CN211815682U - Temporary slope protection structure for traffic engineering construction management - Google Patents

Temporary slope protection structure for traffic engineering construction management Download PDF

Info

Publication number
CN211815682U
CN211815682U CN202020329163.5U CN202020329163U CN211815682U CN 211815682 U CN211815682 U CN 211815682U CN 202020329163 U CN202020329163 U CN 202020329163U CN 211815682 U CN211815682 U CN 211815682U
Authority
CN
China
Prior art keywords
wall
rod
baffle
fixedly mounted
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020329163.5U
Other languages
Chinese (zh)
Inventor
沙世涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020329163.5U priority Critical patent/CN211815682U/en
Application granted granted Critical
Publication of CN211815682U publication Critical patent/CN211815682U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a traffic engineering construction management is with interim slope protection structure, including the slope body, the water drainage tank has been seted up on the slope body, the equidistance is fixed to be inserted on the slope body and is equipped with a plurality of baffles, install first earth bar and the second earth bar of inserting on the outer wall of baffle both sides respectively, first earth bar and the second of inserting is inserted and is installed quick connecting device between the earth bar. Has the advantages that: the utility model discloses set up water drainage tank on the slope body, and inserted in water drainage tank's below and established the baffle, the baffle can stop the stone that the eminence rolls down, and the first land pole of inserting of baffle both sides and the available quick connecting device of second land pole between connect, realize the length that nimble control was erect, made things convenient for and erect.

