CN211773694U - Prefabricated formula cubic metre of earth stone safety supporting construction - Google Patents

Prefabricated formula cubic metre of earth stone safety supporting construction Download PDF

Info

Publication number
CN211773694U
CN211773694U CN201922114835.0U CN201922114835U CN211773694U CN 211773694 U CN211773694 U CN 211773694U CN 201922114835 U CN201922114835 U CN 201922114835U CN 211773694 U CN211773694 U CN 211773694U
Authority
CN
China
Prior art keywords
earthwork
supporting construction
supporting structure
stone
type safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922114835.0U
Other languages
Chinese (zh)
Inventor
张晓梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Guanji Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922114835.0U priority Critical patent/CN211773694U/en
Application granted granted Critical
Publication of CN211773694U publication Critical patent/CN211773694U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a prefabricated formula cubic metre of earth stone safety supporting construction, include: supporting construction, the water seepage layer, the strengthening rib, clamping screw, spacing groove and permeable formation, supporting construction's inside is provided with stable structure, and supporting construction's one end is provided with the water guide part, supporting construction is the setting of L word form, and supporting construction's both ends all are provided with the reinforcing bar climbing rod, through water seepage layer and connection chamber, be convenient for reduce rainwater pressure of drippage, it causes the collapse to avoid the easy break away of rainwater earthwork, and utilize the setting of permeable formation, make water can follow the slow seepage in the permeable formation, avoid breaking away the earthwork of supporting construction bottom, be convenient for slowly permeate into the earthwork bottom with water and carry out the drainage, through strengthening rib and crossbeam criss-cross setting, the effectual intensity that has strengthened supporting construction, and utilize the fixture block of three horn shapes, be convenient for increase supporting construction and the frictional force of earthwork, make supporting construction and earthwork be connected more stably.

Description

Prefabricated formula cubic metre of earth stone safety supporting construction
Technical Field
The utility model relates to an earthwork stone supporting technology field, specificly relate to a prefabricated formula earthwork stone safety supporting construction.
Background
The earthwork is a general name of earthwork and stone, that is, earthwork and stone, and the earthwork project includes an excavation step, filling, transportation, drainage, precipitation and the like of a cut earthwork (stone), and the earthwork generally widely exists in the excavation project of the earthwork and stone, and common earthwork projects include: leveling a field, excavating earthwork stones (grooves) and pipe ditches, excavating a roadbed, excavating civil air defense engineering, filling soil in the terrace, filling the roadbed and backfilling the earthwork stones;
based on the above description, and retrieve an application number: CN 201822159144.8's utility model patent, it is about a dark cubic stone supporting construction that anti striking ability is strong, including dark cubic stone (1), its characterized in that: dark cubic stone (1) includes cubic stone lateral wall (101) and cubic stone diapire (102), lateral wall (101) and cubic stone diapire (102) fixed connection … … the surface swing joint of buffer stop connecting rod (10) has buffer stop (11). Through search, the design of the anti-collision device is mainly found, so that when external impact force impacts the supporting device, the anti-collision device rotates on the connecting rod of the anti-collision device, the direction of the external impact force is changed, the supporting device is protected from being damaged, and the service life of the supporting device is prolonged;
after retrieval and analysis, the soil quality of the existing earthwork stone supporting structure is looser, so that rainwater is large when raining, and the earthwork stone is easy to scatter, so that the problems of collapse and the like are solved.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the technical problem who proposes in the above-mentioned background art, provide a prefabricated formula cubic metre of earth stone safety supporting structure, include: supporting construction, infiltration layer, strengthening rib, clamping screw, spacing groove and permeable formation, supporting construction's inside is provided with stable structure, and supporting construction's one end is provided with the water guide part, and supporting construction is the setting of L word form, and supporting construction's both ends all are provided with the reinforcing bar and climb the pole.
Preferably, the stabilizing structure comprises: strengthening rib and clamping screw, strengthening rib are L word form setting, and the equal fixedly connected with strengthening rib in supporting construction's inside both ends.
Preferably, all run through in two strengthening ribs and be connected with at least three crossbeam, and the strengthening rib is the cross arrangement with the crossbeam.
Preferably, the reinforcing rib and the cross beam are welded with each other, and the expansion bolt is connected with the bottom in the earthwork through penetrating and connecting with one end of the supporting structure.
Preferably, the supporting construction is with the equal fixedly connected with clamping screw in the one end both sides that the cubic metre of earth stone is close, and the clamping screw embedding sets up in the cubic metre of earth stone.
Preferably, the joint of supporting construction and cubic metre of earth stone is connected with a plurality of fixture block, and the fixture block is the triangle-shaped setting.
Preferably, the water guide member includes: the permeable layer is arranged at the upper end of the earthwork stone, and the bottom of the permeable layer is fixedly connected with the connecting cavity.
Preferably, the bottom of the connection cavity is fixedly connected with a connection pipe, and one end of the connection pipe penetrates through the supporting structure in an inclined manner.
Preferably, supporting construction's bottom is provided with two at least spacing grooves, and the inside of spacing groove is provided with the permeable formation to the permeable layer is made by compound geomembrane material with the permeable formation.
Preferably, the bottom of spacing groove is provided with the shutoff piece, and both ends between permeable formation and the shutoff piece all are provided with the delivery port.
Preferably, supporting construction's top fixedly connected with anticollision post, and the inside fixedly connected with anticollision board of anticollision post to the equal joint of one end of anticollision board has at least three buffer spring.
Has the advantages that:
through the arrangement of the water seepage layer and the connecting cavity, the rainwater dropping pressure is reduced conveniently, collapse caused by the fact that rainwater easily breaks away earthwork is avoided, water can slowly seep out of the water seepage layer through the arrangement of the water seepage layer, the earthwork at the bottom of the supporting structure is prevented from breaking away, and the water can slowly penetrate into the bottom of the earthwork to be drained conveniently;
through strengthening rib and crossbeam criss-cross setting, the effectual intensity that has strengthened supporting construction can alleviate the harm that supporting construction received, the effectual life who prolongs deep basal pit and strut to utilize the fixture block of triangle-shaped, be convenient for increase supporting construction and the frictional force of cubic metre of earth stone, make supporting construction and cubic metre of earth stone be connected more stably.
Drawings
Fig. 1 is a schematic view of the overall plane structure of the present invention.
Fig. 2 is a left side view structural diagram of the supporting structure of the present invention;
FIG. 3 is an enlarged schematic view of A of FIG. 1 according to the present invention;
fig. 4 is a schematic view of the plane structure of the limiting groove of the present invention.
In FIGS. 1-4: 1-supporting structure, 2-collision post, 3-buffer spring, 4-collision plate, 5-water seepage layer, 6-connecting cavity, 7-connecting pipe, 8-reinforcing rib, 9-fixing screw, 10-expansion bolt, 11-cross beam, 12-steel bar climbing rod, 13-clamping block, 14-limiting groove, 15-plugging piece, 16-water seepage layer and 17-water outlet.
Detailed Description
Referring to fig. 1 to 4, in an embodiment of the present invention, a prefabricated safety supporting structure for earthwork includes: supporting construction 1, infiltration layer 5, strengthening rib 8, clamping screw 9, spacing groove 14 and permeable formation 16, supporting construction 1's inside is provided with stable structure, and supporting construction 1's one end is provided with the water guide part, and supporting construction 1 is the setting of L word form, and supporting construction 1's both ends all are provided with reinforcing bar climbing pole 12.
Preferably, the stabilizing structure comprises: strengthening rib 8 and clamping screw 9, strengthening rib 8 is the setting of L word form, and the equal fixedly connected with strengthening rib 8 in supporting construction 1's the inside both ends, all through connection has at least three crossbeam 11 in two strengthening ribs 8, and strengthening rib 8 is the cross arrangement with crossbeam 11, strengthening rib 8 welds each other with crossbeam 11, and expansion bolts 10 meet through the bottom in supporting construction 1's one end and the earthwork, through strengthening rib 8 and the criss-cross setting of crossbeam 11, the effectual intensity that has strengthened supporting construction 1, can alleviate the harm that supporting construction 1 received, the effectual life who prolongs deep basal pit and strut.
Preferably, supporting construction 1 is from the equal fixedly connected with clamping screw 9 in one end both sides that cubic earth stone is close, and the clamping screw 9 embedding sets up in cubic earth stone, and supporting construction 1 has a plurality of fixture block 13 with the junction joint of cubic earth stone, and fixture block 13 is the setting of triangle form, utilizes the fixture block 13 of triangle form, is convenient for increase supporting construction 1 and the frictional force of cubic earth stone for supporting construction 1 is connected more stably with cubic earth stone.
Preferably, the water guide member includes: infiltration layer 5 and spacing groove 14, infiltration layer 5 sets up in the upper end of earthwork, and the bottom fixedly connected with of infiltration layer 5 connects chamber 6, connects the bottom fixedly connected with connecting pipe 7 of chamber 6, and the one end of connecting pipe 7 is the slope form and runs through in supporting construction 1's inside, through infiltration layer 5 and connecting chamber 6, is convenient for reduce rainwater pressure of drippage, avoids the rainwater to break away the earthwork easily and causes to sink.
Preferably, supporting construction 1's bottom is provided with two at least spacing grooves 14, and the inside of spacing groove 14 is provided with permeable formation 16 to permeable formation 5 and permeable formation 16 are made by compound geomembrane material, and the bottom of spacing groove 14 is provided with shutoff piece 15, and both ends between permeable formation 16 and the shutoff piece 15 all are provided with delivery port 17, utilize permeable formation 5 to make water slowly ooze in permeable formation 5, avoid breaking up the earthwork stone of supporting construction 1 bottom, be convenient for slowly permeate into the earthwork stone bottom with water and carry out the drainage.
Preferably, supporting construction 1's top fixedly connected with bumping post 2, and bumping post 2's inside fixedly connected with crashproof board 4 to the equal joint of one end of crashproof board 4 has at least three buffer spring 3, and through buffer spring 3's elasticity, when bumping post 2 receives the striking, make buffer spring 3 to 4 directions of crashproof board compression, turn into buffer spring 3's elastic potential energy with partial pressure, reduce bumping post 2 and receive the striking.
The working principle is as follows:
when the prefabricated type earthwork safe supporting structure of the utility model is installed, firstly, one end of the supporting structure 1 is conveniently fixed on the upper surface of the bottom of the earthwork through the expansion bolt 10, and the other end of the supporting structure 1 is conveniently fixed on one side of the earthwork by the fixing screw 9, so that one side of the earthwork can be prevented from sinking, then the strength of the supporting structure 1 is conveniently enhanced through the reinforcing ribs 8 and the cross beams 11 which are arranged in a crossed way, the damage to the supporting structure 1 can be reduced, the friction between the supporting structure 1 and the earthwork is conveniently increased by the triangular fixture blocks 13, so that the supporting structure 1 and one side of the earthwork are connected more stably, then the rainwater can be conveniently infiltrated into the connecting cavity 6 through the water seepage layer 5, the pressure of rainwater dripping can be reduced, the phenomenon that the earthwork is easily dispersed by the rainwater to cause sinking is avoided, and the rainwater in the connecting cavity 6 is conveniently led into the supporting structure by the connecting pipe 7, then through permeable formation 5 in the spacing groove 14 make water can follow slowly oozing to on the shutoff piece 15 in the permeable formation 5, and utilize the bottom of delivery port 17 row income earthwork stone to carry out the drainage, later through buffer spring 3's elasticity, when crashproof post 2 receives the striking, make buffer spring 3 to 4 direction compression of crashproof board, turn into buffer spring 3's elastic potential energy with partial pressure, reduce crashproof post 2 and receive the striking, utilize crashproof post 2 to avoid constructor to drop to the earthwork stone bottom by accident at last, and climb the pole 12 through the reinforcing bar and be convenient for the access of constructor in the earthwork stone foundation pit.

Claims (10)

1. A prefabricated formula earthwork stone safety support structure, comprising: supporting construction (1), infiltration layer (5), strengthening rib (8), clamping screw (9), spacing groove (14) and permeable formation (16), its characterized in that: the inside of supporting construction (1) is provided with firm structure, and the one end of supporting construction (1) is provided with the water guide part, supporting construction (1) is the setting of L word form, and the both ends of supporting construction (1) all are provided with reinforcing bar and climb pole (12).
2. The prefabricated type safety supporting structure for earthwork of claim 1, wherein: the stabilizing structure includes: strengthening rib (8) and clamping screw (9), strengthening rib (8) are L word form setting, and the equal fixedly connected with strengthening rib (8) in inside both ends of supporting construction (1).
3. The prefabricated type safety supporting structure for earthwork of claim 2, wherein: all through connection has at least three crossbeam (11) in two strengthening ribs (8), and strengthening rib (8) are the setting of handing over with crossbeam (11).
4. The prefabricated type safety supporting structure for earthwork of claim 3, wherein: the reinforcing ribs (8) and the cross beam (11) are welded with each other, and the expansion bolts (10) are connected with the bottom in the earthwork through penetrating connection at one end of the supporting structure (1).
5. The prefabricated type safety supporting structure for earthwork of claim 2, wherein: supporting construction (1) is apart from the equal fixedly connected with clamping screw (9) in one end both sides that the earthwork stone is close, and clamping screw (9) embedding sets up in the earthwork stone.
6. The prefabricated type safety supporting structure for earthwork of claim 5, wherein: supporting construction (1) and the junction joint of earthwork stone have a plurality of fixture block (13), and fixture block (13) are triangle-shaped and set up.
7. The prefabricated type safety supporting structure for earthwork of claim 1, wherein: the water guide member includes: the permeable layer (5) is arranged at the upper end of the earthwork stone, and the bottom of the permeable layer (5) is fixedly connected with the connecting cavity (6).
8. The prefabricated type safety supporting structure for earthwork of claim 7, wherein: the bottom of the connecting cavity (6) is fixedly connected with a connecting pipe (7), and one end of the connecting pipe (7) penetrates through the supporting structure (1) in an inclined manner.
9. The prefabricated type safety supporting structure for earthwork of claim 7, wherein: the bottom of the supporting structure (1) is provided with at least two limiting grooves (14), permeable layers (16) are arranged inside the limiting grooves (14), and the permeable layers (5) and the permeable layers (16) are both made of composite geomembrane materials.
10. The prefabricated type safety supporting structure for earthwork of claim 9, wherein: the bottom of spacing groove (14) is provided with shutoff piece (15), and both ends between permeable formation (16) and shutoff piece (15) all are provided with delivery port (17), the top fixedly connected with anticollision post (2) of supporting construction (1), and the inside fixedly connected with anticollision board (4) of anticollision post (2) to the equal joint of one end of anticollision board (4) has at least three buffer spring (3).
CN201922114835.0U 2019-11-29 2019-11-29 Prefabricated formula cubic metre of earth stone safety supporting construction Expired - Fee Related CN211773694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922114835.0U CN211773694U (en) 2019-11-29 2019-11-29 Prefabricated formula cubic metre of earth stone safety supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922114835.0U CN211773694U (en) 2019-11-29 2019-11-29 Prefabricated formula cubic metre of earth stone safety supporting construction

Publications (1)

Publication Number Publication Date
CN211773694U true CN211773694U (en) 2020-10-27

Family

ID=72961219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922114835.0U Expired - Fee Related CN211773694U (en) 2019-11-29 2019-11-29 Prefabricated formula cubic metre of earth stone safety supporting construction

Country Status (1)

Country Link
CN (1) CN211773694U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263200A (en) * 2021-12-29 2022-04-01 四汇建设集团有限公司 Civil construction foundation pit drainage structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263200A (en) * 2021-12-29 2022-04-01 四汇建设集团有限公司 Civil construction foundation pit drainage structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN107250460B (en) Precast block retaining wall method for preventing landslide
CN103485363B (en) Three-dimensional continuous frame formula reinforced concrete structure retaining wall
CN101476466B (en) Giant heavy laver land slide pre-stress anchor cable antiskid tunnel construction method and novel prevention structure
CN109487804B (en) Low-disturbance reinforcement protection system for red-layer soft rock cutting slope and construction method
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN102031760A (en) Anti-rockfall method for subgrade in rock deposit zone
CN111364486B (en) Remediation and reinforcement device and method for emergency rescue of slide-resistant pile side slope
CN202323970U (en) Combined reinforcement system for side slope
CN103233473A (en) Polymer multi-edge pile grouting method
CN111021373A (en) Slope reinforcing apparatus for building municipal works
CN210341949U (en) Slope protection structure with anti-landslide function
CN211773694U (en) Prefabricated formula cubic metre of earth stone safety supporting construction
CN208105292U (en) A kind of water conservancy or highway engineering side slope equipped with draining with protective device
CN204551491U (en) A kind of side slope protection greening structure
CN206418509U (en) A kind of anchored pile supporting of high gradient slope
CN212077981U (en) Combined slope supporting structure
CN206529682U (en) Urban Bridge superhigh tenacity concrete transverse direction block construction
KR101326574B1 (en) Foundation structure for pillar
CN204703189U (en) A kind of cutting barricade being applicable to crevice water, diving growth
CN110593283A (en) Pile-net combined type slope protection device capable of being disassembled and recycled and implementation method
CN105525595A (en) Gabion-piled slab type debris flow retaining structure and implementation method thereof
CN202131610U (en) Prestressed anchor rope buttress type dead wall applicable for rock foundation
CN110593205B (en) High-order debris flow multistage self-adaptive barrier pile group disaster reduction structure and implementation method
CN203639941U (en) Balance weight type retaining wall
CN109098205B (en) Civil air defense underground passage and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211103

Address after: 524001 No. 89 reserved land, yayingshi village, Lianjiang City, Zhanjiang City, Guangdong Province

Patentee after: Guangdong Guanji Construction Co.,Ltd.

Address before: 408200 building 27, Shanghai, shuitianping Industrial Park, Fengdu County, Chongqing

Patentee before: Zhang Xiaomei

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027