CN211775646U - Wall construction scaffold bearing plate convenient for material receiving and placing - Google Patents

Wall construction scaffold bearing plate convenient for material receiving and placing Download PDF

Info

Publication number
CN211775646U
CN211775646U CN201922067159.6U CN201922067159U CN211775646U CN 211775646 U CN211775646 U CN 211775646U CN 201922067159 U CN201922067159 U CN 201922067159U CN 211775646 U CN211775646 U CN 211775646U
Authority
CN
China
Prior art keywords
fixed
pulley
plate body
montant
wall construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922067159.6U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou New Greenland Ecological Environment Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922067159.6U priority Critical patent/CN211775646U/en
Application granted granted Critical
Publication of CN211775646U publication Critical patent/CN211775646U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a make things convenient for wall construction scaffold platform board that material connects was put, it can make things convenient for connecing of building material to put, which comprises a plate body, the side position of plate body is provided with the montant, the fixed twice fixed riser that is provided with in its top position, be provided with pulley one through the pivot is fixed between the fixed riser, the fixed twice fixed slat that is provided with in the top outside of montant, be provided with pulley two through the pivot is fixed between the terminal position of fixed slat, be provided with the entrance to a cave of rectangle form at the inboard position that is provided with the montant position on the plate body, be provided with pulley three through the pivot is fixed between the left and right sides inner wall of entrance to a cave, three pulleys coplane, the accessible is with rope tractive removal between the three one, carry the.

