CN211784769U - But fast assembly's high strength loading reaction frame - Google Patents
But fast assembly's high strength loading reaction frame Download PDFInfo
- Publication number
- CN211784769U CN211784769U CN202020373780.5U CN202020373780U CN211784769U CN 211784769 U CN211784769 U CN 211784769U CN 202020373780 U CN202020373780 U CN 202020373780U CN 211784769 U CN211784769 U CN 211784769U
- Authority
- CN
- China
- Prior art keywords
- installation
- fixed
- mounting
- screw
- reaction frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000006243 chemical reaction Methods 0.000 title claims abstract description 22
- 238000009434 installation Methods 0.000 claims abstract description 53
- 230000000694 effects Effects 0.000 claims description 5
- 239000000956 alloy Substances 0.000 claims description 3
- 125000003003 spiro group Chemical group 0.000 claims 1
- 238000000034 method Methods 0.000 description 6
- 210000001503 joint Anatomy 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model discloses a but fast assembly's high strength loading reaction frame, including PMKD, PMKD top both sides are all fixed and are provided with the fixed column, the installation spout has all been seted up at the relative one side middle part of fixed column. The utility model discloses install PMKD top both sides earlier when assembling the fixed column of both sides, all remove the installation slider bottom to installing the installation slider in the installation spout, then just will drive the connector simultaneously and remove the relative one side lower extreme of fixed column, all advance to install the installation head gomphosis of installing at the spreader both ends when assembling the spreader again and set up inside the mounting groove of establishing in the relative one side of connector, fix between screw is advanced to screw spiral shell round pin spiral shell move installation in proper order, after fixed drive the spreader up-moving with artifical through installation spout and installation slider, when removing relative position spiral shell move again in proper order spacing bolt spiral shell move advance spacing spiral shell inslot portion fix can.
Description
Technical Field
The utility model relates to a loading reaction frame technical field specifically is a but fast assembly's high strength loading reaction frame.
Background
The reaction frame mainly comprises a cross beam, an upright post, a base, a lifting system, a hydraulic system, an adjusting cushion block and the like, is mainly used for checking the jack and can also be used for pressure resistance detection of various materials such as large concrete members, large workpieces and the like;
the traditional high-strength loading reaction frame capable of being assembled quickly has the following defects;
at present, a loading reaction frame is used in the working process of a large concrete member, a common reaction frame is very important equipment in the detection process of the large concrete member, and the common reaction frame is not convenient and fast enough in assembly.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a but fast assembly's high strength loading reaction frame to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a high-strength loading reaction frame capable of being assembled quickly comprises a fixed bottom plate, fixed columns are fixedly arranged on both sides of the top end of the fixed bottom plate, the middle part of one side opposite to the fixed column is provided with an installation sliding groove, the upper end of the inside of the installation sliding groove is provided with an installation sliding block in a sliding way, the opposite side of the mounting slide block is fixedly provided with a connector through the mounting chute, the upper end of the opposite side of the connector is provided with a mounting groove, the mounting grooves are movably provided with mounting heads inside, a cross column is fixedly arranged between opposite sides of the mounting heads, screw holes are arranged at the middle parts of the connecting head and the mounting head, screw pins are arranged between the screw holes in a screwing way, the middle upper end of one side opposite to the fixed column is provided with a groove, the middle of one side, away from the connector, of one side inside the groove and the middle of one side, away from the connector, of the mounting sliding block is provided with a limiting screw groove, and a limiting bolt is arranged between the middle parts of the limiting screw grooves in a screwing mode.
Preferably, the lower end of the middle part of the front side of the connector is movably provided with a mounting rod, the top end of the mounting rod is movably provided with an anti-slip jacket, and the anti-slip jacket is connected with the front end of the limit bolt in a clamping manner.
Preferably, the lower extreme activity is provided with the installation cover in the fixed column outside, the opposite one side of installation cover all is fixed and is provided with fixed branch, fixed branch bottom all is fixed and is provided with fixed bolster, the equal activity in PMKD both sides is provided with the movable rod, the movable rod top all is fixed and is provided with the installation and presss from both sides the cover and the installation presss from both sides the cover all to be connected with fixed branch block.
Preferably, the periphery inside the anti-slip jacket is fixedly provided with a rubber pad.
Preferably, a support rod is fixedly arranged between the top ends of the fixed columns.
Preferably, the mounting sliding block, the connector, the limiting bolt and the mounting head are all made of alloy materials.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses install the fixed column of both sides to PMKD top both sides earlier when assembling, all remove the installation slider of installing in the installation spout to installation slider bottom, then just will drive the connector simultaneously and remove to the relative one side lower extreme of fixed column, all enter the installation groove of seting up in the relative one side of connector the installation head gomphosis of installing at the spreader both ends when assembling the spreader again inside, fix between screwing in proper order the spiral shell round pin spiral shell moves the installation and enters screw inside, after fixing, drive the spreader through installation spout and installation slider and move up with the manual work, when moving to relative position again spiral shell move the spacing bolt spiral shell move in proper order and fix inside the spacing spiral shell groove, more swift still be convenient for adjusting the distance between spreader and PMKD and use when the installation like this;
2. the utility model discloses while the opposite one side lower extreme of fixed column all installs fixed branch through the installation cover, and the fixed branch bottom all installs fixed branch piece, and the PMKD both sides all install the installation through the movable rod and press from both sides the cover, loop through the installation cover after the integrated device equipment is accomplished and install the opposite one side lower extreme of fixed column to fixed branch, and all make the fixed branch piece of installing in the fixed branch bottom dock with ground activity, press the movable rod in proper order again and drive the installation and press from both sides the cover and remove toward fixed branch one side and fix with the butt joint of fixed branch gomphosis, thereby increase the steadiness of integrated device at the during operation.
Drawings
FIG. 1 is a schematic view of the overall structure of a fast assembling high strength loading reaction frame of the present invention;
FIG. 2 is an enlarged structural view of the high strength loading reaction frame of the present invention at A in FIG. 1;
fig. 3 is an enlarged structural diagram of a portion B in fig. 1 of a high strength loading reaction frame capable of being assembled quickly according to the present invention.
In the figure: 1. a support bar; 2. installing a chute; 3. a groove; 4. installing a sleeve; 5. fixing the supporting rod; 6. fixing the supporting block; 7. installing a jacket; 8. fixing the bottom plate; 9. a movable rod; 10. a cross post; 11. a limit bolt; 12. installing a sliding block; 13. a limiting screw groove; 14. a mounting head; 15. mounting grooves; 16. a connector; 17. a screw pin; 18. mounting a rod; 19. an anti-slip jacket; 20. and (5) fixing the column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a but fast assembly's high strength loading reaction frame, including PMKD 8, the equal fixed mounting in 8 top both sides of PMKD has fixed column 20, installation spout 2 has all been seted up at the relative one side middle part of fixed column 20, equal slidable mounting has installation slider 12 in 2 inside upper ends of installation spout, the equal fixed mounting of installation spout 2 is passed to the relative one side of installation slider 12 has connector 16, mounting groove 15 has all been seted up to the relative one side upper end of connector 16, the equal movable mounting of mounting head 14 in 15 inside, fixed mounting has spreader 10 between the relative one side of mounting head 14, screw and screw between the screw inside screw are all seted up to connector 16 and mounting head 14 middle part spiral shell move and install spiral shell 17, recess 3 has all been seted up to the upper end in the opposite one side of fixed column 20, spacing spiral shell 13 has all been seted up in the middle part of one side of keeping away from connector.
