CN211792412U - Scheduling device for converged communication - Google Patents
Scheduling device for converged communication Download PDFInfo
- Publication number
- CN211792412U CN211792412U CN202020422574.9U CN202020422574U CN211792412U CN 211792412 U CN211792412 U CN 211792412U CN 202020422574 U CN202020422574 U CN 202020422574U CN 211792412 U CN211792412 U CN 211792412U
- Authority
- CN
- China
- Prior art keywords
- air
- box
- scheduling
- sides
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Cooling Or The Like Of Electrical Apparatus (AREA)
Abstract
The utility model discloses a scheduling device for fusion communication, which comprises a scheduling box, wherein an equipment installation bin for installing scheduling equipment is arranged in the scheduling box, a supporting cylinder is fixedly arranged on the bottom surface of the inner part of the scheduling box, the upper end of the supporting cylinder is fixedly arranged on the lower surface of the equipment installation bin, a fan is arranged in the supporting cylinder, the upper ends of the two side surfaces of the supporting cylinder are respectively provided with an air hole, the two side surfaces of the supporting cylinder are respectively and fixedly provided with an air inducing pipe communicated with the air holes, the two sides of the inner part of the equipment installation bin are respectively provided with an air outlet pipe, the two sides of the scheduling box are divided into water-isolating cavities by a partition plate, the upper end of the surface of the partition plate is provided with an air inlet, the fan is started by opening a rain shield, external air can enter the scheduling box through the air inlet and then uniformly blow on the equipment in the equipment installation bin through the, because the rectangular opening is lower than the air inlet, rain can be prevented from entering the dispatching box.
Description
Technical Field
The utility model relates to a communication equipment technical field, more specifically say, in particular to fuse scheduling device for communication.
Background
With the development of the times and the gradual progress of science and technology, communication equipment is increased day by day, communication data needs the communication equipment to communicate, the existing communication equipment is generally directly installed in a box body or a cabinet body, most of the communication equipment is installed outdoors, and therefore the dispatching box needs to have certain waterproof and heat dissipation capabilities.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fuse scheduling device for communication to overcome the defect that prior art exists.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a dispatching device for fusion communication comprises a dispatching box, wherein an equipment installation bin for installing dispatching equipment is arranged in the dispatching box, a cover plate is arranged at the upper part of the equipment installation bin, the equipment installation bin is positioned in the middle of the inside of the dispatching box, a supporting barrel is fixedly arranged on the bottom surface of the inside of the dispatching box, the upper end of the supporting barrel is fixedly arranged on the lower surface of the equipment installation bin, a fan is arranged in the supporting barrel, air holes are respectively formed in the upper ends of the two side surfaces of the supporting barrel, air guide pipes communicated with the air holes are fixedly arranged on the two side surfaces of the supporting barrel, air outlet pipes are respectively arranged on the two sides of the inside of the equipment installation bin, the lower ends of the air outlet pipes are communicated and connected with the air guide pipes in corresponding positions, through holes are respectively formed in the surfaces of the supporting barrel and the air outlet pipes, partition plates are fixedly arranged on, rectangle opening has all been seted up on dispatch box both sides surface, the dash board is installed through the hinge in rectangle opening top position to dispatch box both sides surface, and dispatch box both sides surface is located rectangle opening below position and is provided with latch mechanism, the dash board passes through the latch structure and is connected with the rectangle opening.
Further, latch mechanism includes L template and spring, the spout mouth has all been seted up to dispatch case both sides surface below the rectangle opening position, the L template slides and sets up in the spout mouth, and the activity of L template upper end is inserted and is located in the rectangle opening, spring fixed mounting is in spout mouth bottom, the jack has been seted up to dash board one end.
Further, the surface fixed mounting has the rectangle cock board in the dash board inboard, and the size of rectangle cock board corresponds each other with the size of rectangle opening.
Further, the rectangular opening is located at a position below the air inlet.
Compared with the prior art, the utility model has the advantages of:
through opening the dash board, start the fan, in the outside air can get into the dispatch box through the air intake, then evenly blow on the inside equipment of equipment fixing storehouse through going out the tuber pipe to can rapid cooling, because the water proof chamber has been equipped, can avoid outside rainwater to get into the dispatch box in, because the rectangle opening is less than the air intake, can avoid in the rainwater gets into the dispatch box that wafts.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a structural diagram of a scheduling device for converged communication according to the present invention;
fig. 2 is an enlarged schematic view of the structure at a in fig. 1.
In the figure: the device comprises a dispatching box 1, a device installation bin 2, a supporting barrel 3, a partition plate 4, an air inlet 5, an air hole 6, a fan 7, an induced draft pipe 8, an air outlet pipe 9, a rectangular opening 10, a water separation cavity 11, a cover plate 12, a rain shielding plate 13, a rectangular plug plate 14, a handle 15, a sliding groove opening 16, a type plate 17L and a spring 18.
Detailed Description
Further embodiments of the present invention will be described in detail below with reference to the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making more clear and definite definitions of the protection scope of the present invention.
Referring to fig. 1 and 2, the utility model provides a dispatching device for fusion communication, which comprises a dispatching box 1, a device installation bin 2 for installing dispatching devices is arranged in the dispatching box 1, a cover plate 12 is arranged on the upper part of the device installation bin 2, the device installation bin 2 is arranged in the middle part of the dispatching box 1, a support cylinder 3 is fixedly arranged on the bottom surface of the inner part of the dispatching box 1, the upper end of the support cylinder 3 is fixedly arranged on the lower surface of the device installation bin 2, a fan 7 is arranged in the support cylinder 3, air holes 6 are arranged on the upper ends of the surfaces of both sides of the support cylinder 3, air ducts 8 communicated with the air holes 6 are fixedly arranged on the surfaces of both sides of the support cylinder 3, air outlet pipes 9 are arranged on both sides of the inner part of the device installation bin 2, the lower ends of the air outlet pipes 9 are communicated and connected with the air ducts 8 at corresponding positions, through holes are arranged on the surfaces, partition plate 4 separates into water proof chamber 11 with 1 both sides of dispatch box, and air intake 5 has been seted up to partition plate 4 on the surface, and rectangle opening 10 has all been seted up on 1 both sides surface of dispatch box, and 1 both sides surface of dispatch box installs dash board 13 through the hinge in rectangle opening 10 top position, and 1 both sides surface of dispatch box is located rectangle opening 10 below position and is provided with clamping mechanism, and dash board 13 passes through the clamping structure and is connected with rectangle opening 10.
In this embodiment, latch mechanism includes L template 17 and spring 18, and smooth notch 16 has all been seted up to 1 both sides surface of dispatch case in rectangle opening 10 below position, and L template 17 slides and sets up in smooth notch 16, and L template 17 upper end activity is inserted and is located rectangle opening 10, and spring 18 fixed mounting is in smooth notch 16 bottoms, and the jack has been seted up to dash board 13 one end.
In this embodiment, a rectangular plug plate 14 is fixedly mounted on the inner side surface of the flashing 13, and the size of the rectangular plug plate 14 corresponds to the size of the rectangular opening 10.
In this embodiment, the rectangular opening 10 is located below the air inlet 5.
The utility model discloses a theory of operation does: through opening dash board 13, start fan 7, in the outside air can get into dispatch box 1 through air intake 5, then evenly blow on 2 internal plant in equipment fixing storehouse through going out tuber pipe 9 to can rapid cooling, owing to equipped water proof chamber 11, can avoid outside rainwater to get into in the dispatch box 1, because rectangle opening 10 is less than air intake 5, can avoid in the rain entering dispatch box 1 that wafts.
Although the embodiments of the present invention have been described with reference to the accompanying drawings, various changes and modifications can be made by the owner within the scope of the appended claims, and the protection scope of the present invention should not be exceeded by the claims.
Claims (4)
1. The utility model provides a fuse scheduling device for communication, includes the dispatch case, is provided with the equipment fixing storehouse that is used for installing the scheduling equipment in the dispatch case, and the apron, its characterized in that are installed on equipment fixing storehouse upper portion: the equipment installation bin is positioned in the middle of the inside of the dispatching box, a support cylinder is fixedly installed on the surface of the inner bottom of the dispatching box, the upper end of the support cylinder is fixedly installed on the lower surface of the equipment installation bin, a fan is installed in the support cylinder, air holes are formed in the upper ends of the two side surfaces of the support cylinder, air guide pipes communicated with the air holes are fixedly installed on the two side surfaces of the support cylinder, air outlet pipes are installed on the two sides of the inside of the equipment installation bin, the lower ends of the air outlet pipes are communicated and connected with the air guide pipes in corresponding positions, through holes are formed in the surfaces of the support cylinder and the air outlet pipes, partition plates are fixedly installed on the two sides of the inside of the dispatching box and divide the two sides of the dispatching box into water separation cavities by the partition plates, air inlets are formed in the upper ends of the surfaces of the partition plates, rectangular openings are formed in the surfaces of the two sides of the dispatching, the flashing is connected with the rectangular opening through a clamping structure.
2. The scheduling apparatus for converged communication according to claim 1, wherein: clamping mechanism includes L template and spring, the spout mouth has all been seted up to dispatch case both sides surface below the rectangle opening position, the L template slides and sets up in the spout mouth, and the activity of L template upper end is inserted and is located in the rectangle opening, spring fixed mounting is in spout mouth bottom, the jack has been seted up to dash board one end.
3. The scheduler for converged communication according to claim 2, wherein: the inboard fixed surface of dash board installs the rectangle cock board, and the size of rectangle cock board corresponds each other with rectangle open-ended size.
4. The scheduling apparatus for converged communication according to claim 3, wherein: the rectangular opening is positioned below the air inlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020422574.9U CN211792412U (en) | 2020-03-29 | 2020-03-29 | Scheduling device for converged communication |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020422574.9U CN211792412U (en) | 2020-03-29 | 2020-03-29 | Scheduling device for converged communication |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211792412U true CN211792412U (en) | 2020-10-27 |
Family
ID=72927767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020422574.9U Active CN211792412U (en) | 2020-03-29 | 2020-03-29 | Scheduling device for converged communication |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211792412U (en) |
-
2020
- 2020-03-29 CN CN202020422574.9U patent/CN211792412U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211792412U (en) | Scheduling device for converged communication | |
CN205123021U (en) | Power distribution panel | |
CN112566426A (en) | Artificial intelligence edge calculation box | |
CN205355629U (en) | Electrical automation control's heat dissipation formula regulator cubicle | |
CN108777436A (en) | A kind of electrical cabinet of maintenance easy to disassemble | |
CN209472093U (en) | A kind of new waterproof coupler | |
CN208401863U (en) | A kind of network monitoring apparatus | |
CN216745146U (en) | Improved air duct structure for improving heat dissipation effect | |
CN210350546U (en) | Better block terminal of heat dispersion | |
CN209608576U (en) | A kind of frequency converter with dust and water protection dual function | |
CN207639069U (en) | A kind of radiating dustproof acid bronze alloy electrooptical device | |
CN209119313U (en) | A kind of water-proof radiator | |
CN217238735U (en) | Computer software and hardware protection device | |
CN202548391U (en) | Quick junction box for communication optical cable | |
CN207020623U (en) | A kind of easy-to-dismount wind guide cover device | |
CN213185234U (en) | Box-type substation with ventilation structure | |
CN204991155U (en) | Intelligent instrument dish with prevent dust and defogging function | |
CN204948601U (en) | A kind of electric machine controller | |
CN216646767U (en) | Auxiliary detection device for battery pack | |
CN218069985U (en) | Built-in battery heat abstractor of electric bicycle | |
CN211319163U (en) | Mobile application development terminal equipment case with heat dissipation function | |
CN215600877U (en) | Dampproofing type integrated form low pressure distribution device | |
CN204145277U (en) | A kind of fan of frequency converter mounting structure | |
CN216850980U (en) | Ring main unit with controllable convection heat dissipation function | |
CN221666548U (en) | Air-separating control structure for glass air-drying |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |