CN211776442U - Building construction partition wall - Google Patents

Building construction partition wall Download PDF

Info

Publication number
CN211776442U
CN211776442U CN201922074397.XU CN201922074397U CN211776442U CN 211776442 U CN211776442 U CN 211776442U CN 201922074397 U CN201922074397 U CN 201922074397U CN 211776442 U CN211776442 U CN 211776442U
Authority
CN
China
Prior art keywords
water
wall
wallboard
plate
wall plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922074397.XU
Other languages
Chinese (zh)
Inventor
左斌峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Polytechnic
Original Assignee
Tongling Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongling Polytechnic filed Critical Tongling Polytechnic
Priority to CN201922074397.XU priority Critical patent/CN211776442U/en
Application granted granted Critical
Publication of CN211776442U publication Critical patent/CN211776442U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a building construction isolation wall, which relates to the technical field of construction equipment, and comprises a wall plate with an arc-shaped top end, wherein one side of the wall plate is provided with a connecting clamping strip, the other side of the wall plate is provided with a clamping groove matched with the connecting clamping strip, a water cylinder is fixed on the front surface of the wall plate and close to the bottom side, the bottom of the inner wall of the water cylinder is provided with a water pump, a filter plate is clamped inside the water cylinder and above the water pump, the water outlet end of the water pump is connected with a water guide pipe, the building construction isolation wall can carry and recycle the falling water mist while spraying and reducing dust through a strip water cylinder structure with an open top, thereby reducing the waste of water resources, avoiding the problem that the earth surface mud is caused after the water mist falls on a construction site and the working environment is influenced, and simultaneously, the wall plate full of dust can be cleaned when the water mist falls down, no extra cleaning operation is needed, and the practicability is better.

Description

Building construction partition wall
Technical Field
The utility model relates to a construction equipment field, concretely relates to building construction partition wall.
Background
The building construction refers to the production activity in the engineering construction implementation stage, is the process of building of all kinds of buildings, building site because construction environmental factor, often can dust fly upward, cause huge harm to the environment, operational environment is extremely bad and slightly, dust fall isolation to building site relies on the dust shaker at present mainly, but it has occupation space greatly, the shortcoming of being not convenient for remove, present job site plays the inhibitory action to the dust through installing the atomising head in the partition wall top, but the waste of water resource is great in the dust fall process, construction cost has been improved, the water that falls down simultaneously easily causes the muddy of job site, influence personnel work, and the loading and unloading complex operation of partition wall, influenced enclosure work's efficiency.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an environmental protection and loading and unloading are easy and simple to handle's building construction division wall.
The utility model provides a technical scheme that above-mentioned problem adopted is:
the utility model provides a construction partition wall, includes the wallboard that the top crook is the arcuation, the connector card strip is installed to one side of wallboard, the draw-in groove with connector card strip looks adaptation is seted up to the opposite side of wallboard, the front surface of wallboard just is close to the bottom side and is fixed with a water section of thick bamboo, the water pump is installed to the inner wall bottom of a water section of thick bamboo, the inside of a water section of thick bamboo and the top joint that is located the water pump have a filter plate, the play water end of water pump is connected with the aqueduct, and the tip of aqueduct extends to the lateral wall top of wallboard and is connected with violently the pipe, five atomising heads are installed at the top of violently managing, the kerve has all been seted up at the below both ends that the front surface of wallboard just is located a water section of thick.
As above-mentioned technical scheme's further improvement, the cavity has been seted up to the inside of wallboard, and the internally mounted of cavity has the abatvoix, the through-hole with the cavity intercommunication is seted up to the lateral wall of wallboard, and the one end slope that the abatvoix was kept away from to the through-hole is downward, and the abatvoix setting does benefit to and improves its durability in the inside of wallboard, and the setting of through-hole reduces the sound absorbing effect that the wallboard influences the abatvoix simultaneously, and the abatvoix can absorb the noise that produces when the construction, reduces the influence of job site to the external world, reduces the social burden that the.
As the further improvement of above-mentioned technical scheme, the top of a water section of thick bamboo and keep away from one side of wallboard have through hinge movable mounting accept the board, the top of a water section of thick bamboo just is located the board and keeps away from one side of wallboard and installs to the piece, accepts the board slope and contradicts to the piece and can accept more water smoke that fall down, improves the ability of reclaimed water, reduces the waste of water resource, accepts the board slope simultaneously and hugs closely the wallboard, can reduce the occupation space of divider wall, the transportation of being convenient for.
As the further improvement of the technical scheme, the outer wall of the fixing nail is in threaded connection with the spiral ring above the support, the gasket is sleeved at the bottom of the outer wall of the fixing nail and located on the spiral ring, the spiral ring rotates to enable the gasket to abut against the top of the support, the length of the fixing nail extending out of the bottom of the support can be limited, when the ground geology is hard to erect, the position of the spiral ring can be adjusted through the fixing nail, the gasket abuts against the top of the support, and the stability of erecting the isolation wall is improved.
As the further improvement of the technical scheme, the handles are installed on the two sides of the wallboard and symmetrically arranged, and the handles are convenient for workers to move the wallboard and to install the wallboard.
As the further improvement of the technical scheme, the bottom of the wallboard is fixed with wear-resisting plates, and the bottom of the wear-resisting plates is provided with two rows of bottom nails, the wear-resisting plates can reduce the wear degree of the wallboard assembled for many times, the bottom nails can improve the ground gripping capacity of the wallboard, and the wallboard is prevented from being askew moved by the lateral acting force of wind and the like after being installed.
Compared with the prior art, the utility model, have following advantage and effect:
1. the utility model discloses through the open strip water drum structure in top when using, when spraying the dust fall, can accept recycle to the water smoke that falls down, reduced the waste of water resource, also avoided water smoke to fall to cause the earth's surface muddy behind the job site, influence operational environment's problem, can wash the wallboard that is stained with the dust when water smoke falls down simultaneously, make its moment be in clean state, need not extra clean operation, the practicality is better.
2. The utility model discloses through support and staple when using, can install fast the wallboard, it is easy and simple to handle firm, connect card strip and draw-in groove and improved the stability and the compactness after the division wall installation, can effectively avoid the dust to arrange to the external world through the gap between the wallboard, reduce the influence of construction dust to the external world.
Drawings
Fig. 1 is a front view of an embodiment of the present invention.
Fig. 2 is a side view of an embodiment of the invention.
Fig. 3 is an internal schematic view of a water drum according to an embodiment of the present invention.
Fig. 4 is an internal schematic view of the wall panel of the embodiment of the present invention.
Wherein: the device comprises a wall plate 1, a water cylinder 2, a water pump 3, a water guide pipe 4, a transverse pipe 5, a spray head 6, a side groove 7, a support 8, fixing nails 9, connecting clamping strips 10, a bearing plate 11, a resisting block 12, a filter plate 13, a sound-absorbing plate 14, a through hole 15, a spiral ring 16 and a handle 17.
Detailed Description
The present invention will be described in further detail by way of examples with reference to the accompanying drawings, which are illustrative of the present invention and are not intended to limit the present invention.
Referring to fig. 1 to 4, the embodiment provides a building construction partition wall, including a wall panel 1 with an arc-shaped top end, a connector strip 10 is installed on one side of the wall panel 1, a slot matched with the connector strip 10 is opened on the other side of the wall panel 1, handles 17 are installed on both sides of the wall panel 1, the handles 17 on both sides are symmetrically arranged, the handles 17 are convenient for workers to move the wall panel 1 and install the wall panel, a wear-resistant plate is fixed on the bottom of the wall panel 1, two rows of bottom nails are installed on the bottom of the wear-resistant plate, the wear-resistant plate can reduce the wear degree of the wall panel 1 after being assembled for many times, the bottom nails can improve the ground-holding capacity of the wall panel 1, and prevent the wall panel from moving and tilting due to lateral forces such as wind after being installed, a water cylinder 2 is fixed on the front surface of the wall panel 1 and close to the bottom side, a water injection pipe is connected, intermittent water can be added into the water barrel 2, the water pump 3 is arranged at the bottom of the inner wall of the water barrel 2, a switch electrically connected with the water pump 3 is arranged on the side wall of the water barrel 2, a filter plate 13 is clamped inside the water barrel 2 and positioned above the water pump 3, the water outlet end of the water pump 3 is connected with a water guide pipe 4, the end part of the water guide pipe 4 extends to the top of the side wall of the wallboard 1 and is connected with a transverse pipe 5, five spray heads 6 are arranged at the top of the transverse pipe 5, a bearing plate 11 is movably arranged at the top of the water barrel 2 and at one side far away from the wallboard 1 through a hinge, a resisting block 12 is arranged at the top of the water barrel 2 and at one side far away from the wallboard 1 of the bearing plate 11, the bearing plate 11 is obliquely abutted against the resisting block 12 to bear more falling water mist, the capability of recovering water is improved, the waste of water resources is reduced, meanwhile, the water pump 3 in the water cylinder 2 sprays water from the spray head 6 through the water guide pipe 4 and the transverse pipe 5, the water can adsorb and intercept dust diffusing outwards, the influence of construction on the surrounding environment is reduced, meanwhile, water mist can fall on the top side of the arc-shaped wall plate 1 under the action of gravity and flows back to the inside of the water cylinder 2 along with the side wall of the wall plate 1, the water pump 3 is used for spraying and dust falling again after being filtered by the filter plate 13, the waste of water resources is effectively reduced, the problems that the ground surface is muddy and the working environment is influenced due to the falling of the water mist on a construction site are solved, the side grooves 7 are respectively arranged on the front surface of the wall plate 1 and at the two ends below the water cylinder 2, the Z-shaped bracket 8 is movably arranged inside the side grooves 7, the fixing nails 9 penetrate through the bracket 8, the shape of the side grooves 7 is matched with the bracket 8 and the fixing nails 9, the outer wall of the fixing nails 9 and at the upper part of, the gasket is sleeved on the outer wall of the fixing nail 9 and positioned at the bottom of the spiral ring 16, the spiral ring 16 is rotated to enable the gasket to abut against the top of the support 8, the length of the fixing nail 9 extending out of the bottom of the support 8 can be limited, when the ground is hard in geological structure, the position of the spiral ring 16 can be adjusted to abut against the top of the support 8, the stability of the partition wall erection is improved, the support 8 is rotated to keep a certain included angle with the wall plate 1, the length of the fixing nail 9 is adjusted and is nailed into the erection surface, the fixing of the wall plate 1 can be completed, the adjacent wall plates 1 are connected through the connecting clamping strip 10 and the clamping groove, the stability of the connection of the partition wall is effectively improved, the support 8 can be bent to the inside of the side groove 7 to be conveniently carried and transported, a cavity is formed in the wall plate 1, the sound absorption plate 14 is arranged in the cavity, and the one end that the through-hole 15 kept away from the abatvoix 14 slopes downwards, and the abatvoix 14 sets up in the inside of wallboard 1, does benefit to and improves its durability, and the setting of through-hole 15 reduces wallboard 1 and influences the sound absorbing effect of abatvoix 14 simultaneously, and abatvoix 14 can absorb the noise that produces during the construction, reduces the influence of job site to the external world, reduces the social burden that the disturbing citizen brought.
To sum up, the utility model discloses a use method as follows:
when in installation, the side of the wall plate 1 with the water cylinder 2 faces the construction site, the bracket 8 is rotated to keep a certain included angle with the wall plate 1, the length of the fixing nail 9 is adjusted and is nailed into the erection surface, the fixing of the wall boards 1 can be completed, the adjacent wall boards 1 are connected with the clamping grooves through the connecting clamping strips 10, the connection of the partition wall is more stable, the water pump 3 in the water cylinder 2 sprays water out of the spray head 6 through the water guide pipe 4 and the transverse pipe 5, the outward-diffused dust can be adsorbed and intercepted, the influence of construction on the surrounding environment is reduced, meanwhile, the water mist falls on the top side of the arc-shaped wall plate 1 under the action of gravity and flows back to the inside of the water cylinder 2 along with the side wall of the wall plate 1, the water pump 3 is used for spraying and dust falling again after the filter plates 13 are used for filtering, waste of water resources is effectively reduced, the sound-absorbing plates 14 in the wall plate 1 can absorb noise generated during construction, and influence of a construction site on the outside is reduced.
The above description in this specification is merely illustrative of the present invention. Various modifications, additions and substitutions may be made by those skilled in the art without departing from the scope of the invention as defined in the accompanying claims.

Claims (6)

1. The utility model provides a construction division wall which characterized in that: the wall comprises a wall plate (1) with an arc-shaped top end, wherein a connecting clamping strip (10) is installed on one side of the wall plate (1), a clamping groove matched with the connecting clamping strip (10) is formed in the other side of the wall plate (1), a water cylinder (2) is fixed on the front surface of the wall plate (1) and close to the bottom side, a water pump (3) is installed at the bottom of the inner wall of the water cylinder (2), a filter plate (13) is clamped inside the water cylinder (2) and above the water pump (3), a water outlet end of the water pump (3) is connected with a water guide pipe (4), the end of the water guide pipe (4) extends to the top of the side wall of the wall plate (1) and is connected with a transverse pipe (5), five spray heads (6) are installed at the top of the transverse pipe (5), side grooves (7) are formed in the front surface of the wall plate (1) and two ends below the water cylinder (2), and a support (8) in a Z shape is, the fixing nail (9) penetrates through the support (8).
2. The construction partition wall according to claim 1, wherein: the utility model discloses a wallboard, including wallboard (1), through-hole (15), and the one end slope that abatvoix (14) were kept away from in through-hole (15), wallboard (1) has the cavity to seted up the inside cavity, and the internally mounted of cavity has abatvoix (14), the through-hole (15) that communicate with the cavity are seted up to the lateral wall of wallboard (1), and through-hole (15) are kept away from.
3. The construction partition wall according to claim 1, wherein: the top of a water section of thick bamboo (2) and keep away from one side of wallboard (1) have through hinge movable mounting accept board (11), the top of a water section of thick bamboo (2) and be located and accept board (11) and keep away from one side of wallboard (1) and install and support piece (12).
4. The construction partition wall according to claim 1, wherein: the outer wall of the fixing nail (9) is in threaded connection with a spiral ring (16) above the support (8), and the gasket is sleeved on the outer wall of the fixing nail (9) and at the bottom of the spiral ring (16).
5. The construction partition wall according to claim 1, wherein: handles (17) are installed on the two sides of the wallboard (1), and the handles (17) on the two sides are symmetrically arranged.
6. The construction partition wall according to claim 1, wherein: the bottom of wallboard (1) is fixed with the antifriction plate, and two rows of end nails are installed to the bottom of antifriction plate.
CN201922074397.XU 2019-11-27 2019-11-27 Building construction partition wall Active CN211776442U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922074397.XU CN211776442U (en) 2019-11-27 2019-11-27 Building construction partition wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922074397.XU CN211776442U (en) 2019-11-27 2019-11-27 Building construction partition wall

Publications (1)

Publication Number Publication Date
CN211776442U true CN211776442U (en) 2020-10-27

Family

ID=72960943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922074397.XU Active CN211776442U (en) 2019-11-27 2019-11-27 Building construction partition wall

Country Status (1)

Country Link
CN (1) CN211776442U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113500077A (en) * 2021-05-28 2021-10-15 杨春芳 Dust removal wall for sealing dust removal and saving water resources

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113500077A (en) * 2021-05-28 2021-10-15 杨春芳 Dust removal wall for sealing dust removal and saving water resources
CN113500077B (en) * 2021-05-28 2022-09-02 义乌市诚胜市政工程有限公司 Dust removal wall for sealing dust removal and saving water resources

Similar Documents

Publication Publication Date Title
CN211776442U (en) Building construction partition wall
CN211973954U (en) Hook assembly type partition wall panel structure
CN103216050B (en) A kind of building in the style of the ancients eave-rafter construction method of installation
CN204001219U (en) Movable plank house assembly type beam column linkage
CN207690667U (en) switch panel mounting device
CN217353855U (en) Barrier wallboard with dust fall function for construction
CN216457775U (en) A dust device for building management
CN218265325U (en) A green building construction noise isolating device for building
CN211473189U (en) Building slabstone hangs structure futilely
CN212614594U (en) Dust falling device of down-hole drill
CN111254988B (en) Double-layer waterproof concrete wall for basement
CN214328516U (en) Road and bridge engineering is with making an uproar protection rail that falls
CN208870336U (en) Fixed component is stitched in a kind of assembled integrated wall brick system
CN202530603U (en) Small-unit stone material suspended ceiling hanging piece system with double safety structures
CN111055385A (en) Building grit environmental protection multiple cleaning equipment in building engineering field
CN218581332U (en) Temporary protective guard for building engineering quality detection
CN218562842U (en) Hang wooden abatvoix node structure futilely
CN218576659U (en) Noise-reducing environment-friendly bridge type combined stone cutting machine
CN215290978U (en) Novel assembled PC-GRC integration composite wall panel
CN216537566U (en) Construction dust device that housing construction used
CN214391023U (en) Open type anti-blocking coal separator with vibrating screen
CN217632427U (en) Coal road fully-mechanized excavation working surface spraying dust-settling device
CN217810590U (en) Sound insulation device for municipal building
CN218092480U (en) Construction guardrail
CN218227078U (en) Timber processing waste material clearance recoverer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant