CN211774694U - Be used for building engineering construction outer wall transformation winter protection to hang brick frame - Google Patents

Be used for building engineering construction outer wall transformation winter protection to hang brick frame Download PDF

Info

Publication number
CN211774694U
CN211774694U CN201922215086.0U CN201922215086U CN211774694U CN 211774694 U CN211774694 U CN 211774694U CN 201922215086 U CN201922215086 U CN 201922215086U CN 211774694 U CN211774694 U CN 211774694U
Authority
CN
China
Prior art keywords
frame
wall
screw rod
brick
cold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922215086.0U
Other languages
Chinese (zh)
Inventor
梁勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Yongsheng Construction Engineering Co ltd
Original Assignee
Hubei Yongsheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Yongsheng Construction Engineering Co ltd filed Critical Hubei Yongsheng Construction Engineering Co ltd
Priority to CN201922215086.0U priority Critical patent/CN211774694U/en
Application granted granted Critical
Publication of CN211774694U publication Critical patent/CN211774694U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a winter protection brick hanging frame for the modification of the outer wall of the house construction project, which comprises a brick hanging frame body, the brick hanging frame body comprises a frame, a heat insulation plate and a clamping plate, the heat insulation plate is welded at the bottom of the frame, the clamping plate is arranged at the top of the frame, the bottom of the clamping plate is welded with a transverse plate, the frame is provided with a fixing bolt, the bottom of the frame is welded with a bearing, the frame is provided with a clamping groove, the frame is welded with a screw rod, the screw rod is sleeved with a screw cap, the top of the screw rod is clamped with a wedge block, the fixed bolt is provided with an interface, the inner side of the interface is clamped with a joint, one end of the fixed bolt is provided with an inner hexagon, this be used for building construction engineering construction outer wall transformation winter protection to hang brick frame reasonable in design, it is comparatively convenient during the use, the external fixed use of winter protection brick when being applicable to outer wall transformation in the building construction engineering construction.

Description

Be used for building engineering construction outer wall transformation winter protection to hang brick frame
Technical Field
The utility model relates to an engineering equipment technical field is built in the room specifically is a be used for building engineering construction outer wall transformation winter protection to hang brick frame.
Background
In order to improve the heat insulation effect of a house and reduce indoor energy consumption, the construction outer wall of a building project needs to be correspondingly modified, heat insulation bricks need to be additionally arranged on the outer wall during modification, in order to improve the heat insulation effect, the heat insulation bricks need to be erected on the outer wall of the building, and then the heat insulation bricks need to be fixed and installed by using a brick hanging frame, the existing brick hanging frame has the advantages of firm structure, convenient installation, easy processing and use, low price and the like, however, for the existing brick hanging frame, on one hand, after the heat insulation bricks are installed and fixed, nuts are easy to loosen and fall off after being used for a long time, and further, the safety and the fixation of the heat insulation bricks are not ensured, on the other hand, the outer wall needs to be punched when being installed, because the thicknesses of the outer walls at different positions are different, and water pipes or electric wire pipes and the like are arranged in part of the, the bolt is exposed, which is not beneficial to ensuring the attractive appearance of the brick hanging frame.
Therefore, how to design a cold-proof brick hanging frame for reconstructing the outer wall of the house construction project becomes a problem to be solved currently.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a be used for building engineering construction outer wall transformation winter protection to hang brick frame to solve the problem that proposes in the above-mentioned background art, the utility model relates to a rationally, it is comparatively convenient during the use, the external fixed use of winter protection brick when being applicable to outer wall transformation in the building engineering construction.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a be used for building engineering construction outer wall to reform transform winter protection and hang brick frame, includes and hangs brick frame body, it includes frame, heated board and splint to hang brick frame body, the heated board welding is in the bottom of frame, splint set up the top at the frame, the bottom welding of splint has the diaphragm, be provided with the gim peg on the frame, the bottom welding of frame has the bearing, the draw-in groove has been seted up on the frame, the welding has the screw rod on the frame, the cover is equipped with the nut on the screw rod, the top card of screw rod has the voussoir, the interface has been seted up on the gim peg, the inboard card of interface has the joint, the allen key has been seted up.
As an optimal implementation mode of the utility model, opening one has been seted up on the heated board, the one end of bearing is passed the opening and is extended to the outside of heated board in the lump.
As a preferred embodiment of the present invention, the frame is provided with a groove, the outer side of the fixing bolt is welded to the inner ring of the bearing, and one end of the fixing bolt is clamped inside the groove.
As an optimal implementation manner of the present invention, the first external thread is provided on the joint, the first internal thread is provided on the inner side of the interface, and the first external thread is matched with the first internal thread.
As an embodiment of the present invention, the top of the screw rod sequentially passes through the transverse plate and the clamping plate and extends to the top of the nut, the screw rod is provided with the second external thread, the inner side of the nut is provided with the second internal thread, and the second external thread is matched with the second internal thread.
As a preferred embodiment of the present invention, the inner side of the screw rod is provided with a cutting slit, and the wedge block is clamped at the inner side of the cutting slit.
As an embodiment of the present invention, the two ends of the clamping plate are clamped inside the clamping grooves, and the transverse plate is perpendicular to the clamping plate.
The utility model has the advantages that: the utility model discloses a be used for building engineering construction outer wall transformation winter protection to hang brick frame, including frame, heated board, splint, diaphragm, gim peg, bearing, draw-in groove, screw rod, nut, voussoir, interface, joint, interior hexagonal.
1. This be used for building engineering construction outer wall transformation winter protection to hang brick frame owing to be provided with frame, diaphragm, splint, draw-in groove, screw rod, nut and voussoir, can effectually prevent the reversal of nut, and then avoid the nut not hard up situation to appear, and then the guarantee is to the fixed effect of insulating brick, the safe handling of guarantee insulating brick.
2. This be used for building engineering construction outer wall transformation winter protection to hang brick frame owing to be provided with frame, gim peg, bearing, interface, joint and hexagon socket head, can make the gim peg can be according to the length of the degree of depth adjustment self of the mounting hole of wall, and then make it can adapt to the installation on the different positions outer wall to can avoid the gim peg outwards outstanding, the guarantee hangs brick frame vision pleasing to the eye.
3. This be used for building construction engineering construction outer wall transformation winter protection to hang brick frame reasonable in design, comparatively high-efficient safety during the use is applicable to the external fixed use of winter protection brick when the outer wall is transformed in the building construction engineering construction.
Drawings
FIG. 1 is a schematic structural view of a winter protection brick hanging rack for the modification of an exterior wall in building construction;
FIG. 2 is a cross-sectional view of a screw rod of the cold-proof brick hanging rack for the reconstruction of the outer wall of the house construction project of the utility model;
FIG. 3 is a cross-sectional view of the fixing bolt for the cold-proof brick hanging rack for the modification of the outer wall of the house construction project of the utility model;
in the figure: the device comprises a frame 1, a heat insulation plate 2, a clamping plate 3, a transverse plate 4, a fixing bolt 5, a bearing 6, a clamping groove 7, a screw rod 8, a screw cap 9, a wedge block 10, an interface 11, a joint 12 and an inner hexagon 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a be used for building engineering construction outer wall to reform transform winter protection and hang brick frame, includes and hangs brick frame body, it includes frame 1, heated board 2 and splint 3 to hang brick frame body, heated board 2 welding is in the bottom of frame 1, splint 3 are put at the top of frame 1, the bottom welding of splint 3 has diaphragm 4, be provided with gim peg 5 on the frame 1, the bottom welding of frame 1 has bearing 6, draw-in groove 7 has been seted up on the frame 1, the welding has screw rod 8 on the frame 1, the cover is equipped with nut 9 on the screw rod 8, the top card of screw rod 8 has voussoir 10, interface 11 has been seted up on the gim peg 5, the inboard card of interface 11 has joint 12, hexagon socket 13 has been seted up to the one end of gim peg 5.
As an optimal implementation mode of the utility model, the opening has been seted up on the heated board 2, the one end of bearing 6 is passed the opening and is extended to the outside of heated board 2.
As a preferred embodiment of the present invention, the frame 1 is provided with a groove, the outside side of the fixing bolt 5 is welded on the inner ring of the bearing 6, the one end of the fixing bolt 5 is clamped in the inner side of the groove, so that the fixing bolt 5 passes through the inner side of the fixing post frame 1 of the bearing 6, and further the fixing bolt 5 can rotate through the bearing 6, and the position of the fixing bolt 5 can be ensured, thereby preventing the fixing bolt 5 from protruding outwards.
As an embodiment of the present invention, the first external thread has been opened on the joint 12, the first internal thread has been opened on the inside of the interface 11, the first external thread matches with the first internal thread, the joint 12 is installed in the inside of the interface 11 through the screw thread, and then the length of the fixing bolt 5 can be changed by adjusting the number of the joint 12, and then the fixing hole can be adapted to different depths.
As an optimal implementation mode of the utility model, diaphragm 4 and splint 3 and the top that extends to nut 9 are passed in proper order at the top of screw rod 8, external screw thread two has been seted up on the screw rod 8, internal thread two has been seted up to the inboard of nut 9, external screw thread two and internal thread two-phase cooperation can utilize screw rod 8 and nut 8 with on splint 3 and the diaphragm 4 fixed column frame 1.
As a preferred embodiment of the utility model, the joint-cutting has been seted up to screw rod 8's inboard, voussoir 10 card can outwards strut the top of screw rod 8 through voussoir 10 in the inboard of joint-cutting, and then avoids nut 9 rebound, ensures nut 9's fixed position, and then improves splint 3 and insulating brick's fastness.
As a preferred embodiment of the present invention, the two ends of the clamping plate 3 are clamped inside the clamping grooves 7, and the transverse plate 4 is perpendicular to the clamping plate 3.
The working principle is as follows: when the cold-proof brick hanging frame for building engineering construction outer wall transformation is used, heat-insulating ceramic bricks are placed on the inner side of a frame 1, then clamp plates 3 are clamped on the outer side of the heat-insulating ceramic bricks, the clamp plates 3 are fastened and fixed through screwing nuts 9, the bottoms of wedge blocks 10 are inserted into cutting seams on screw rods 8, the wedge blocks 10 are hammered downwards by using hammers and the like, so that the wedge blocks 10 are embedded into the inner sides of the screw rods 8, the tops of the screw rods 8 can be outwards propped open through the wedge blocks 10, the screw caps 9 are prevented from moving upwards, loosening of the screw caps 9 is avoided, the fixing positions of the screw caps 9 are guaranteed, firmness of the clamp plates 3 and the heat-insulating bricks is improved, the fixing effect of the heat-insulating bricks is guaranteed, the safe use of the heat-insulating bricks is guaranteed, mounting holes are drilled on outer walls, one ends of fixing bolts 5 are clamped on the inner sides of the mounting holes, and then outer, through rotating the spanner, twist gim peg 5 in the mounting hole, and then will hang the brick frame and fix on the wall, when the mounting hole is more shallow on partial wall, separate interface 11 and joint 12 through the rotation, according to the degree of depth adjustment of mounting hole quantity of joint 12, when the distance of the partial mounting hole of outer wall unevenness and frame 1 is longer, splice 12 the splice under will dismantling on gim peg 5 here, can make gim peg 5 can be according to the degree of depth adjustment self length of the mounting hole of wall, and then make it can adapt to the installation on the different positions outer wall, ensure that all hang the brick frame and level and smooth the concatenation, and can avoid gim peg 5 outwards outstanding, it is pleasing to the eye to ensure to hang brick frame vision.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a be used for building engineering construction outer wall transformation winter protection to hang brick frame, includes to hang brick frame body, its characterized in that: hang brick frame body and include frame (1), heated board (2) and splint (3), heated board (2) welding is in the bottom of frame (1), splint (3) are put at the top of frame (1), the bottom welding of splint (3) has diaphragm (4), be provided with gim peg (5) on frame (1), the bottom welding of frame (1) has bearing (6), draw-in groove (7) have been seted up on frame (1), the welding has screw rod (8) on frame (1), the cover is equipped with nut (9) on screw rod (8), the top card of screw rod (8) has voussoir (10), interface (11) have been seted up on gim peg (5), the inboard card of interface (11) has joint (12), interior hexagonal (13) have been seted up to the one end of gim peg (5).
2. The cold-proof brick hanging frame for the reconstruction of the outer wall of the house construction project, according to the claim 1, is characterized in that: the heat preservation board (2) is provided with a through hole, and one end of the bearing (6) penetrates through the through hole and extends to the outer side of the heat preservation board (2).
3. The cold-proof brick hanging frame for the reconstruction of the outer wall of the house construction project, according to the claim 1, is characterized in that: the frame (1) is clamped with a groove, the outer side of the fixing bolt (5) is welded on an inner ring of the bearing (6), and one end of the fixing bolt (5) is clamped on the inner side of the groove.
4. The cold-proof brick hanging frame for the reconstruction of the outer wall of the house construction project, according to the claim 1, is characterized in that: the connector (12) is provided with a first external thread, the inner side of the connector (11) is provided with a first internal thread, and the first external thread is matched with the first internal thread.
5. The cold-proof brick hanging frame for the reconstruction of the outer wall of the house construction project, according to the claim 4, is characterized in that: the top of the screw rod (8) sequentially penetrates through the transverse plate (4) and the clamping plate (3) and extends to the top of the screw cap (9), an external thread II is arranged on the screw rod (8), an internal thread II is arranged on the inner side of the screw cap (9), and the external thread II is matched with the internal thread.
6. The cold-proof brick hanging frame for the reconstruction of the outer wall of the house construction project, according to the claim 1, is characterized in that: the inner side of the screw rod (8) is provided with a cutting slit, and the wedge block (10) is clamped on the inner side of the cutting slit.
7. The cold-proof brick hanging frame for the reconstruction of the outer wall of the house construction project, according to the claim 1, is characterized in that: the two ends of the clamping plate (3) are clamped on the inner side of the clamping groove (7), and the transverse plate (4) is perpendicular to the clamping plate (3).
CN201922215086.0U 2019-12-12 2019-12-12 Be used for building engineering construction outer wall transformation winter protection to hang brick frame Expired - Fee Related CN211774694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922215086.0U CN211774694U (en) 2019-12-12 2019-12-12 Be used for building engineering construction outer wall transformation winter protection to hang brick frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922215086.0U CN211774694U (en) 2019-12-12 2019-12-12 Be used for building engineering construction outer wall transformation winter protection to hang brick frame

Publications (1)

Publication Number Publication Date
CN211774694U true CN211774694U (en) 2020-10-27

Family

ID=72980897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922215086.0U Expired - Fee Related CN211774694U (en) 2019-12-12 2019-12-12 Be used for building engineering construction outer wall transformation winter protection to hang brick frame

Country Status (1)

Country Link
CN (1) CN211774694U (en)

Similar Documents

Publication Publication Date Title
CN211774694U (en) Be used for building engineering construction outer wall transformation winter protection to hang brick frame
CN108487485A (en) A kind of Fast Installation structure of insulating board for building
CN210530017U (en) Building heat preservation wall mounting structure
CN214006135U (en) Screw rod for connecting piece of heat-insulation wallboard
CN206928805U (en) A kind of hidden hinge Fast Installation structure
KR101374162B1 (en) Endorsement rafters, and a method for manufacturing the same
KR101374161B1 (en) Endorsement rafters, and a method for manufacturing the same
CN207392480U (en) Mounting structure for exterior wall insulation board
CN215490967U (en) Drying room capable of facilitating ventilation
CN217054958U (en) High strength aluminum alloy guardrail anchor base
CN221095808U (en) Scaffold joint
CN216689958U (en) Rail splicing type curtain wall for assembly type building
CN214384215U (en) Detachable expansion screw
CN219343682U (en) Combined type safe energy-saving steel structure unit curtain wall
CN220504220U (en) Building environment-friendly composite outer wall structure
CN110541507A (en) Glass curtain wall mounting assembly and using method
CN217325984U (en) Heat-insulating sound-insulating glass curtain wall
CN107366672A (en) A kind of high-mechanic blind hole bolt
CN215906994U (en) Large-span assembled space steel network building structure
CN216196522U (en) Detachable embedded wall connecting piece
CN114809384B (en) Cast-in-place shear wall connecting piece and shear wall
CN220414550U (en) Seepage-proofing structure of building heat-preservation decorative structural board
CN208701930U (en) Insulating anchor bolt
CN214090501U (en) Curtain wall connecting structure based on high-rise building
CN214833624U (en) Heat preservation wall structure of energy-saving building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027

Termination date: 20211212

CF01 Termination of patent right due to non-payment of annual fee