CN211774397U - Pipeline installation device for water conservancy construction - Google Patents

Pipeline installation device for water conservancy construction Download PDF

Info

Publication number
CN211774397U
CN211774397U CN202020228818.XU CN202020228818U CN211774397U CN 211774397 U CN211774397 U CN 211774397U CN 202020228818 U CN202020228818 U CN 202020228818U CN 211774397 U CN211774397 U CN 211774397U
Authority
CN
China
Prior art keywords
fixedly connected
sliding
sleeve
groove
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020228818.XU
Other languages
Chinese (zh)
Inventor
李琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020228818.XU priority Critical patent/CN211774397U/en
Application granted granted Critical
Publication of CN211774397U publication Critical patent/CN211774397U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of pipeline installation, in particular to a pipeline installation device for water conservancy construction, which comprises a frame, wherein a first groove and a second groove are formed in the frame, a bearing is embedded in the frame, a rotating shaft is arranged in the bearing in a penetrating way, a threaded column is fixedly connected to the bottom end of the rotating shaft, a threaded cylinder is connected to the surface of the threaded column through threads, a fixed block is fixedly connected to the side surface of the threaded cylinder, and a sleeve is fixedly connected to the side surface of the fixed block; the utility model discloses, can drive the screw thread post through setting up the carousel and rotate, can drive a screw thread section of thick bamboo up-and-down motion simultaneously to driving the sleeve pipe and carrying out the up-and-down motion, also being convenient for adjust the height about the pipeline that needs the installation, set up fixing bolt and can adjust the position about the couple under the cooperation of sliding sleeve, the installation and the welding of the later stage pipeline of also being convenient for simultaneously make holistic result of use better through mutually supporting between each structure.

Description

Pipeline installation device for water conservancy construction
Technical Field
The utility model belongs to the technical field of the piping erection, concretely relates to piping erection device for water conservancy construction.
Background
The hydraulic engineering construction, according to the engineering structure, quantity, quality, progress and cost of the design, including the content of construction preparation, construction technology and construction management, along with the development of science and technology, the hydraulic engineering construction has become an independent subject, the hydraulic engineering construction, with social and natural environment relationship, so the impact of the implementation engineering is also large, need to grasp the opportunity, arrange the plan reasonably, organize the construction meticulously, solve the flood control, flood fighting and other problems in the construction in time, with the policy and safety, most hydraulic engineering at present need to install the drainage pipe, but because the drainage pipe is heavy, when carrying out transport and installation, when the pipe is supported, the height of the pipe can not be adjusted again, at the same time, the constructor can be very strenuous, greatly reducing the work efficiency of the constructor, and transport the cost higher, the welding and the installation between the pipeline butt joint of operating personnel of being not convenient for to above-mentioned problem, provide a pipeline installation device for water conservancy construction.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a pipe-line installation device for water conservancy construction has the characteristics of the pipeline height of being convenient for adjust and the pipeline position of being convenient for remove.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline installation device for water conservancy construction, includes the frame, first recess and second recess have been seted up in the frame, it has the bearing to inlay in the frame, wear to be equipped with the pivot in the bearing, the bottom fixedly connected with screw thread post of pivot, screw thread post surface threaded connection has a screw thread section of thick bamboo, the side fixedly connected with fixed block of a screw thread section of thick bamboo, the side fixedly connected with sleeve pipe of fixed block, wear to be equipped with the dead lever in the sleeve pipe, the upper end and the first recess inner wall fixed connection of dead lever.
Preferably, a sliding rod is fixedly connected in the second groove, a sliding sleeve is fixedly connected to the surface of the sliding rod, and a hook is fixedly connected to the bottom end of the sliding sleeve.
Preferably, a first sliding groove is formed in the first groove, a first sliding block is connected in the first sliding groove in a sliding mode, and the side face of the first sliding block is fixedly connected with the sleeve.
Preferably, a second sliding groove is formed in the second groove, a second sliding block is connected in the second sliding groove in a sliding mode, and the side face of the second sliding block is fixedly connected with the sliding sleeve.
Preferably, the frame surface is provided with fixing bolt, fixing bolt passes sliding sleeve and slide bar surface overlap joint, the upper end fixedly connected with carousel of pivot, sleeve pipe bottom fixedly connected with universal wheel.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model can support the whole frame, and simultaneously is convenient for lifting the pipeline to be installed, and is convenient for welding and installing the pipeline at the later stage, the turntable can drive the threaded column to rotate and the threaded cylinder to move up and down, thereby driving the sleeve to move up and down, being convenient for adjusting the height of the pipeline to be installed, arranging the fixing bolt to adjust the position of the hook under the matching of the sliding sleeve, meanwhile, the installation and welding of pipelines at the later period are facilitated, the first sliding groove and the first sliding block can be matched with the sleeve to move up and down to prevent the sleeve from inclining when moving up and down, the first sliding groove and the second sliding block can be matched with the sliding sleeve to move left and right, thereby alleviate the pipeline to the gravity that slide bar and sliding sleeve produced, make holistic result of use better through mutually supporting between each structure.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic top view of the present invention;
in the figure: 1. a frame; 2. a first groove; 3. fixing the rod; 4. a sleeve; 5. a universal wheel; 6. a first chute; 7. a first slider; 8. a turntable; 9. a second groove; 10. a slide bar; 11. a sliding sleeve; 12. fixing the bolt; 13. hooking; 14. a bearing; 15. a rotating shaft; 16. a threaded post; 17. a threaded barrel; 18. a fixed block; 19. a second chute; 20. and a second slider.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a pipeline installation device for water conservancy construction, includes frame 1, first recess 2 and second recess 9 have been seted up in the frame 1, through setting up the effect that frame 1 whole can play the support, also be convenient for simultaneously rise the pipeline that needs the installation, the welding and the installation of the later stage pipeline of being convenient for, it has bearing 14 to inlay in the frame 1, wear to be equipped with pivot 15 in the bearing 14, the bottom fixedly connected with screw thread post 16 of pivot 15, 16 surperficial threaded connection of screw thread post have a screw thread section of thick bamboo 17, the side fixedly connected with fixed block 18 of a screw thread section of thick bamboo 17, the side fixedly connected with sleeve pipe 4 of fixed block 18, wear to be equipped with dead lever 3 in the sleeve pipe 4, the upper end and the 2 inner wall fixed connection of first recess of dead lever 3.
Specifically, a sliding rod 10 is fixedly connected in the second groove 9, a sliding sleeve 11 is fixedly connected to the surface of the sliding rod 10, and a hook 13 is fixedly connected to the bottom end of the sliding sleeve 11.
Specifically, first spout 6 has been seted up in first recess 2, sliding connection has first slider 7 in first spout 6, sets up first spout 6 and first slider 7 and can cooperate sleeve pipe 4 to carry out the up-and-down motion, the emergence slope when preventing sleeve pipe 4 up-and-down motion, the side and the sleeve pipe 4 fixed connection of first slider 7.
Specifically, a second sliding groove 19 is formed in the second groove 9, a second sliding block 20 is connected in the second sliding groove 19 in a sliding mode, the first sliding groove 6 and the second sliding block 20 are arranged to be capable of being matched with the sliding sleeve 11 to move left and right, so that gravity generated by the pipeline to the sliding rod 10 and the sliding sleeve 11 is reduced, and the side face of the second sliding block 20 is fixedly connected with the sliding sleeve 11.
Specifically, frame 1 surface is provided with fixing bolt 12, sets up fixing bolt 12 and can adjust the position about 13 of couple under the cooperation of sliding sleeve 11, the installation and the welding of the later stage pipeline of also being convenient for simultaneously, fixing bolt 12 passes sliding sleeve 11 and slide bar 10 overlap joint, the upper end fixedly connected with carousel 8 of pivot 15 sets up carousel 8 and can drives screw thread post 16 and rotate, can drive screw thread section of thick bamboo 17 up-and-down motion simultaneously to drive sleeve pipe 4 and carry out the up-and-down motion, also be convenient for adjust the height about the pipeline that needs the installation, sleeve pipe 4 bottom fixedly connected with universal wheel 5.
The utility model discloses a theory of operation and use flow: in the utility model, when in use, an operator firstly moves the device to an appointed position through the universal wheel 5, then moves the sliding sleeve 11 and the hook 13 to the left and right on the sliding rod 10 through the loosening fixing bolt 12, then hooks the hook 13 on the rope fixed on the surface of the pipeline, then adjusts the position of the sliding sleeve 11, then fixes the sliding sleeve 11 and the hook 13 through the fixing bolt 12, after the position of the hook 13 and the sliding sleeve 11 is fixed, then adjusts the left and right turntables 8, the turntables 8 can drive the threaded post 16 to rotate through the rotating shaft 15, meanwhile, the sleeve 4 is driven to move downwards through the threaded barrel 17, the height of the left and right ends of the frame 1 is adjusted, then the pipeline is further butted, after the pipeline is butted successfully, the butted pipeline is welded, after the welding is completed, only the loosening fixing bolt 12 and the turntables 8 need to retract the sleeve 4 into the first groove 2 through the threaded post 16 and the threaded barrel 17, the frame 1 is then lowered and the hook 13 is removed from the line on the pipe surface and the device is moved to a position where it is not in use, thereby completing the use of the device.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a pipe installation device for water conservancy construction, includes frame (1), its characterized in that: first recess (2) and second recess (9) have been seted up in frame (1), it has bearing (14) to inlay in frame (1), wear to be equipped with pivot (15) in bearing (14), the bottom fixedly connected with screw thread post (16) of pivot (15), screw thread post (16) surface threaded connection has a screw thread section of thick bamboo (17), the side fixedly connected with fixed block (18) of a screw thread section of thick bamboo (17), the side fixedly connected with sleeve pipe (4) of fixed block (18), wear to be equipped with dead lever (3) in sleeve pipe (4), the upper end and the first recess (2) inner wall fixed connection of dead lever (3).
2. The pipeline installation device for water conservancy construction according to claim 1, characterized in that: the sliding rod (10) is fixedly connected in the second groove (9), a sliding sleeve (11) is fixedly connected to the surface of the sliding rod (10), and a hook (13) is fixedly connected to the bottom end of the sliding sleeve (11).
3. The pipeline installation device for water conservancy construction according to claim 1, characterized in that: a first sliding groove (6) is formed in the first groove (2), a first sliding block (7) is connected in the first sliding groove (6) in a sliding mode, and the side face of the first sliding block (7) is fixedly connected with the sleeve (4).
4. The pipeline installation device for water conservancy construction according to claim 1, characterized in that: a second sliding groove (19) is formed in the second groove (9), a second sliding block (20) is connected in the second sliding groove (19) in a sliding mode, and the side face of the second sliding block (20) is fixedly connected with the sliding sleeve (11).
5. The pipeline installation device for water conservancy construction according to claim 1, characterized in that: the frame (1) surface is provided with fixing bolt (12), fixing bolt (12) pass sliding sleeve (11) and slide bar (10) surface overlap joint, the upper end fixedly connected with carousel (8) of pivot (15), sleeve pipe (4) bottom fixedly connected with universal wheel (5).
CN202020228818.XU 2020-02-29 2020-02-29 Pipeline installation device for water conservancy construction Expired - Fee Related CN211774397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020228818.XU CN211774397U (en) 2020-02-29 2020-02-29 Pipeline installation device for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020228818.XU CN211774397U (en) 2020-02-29 2020-02-29 Pipeline installation device for water conservancy construction

Publications (1)

Publication Number Publication Date
CN211774397U true CN211774397U (en) 2020-10-27

Family

ID=72910582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020228818.XU Expired - Fee Related CN211774397U (en) 2020-02-29 2020-02-29 Pipeline installation device for water conservancy construction

Country Status (1)

Country Link
CN (1) CN211774397U (en)

Similar Documents

Publication Publication Date Title
CN211398794U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN108838954A (en) A kind of novel and multifunctional mechanical equipment inspection rack device and its repair method
CN211774397U (en) Pipeline installation device for water conservancy construction
CN202315437U (en) Lifting device for dross well of sewage treatment primary settling tank
CN215160846U (en) Plateau belt pumping unit moves quick-witted device
CN204960365U (en) Building has integral translation device of power
CN108609497A (en) Excavator pivoting support automatic hanging loads onto flow-line equipment
CN108393839A (en) A kind of flange rectifier
CN213773203U (en) Ecological bank protection of hydraulic engineering
CN211398762U (en) Pipeline connection auxiliary device for building water supply and drainage
CN211036931U (en) River course cleaning device for hydraulic engineering
CN207348829U (en) Hydraulic double-arm balance oil extractor
CN208648090U (en) A kind of timber grab slewing equipment
CN208037877U (en) A kind of portable small-sized electrical equipment lifting auxiliary tool
CN2207241Y (en) Tub shaping equipment
CN207015389U (en) A kind of water conservancy construction handling device
CN205170953U (en) Automatic stifled mechanism of flowing of aluminium smelting pot
CN110607764A (en) Bridge rotation construction structure and construction method thereof
CN215967211U (en) Automatic welding operation frame for repairing wear-resistant part
CN209367622U (en) A kind of pipe dredging rubbish hoisting mechanism
CN216664406U (en) Pipeline supporting and positioning device for municipal drainage engineering construction
CN212672558U (en) Be used for pipeline local non-excavation to restore support
CN209818900U (en) Pipeline laying robot welding device based on rectangular coordinate system
CN212508145U (en) Automatic pipe rod conveying equipment
CN201284568Y (en) Tier pole soldering stand of telephone pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027

Termination date: 20210228