Description

Temporary slope protection structure for traffic engineering construction management
Technical Field
The utility model belongs to the technical field of traffic engineering, a traffic engineering construction management is with interim slope protection structure is related to.
Background
The road pavement in the mountainous area is generally built according to mountains, so that a lot of mountain slopes exist on the roadside, dangerous articles such as falling rocks often appear on the mountain slopes on the side edges in the driving process of the vehicle, the normal driving of the vehicle is affected, and serious traffic accidents are caused more seriously.
In the prior art, a cement net frame with a square-shaped structure is generally adopted to reinforce a slope, or a net covers the slope to prevent collapse, but the structure cannot prevent the danger that falling rocks at a higher position roll off.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a traffic engineering construction management is with interim slope protection structure solves the problem that prior art can not carry out the protection to eminence rockfall.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a traffic engineering construction management is with interim slope protection structure, includes the slope body, the water drainage tank has been seted up on the slope body, equidistant fixed the inserting is equipped with a plurality of baffles on the slope body, install first earth pole and the second of inserting on the outer wall of baffle both sides respectively and insert the earth pole, first earth pole and the second of inserting is inserted and is installed quick connecting device between the earth pole.
In foretell traffic engineering construction temporary slope protection structure for management, the first ground pole of inserting and the second ground pole of inserting all seted up the spacing groove on being close to the outer wall of one side mutually, symmetrical fixed mounting has two gag lever posts on the outer wall of baffle both sides, gag lever post and spacing groove are "T" shape, and sliding connection between gag lever post and the spacing groove.
In foretell traffic engineering construction temporary slope protection structure for management, the baffle is kept away from on the outer wall of water drainage tank one side symmetry fixed mounting and is had two mounting panels, two the mounting panel is close to common movable mounting between the outer wall of one side mutually and has the dwang, fixed mounting has the anchor strut on the dwang.
In foretell a traffic engineering construction management is with interim slope protection structure, quick connecting device includes that first ground pole of inserting keeps away from fixed block of fixed mounting on baffle one side outer wall, the fixed block is kept away from and is seted up the slot on the first ground pole one side outer wall of inserting, the second is inserted ground pole and is kept away from fixed mounting on baffle one side outer wall and have the inserted bar, mutually support between inserted bar and the slot.
In foretell a traffic engineering construction management is with interim slope protection structure, the spacing groove has been seted up on the inserted bar upside outer wall, fixed mounting has the spring on the limiting groove diapire, spacing groove one end fixed mounting is kept away from to the spring has the limiting plate, the limiting plate is kept away from fixed mounting on the outer wall of spring one side and is had the kelly, the kelly is kept away from second and is inserted ground pole one side outer wall and be the inclined plane, the draw-in groove has been seted up to slot upside inner wall, mutually support between kelly and the draw-in groove, movable mounting has the fly leaf in the draw-.
In foretell temporary slope protection structure for traffic engineering construction management, the activity of fixed block upside outer wall is inserted and is equipped with the movable rod, the movable rod activity runs through the fixed block and extends to in the draw-in groove, the movable rod is close to draw-in groove one end fixed mounting on the outer wall of fly leaf, the movable rod is kept away from draw-in groove one end fixed mounting helping hand board.
Compared with the prior art, the utility model discloses the advantage lies in:
the utility model discloses set up water drainage tank on the slope body, and inserted in water drainage tank's below and established the baffle, the baffle can stop the stone that the eminence rolls down, and the first land pole of inserting of baffle both sides and the available quick connecting device of second land pole between connect, realize the length that nimble control was erect, made things convenient for and erect.
Drawings
Fig. 1 is a schematic structural view of a temporary slope protection structure for traffic engineering construction management provided by the present invention;
fig. 2 is a schematic front structural view of a baffle plate in a temporary slope protection structure for traffic engineering construction management provided by the utility model;
fig. 3 is a top view of a baffle plate of a temporary slope protection structure for traffic engineering construction management provided by the present invention;
fig. 4 is an enlarged view of a part a of a temporary slope protection structure for traffic engineering construction management provided by the present invention;
fig. 5 is the utility model provides a traffic engineering construction management is with enlargements of B part structure in the interim slope protection structure.
In the figure: 1 slope body, 2 water drainage tank, 3 baffles, 4 first ground poles of inserting, 5 gag lever posts, 6 gag lever posts, 7 fixed blocks, 8 slots, 9 inserted bars, 10 mounting grooves, 11 springs, 12 limiting plates, 13 kellies, 14 draw-in grooves, 15 fly leaf, 16 movable rods, 17 helping hand boards, 18 mounting panels, 19 anchor strut, 20 second ground poles of inserting.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, a temporary slope protection structure for traffic engineering construction management, comprising a slope body 1, a drainage groove 2 is provided on the slope body 1, a plurality of baffles 3 are fixedly inserted at equal distances on the slope body 1, a first ground inserting rod 4 and a second ground inserting rod 20 are respectively installed on the outer walls of both sides of the baffles 3, a limiting groove 6 is provided on the outer wall of one side of the first ground inserting rod 4 and the outer wall of one side of the second ground inserting rod 20, two limiting rods 5 are symmetrically and fixedly installed on the outer walls of both sides of the baffles 3, the limiting rods 5 and the limiting grooves 6 are both in a "T" shape, the limiting rods 5 and the limiting grooves 6 are connected in a sliding manner, two mounting plates 18 are symmetrically and fixedly installed on the outer wall of one side of the baffle 3 far from the drainage groove 2, a rotating rod is movably installed between the outer walls of both sides of the two mounting plates 18 close to one side, a reinforcing rod 19 is fixedly installed on the rotating, and the baffle 3 is inserted below the drainage channel 2, the baffle 3 can block the stones rolled off from the high position, the rolling stones at the high position are blocked, and the safety of the slope body 1 is further improved.
A quick connecting device is arranged between the first ground inserting rod 4 and the second ground inserting rod 20, the quick connecting device comprises a fixed block 7 fixedly arranged on the outer wall of one side of the first ground inserting rod 4 far away from the baffle 3, a slot 8 is arranged on the outer wall of one side of the fixed block 7 far away from the first ground inserting rod 4, an inserting rod 9 is fixedly arranged on the outer wall of one side of the second ground inserting rod 20 far away from the baffle 3, the inserting rod 9 and the slot 8 are mutually matched, a mounting groove 10 is arranged on the outer wall of the upper side of the inserting rod 9, a spring 11 is fixedly arranged on the inner bottom wall of the mounting groove 10, a limiting plate 12 is fixedly arranged at one end of the spring 11 far away from the mounting groove 10, a clamping rod 13 is fixedly arranged on the outer wall of one side of the limiting plate 12 far away from the spring 11, the outer wall of one side of the clamping rod 13 far away from the second ground inserting rod 20, fixed block 7 upside outer wall activity is inserted and is equipped with movable rod 16, movable rod 16 activity runs through fixed block 7 and extends to in the draw-in groove 14, movable rod 16 is close to draw-in groove 14 one end fixed mounting on the outer wall of fly leaf 15, movable rod 16 keeps away from draw-in groove 14 one end fixed mounting helping hand board 17, it is worth noting, quick connecting device can help the quick connection between two baffles 3, and then the length that nimble control will erect, customization length has been replaced, laying is made things convenient for.
Further, unless otherwise specifically stated or limited, the above-described fixed connection is to be understood in a broad sense, and may be, for example, welded, glued, or integrally formed as is conventional in the art.
The utility model discloses the theory of operation: insert the inserted bar 9 and establish in slot 8, card pole 13 is pressed into mounting groove 10 under the pressure effect of slot 8 inner wall during the establishment of inserting, compression spring 11, until card pole 13 and draw-in groove 14 between the back of keeping in alignment, card pole 13 is popped out mounting groove 10 by spring 11, block in draw-in groove 14, during the dismantlement, only need to push down helping hand board 17, drive fly leaf 15 with card pole 13 extrusion draw-in groove 14, take out inserted bar 9 again can.
Baffle 3 and first insert ground pole 4 and second and insert ground pole 20 between adopt between gag lever post 5 and the spacing groove 6 sliding connection's the mode to be connected, upwards can push out baffle 3.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a traffic engineering construction management is with interim slope protection structure, includes the slope body (1), its characterized in that, water drainage tank (2) have been seted up on the slope body (1), the equidistance is fixed to be inserted and is equipped with a plurality of baffles (3) on the slope body (1), install first earth pole (4) of inserting and second earth pole (20) of inserting on baffle (3) both sides outer wall respectively, install quick connecting device between first earth pole (4) of inserting and second earth pole (20).
2. The temporary slope protection structure for traffic engineering construction management according to claim 1, wherein the first ground inserting rod (4) and the second ground inserting rod (20) are provided with a limiting groove (6) on the outer wall close to one side, two limiting rods (5) are symmetrically and fixedly mounted on the outer walls on two sides of the baffle (3), the limiting rods (5) and the limiting grooves (6) are T-shaped, and the limiting rods (5) and the limiting grooves (6) are connected in a sliding manner.
3. The temporary slope protection structure for traffic engineering construction management according to claim 1, wherein two mounting plates (18) are symmetrically and fixedly mounted on the outer wall of one side of the baffle (3) away from the drainage channel (2), a rotating rod is movably mounted between the two mounting plates (18) close to the outer wall of one side of the baffle, and a reinforcing rod (19) is fixedly mounted on the rotating rod.
4. The temporary slope protection structure for traffic engineering construction management according to claim 1, wherein the quick connection device comprises a first ground inserting rod (4) and a fixing block (7) fixedly mounted on the outer wall of the side away from the baffle (3), the fixing block (7) is provided with a slot (8) on the outer wall of the side away from the first ground inserting rod (4), the second ground inserting rod (20) is fixedly mounted on the outer wall of the side away from the baffle (3), and the slot (8) and the inserting rod (9) are matched with each other.
5. The temporary slope protection structure for traffic engineering construction management according to claim 4, wherein a mounting groove (10) is formed in an outer wall of the upper side of the insert rod (9), a spring (11) is fixedly mounted on an inner bottom wall of the mounting groove (10), one end, away from the mounting groove (10), of the spring (11) is fixedly mounted with a limiting plate (12), the limiting plate (12) is fixedly mounted on an outer wall of one side, away from the spring (11), of the spring (11) is fixedly mounted with a clamp rod (13), the outer wall, away from the second ground rod (20), of the clamp rod (13) is an inclined plane, a clamping groove (14) is formed in an inner wall of the upper side of the slot (8), the clamp rod (13) and the clamping groove (14) are matched with each other, and a movable plate.
6. The temporary slope protection structure for traffic engineering construction management according to claim 5, wherein a movable rod (16) is movably inserted into an outer wall of an upper side of the fixed block (7), the movable rod (16) movably penetrates through the fixed block (7) and extends into the clamping groove (14), one end of the movable rod (16) close to the clamping groove (14) is fixedly mounted on an outer wall of the movable plate (15), and an auxiliary board (17) is fixedly mounted at one end of the movable rod (16) far away from the clamping groove (14).
CN202020329163.5U 2020-03-17 2020-03-17 Temporary slope protection structure for traffic engineering construction management Expired - Fee Related CN211815682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020329163.5U CN211815682U (en) 2020-03-17 2020-03-17 Temporary slope protection structure for traffic engineering construction management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020329163.5U CN211815682U (en) 2020-03-17 2020-03-17 Temporary slope protection structure for traffic engineering construction management

Publications (1)

Publication Number Publication Date
CN211815682U true CN211815682U (en) 2020-10-30

Family

ID=73012761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020329163.5U Expired - Fee Related CN211815682U (en) 2020-03-17 2020-03-17 Temporary slope protection structure for traffic engineering construction management

Country Status (1)

Country Link
CN (1) CN211815682U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529596A (en) * 2021-07-28 2021-10-22 中交路桥南方工程有限公司 Highway slope protection structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529596A (en) * 2021-07-28 2021-10-22 中交路桥南方工程有限公司 Highway slope protection structure and construction method

Similar Documents

Publication Publication Date Title
CN211257007U (en) A supporting construction for building foundation ditch construction
CN211815682U (en) Temporary slope protection structure for traffic engineering construction management
CN109162202A (en) A kind of light-duty assembled anticollision barrier component and installation method
CN211285433U (en) Mobilizable intelligent transportation guardrail connection structure
CN211142857U (en) Stake woods formula mud-rock flow structure of blocking
CN212742551U (en) Foundation pit support pile and foundation pit support device
CN210561982U (en) Slope protection device for civil engineering
CN211472002U (en) Highway soft soil layer stake composite foundation
CN212316942U (en) Inclined support foundation pit supporting system
CN211973507U (en) Work pit structure for frame bridge construction
CN202644590U (en) Foundation trench anti-floating structure for underground construction
CN212054095U (en) Foundation ditch safety device for highway engineering
CN216586603U (en) Side slope building structure
CN220433697U (en) Slope protection unit and slope protection structure for geological disaster management
CN221193353U (en) Foundation pit supporting device
CN212025797U (en) Highway soft soil layer stake composite foundation
CN218116218U (en) Warning device for ecological restoration of river bank side slope
CN220847631U (en) Pile-up type slope protection device for preventing landslide
CN215329959U (en) Slope surface reinforcing device for slope protection
CN219653450U (en) Integrated permeable concrete pavement slab structure
CN220503754U (en) Anti-collision guardrail for transportation
CN217601334U (en) Multi-functional flood control structure
CN215629501U (en) Mountain road construction formula protector that rises
CN219364469U (en) Water retaining device for forming canal to drain waterlogging
CN217870192U (en) Concrete guardrail unit and concrete guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

CF01 Termination of patent right due to non-payment of annual fee