure of the present invention.
In the figure: the novel fixing device comprises a vertical plate 1, a base plate 2, a transverse plate 3, a clamping groove 4, a connecting block 5, a first threaded rod 6, a first nut 7, a second threaded rod 8, a second nut 9, a positioning sleeve plate 10, a positioning insertion plate 11, a guide groove 12, a third threaded rod 13, a third nut 14, a long hole 15, a threaded hole 16 and a bolt 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model discloses a riser 1, backing plate 2, diaphragm 3, draw-in groove 4, connecting block 5, first threaded rod 6, first nut 7, second threaded rod 8, second nut 9, location lagging 10, location picture peg 11, guide way 12, third threaded rod 13, third nut 14, slot hole 15, screw hole 16 and bolt 17 part are the parts that general standard or technical personnel in the field know, and its structure and principle all can learn through the technical manual or learn through conventional experimental approach for this technical personnel.
Referring to fig. 1-3, a steel structure with stable splicing comprises a vertical plate 1, wherein the top and the bottom of one side opposite to the vertical plate 1 are fixedly connected with a backing plate 2, the back side of the backing plate 2 is provided with a transverse plate 3, the top and the bottom of the vertical plate 1 are respectively provided with a clamping groove 4, one side of the transverse plate 3 away from the backing plate 2 is provided with a connecting block 5, one side of the connecting block 5 close to the clamping groove 4 is fixedly connected with a first threaded rod 6, one end of the first threaded rod 6 away from the connecting block 5 penetrates through the clamping groove 4 and extends to the outside of the clamping groove 4, one end of the first threaded rod 6 located outside the clamping groove 4 is sleeved with a first nut 7, one side of the connecting block 5 close to the transverse plate 3 is fixedly connected with a second threaded rod 8, one end of the second threaded rod 8 away from the connecting block 5 sequentially penetrates through the transverse plate 3 and, the two sides of the bottom of the transverse plate 3 are fixedly connected with positioning insertion plates 11, the bottoms of the positioning insertion plates 11 penetrate through the inner cavity of a positioning sleeve plate 10, the two sides of the positioning sleeve plate 10 are respectively provided with a guide groove 12, the bottoms of the two sides of the positioning insertion plates 11 are respectively fixedly connected with a third threaded rod 13, one end, far away from the positioning insertion plates 11, of each third threaded rod 13 penetrates through the guide grooves 12, the surface of each third threaded rod 13 is sleeved with a third nut 14, each third threaded rod 13 is in threaded connection with the corresponding third nut 14, one side of each third nut 14 is in contact with the corresponding positioning sleeve plate 10, the front surface of each positioning insertion plate 11 is provided with a long hole 15, the back surface of each positioning sleeve plate 10 is provided with a threaded hole 16, the front surface of each positioning sleeve plate 10 is provided with a bolt 17 in a penetrating mode, the rear end of each bolt 17 penetrates through the corresponding positioning sleeve, one side of a first nut 7 is contacted with a vertical plate 1, a second threaded rod 8 is in threaded connection with a second nut 9, a base plate 2 at one side of the second nut 9 is contacted, one side of a transverse plate 3, which is close to the base plate 2, is contacted with the base plate 2, two sides of the transverse plate 3 are both contacted with the vertical plate 1, one side of a connecting block 5, which is close to the transverse plate 3, is contacted with the transverse plate 3, the transverse plate 3 can be positioned through a positioning sleeve plate 10 and a positioning inserting plate 11, the positioning inserting plate 11 and the positioning sleeve plate 10 can be stably connected together through a threaded hole 16 and a bolt 17, the stability of the connection of the two transverse plates 3 is improved, the positioning inserting plate 11 and the positioning sleeve plate 10 can be reinforced through a third threaded rod 13 and a third nut 14, the vertical plate 1, the base plate 2, the transverse plate 3, a clamping groove 4, the connecting block 5, the first threaded rod 6, the, possess to connect firmly, the high advantage of security has solved current steel sheet part and has mostly passed through screw fixed connection, and stability is relatively poor, when suffering factors such as collision in long-time use, can make the screw produce not hard up to can the stability of greatly reduced steel construction, there is the problem of certain potential safety hazard.
During the use, through second threaded rod 8 and second nut 9, can be in the same place diaphragm 3 and backing plate 2 fixed connection, thereby make diaphragm 3 link together with riser 1, through setting up first threaded rod 6, first nut 7 and connecting block 5, can consolidate the junction between diaphragm 3 and riser 1, through location lagging 10 and location picture peg 11, can fix a position diaphragm 3, through screw hole 16 and bolt 17, can be in the same place the firm connection of location picture peg 11 and location lagging 10, the stability that two diaphragms 3 are connected has been improved, through setting up third threaded rod 13 and third nut 14, can consolidate location picture peg 11 and location lagging 10, thereby it is more firm to make to connect between diaphragm 3 and the riser 1, even appear single screw rod not hard up yet, can not influence its stability, and the security is high.
In summary, the following steps: this stable steel construction of concatenation cooperates through riser 1, backing plate 2, diaphragm 3, draw-in groove 4, connecting block 5, first threaded rod 6, first nut 7, second threaded rod 8 and second nut 9, has solved current steel sheet part and has mostly passed through screw fixed connection, and stability is relatively poor, when suffering factors such as collision in the long-time use, can make the screw produce not hard up to can the stability of greatly reduced steel construction, there is the problem of certain potential safety hazard.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a stable steel construction of concatenation, includes riser (1), its characterized in that: the top and the bottom of one side opposite to the vertical plate (1) are fixedly connected with a base plate (2), one side of the base plate (2) facing back is provided with a transverse plate (3), the top and the bottom of the vertical plate (1) are both provided with a clamping groove (4), one side of the transverse plate (3) far away from the base plate (2) is provided with a connecting block (5), one side of the connecting block (5) near the clamping groove (4) is fixedly connected with a first threaded rod (6), one end of the first threaded rod (6) far away from the connecting block (5) penetrates through the clamping groove (4) and extends to the outside of the clamping groove (4), one end of the first threaded rod (6) located outside the clamping groove (4) is sleeved with a first nut (7), one side of the connecting block (5) near the transverse plate (3) is fixedly connected with a second threaded rod (8), one end of the second threaded rod (8) far away from the connecting block, the surface cover of second threaded rod (8) is equipped with second nut (9), the equal fixedly connected with location lagging (10) in both sides at diaphragm (3) top, the equal fixedly connected with location picture peg (11) in both sides of diaphragm (3) bottom, the inner chamber to location lagging (10) is run through to the bottom of location picture peg (11).
2. The stably spliced steel structure of claim 1, wherein: guide way (12) have all been seted up to the both sides of location lagging (10), the equal fixedly connected with third threaded rod (13) in bottom of location picture peg (11) both sides, the one end that location picture peg (11) was kept away from in third threaded rod (13) runs through guide way (12), the surface cover of third threaded rod (13) is equipped with third nut (14), third threaded rod (13) and third nut (14) threaded connection, one side and location lagging (10) contact of third nut (14).
3. The stably spliced steel structure of claim 2, wherein: slotted hole (15) have been seted up in the front of location picture peg (11), screw hole (16) have been seted up at the back of location lagging plate (10), the front of location lagging plate (10) is run through and is provided with bolt (17), the rear end of bolt (17) runs through location lagging plate (10), slotted hole (15) and screw hole (16) in proper order, bolt (17) and screw hole (16) threaded connection.
4. The stably spliced steel structure of claim 1, wherein: first threaded rod (6) and first nut (7) threaded connection, one side and riser (1) contact of first nut (7), second threaded rod (8) and second nut (9) threaded connection, one side backing plate (2) contact of second nut (9).
5. The stably spliced steel structure of claim 1, wherein: one side that diaphragm (3) are close to backing plate (2) contacts with backing plate (2), the both sides of diaphragm (3) all contact with riser (1), one side that connecting block (5) are close to diaphragm (3) contacts with diaphragm (3).
CN201922144666.5U 2019-12-02 2019-12-02 Steel construction that concatenation is stable Expired - Fee Related CN211816904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922144666.5U CN211816904U (en) 2019-12-02 2019-12-02 Steel construction that concatenation is stable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922144666.5U CN211816904U (en) 2019-12-02 2019-12-02 Steel construction that concatenation is stable

Publications (1)

Publication Number Publication Date
CN211816904U true CN211816904U (en) 2020-10-30

Family

ID=73031832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922144666.5U Expired - Fee Related CN211816904U (en) 2019-12-02 2019-12-02 Steel construction that concatenation is stable

Country Status (1)

Country Link
CN (1) CN211816904U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585095A (en) * 2021-09-09 2021-11-02 四川志德公路工程有限责任公司 Bridge lifting device and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585095A (en) * 2021-09-09 2021-11-02 四川志德公路工程有限责任公司 Bridge lifting device and construction method
CN113585095B (en) * 2021-09-09 2023-01-17 四川志德公路工程有限责任公司 Bridge lifting device and construction method

Similar Documents

Publication Publication Date Title
CN211816904U (en) Steel construction that concatenation is stable
CN217480405U (en) Assembled steel construction building
CN209989942U (en) Building steel structure combination beam convenient to equipment
CN212534489U (en) A assembled building frame for in construction
CN213868312U (en) Convenient assembled building steel construction who dismantles
CN210342676U (en) Adjustable direct-buried sleeve
CN211312832U (en) Assembled steel construction building
CN210927519U (en) Embedded support fixing table post for small solar power supply electric system
CN211948891U (en) Steel-wood composite beam
CN210827849U (en) A assembled building frame for in construction
CN213174344U (en) Sealing and fixing structure of glass curtain wall
CN213296871U (en) Toughened glass mounting structure
CN212104719U (en) Glass curtain wall connecting structure
CN218264810U (en) Construction frame
CN213329413U (en) Steel construction convenient to high-speed joint installation
CN211341145U (en) Aluminum profile installation mosaic structure for building
CN217128831U (en) Assembled bending resistance fossil fragments connection structure
CN213477215U (en) Combined spliced steel structure
CN210799600U (en) Wood furniture board convenient to concatenation
CN213204478U (en) Bottom corner piece and bottom corner piece connecting beam mounting structure for container room
CN212897016U (en) Connecting frame for glass curtain wall
CN217812801U (en) Assembled warning fence for construction site of constructional engineering
CN218894203U (en) Steel construction concatenation subassembly that stability is high
CN212224631U (en) Section bar side connecting piece for building
CN214194958U (en) Steel structure beam column connecting and assembling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220301

Address after: 201500 b-1402, 4th floor, No. 421, Weiqing West Road, Jinshan District, Shanghai

Patentee after: Henghang (Shanghai) Supply Chain Management Co.,Ltd.

Address before: 351111 5th floor, no.341, Jingmin Road, Guohuan Town, Hanjiang District, Putian City, Fujian Province

Patentee before: PUTIAN CHAOYI TRADING Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

CF01 Termination of patent right due to non-payment of annual fee