The lower end of the middle part of the front side of the connector 16 is movably provided with a mounting rod 18, the top ends of the mounting rods 18 are fixedly provided with anti-skidding jackets 19 through hinges, and the anti-skidding jackets 19 are all connected with the front end of the screw pin 17 in a clamping manner, so that after the limiting bolt 11 is mounted in a screw manner, the mounting rods 18 are sequentially pressed to drive the anti-skidding jackets 19 to move towards one side of the limiting bolt 11 and are all clamped and butted with the front side of the limiting bolt 11 for fixing, and the situation that the limiting bolt 11 is loosened after long working time is prevented; the middle lower end outside the fixed column 20 is movably provided with an installation sleeve 4, one side opposite to the installation sleeve 4 is fixedly provided with a fixed support rod 5, the bottom end of the fixed support rod 5 is fixedly provided with a fixed support block 6, two sides of a fixed bottom plate 8 are movably provided with movable rods 9, the top ends of the movable rods 9 are fixedly provided with installation jackets 7, and the installation jackets 7 are clamped and connected with the fixed support rod 5, so that the fixed support rod 5 is installed at the lower end of the side opposite to the fixed column 20 through the installation sleeve 4 after the whole device is assembled, the fixed support blocks 6 installed at the bottom end of the fixed support rod 5 are movably butted with the ground, and then the movable rods 9 are pressed in sequence to drive the installation jackets 7 to move towards one side of the fixed support rod 5 and be fixedly butted with the fixed support; rubber pads are fixedly arranged on the periphery inside the anti-skid jacket 19 through welding, so that the friction force during use is increased through the rubber pads; the supporting rods 1 are fixedly arranged between the top ends of the fixing columns 20 through screws, so that firmness between the fixing columns 20 is improved through the supporting rods 1; the mounting slider 12, the connecting head 16, the limiting bolt 11 and the mounting head 14 are all made of alloy materials, and the materials are firm and light, so that the service life is prolonged.
The working principle is as follows: the utility model is characterized in that the fixing columns 20 at two sides are firstly arranged at two sides of the top end of the fixed base plate 8 when the assembly is carried out, the mounting slide block 12 arranged in the mounting chute 2 is moved to the bottom end of the mounting slide block 12, then the connector 16 is simultaneously driven to move to the lower end of the opposite side of the fixing column 20, the mounting heads 14 arranged at two ends of the cross post 10 are embedded into the mounting groove 15 arranged at the opposite side of the connector 16 when the cross post 10 is assembled, the fixing is carried out between the screwing installation of the screw pin 17 in sequence, the cross post 10 is driven to move upwards by manpower through the mounting chute 2 and the mounting slide block 12 after the fixing, when the relative position is moved, the screw limiting bolt 11 is screwed into the limiting screw groove 13 in sequence to fix, thus, the rapidness is more convenient for adjusting the distance between the cross post 10 and the fixed base plate 8, simultaneously fixed branch 5 is all installed through installation cover 4 to the opposite side lower extreme of fixed column 20, and fixed branch 6 is all installed to fixed branch 5 bottom, and 8 both sides of PMKD all install through movable rod 9 and press from both sides the cover 7, loop through installation cover 4 after the integrated device equipment is accomplished and install fixed branch 5 to the opposite side lower extreme of fixed column 20, and all make and install fixed branch 6 in fixed branch 5 bottom and ground activity butt joint, press in proper order again and press movable rod 9 to drive installation and press from both sides cover 7 and move and fix with fixed branch 5 gomphosis butt joint toward fixed branch 5 one side, thereby increase the steadiness of integrated device at the during operation.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. A but fast assembly's high strength loading reaction frame, includes PMKD (8), its characterized in that: fixing base plate (8) top both sides are all fixed and are provided with fixed column (20), installation spout (2) have all been seted up at the relative one side middle part of fixed column (20), equal slidable mounting in installation spout (2) inside upper end has installation slider (12), installation slider (12) relative one side is passed installation spout (2) and is all fixed and be provided with connector (16), mounting groove (15) have all been seted up to the relative one side upper end of connector (16), the inside equal activity of mounting head (14) that is provided with of mounting groove (15), it is fixed between the relative one side of mounting head (14) is provided with spreader (10), screw and screw between the screw is all seted up at connector (16) and mounting head (14) middle part spiro union and is installed swivel (17), upper end all sets up fluted (3) in the opposite one side of fixed column (20), recess (3) inside one side and installation slider (12) are all seted up screw in the middle And a limiting screw groove (13), wherein a limiting bolt (11) is arranged between the middle parts of the limiting screw grooves (13) in a screwing manner.
2. A quick-assembly high strength load reaction frame as claimed in claim 1, wherein: the anti-skid connector is characterized in that a mounting rod (18) is movably arranged at the lower end of the middle of the front side of the connector (16), an anti-skid jacket (19) is movably arranged at the top end of the mounting rod (18), and the anti-skid jacket (19) is connected with the front end of the screw pin (17) in a clamping mode.
3. A quick-assembly high strength load reaction frame as claimed in claim 1, wherein: the fixing device is characterized in that an installation sleeve (4) is movably arranged at the middle lower end of the outside of the fixing column (20), a fixed supporting rod (5) is fixedly arranged on one side opposite to the installation sleeve (4), a fixed supporting block (6) is fixedly arranged at the bottom end of the fixed supporting rod (5), movable rods (9) are movably arranged on two sides of the fixed base plate (8), an installation clamping sleeve (7) is fixedly arranged at the top end of each movable rod (9), and the installation clamping sleeve (7) is connected with the fixed supporting rod (5) in a clamping mode.
4. A quick-assembly high strength load reaction frame as claimed in claim 2, wherein: and rubber pads are fixedly arranged on the periphery inside the anti-skid clamping sleeve (19).
5. A quick-assembly high strength load reaction frame as claimed in claim 1, wherein: a support rod (1) is fixedly arranged between the top ends of the fixing columns (20).
6. A quick-assembly high strength load reaction frame as claimed in claim 1, wherein: the mounting sliding block (12), the connecting head (16), the limiting bolt (11) and the mounting head (14) are all made of alloy materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020373780.5U CN211784769U (en) | 2020-03-23 | 2020-03-23 | But fast assembly's high strength loading reaction frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020373780.5U CN211784769U (en) | 2020-03-23 | 2020-03-23 | But fast assembly's high strength loading reaction frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211784769U true CN211784769U (en) | 2020-10-27 |
Family
ID=72931289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020373780.5U Expired - Fee Related CN211784769U (en) | 2020-03-23 | 2020-03-23 | But fast assembly's high strength loading reaction frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211784769U (en) |
-
2020
- 2020-03-23 CN CN202020373780.5U patent/CN211784769U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107971676B (en) | A kind of weld clamp method of automotive suspension control arm | |
CN210849145U (en) | Fixed beam type milling and drilling integrated special machine for processing orientation | |
CN109511081B (en) | Magnetic circuit centering clamp for magnetic shielding full-band loudspeaker | |
CN211784769U (en) | But fast assembly's high strength loading reaction frame | |
CN211804594U (en) | Bending part welding fixture | |
CN219297669U (en) | Aluminium alloy anodic oxidation anchor clamps that stability is good efficient | |
CN218201626U (en) | Elevator overhauls safety arrangement | |
CN217799907U (en) | Auxiliary welding positioning device for hanging bracket | |
CN210834774U (en) | Test tool for ultrasonic flaw detection | |
CN114700893A (en) | Righting device convenient for pipeline connection for oil exploration and exploitation | |
CN220547825U (en) | Diagonal draw bar assembly equipment | |
CN211467018U (en) | Brick laying and splitting machine | |
CN220751818U (en) | Bending test instrument for detecting plate strength | |
CN217132782U (en) | Building engineering who conveniently clears up piece detects uses resistance to compression anchor clamps | |
CN113848126B (en) | Building concrete strength detection device and method | |
CN220982900U (en) | Reinforcing steel bar strength detection device for detection | |
CN214096959U (en) | A reinforcing bar detector for civil engineering quality supervise | |
CN216326108U (en) | Three-dimensional positioning tool for lower frame | |
CN219714319U (en) | Gauge assembly for steering gear pipe column assembly size | |
CN216780216U (en) | Six-point riveting platform for corner connectors | |
CN217975405U (en) | Building templates connects steelframe for civil engineering | |
CN221572119U (en) | Reinforcing bar intensity detection device for engineering management | |
CN217359434U (en) | Pipe shock resistance test detection equipment | |
CN220259988U (en) | Welding positioning tool for frame assembly | |
CN209665183U (en) | A kind of graphite jig fixture conducive to production safety |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201027 |
|
CF01 | Termination of patent right due to non-payment of annual fee |