CN211773723U - Welding-free and dismantling-free bracket for steel sheet pile - Google Patents

Welding-free and dismantling-free bracket for steel sheet pile Download PDF

Info

Publication number
CN211773723U
CN211773723U CN202020206363.1U CN202020206363U CN211773723U CN 211773723 U CN211773723 U CN 211773723U CN 202020206363 U CN202020206363 U CN 202020206363U CN 211773723 U CN211773723 U CN 211773723U
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
bracket
welding
free
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020206363.1U
Other languages
Chinese (zh)
Inventor
白子民
陈小羊
王小康
张�浩
王廷发
冯明哲
刘志敏
张康
潘铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202020206363.1U priority Critical patent/CN211773723U/en
Application granted granted Critical
Publication of CN211773723U publication Critical patent/CN211773723U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a welding-free and dismantling-free bracket for steel sheet piles, which effectively solves the problems that the welding and dismantling of the bracket takes time and labor and causes material damage and influences the repeated use; the technical scheme includes that the steel sheet pile comprises a vertical steel sheet pile and a bracket assembly, wherein a vertical sliding groove is formed in the steel sheet pile, the bracket assembly comprises a back plate parallel to the steel sheet pile, a bracket perpendicular to the back plate is welded on the back plate, a bolt penetrates through the back plate and is arranged in the sliding groove, the back plate can be fixed on the steel sheet pile when the bolt is screwed down, and the back plate can slide up and down along the sliding groove when the bolt is loosened; the utility model discloses fine solution the bracket welding, the problem of demolising, and compare with conventional method, convenient operation, laborsaving saving time, reduce cost improves work efficiency.

Description

Welding-free and dismantling-free bracket for steel sheet pile
Technical Field
The utility model relates to a foundation ditch support field specifically is a exempt from to weld, exempt from to demolish bracket for steel sheet pile.
Background
In the process of supporting the foundation pit, after the steel sheet piles are inserted and driven to finish excavating a first layer of soil body, corbel leveling and installation are needed. The conventional method for installing the bracket is welding, namely full welding between the bracket and the steel sheet pile, and although the method is firm, the method has the following defects:
1. the welding process takes a long time;
2. after the supporting structure is used, the bracket is required to be dismantled (if the bracket is not dismantled, the bracket cannot be guaranteed to be on the same horizontal plane in the next use), which is labor-consuming and time-consuming;
3. the material is damaged by multiple welding and dismantling, and the repeated use of the material is influenced.
Disclosure of Invention
To the above situation, for overcoming prior art's defect, the utility model provides a welding-free, exempt from to demolish bracket for steel sheet pile, the effectual bracket welding of having solved, demolish that the labour-and-time-consuming and cause the material to destroy, influence used repeatedly's problem.
The technical scheme of its solution is, a exempt from to weld, exempt from to demolish bracket for steel sheet pile, including vertical steel sheet pile and bracket subassembly, seted up vertical spout on the steel sheet pile, the bracket subassembly includes a backplate parallel with the steel sheet pile, the welding has rather than vertically bracket on the backplate, wears to be equipped with the bolt on the backplate, in arranging the spout in of bolt, can fix the backplate on the steel sheet pile when the bolt is screwed up, the bolt loosens and to make the backplate slide from top to bottom along the spout.
The utility model discloses fine solution the bracket welding, the problem of demolising, and compare with conventional method, convenient operation, laborsaving saving time, reduce cost improves work efficiency.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a sectional view taken along line a-a of fig. 1.
Fig. 3 is an enlarged view of the position B in fig. 2.
Fig. 4 is a front view of the corbel assembly.
Fig. 5 is a left side view of the corbel assembly.
Fig. 6 is a top view of the corbel assembly.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings.
By figure 1 to figure 6, the utility model discloses a vertical steel sheet pile 1 and bracket 4 subassembly have seted up vertical spout 2 on the steel sheet pile 1, and bracket 4 subassembly includes a backplate 3 parallel with steel sheet pile 1, and the welding has rather than vertically bracket 4 on the backplate 3, wears to be equipped with bolt 5 on the backplate 3, and in arranging spout 2 in of bolt 5, can fix backplate 3 on steel sheet pile 1 when bolt 5 screws up, bolt 5 loosens and to make backplate 3 slide from top to bottom along spout 2.
Two sliding grooves 2 are symmetrically formed in the steel sheet pile 1 in the left-right direction, four bolts 5 are arranged on the back plate 3, two bolts 5 penetrate through the sliding grooves 2 in each side, the back plate 3 can be stably fixed on the steel sheet pile 1 through the four bolts 5, and the back plate 3 is prevented from sliding and twisting.
The head of the bolt 5 is welded with a stop block 6, so that the nut is prevented from falling off in the material using and transferring processes.
The utility model discloses when using, the survey crew uses every 20m survey 1 point of GPS or theodolite, emits the supporting construction sideline, then spills the lime line subaerial, then adopts the vibratory hammer to squeeze into the soil body according to the lime line with steel sheet pile 1 in proper order, and a plurality of steel sheet piles 1 are protected and are bored the body edge, excavate the first layer soil body afterwards, and the first layer soil body excavates to enclosing purlin position 50-100cm below, makes things convenient for workman's adjustment fixed bracket 4 and installation to enclose the purlin.
Note that the steel sheet pile 1 with the bracket 4 is to descend the bracket 4 assembly to the bottom of the chute 2 before driving, and then to insert and drive after tightening the bolt 5. In the method, the height of the bracket 4 assembly is conveniently adjusted, because one end of the bolt 5 is arranged in the soil layer, after the first layer of soil is excavated, the bolt 5 cannot be subjected to the resistance of the soil when the bracket 4 is adjusted upwards, and the adjustment is more convenient; on the contrary, if the bracket 4 component is adjusted downwards, the end of the bolt 5 is affected by the soil body below, and the adjustment is laborious.
After the excavation of the first layer of soil body is finished, marking the positions of the top surfaces of the designed brackets 4 on the steel sheet piles 1 on the two sides at intervals of 20m by adopting a level gauge, then manually pulling a wire, marking the designed elevation of the top surface of each bracket 4 on each steel sheet pile 1 with the bracket 4, loosening the bolts 5, moving the bracket 4 to the designed height, then screwing the bolts 5, and adjusting all the brackets 4 one by one according to the method; and after the bracket 4 is adjusted and fixed, installing an enclosing purlin and a cross brace on the bracket 4, then excavating a second layer of soil body, and carrying out engineering construction in a foundation pit.
After the supporting structure is used, the surrounding purlin and the cross brace are disassembled, the bolts 5 are loosened, and the steel sheet pile 1 is directly pulled out.
The utility model has the advantages that:
1. the sliding chute 2 on the steel sheet pile 1 can realize the free leveling of the bracket 4;
2. a back plate 3 is additionally arranged on the bracket 4, so that the contact area between the bracket 4 and the steel sheet pile 1 is increased, and the bracket 4 and the steel sheet pile 1 can be effectively fixed;
3. the purposes of welding-free and dismantling-free can be realized.
The utility model discloses fine solution bracket 4 welding, demolish that it is time-consuming to take a lot of work, destroy difficult problems such as material, and compare with conventional method, saved the process of component welding and excision for the construction progress has practiced thrift construction cost, has improved the rate of utilization of material.

Claims (3)

1. The utility model provides a exempt from to weld for steel sheet pile, exempt from to demolish the bracket, a serial communication port, including vertical steel sheet pile (1) and bracket (4) subassembly, vertical spout (2) have been seted up on steel sheet pile (1), bracket (4) subassembly includes one backplate (3) parallel with steel sheet pile (1), the welding has on backplate (3) rather than vertically bracket (4), wear to be equipped with bolt (5) on backplate (3), arranging of bolt (5) in spout (2), can fix backplate (3) on steel sheet pile (1) when bolt (5) are screwed up, bolt (5) are loosened and are made backplate (3) slide from top to bottom along spout (2).
2. The welding-free and dismantling-free corbel for the steel sheet pile according to claim 1, wherein two sliding grooves (2) are symmetrically formed in the steel sheet pile (1) in the left-right direction, four bolts (5) are arranged on the back plate (3), and two bolts (5) are arranged in the sliding groove (2) on each side in a penetrating manner.
3. A welding-free, dismantling-free corbel for a steel sheet pile as claimed in claim 1, characterized in that a stop (6) is welded to the head of the bolt (5) to prevent the nut from falling off during the use and turnover of the material.
CN202020206363.1U 2020-02-25 2020-02-25 Welding-free and dismantling-free bracket for steel sheet pile Active CN211773723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020206363.1U CN211773723U (en) 2020-02-25 2020-02-25 Welding-free and dismantling-free bracket for steel sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020206363.1U CN211773723U (en) 2020-02-25 2020-02-25 Welding-free and dismantling-free bracket for steel sheet pile

Publications (1)

Publication Number Publication Date
CN211773723U true CN211773723U (en) 2020-10-27

Family

ID=72910231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020206363.1U Active CN211773723U (en) 2020-02-25 2020-02-25 Welding-free and dismantling-free bracket for steel sheet pile

Country Status (1)

Country Link
CN (1) CN211773723U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113373945A (en) * 2021-07-07 2021-09-10 中国十七冶集团有限公司 Pipeline engineering steel sheet pile supporting structure and construction method thereof
CN114855824A (en) * 2022-06-08 2022-08-05 浙江国进建设有限公司 Construction method of Larsen steel sheet pile of foundation pit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113373945A (en) * 2021-07-07 2021-09-10 中国十七冶集团有限公司 Pipeline engineering steel sheet pile supporting structure and construction method thereof
CN113373945B (en) * 2021-07-07 2022-04-26 中国十七冶集团有限公司 Pipeline engineering steel sheet pile supporting structure and construction method thereof
CN114855824A (en) * 2022-06-08 2022-08-05 浙江国进建设有限公司 Construction method of Larsen steel sheet pile of foundation pit

Similar Documents

Publication Publication Date Title
CN107653884B (en) Steel casing setting device for drilling of sand foundation cast-in-place pile and construction method thereof
CN211773723U (en) Welding-free and dismantling-free bracket for steel sheet pile
WO2016107434A1 (en) Regional stress field optimization method for main haulageway
CN110952554B (en) Walking lifting disc type pile head cutting mechanism
CN111021355B (en) Hoisting type cast-in-place pile head cutting device
CN111472801A (en) Construction method for passing existing line under shallow-buried underground excavation drainage gallery
CN112523767A (en) Construction method for shield pile grinding of expansion soil layer
CN104452804A (en) Full-face stirring and cutting wall construction machine
CN204225101U (en) The construction equipment of concrete pile
US10633930B2 (en) Platform based drill capable of negative angle drilling
CN215715333U (en) Pre-buried device of flow plasticity geology bottom plate construction
CN1088487C (en) Method for forming retaining wall
CN214033851U (en) Rolling roller type cut-off wall grooving device
KR20130061377A (en) Structure of retaining wall and construction method for installing underground structures
CN213775246U (en) Stirring rig of angularly adjustable
CN211773974U (en) Building inclination correcting and sinking accelerating device
CN210033265U (en) Hydraulic double-wheel milling and stirring drilling machine cutter head
JP6998836B2 (en) How to install the support device for solar panels and the support device for solar panels
CN218204660U (en) Auxiliary leveling excavator bucket
WO2020093922A1 (en) Cast-in-situ concrete foundation for soft soil, and construction method
CN218175845U (en) Enclosing purlin mounting structure on larsen steel sheet pile
CN220225405U (en) Deviation correcting device is subsided to open caisson non-uniformity
CN221094747U (en) Foundation leveling equipment for construction engineering technology
CN110777859B (en) Horizontal foundation replacement and pile body jacking reinforcement deviation rectifying method
CN214464192U (en) Supporting device of tunneling and anchoring machine and tunneling and anchoring machine with same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant