CN211806932U - Building ash bucket beneficial to avoiding rapid mortar condensation - Google Patents

Building ash bucket beneficial to avoiding rapid mortar condensation Download PDF

Info

Publication number
CN211806932U
CN211806932U CN201922073016.6U CN201922073016U CN211806932U CN 211806932 U CN211806932 U CN 211806932U CN 201922073016 U CN201922073016 U CN 201922073016U CN 211806932 U CN211806932 U CN 211806932U
Authority
CN
China
Prior art keywords
mortar
connecting block
disc
handle
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922073016.6U
Other languages
Chinese (zh)
Inventor
王梓楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922073016.6U priority Critical patent/CN211806932U/en
Application granted granted Critical
Publication of CN211806932U publication Critical patent/CN211806932U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a be favorable to avoiding building ash bucket that mortar condenses fast, including urceolus and slide rail, the top outside fixed mounting of urceolus has the hangers, and the outside of hangers is provided with the handle, the top inboard of handle is connected with the horizontal pole, the inboard of urceolus is provided with the inner tube, the below of going up the connecting block is provided with down the connecting block, and is provided with the perpendicular groove that is located the inner wall of urceolus in the connecting block outside down, the bottom of urceolus is connected with the fixed disk, and installs the connection pad below the inboard of fixed disk, the outside of connection pad is connected with the connection rope, the slide rail is installed to the front side of urceolus, and the outside sliding connection of slide rail has the slider. This be favorable to avoiding the building ash bucket that mortar condenses fast, be convenient for carry and draw and be convenient for hoist and mount, be favorable to avoiding the rapid condensation of mortar simultaneously, can stir the mortar simultaneously to be favorable to guaranteeing construction quality.

Description

Building ash bucket beneficial to avoiding rapid mortar condensation
Technical Field
The utility model relates to a building correlation technique field specifically is a be favorable to avoiding building ash bucket that mortar condenses fast.
Background
The construction engineering is a big project in the modern society, and plastering operation is needed to be carried out in most corners or walls when the building is constructed, so that a building ash bucket is needed to be used for operation for the convenience of workers;
however, when the building ash bucket in the prior art is used, the building ash bucket is not convenient to lift and hoist, and is not beneficial to avoiding quick condensation of mortar, and when the building ash bucket is poured into the building ash bucket, mortar is not convenient to stir, and construction quality is not beneficial to guarantee.
Disclosure of Invention
An object of the utility model is to provide a be favorable to avoiding building ash bucket that mortar condenses fast to solve present building ash bucket that above-mentioned background art provided, when using, be not convenient for carry and draw and be not convenient for hoist and mount, be unfavorable for simultaneously avoiding the rapid condensation of mortar, in pouring into ash bucket, be not convenient for stir the mortar, be unfavorable for guaranteeing construction quality's problem.
In order to achieve the above object, the utility model provides a following technical scheme: a building ash bucket beneficial to avoiding quick mortar condensation comprises an outer barrel and a slide rail, wherein a hanging lug is fixedly mounted on the outer side of the top end of the outer barrel, a handle is arranged on the outer side of the hanging lug, a cross rod is connected to the inner side of the top end of the handle, an inner barrel is arranged on the inner side of the outer barrel, an upper connecting block is mounted on the outer side of the middle of the inner barrel, a lower connecting block is arranged below the upper connecting block, a vertical groove located on the inner wall of the outer barrel is arranged on the outer side of the lower connecting block, a cross groove is formed in the outer side of the vertical groove, a fixing disk is connected to the bottom of the outer barrel, a connecting disk is mounted below the inner side of the fixing disk, a connecting rope is connected to the outer side of the connecting disk, a limiting block located on the outer side of the outer, and the outer side of the supporting rod is fixedly provided with a stirring blade.
Preferably, the bottom of the handle is of an elastic structure, the handle forms a dismounting structure with the outer cylinder through the hanging lugs, and a cross rod fixedly mounted on the inner side of the handle is arranged in parallel with the top surface of the outer cylinder.
Preferably, the inner tube is connected through last connecting block and lower connecting block and perpendicular between the groove block, and erects the outside in groove and be provided with 2 groups of cross slots to go up connecting block and lower connecting block and correspond the setting with 2 groups of cross slots from top to bottom respectively.
Preferably, the inner cylinder is connected with the connecting disc in a clamping manner through a fixed disc, the fixed disc is rotatably connected with the inner cylinder through a speed change bearing, and the connecting disc is rotatably connected with the outer cylinder.
Preferably, the connecting rope is wound on the outer side of the connecting disc, the end part of the connecting rope is connected with the sliding block, and a linkage structure is formed among the connecting disc, the connecting rope and the sliding block.
Compared with the prior art, the beneficial effects of the utility model are that: the building ash bucket beneficial to preventing mortar from being rapidly condensed is convenient to lift and hoist, is beneficial to preventing mortar from being rapidly condensed, and can be used for stirring mortar, so that the construction quality is guaranteed;
1. the ash bucket is convenient to lift and increase the contact area through the transverse rod transversely arranged on the inner side of the handle, and the lifting is convenient through the enclosing between the transverse rod and the handle, so that the ash bucket is prevented from falling off;
2. the sliding block slides on the outer side of the sliding rail, so that the connecting rope is conveniently pulled through the sliding block, the connecting rope drives the connecting disc to rotate, the fixed disc driving support rod and the stirring blades rotate on the inner side of the inner cylinder, mortar is conveniently stirred, and quick coagulation of the mortar is conveniently avoided;
3. through last connecting block and the corresponding setting between lower connecting block and the cross slot, be convenient for guarantee the laminating between inner tube and the urceolus, and the rotation of the inner tube of being convenient for, be convenient for simultaneously guarantee the structural stability of this ash bucket, be favorable to long-term use.
Drawings
FIG. 1 is a front sectional structure of the present invention;
FIG. 2 is a schematic view of the overall structure of the inner cylinder of the present invention;
FIG. 3 is a schematic view of the overall structure of the outer barrel of the present invention;
FIG. 4 is a schematic view of a sectional structure of the outer cylinder of the present invention;
FIG. 5 is a schematic view of the inner tube of the present invention
In the figure: 1. an outer cylinder; 2. hanging a lug; 3. a handle; 4. a cross bar; 5. an inner barrel; 6. an upper connecting block; 7. a lower connecting block; 8. a vertical slot; 9. a transverse groove; 10. fixing the disc; 11. a connecting disc; 12. connecting ropes; 13. a limiting block; 14. a slide rail; 15. a slider; 16. a strut; 17. stirring the leaves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a building ash bucket beneficial to preventing mortar from being rapidly condensed comprises an outer barrel 1, a hanging lug 2, a handle 3, a cross rod 4, an inner barrel 5, an upper connecting block 6, a lower connecting block 7, a vertical groove 8, a cross groove 9, a fixed disk 10, a connecting disk 11, a connecting rope 12, a limiting block 13, a sliding rail 14, a sliding block 15, a supporting rod 16 and a stirring blade 17, wherein the hanging lug 2 is fixedly installed on the outer side of the top end of the outer barrel 1, the handle 3 is arranged on the outer side of the hanging lug 2, the cross rod 4 is connected to the inner side of the top end of the handle 3, the inner barrel 5 is arranged on the inner side of the outer barrel 1, the upper connecting block 6 is installed on the outer side of the middle part of the inner barrel 5, the lower connecting block 7 is arranged below the upper connecting block 6, the vertical groove 8 located on the inner wall of the outer barrel 1 is arranged on the outer side of the, the outer side of the connecting disc 11 is connected with a connecting rope 12, the outer side of the connecting rope 12 is provided with a limiting block 13 located on the outer side of the outer cylinder 1, the front side of the outer cylinder 1 is provided with a sliding rail 14, the outer side of the sliding rail 14 is connected with a sliding block 15 in a sliding mode, the upper portion of the fixed disc 10 is connected with a supporting rod 16 in a clamping mode, and the outer side of the supporting rod 16 is fixedly provided with a stirring blade 17.
As shown in figure 1, the bottom of the handle 3 is of an elastic structure, the handle 3 forms a dismounting structure with the outer cylinder 1 through the hanging lug 2, and a cross rod 4 fixedly arranged on the inner side of the handle 3 is arranged in parallel with the top surface of the outer cylinder 1, so that the ash bucket is convenient to lift.
Like in fig. 1, fig. 2 and fig. 3 inner tube 5 through last connecting block 6 and lower connecting block 7 with erect between the groove 8 block be connected, and erect the outside of groove 8 and be provided with 2 groups of cross slots 9 to go up connecting block 6 and lower connecting block 7 and correspond the setting with 2 groups of cross slots 9 from top to bottom respectively, be convenient for guarantee the rotation of inner tube 5 in the inboard of urceolus 1, be convenient for guarantee the stable in structure of inner tube 5.
As shown in fig. 1 and 4, the inner cylinder 5 is connected with the connecting disc 11 through the fixed disc 10 in a clamping manner, the fixed disc 10 is rotatably connected with the inner cylinder 5 through a speed changing bearing, the connecting disc 11 is rotatably connected with the outer cylinder 1, the fixed disc 10 is driven to rotate by the connecting disc 11, the inner cylinder 5 is driven to rotate, mortar is convenient to stir, the connecting rope 12 is wound on the outer side of the connecting disc 11, the end part of the connecting rope 12 is connected with the sliding block 15, and the connecting disc 11, the connecting rope 12 and the sliding block 15 form a linkage structure, so that operation from the outside is convenient, and construction and use are convenient to guarantee.
The working principle is as follows: when the building ash bucket beneficial to preventing the mortar from being rapidly condensed is used, as shown in fig. 1, firstly, the support rod 16 and the fixed disc 10 are connected in a clamping manner, the mortar is poured into the inner cylinder 5, the ash bucket is lifted for use through the handle 3 and the cross rod 4, and the ash bucket can be hoisted through the enclosing between the handle 3 and the cross rod 4;
during the plastering operation, the sliding block 15 slides on the outer side of the sliding rail 14 as shown in figures 1 and 4, so that the slide block 15 drives the connecting rope 12 to move, and the connecting rope 12 drives the connecting disc 11 to rotate at the bottom of the outer cylinder 1, and the fixed disc 10 and the inner cylinder 5 are driven to rotate by the connecting disc 11, and as shown in fig. 1, 2 and 3, the stability of the inner cylinder 5 is ensured by the clamping between the upper connecting block 6 and the lower connecting block 7 and the transverse groove 9, and the mortar is conveniently stirred by the rotation of the fixed disk 10, so that the mortar is prevented from being rapidly coagulated, meanwhile, mortar can be prepared and stirred in the inner cylinder 5 so as to ensure construction and use, this is the whole working process of building ash drums which is advantageous for avoiding rapid setting of the mortar, and the contents not described in detail in this specification are well known to those skilled in the art.
The utility model discloses the standard part that uses all can purchase from the market, and dysmorphism piece all can be customized according to the description with the record of drawing of description, and the concrete connection mode of each part all adopts conventional means such as ripe bolt, rivet, welding among the prior art, and machinery, part and equipment all adopt prior art, and conventional model, including circuit connection adopts conventional connection mode among the prior art, does not detailed here again.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. A building ash bucket beneficial to avoiding quick setting of mortar comprises an outer barrel (1) and a sliding rail (14), and is characterized in that: the outer side of the top of the outer cylinder (1) is fixedly provided with a hanging lug (2), the outer side of the hanging lug (2) is provided with a handle (3), the inner side of the top of the handle (3) is connected with a cross rod (4), the inner side of the outer cylinder (1) is provided with an inner cylinder (5), the outer side of the middle part of the inner cylinder (5) is provided with an upper connecting block (6), the lower part of the upper connecting block (6) is provided with a lower connecting block (7), the outer side of the lower connecting block (7) is provided with a vertical groove (8) positioned on the inner wall of the outer cylinder (1), the outer side of the vertical groove (8) is provided with a transverse groove (9), the bottom of the outer cylinder (1) is connected with a fixed disc (10), a connecting disc (11) is arranged below the inner side of the fixed disc (10), the outer side of the connecting disc (11) is connected with a connecting rope, slide rail (14) are installed to the front side of urceolus (1), and the outside sliding connection of slide rail (14) has slider (15), the top block of fixed disk (10) is connected with branch (16), and the outside fixed mounting of branch (16) has stirring leaf (17).
2. A building drum for facilitating the avoidance of rapid setting of mortar as claimed in claim 1 wherein: the bottom of the handle (3) is of an elastic structure, the handle (3) forms a dismounting structure with the outer barrel (1) through the hanging lug (2), and a cross rod (4) fixedly installed on the inner side of the handle (3) is arranged in parallel with the top surface of the outer barrel (1).
3. A building drum for facilitating the avoidance of rapid setting of mortar as claimed in claim 1 wherein: inner tube (5) are connected through last connecting block (6) and lower connecting block (7) and perpendicular between groove (8) block, and erect the outside of groove (8) and be provided with 2 groups transverse groove (9) to go up connecting block (6) and lower connecting block (7) and correspond the setting with 2 groups transverse groove (9) from top to bottom respectively.
4. A building drum for facilitating the avoidance of rapid setting of mortar as claimed in claim 1 wherein: the inner cylinder (5) is connected with the connecting disc (11) through a fixed disc (10) in a clamping mode, the fixed disc (10) is rotatably connected with the inner cylinder (5) through a speed change bearing, and the connecting disc (11) is rotatably connected with the outer cylinder (1).
5. A building drum for facilitating the avoidance of rapid setting of mortar as claimed in claim 1 wherein: the connecting rope (12) is wound on the outer side of the connecting disc (11), the end part of the connecting rope (12) is connected with the sliding block (15), and a linkage structure is formed among the connecting disc (11), the connecting rope (12) and the sliding block (15).
CN201922073016.6U 2019-11-27 2019-11-27 Building ash bucket beneficial to avoiding rapid mortar condensation Expired - Fee Related CN211806932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922073016.6U CN211806932U (en) 2019-11-27 2019-11-27 Building ash bucket beneficial to avoiding rapid mortar condensation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922073016.6U CN211806932U (en) 2019-11-27 2019-11-27 Building ash bucket beneficial to avoiding rapid mortar condensation

Publications (1)

Publication Number Publication Date
CN211806932U true CN211806932U (en) 2020-10-30

Family

ID=73028256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922073016.6U Expired - Fee Related CN211806932U (en) 2019-11-27 2019-11-27 Building ash bucket beneficial to avoiding rapid mortar condensation

Country Status (1)

Country Link
CN (1) CN211806932U (en)

Similar Documents

Publication Publication Date Title
CN109680967B (en) Jacking equipment of steel structure beam for mounting small-sized factory building
CN201971567U (en) Small-sized indoor sand hoister
CN205114894U (en) Manual formula wall type swing crane; derrick
CN211806932U (en) Building ash bucket beneficial to avoiding rapid mortar condensation
CN208454270U (en) A kind of building tower crane apparatus for correcting for slowing down lifting rope swing
CN201952153U (en) Portable detachable hoisting equipment
CN219217279U (en) Assembled building wallboard hoist device
CN211687957U (en) Quick overhead hoist of aerated concrete block
CN208686051U (en) A kind of construction material lift equipment
CN216549212U (en) High-stability hoisting tool for tower of wind driven generator
CN213174734U (en) Conveniently remove telescopic building installation gallows
CN211078295U (en) Lifting device for engineering machinery
CN209942208U (en) Pulley type front-hung hoist mounting structure for climbing frame lifting
CN211056518U (en) Wheel hub hoist
CN207877104U (en) A kind of adjustable large-scale steel pipe suspender
CN207061739U (en) template hoisting frame
CN210105244U (en) Cotton laborsaving level and smooth device of partition wall heat preservation
CN215666913U (en) Lifting support for constructional engineering construction
CN217201641U (en) Novel adjustable lifting appliance
CN220334584U (en) Hoisting device for chemical plant room
CN209969543U (en) Pouring device for lost foam casting
CN220148996U (en) Assembled building board hoist device
CN220555612U (en) Lifting appliance for building construction
CN217972276U (en) Material hoisting device for building engineering
CN214831972U (en) Portable bridge suspended member steel formwork mounting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

Termination date: 20211127

CF01 Termination of patent right due to non-payment of annual fee