Description

Wall construction scaffold bearing plate convenient for material receiving and placing
Technical Field
The utility model relates to a scaffold technical field especially relates to a make things convenient for wall construction scaffold bearing plate that material connects was put.
Background
The scaffold is the indispensable instrument in the building work progress, be in order to guarantee that each work progress goes on smoothly and the work platform of setting up, such as wall body is built by laying bricks or stones, processes such as plastering all need be used, if in wall body is built by laying bricks or plaster the in-process, need be continuous carry the building material to scaffold cushion cap board on, building brick piece and mortar that need to use etc. the workman can only make a round trip the scaffold frame from top to bottom and take the material, or push away the transmission through other workman through pole etc. in the below, because the building material is generally heavier, it still injures personnel very easily to connect to put the shakiness, cause unnecessary damage, so it is necessary to design the device that is used for conveniently accepting and putting the building material on the scaffold frame.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem of providing a wall construction scaffold bearing plate convenient for receiving and placing materials, which can facilitate receiving and placing of building materials, and comprises a plate body, wherein the plate body is a long strip-shaped plate-shaped structure with a certain width, actually, the overall outline shape of the plate body is a long strip-shaped plate-shaped structure, and common scaffolds are made of metal materials, in order to save materials, a large number of hollowed parts can be arranged on the plate body, and only enough bearing capacity is needed, the side part of the plate body is provided with a vertical rod, the vertical rod and the plate body keep a vertical relation, the top part of the vertical rod is fixedly provided with two fixed vertical plates, a first pulley is fixedly arranged between the fixed vertical plates through a rotating shaft, the first pulley can rotate between the fixed vertical plates, the outer side part of the top position of the vertical rod is fixedly provided with two fixed slats, the pulley II is fixedly arranged between the tail end parts of the fixed slats through a rotating shaft, and can rotate between the tail end parts of the fixed slats, and the plane where the pulley I is located is coplanar with the plane where the pulley II is located, namely the pulley I and the pulley II are located on the same plane.
The inside position that is provided with the montant position on the plate body is provided with the entrance to a cave of rectangle form, be provided with pulley three through the pivot is fixed between the left and right sides inner wall of entrance to a cave, equally, pulley three can rotate in the entrance to a cave, and the plane of pulley three places and pulley one and the plane coplane of pulley two places, then three pulley coplanaries, accessible one with the rope tractive between the three removes, interior width between the entrance to a cave left and right sides only need slightly be greater than the width of pulley three, and interior width between the fixed riser and the fixed slat also only need slightly be greater than the width of pulley one and pulley two, stability when can guaranteeing the pulley rotation like this, skew about taking place when avoiding it to rotate.
The utility model has the advantages of the utility model discloses an advantageous advantage is, can wear to establish on three pulleys through the rope and carry the material and draw, if mix the mortar, the brick of building block etc. makes things convenient for the material to connect and put, because when building the wall body or plastering the wall body, go on after the take the altitude, because the plate body position that constructor stood is higher on the scaffold, the workman just can touch the construction like this, but connect for the material and put and bring inconvenience, the workman can only make a round trip the upper and lower scaffold and take the material, perhaps push away the transmission through other workmen through pole etc. in the below, because building material is generally heavier, connect to put the shakiness and still injure the personnel very easily, cause the unnecessary damage, the utility model discloses then can conveniently solve this problem.
As an improved embodiment, the upper position of the fixed vertical plate and the upper position of the tail end of the fixed strip plate are respectively provided with a limiting piece, the two ends of each limiting piece are respectively fixed on the upper side of the fixed vertical plate and the tail end upper side of the fixed strip plate through connecting pieces, so that the limiting pieces are fixed, the upper side edge of the first pulley and the upper side edge of the second pulley are close to the bottom side faces of the limiting pieces at the corresponding positions, the limiting pieces are equivalent to limit the upper sides of the first pulley and the second pulley, and the first pulley and the second pulley are prevented from being separated from the first pulley and the second pulley by a traction rope.
As a modified embodiment, the front side edge of the pulley III is close to the inner front side edge part of the hole, so that the pulling rope passing through the front side edge is limited, and the rope is prevented from being separated from the pulley III.
As improving the embodiment, the montant belongs to the activity and sets up the side position at the plate body, the fixed stationary blade that is provided with in bottom both sides of montant, be provided with the fixed orifices on the stationary blade, the side position of plate body is provided with the twice screw hole that corresponds with the fixed orifices position setting up the corresponding position of montant, and same way bolt can be anchored in corresponding fixed orifices and the screw hole to fix stationary blade and montant on the plate body, and need not use the utility model discloses a during the effect, only need with the montant wholly pull down can, do not influence the plate body and be used for other departments.
Drawings
Fig. 1 is a schematic view of the whole body of the utility model in use.
Fig. 2 is a partially enlarged perspective view of the utility model in the use process.
Fig. 3 is a schematic perspective view of the present invention showing a part position separated from the component.
Fig. 4 is a schematic top view of the middle opening of the present invention.
Detailed Description
The following detailed description of embodiments of the present invention will be made with reference to the accompanying drawings.
A wall construction scaffold bearing plate convenient for material receiving and placing comprises a plate body 1, wherein the plate body 1 is of a long strip-shaped plate structure with a certain width, actually, the overall outline shape of the plate body 1 is of the long strip-shaped plate structure, common scaffolds are made of metal materials, a large number of hollowed parts can be arranged on the plate body 1 for saving materials, and only enough bearing capacity is needed, a vertical rod 2 is arranged at the side part of the plate body 1, as shown in figure 2, the vertical rod 2 and the plate body 1 are in a vertical relation, two fixed vertical plates 21 are fixedly arranged at the top end part of the vertical rod 2, a pulley I31 is fixedly arranged between the fixed vertical plates 21 through a rotating shaft, the pulley I31 can rotate between the fixed vertical plates 21, two fixed battens 22 are fixedly arranged at the outer side part of the top part of the vertical rod 2, the second pulleys 32 are fixedly arranged between the tail end parts of the fixed slats 22 through rotating shafts, similarly, the second pulleys 32 can rotate between the tail end parts of the fixed slats 22, and the plane where the first pulley 31 is located and the plane where the second pulley 32 is located are coplanar, namely the first pulley 31 and the second pulley 32 are located on the same plane.
The inside position that is provided with montant 2 position on the plate body 1 is provided with the entrance to a cave 11 of rectangle form, as shown in the entrance to a cave position top view in fig. 2 and fig. 4, be provided with pulley three 33 through the pivot is fixed between the left and right sides inner wall of entrance to a cave 11, likewise, pulley three 33 can rotate in entrance to a cave 11, and the plane that pulley three 33 is located is coplanar with pulley one 31 and the plane that pulley two 32 is located, then three pulleys coplane, then the same rope of accessible pulls between the three and removes, the internal width between the left and right sides of entrance to a cave 11 only needs to be slightly more than the width of pulley three 33, and the internal width between fixed riser 21 and the fixed slat 22 also only needs to be slightly more than the width of pulley one 31 and pulley two 32, can guarantee the stability when the pulley rotates like this, avoid it to take place when rotating and control the skew.
The utility model has the advantages of the utility model discloses an advantageous advantage is, can wear to establish through the rope and carry the material on three pulleys and draw, as shown in fig. 1, be convenient for stir the mortar, the connecing of material such as building brick piece is put, because when building the wall body or plastering the wall body, go on after the take the altitude, on the scaffold because the plate body 1 position that constructor stood is higher, the workman just can touch the construction like this, but put for the material and bring inconvenience, the workman can only make a round trip the scaffold frame from top to bottom and put the material, perhaps push away the transmission through tools such as other workman through instruments such as pole in the below, because building material is generally heavier, connect to put the shakiness and still injure the personnel very easily, cause the unnecessary damage, the utility model discloses then can conveniently solve this problem.
As an improved embodiment, as shown in fig. 2, the position above the fixed vertical plate 21 and the position above the end of the fixed slat 22 are respectively provided with a limiting piece 4, two end portions of the limiting piece 4 are respectively fixed on the upper side of the fixed vertical plate 21 and the upper side of the end of the fixed slat 22 through connecting pieces 41, so that the limiting piece 4 is fixed, and the upper side edge of the first pulley 31 and the upper side edge of the second pulley 32 are close to the bottom side surface of the limiting piece 4 at the corresponding position, which is equivalent to that the limiting piece 4 limits the upper sides of the first pulley 31 and the second pulley 32, thereby avoiding the pulling rope from being separated from the first pulley 31 and the second pulley 32.
As a modified example, as shown in figure 4, the front side edge of the pulley three 33 is close to the inner front side edge part of the hole 11, so that the pulling rope passing through the position is limited, and the rope is prevented from being separated from the roller three 33.
As improving the embodiment, montant 2 belongs to the activity and sets up the side position at plate body 1, as shown in fig. 3, the fixed stationary blade 23 that is provided with in bottom both sides of montant 2, be provided with fixed orifices 24 on the stationary blade 23, the side position of plate body 1 is provided with twice and the screw hole 12 that the 24 positions of fixed orifices correspond in the corresponding position that sets up montant 2, can anchor into same way bolt in corresponding fixed orifices 24 and the screw hole 12 to fix stationary blade 23 and montant 2 to plate body 1 on, need not use the utility model discloses an during the effect, only need with montant 2 wholly pull down can, do not influence plate body 1 and be used for other departments.
It is obvious that the described embodiments are only some of the embodiments of the present invention, and not all of them. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts shall belong to the protection scope of the present invention.

Claims (4)

1. The utility model provides a make things convenient for wall construction scaffold platform board that material received and was put which characterized in that: comprises a plate body (1), the plate body (1) is a strip-shaped plate-shaped structure with a certain width, the side edge part of the plate body (1) is provided with a vertical rod (2), the vertical rod (2) and the plate body (1) keep vertical relation, two fixed vertical plates (21) are fixedly arranged at the top end part of the vertical rod (2), a first pulley (31) is fixedly arranged between the fixed vertical plates (21) through a rotating shaft, the first pulley (31) can rotate between the fixed vertical plates (21), two fixed strips (22) are fixedly arranged at the outer side part of the top position of the vertical rod (2), a second pulley (32) is fixedly arranged between the tail end parts of the fixed laths (22) through a rotating shaft, and similarly, the second pulley (32) can rotate between the tail end parts of the fixed laths (22), the plane of the first pulley (31) is coplanar with the plane of the second pulley (32);
the inboard position that is provided with montant (2) position on the plate body (1) is provided with entrance to a cave (11) of rectangle form, be provided with pulley three (33) through the pivot is fixed between the left and right sides inner wall of entrance to a cave (11), likewise, pulley three (33) can rotate in entrance to a cave (11), and the plane that pulley three (33) are located and pulley one (31) and pulley two (32) are located the plane coplane.
2. The wall construction scaffold platform board convenient for material receiving and placing of claim 1, which is characterized in that: the top position of fixed riser (21) and the terminal top position of fixed slat (22) are provided with spacing piece (4) respectively, the both ends position of spacing piece (4) is fixed respectively in the upside of fixed riser (21) and the terminal upside of fixed slat (22) through connection piece (41) for spacing piece (4) are fixed, and the upside border of pulley one (31) and the upside border of pulley two (32) all press close to the bottom surface of its spacing piece (4) that corresponds the position.
3. The wall construction scaffold platform board convenient for material receiving and placing of claim 2, wherein: the front side edge of the third pulley (33) is close to the inner front side edge part of the hole (11).
4. A wall construction scaffolding platform facilitating the receiving and placing of materials according to any one of claims 1 to 3, wherein: montant (2) belong to the activity and set up the side position at plate body (1), the fixed stationary blade (23) that is provided with in bottom both sides of montant (2), be provided with fixed orifices (24) on stationary blade (23), the side position of plate body (1) is provided with twice screw hole (12) that correspond with fixed orifices (24) position in the corresponding position that sets up montant (2), and same way bolt can be anchored in corresponding fixed orifices (24) and screw hole (12).
CN201922067159.6U 2019-11-26 2019-11-26 Wall construction scaffold bearing plate convenient for material receiving and placing Expired - Fee Related CN211775646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922067159.6U CN211775646U (en) 2019-11-26 2019-11-26 Wall construction scaffold bearing plate convenient for material receiving and placing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922067159.6U CN211775646U (en) 2019-11-26 2019-11-26 Wall construction scaffold bearing plate convenient for material receiving and placing

Publications (1)

Publication Number Publication Date
CN211775646U true CN211775646U (en) 2020-10-27

Family

ID=72960834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922067159.6U Expired - Fee Related CN211775646U (en) 2019-11-26 2019-11-26 Wall construction scaffold bearing plate convenient for material receiving and placing

Country Status (1)

Country Link
CN (1) CN211775646U (en)

Similar Documents

Publication Publication Date Title
CN207453490U (en) A kind of wall turnover device
CN211775646U (en) Wall construction scaffold bearing plate convenient for material receiving and placing
CN213927071U (en) Simple and easy angle steel lintel strutting arrangement
CN110374204A (en) Detachable concrete mobile house
CN214942114U (en) Automatic wall tile sticking device for building construction
CN111561130A (en) Plastering device for assisting tiling
CN212957617U (en) Ratchet type template sliding device
CN211813207U (en) Liftable support for construction engineering construction
CN111075206B (en) ALC wallboard installation device
CN211078260U (en) Building is built a wall and is used fragment of brick hoisting device
CN210195204U (en) Building construction safety platform
CN210888063U (en) Regularization picture peg stair template
CN214696828U (en) Wall sealing template assembly with beam bottom internal corner template
CN216276928U (en) Bearing structure of building template
CN210598147U (en) Openable sizing protection device for aluminum die material conveying port
CN215717412U (en) Semi-automatic mortar spreader
CN215254779U (en) Building construction entrance to a cave safety device
CN211283633U (en) Brick-building wall decoration elevator
CN220539148U (en) Concrete cambered surface reentrant corner construction equipment
CN215402434U (en) Safe anti-falling device for building construction
CN214995937U (en) Aluminum alloy building templates outer wall has more than two to accept board reinforcing apparatus
CN212942361U (en) A blendor for production of heat preservation energy saving building wall material
CN217680516U (en) Tool type bracket device for pouring opening at top of constructional column
CN215037383U (en) Building engineering material management device
CN215107319U (en) Detachable sizing constructional column template dustpan opening device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201029

Address after: 318000 No.70, 1st floor, building 2, No.818, east section of Kaifa Avenue, Taizhou Development Zone, Zhejiang Province

Patentee after: Taizhou new Greenland Ecological Environment Engineering Co.,Ltd.

Address before: Jiangsu Tongtian Construction Engineering Co., Ltd., No. 1, Huaxi West Road, Rugao City, Nantong City, Jiangsu Province

Patentee before: Cao Hongming

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee