CN211806494U - Cut book rim charge and concentrate collecting system - Google Patents

Cut book rim charge and concentrate collecting system Download PDF

Info

Publication number
CN211806494U
CN211806494U CN202020127713.5U CN202020127713U CN211806494U CN 211806494 U CN211806494 U CN 211806494U CN 202020127713 U CN202020127713 U CN 202020127713U CN 211806494 U CN211806494 U CN 211806494U
Authority
CN
China
Prior art keywords
arc
book
pipe
groove
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020127713.5U
Other languages
Chinese (zh)
Inventor
熊佑平
徐贞银
吴晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Xinhua Printing Co ltd
Original Assignee
Wuhan Xinhua Printing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Xinhua Printing Co ltd filed Critical Wuhan Xinhua Printing Co ltd
Priority to CN202020127713.5U priority Critical patent/CN211806494U/en
Application granted granted Critical
Publication of CN211806494U publication Critical patent/CN211806494U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model relates to a collection system is concentrated to book cutting rim charge, it is including inhaling the material fan, with the drawing tube of inhaling material fan air intake intercommunication, with the row's material pipe of inhaling material fan air outlet intercommunication, arrange the material pipe hoist and mount on factory building top, the interval intercommunication has a plurality of three way connection on the drawing tube, three way connection's free end is connected with the material collection pipe, the one end intercommunication that the drawing tube was kept away from to the material collection pipe has the cover that gathers materials, three way connection free end and the connecting portion department of material collection pipe are provided with the both ends respectively with three way connection's free end and the steel wire expansion hose that the material collection pipe is with the footpath, the equal coaxial rigid coupling in steel wire expansion hose both ends has the ring flange, three way connection's free end and the equal coaxial rotation of tip of. The utility model discloses a ring plate and the ring flange separation on the steel wire expansion hose on the quick detach device with three way connection have realized the convenient mediation to blockking up the pipeline.

Description

Cut book rim charge and concentrate collecting system
Technical Field
The utility model belongs to the technical field of the technique of cut paper rim charge and specifically relates to a collection system is concentrated to book cutting rim charge.
Background
In the process of manufacturing printed matters, a paperboard with a standard size is usually cut into a required size by a paper cutter and then printed, after printing is finished, packaging operations such as folding, collating, gluing/riding/binding are also carried out, in order to ensure the printing quality of finished products, margin is usually left on three sides of a packaged book except the book back, therefore, the bound book needs to be cut by a three-side book cutter, the cut paper margin is accumulated on the periphery of equipment, a large space is occupied, maintenance of the sanitary condition of a production workshop is not facilitated, fire disasters are easily caused by dust and paper edges, safety production is not facilitated, and special persons need to clean, collect and process the margin, and the working hours are consumed.
To the above-mentioned problem, chinese patent that patent publication is CN109174342A provides a solid waste rim charge shredding conveyor fan, and it is connected with different production lines and waste material concentration district through pipeline to the waste rim charge that produces the production line is sucked to same waste material concentration district and is collected the recovery. Wherein, the fan sets up in pipeline through its impeller to set up sword form blade on the impeller, thereby realize the effect that the abandonment rim charge was concentrated in the suction fan with abandonment rim charge suction fan behind the fan motion production negative pressure, make simultaneously abandonment rim charge cut up into when sword form blade and carried to the waste material after the size of predetermineeing and concentrate the district. The fan overcomes the defects of high cost, large occupied area, high maintenance amount, low efficiency, low productivity and the like of the existing belt conveying and manual conveying, can transmit the waste scraps while cutting the waste scraps through the rotation of the impeller in the fan, and achieves the beneficial technical effects of low energy consumption, high efficiency, practicability and the like.
The technical scheme has the following problems: the recovery system is communicated with the fans through a conveying pipeline, when the leftover materials of the book cutters are recovered, in order to reduce the assembly cost of the collection system, one material suction fan corresponds to a plurality of book cutters, and in order to enable the material suction fan to suck waste materials generated by all the book cutters, the material suction fan with high power is inevitably used, so that the noise in a production workshop is high, and the physical and mental health of production personnel is seriously influenced; when a material suction fan with lower power is used, the cut book edge materials are easily blocked at the corners of the conveying pipeline, and the edge material conveying efficiency is further influenced.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a cut book rim charge and concentrate collecting system, its advantage that has convenient clearance conveying pipeline and blocks up.
The above object of the present invention can be achieved by the following technical solutions:
the utility model provides a collection system is concentrated to book cutting rim charge, including inhale the material fan, with inhale the drawing pipe of material fan air intake intercommunication, with inhale the row's of material fan air outlet intercommunication material pipe, arrange the material pipe hoist and mount on factory building top, the interval intercommunication has a plurality of three way connection on the drawing pipe, three way connection's free end is connected with the collecting pipe, the collecting pipe is kept away from the one end intercommunication of drawing pipe has the cover that gathers materials, three way connection free end with the connecting portion department of collecting pipe be provided with both ends respectively with three way connection's free end with the steel wire expansion hose of collecting pipe with the footpath, the equal coaxial rigid coupling in steel wire expansion hose both ends has the ring flange, three way connection's free end with the equal coaxial rotation of tip of collecting pipe is connected with the ring piece, the ring piece with be provided with quick detach device between the ring flange.
By adopting the technical scheme, when the plurality of book cutters work, the material suction fan is started, the material suction fan pumps out air in a conveying pipeline formed by the material pumping pipe, the three-way joint, the material collecting pipe and the material collecting cover, so that the edge materials falling to the adjacent material collecting covers from the plurality of book cutters are conveyed to the material suction fan along with air flow and are intensively discharged and collected from the material discharging pipe, the centralized and effective collection of the edge materials of the plurality of book cutters by the book cutting edge material centralized collection system is realized, and the influence of the cleanliness of a production site caused by the accumulation of a plurality of edge materials on the production site is avoided; when the book cutting rim charge is conveyed in a conveying pipeline, blockage occurs at the corner of the three-way joint easily, the ring piece on the three-way joint is separated from the flange plate on the steel wire telescopic hose through the quick disassembling device, the steel wire telescopic hose is compressed again, and the blocked rim charge is dredged by stretching an iron wire or a hook-shaped object into the three-way joint, so that the blocked pipeline is dredged conveniently.
The present invention may be further configured in a preferred embodiment as: quick detach device is including running through set up on the ring flange and with a plurality of arc slot and a plurality of arc spout of ring flange with the footpath, arc slot groove width is greater than arc spout groove width and the two communicates in order, the ring piece is close to steel wire flexible hose's one end rigid coupling have with the card of the adaptation that the arc spout slided, the card is kept away from the one end rigid coupling of ring piece have with the fixture block of arc slot grafting adaptation.
Through adopting above-mentioned technical scheme, during flange plate and ring piece are connected, insert in the arc slot until the fixture block fully salient in the flange plate be close to one side of steel wire flexible hose, rotatory ring piece makes the card slide towards the direction that is close to the arc spout again, when the card was in the arc spout completely, the fixture block salient in the head and the flange butt of card to the convenient joint of flange plate and ring piece has been realized and has been connected.
The present invention may be further configured in a preferred embodiment as: and a sealing ring is arranged at one end of the flange plate, which is far away from the steel wire telescopic hose.
Through adopting above-mentioned technical scheme, the leakproofness between ring flange and the ring piece has been improved to the sealing washer for be connected between wire expansion hose and three way connection and the collecting pipe inseparabler, reduced the possibility of gas leakage.
The present invention may be further configured in a preferred embodiment as: and a locking mechanism used for locking the card in the arc-shaped sliding groove is arranged at the joint part of the flange plate, the arc-shaped slot and the arc-shaped sliding groove.
Through adopting above-mentioned technical scheme, locking mechanism carries out the locking to the card to the unexpected counter rotation of ring piece leads to the connection unstability of steel wire expansion hose and three way connection or collection pipe.
The present invention may be further configured in a preferred embodiment as: the locking mechanism comprises a holding groove formed in the wall of the arc-shaped slot of the flange plate, a lock pin is elastically arranged in the holding groove, and an unlocking assembly used for driving the lock pin to retract into the holding groove is arranged on the flange plate.
Through adopting above-mentioned technical scheme, the card inserts in the arc slot after, through unblock subassembly drive lockpin retraction holding tank, with card screw in arc spout after, removes the restriction of unblock subassembly to the lockpin again, and the lockpin pops out and carries out the locking to the card in the arc spout in the holding tank, has realized the convenient locking to the card.
The present invention may be further configured in a preferred embodiment as: an elastic piece is arranged between the lock pin and the bottom wall of the accommodating groove, and one side of the lock pin, which faces the arc-shaped slot, is provided with an inclined plane.
Through adopting above-mentioned technical scheme, the card inserts back in the arc slot, and rotatory ring piece drives the card and slides towards the direction that is close to the arc spout, in card promoted the lockpin retraction holding tank through this inclined plane during with the inclined plane butt of lockpin, the elastic component is compressed and is produced deformation, and when the card was in the arc spout completely screwed in, the deformation power of elastic component pushed the lockpin and pops out the holding tank and carry out the locking in order to the card, has realized the automatic locking of lockpin to the card.
The present invention may be further configured in a preferred embodiment as: the unlocking assembly comprises a bolt which penetrates through the flange plate in a threaded mode and extends into the accommodating groove, a groove is formed in one side, close to the bolt, of the lock pin, and a groove wall, close to one side of the elastic piece, of the groove is arranged to be an inclined plane back to the elastic piece.
Through adopting above-mentioned technical scheme, when needing to relieve the locking of lockpin to the card, rotatory bolt makes the bolt move towards the direction of deepening the holding tank, and the tip of bolt supports tightly on the inclined plane of lockpin upper groove to along with deepening gradually of bolt promotes the lockpin and move towards the direction that is close to the elastic component through the inclined plane, make the set bar retract in the holding tank in order to relieve the locking to the card.
The present invention may be further configured in a preferred embodiment as: the side wall of the three-way joint is provided with an observation opening along the length direction of the material pumping pipe, and a transparent plate is fixed at the position of the observation opening of the three-way joint.
Through adopting above-mentioned technical scheme, set up behind observation mouth and the transparent plate, the jam condition in the three way connection can be observed immediately to the site work personnel, is convenient for in time dredge the conveying pipeline who blocks up.
To sum up, the utility model discloses a following at least one useful technological effect:
1. when the book cutting edge materials are conveyed in the conveying pipeline, the corners of the three-way joint are easy to block, at the moment, the ring sheet on the three-way joint can be separated from the flange plate on the steel wire flexible hose through the quick disassembling device, then the steel wire flexible hose is compressed, and the blocked edge materials are dredged by stretching an iron wire or a hook-shaped object into the three-way joint, so that the blocked pipeline is dredged conveniently;
2. when the flange plate and the ring plate are connected, the clamping piece on the ring plate is inserted into the arc-shaped slot until the clamping block completely protrudes out of one side of the flange plate close to the steel wire telescopic hose, then the ring plate is rotated to enable the clamping piece to slide towards the direction close to the arc-shaped chute, and when the clamping piece is completely screwed into the arc-shaped chute, the clamping block protrudes out of the head of the clamping piece and is abutted to the flange plate, so that the convenient clamping connection of the flange plate and the ring plate is;
3. after the card inserted in the arc slot, rotatory bolt drive lockpin retraction holding tank in, with card screw in arc spout after, the reverse rotation bolt, the lockpin pops out and carries out the locking to the card in the arc spout in the holding tank, has realized the automatic locking and the convenient unblock of set bar to the card.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural diagram of the three-way joint, the ring piece, the flange, the quick-connection device, the steel wire flexible hose and the material collecting pipe of the present invention.
Fig. 3 is a partially enlarged schematic view of a portion a in fig. 2.
Reference numerals: 1. a material suction fan; 2. a material pumping pipe; 3. a discharge pipe; 4. a three-way joint; 5. a material collecting pipe; 6. a material collecting cover; 7. a steel wire flexible hose; 8. a flange plate; 9. a ring sheet; 10. an arc slot; 11. an arc-shaped chute; 12. a card; 13. a clamping block; 14. a seal ring; 15. accommodating grooves; 16. a lock pin; 17. an elastic member; 18. a bolt; 19. a groove; 20. an observation port; 21. a transparent plate.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, the present invention discloses a book-cutting edge material centralized collection system, which comprises a suction fan 1, a material pumping pipe 2 communicated with an air inlet of the suction fan 1, and a material discharging pipe 3 communicated with an air outlet of the suction fan 1, wherein the material discharging pipe 3 is hoisted on the top of a factory building, the material pumping pipe 2 is communicated with a plurality of three-way joints 4 at intervals, the free end of each three-way joint 4 is connected with a material collecting pipe 5, one end of the material collecting pipe 5 far away from the material pumping pipe 2 is communicated with a material collecting cover 6, the side wall of the material collecting cover 6 is provided with an opening communicated with a blanking port of a book cutter, the connecting part of the free end of the three-way joint 4 and the material collecting pipe 5 is provided with a steel wire flexible hose 7, the two ends of the steel wire flexible hose 7 are coaxially and fixedly connected with flange plates 8, the free end of the three-way joint 4 and the end of the, a quick-release device is arranged between the ring piece 9 and the flange plate 8, an observation opening 20 along the length direction of the material pumping pipe 2 is formed in the side wall of the three-way joint 4, and a transparent plate 21 is fixed at the observation opening 20 of the three-way joint 4.
When a plurality of book cutters work, the suction fan 1 is started, the suction fan 1 pumps out air in a conveying pipeline formed by the pumping pipe 2, the three-way joint 4, the collecting pipe 5 and the collecting cover 6, so that the edge materials falling to the adjacent collecting covers 6 from the book cutters are conveyed to the suction fan 1 along with air flow and are intensively discharged and collected from the discharging pipe 3, the centralized collection system for the edge materials of the book cutters is realized, and the influence of accumulation of a plurality of edge materials on the production site on the cleanliness of the production site is avoided; when the book cutting edge materials are conveyed in a conveying pipeline, the corners of the three-way joint 4 are easy to block, at the moment, the ring piece 9 on the three-way joint 4 can be separated from the flange plate 8 on the steel wire telescopic hose 7 through the quick-dismantling device, then the steel wire telescopic hose 7 is compressed, and the blocked edge materials are dredged by stretching an iron wire or a hook-shaped object into the three-way joint 4, so that the blocked pipeline is dredged conveniently; and after the observation port 20 and the transparent plate 21 are arranged, field workers can immediately observe the blockage condition in the three-way joint 4, so that the blocked conveying pipeline can be conveniently dredged in time.
Referring to fig. 2 and 3, quick detach device is including running through set up on ring flange 8 and with a plurality of arc slot 10 and a plurality of arc spout 11 of ring flange 8 with the footpath, arc slot 10 groove width is greater than 11 groove widths of arc spout and the two communicates in order, the one end rigid coupling that ring piece 9 is close to steel wire expansion hose 7 has the card 12 with the adaptation that slides of arc spout 11, the one end rigid coupling that ring piece 9 was kept away from to card 12 has the fixture block 13 with the adaptation of pegging graft of arc slot 10, the fixture block 13 cross section sets up right triangle, the one end that steel wire expansion hose 7 was kept away from to ring flange 8 is provided with sealing washer 14.
When the flange plate 8 and the ring plate 9 are connected, the clamping piece 12 on the ring plate 9 is inserted into the arc-shaped slot 10 until the clamping block 13 completely protrudes out of one side of the flange plate 8 close to the steel wire telescopic hose 7, then the ring plate 9 is rotated to enable the clamping piece 12 to slide towards the direction close to the arc-shaped chute 11, and when the clamping piece 12 is completely screwed into the arc-shaped chute 11, the clamping block 13 protrudes out of the head of the clamping piece 12 and is abutted to the flange plate 8, so that the convenient clamping connection of the flange plate 8 and the ring plate 9 is; the sealing ring 14 improves the sealing performance between the flange 8 and the ring piece 9, so that the connection between the steel wire telescopic hose 7 and the tee joint 4 and the collecting pipe 5 is tighter, and the possibility of air leakage is reduced.
Referring to fig. 3, a locking mechanism for locking the card 12 in the arc-shaped chute 11 (as shown in fig. 2) is disposed at a joint portion of the arc-shaped slot 10 and the arc-shaped chute 11 of the flange 8, the locking mechanism includes an accommodating groove 15 formed in a wall of the arc-shaped slot 10 of the flange 8, a lock pin 16 is elastically disposed in the accommodating groove 15, an unlocking assembly for driving the lock pin 16 to retract into the accommodating groove 15 is disposed on the flange 8, an elastic member 17 is disposed between the lock pin 16 and a bottom wall of the accommodating groove 15, the elastic member 17 is preferably a spring, and one side of the lock pin 16 facing the arc-shaped slot; the unlocking assembly comprises a bolt 18 which penetrates through the flange plate 8 through threads and extends into the accommodating groove 15, a groove 19 is formed in one side, close to the bolt 18, of the lock pin 16, an inclined surface facing away from the elastic piece 17 is formed in the groove wall of one side, close to the elastic piece 17, of the groove 19, and one end, extending into the accommodating groove 15, of the bolt 18 is abutted to the inclined surface of the groove 19.
The bolt 18 is rotated reversely to enable the bolt 18 to be far away from the accommodating groove 15, the card 12 is inserted into the arc-shaped slot 10, the ring plate 9 is rotated to drive the card 12 to slide towards the direction close to the arc-shaped sliding groove 11, the locking pin 16 is pushed to retract into the accommodating groove 15 through the inclined surface when the card 12 is abutted to the inclined surface of the locking pin 16, the elastic piece 17 is compressed to generate deformation, when the card 12 is completely screwed into the arc-shaped sliding groove 11, the deformation force of the elastic piece 17 pushes the locking pin 16 to pop out the accommodating groove 15 to lock the card 12, automatic locking of the locking pin 16 on the card 12 is realized, and therefore the flange plate 8 is tightly connected with the ring plate 9, and the steel wire; when the blockage needs to be cleaned, the bolt 18 is rotated to enable the bolt 18 to move towards the direction penetrating into the accommodating groove 15, the end part of the bolt 18 abuts against the inclined surface of the groove 19 on the lock pin 16, the lock pin 16 is pushed to move towards the direction close to the elastic piece 17 along with the gradual penetration of the bolt 18 through the inclined surface, the lock bolt is retracted into the accommodating groove 15 to release the locking of the clamping piece 12, and then the clamping piece 12 can be slid into the arc-shaped slot 10 by reversely rotating the ring piece 9 to achieve the dismounting of the flange plate 8.
The implementation principle of the embodiment is as follows:
when a plurality of book cutters work, the suction fan 1 is started, the suction fan 1 pumps out air in a conveying pipeline formed by the pumping pipe 2, the three-way joint 4, the collecting pipe 5 and the collecting cover 6, so that the edge materials falling to the adjacent collecting covers 6 from the book cutters are conveyed to the suction fan 1 along with air flow and are intensively discharged and collected from the discharging pipe 3, the centralized collection system for the edge materials of the book cutters is realized, and the influence of accumulation of a plurality of edge materials on the production site on the cleanliness of the production site is avoided; when the book cutting rim charge is conveyed in a conveying pipeline, blockage occurs at the corner of the three-way joint 4 easily, the ring piece 9 on the three-way joint 4 is separated from the flange plate 8 on the steel wire telescopic hose 7 through the quick-dismantling device, the steel wire telescopic hose 7 is compressed again, the blocked rim charge is dredged by stretching an iron wire or a hook-shaped object into the three-way joint 4, and the convenient dredging of the blocked pipeline is realized.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a collection system is concentrated to book scrap edge cuts which characterized in that: the material suction device comprises a material suction fan (1), a material suction pipe (2) communicated with an air inlet of the material suction fan (1), and a material discharge pipe (3) communicated with an air outlet of the material suction fan (1), wherein the material discharge pipe (3) is hoisted on the top of a factory building, a plurality of three-way joints (4) are communicated on the material suction pipe (2) at intervals, the free end of each three-way joint (4) is connected with a material collection pipe (5), one end, far away from the material suction pipe (2), of the material collection pipe (5) is communicated with a material collection cover (6), a steel wire telescopic hose (7) with the same diameter as that of the free end of the three-way joint (4) and the material collection pipe (5) is arranged at the connecting part of the free end of the three-way joint (4) and the material collection pipe (5), two ends of the steel wire telescopic hose (7) are coaxially and fixedly connected with a flange (8), and the free end of the three-way joint (4) and, and a quick-release device is arranged between the ring piece (9) and the flange plate (8).
2. The book-cutting scrap centralized collection system according to claim 1, wherein: quick detach device is including running through set up on ring flange (8) and with a plurality of arc slot (10) and a plurality of arc spout (11) of ring flange (8) with the footpath, arc slot (10) groove width is greater than arc spout (11) groove width and the two communicate in order, ring piece (9) are close to the one end rigid coupling of steel wire expansion hose (7) have with card (12) of arc spout (11) the adaptation that slides, card (12) are kept away from the one end rigid coupling of ring piece (9) have with fixture block (13) of arc slot (10) grafting adaptation.
3. The book-cutting scrap centralized collection system according to claim 2, wherein: and a sealing ring (14) is arranged at one end, far away from the steel wire telescopic hose (7), of the flange plate (8).
4. The book-cutting scrap centralized collection system according to claim 3, wherein: and a locking mechanism for locking the card (12) in the arc-shaped sliding groove (11) is arranged at the joint part of the flange plate (8) between the arc-shaped slot (10) and the arc-shaped sliding groove (11).
5. The book-cutting scrap centralized collection system according to claim 4, wherein: the locking mechanism comprises a containing groove (15) formed in the wall of the arc-shaped slot (10) of the flange plate (8), a lock pin (16) is elastically arranged in the containing groove (15), and an unlocking assembly used for driving the lock pin (16) to retract into the containing groove (15) is arranged on the flange plate (8).
6. The book-cutting scrap centralized collection system according to claim 5, wherein: an elastic piece (17) is arranged between the lock pin (16) and the bottom wall of the accommodating groove (15), and an inclined surface is arranged on one side, facing the arc-shaped inserting groove (10), of the lock pin (16).
7. The book-cutting scrap centralized collection system according to claim 6, wherein: the unlocking assembly comprises a bolt (18) which penetrates through the flange plate (8) in a threaded mode and extends into the accommodating groove (15), a groove (19) is formed in one side, close to the bolt (18), of the lock pin (16), and an inclined surface facing away from the elastic piece (17) is formed in the groove wall of one side, close to the elastic piece (17), of the groove (19).
8. The book-cutting scrap centralized collection system according to claim 1, wherein: the side wall of the three-way joint (4) is provided with an observation opening (20) along the length direction of the material pumping pipe (2), and the three-way joint (4) is fixed with a transparent plate (21) at the observation opening (20).
CN202020127713.5U 2020-01-19 2020-01-19 Cut book rim charge and concentrate collecting system Expired - Fee Related CN211806494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020127713.5U CN211806494U (en) 2020-01-19 2020-01-19 Cut book rim charge and concentrate collecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020127713.5U CN211806494U (en) 2020-01-19 2020-01-19 Cut book rim charge and concentrate collecting system

Publications (1)

Publication Number Publication Date
CN211806494U true CN211806494U (en) 2020-10-30

Family

ID=72991998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020127713.5U Expired - Fee Related CN211806494U (en) 2020-01-19 2020-01-19 Cut book rim charge and concentrate collecting system

Country Status (1)

Country Link
CN (1) CN211806494U (en)

Similar Documents

Publication Publication Date Title
CN207105122U (en) A kind of composite plate Veneer Cutting device
CN215319276U (en) Multi-blade saw scrap removing device
CN211806494U (en) Cut book rim charge and concentrate collecting system
CN209682316U (en) The wastepaper collecting device of ripper
CN113731616B (en) Negative pressure dust fall type pulverizer capable of preventing material residues
CN210081892U (en) Recovery system is concentrated to cut paper rim charge
CN217674938U (en) Scraper conveyor protection casing
CN212122567U (en) Chip removal machine capable of improving production efficiency of machining center
CN215820754U (en) System bag machine piece vacuum collection device
CN214513395U (en) Novel centrifugal fan
CN210303868U (en) Essence draws sediment recovery unit convenient to collect waste material
CN215539267U (en) Stifled device is prevented to strength ash conveying pipeline filtration debris
CN109421104A (en) A kind of composite plate Veneer Cutting device
CN206853362U (en) A kind of exhausting-dusting system of workshop cleaning
CN201709382U (en) Filament cutter dedusting and air separation device
CN216543631U (en) Discharged material collecting system of paper cutter
CN218985095U (en) Three-dimensional dust collector of cut-to-size saw
CN212825762U (en) Double-cutter waste box
CN219337291U (en) Waste residue separation and collection device for metallographic specimen cutting machine
CN215617422U (en) Double-sided sander and dust removal system
CN210969140U (en) Dust collector is used in corrugated paper production
CN212352126U (en) Hydraulic double-digital display paper cutter
CN220639066U (en) Processing device of die cutting machine
CN217098909U (en) Stone paper slitting and rewinding system
CN210187992U (en) Briquetting machine waste material passageway deoiling fog device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

Termination date: 20220119