CN211772727U - Newly repair road bridge with supplementary marking device - Google Patents

Newly repair road bridge with supplementary marking device Download PDF

Info

Publication number
CN211772727U
CN211772727U CN201921985411.5U CN201921985411U CN211772727U CN 211772727 U CN211772727 U CN 211772727U CN 201921985411 U CN201921985411 U CN 201921985411U CN 211772727 U CN211772727 U CN 211772727U
Authority
CN
China
Prior art keywords
marking device
pipe
bridge
mould
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921985411.5U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Ping'an Transportation Facilities Engineering Maintenance Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921985411.5U priority Critical patent/CN211772727U/en
Application granted granted Critical
Publication of CN211772727U publication Critical patent/CN211772727U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses an auxiliary marking device for newly-repaired roads and bridges, which comprises a mould box body, wherein an extension wall is integrally formed at the rear side of the mould box body, a mould hole is formed in the lower side wall of the mould box body, a slide hole is formed in the upper end of the extension wall, a slide rod is slidably mounted in the slide hole, clamping plates are welded at the front end and the rear end of the slide rod, a material spraying pipe penetrating through the slide hole is inserted in the middle of the clamping plate, the rear end of the material spraying pipe is communicated with a compressor and a material barrel through a guide pipe, the material spraying pipe can be slid along the slide hole when the external compressor is started, marking work of a section can be completed, the clamping plates are compared and aligned with previously-drawn lines, a complete straight line is ensured after each section of line is spliced, when the equipment is used for spraying ground marks, a worker only needs to stage move the mould and repeatedly slide the material spraying pipe, and an auxiliary effect is achieved, the workload of workers is reduced, and the purpose of improving the scribing efficiency is achieved.

Description

Newly repair road bridge with supplementary marking device
Technical Field
The utility model relates to a warning line air brushing technical field specifically is a newly repair road bridge auxiliary marking device for roof beam.
Background
The ground traffic sign is a white sign with yellow bottom laid on the ground, is mainly arranged at two ends of a single-row allen, writes a 'one-way driving' direction in a traffic-permitted direction, and is marked with a large arrow for forward driving; the direction of no passing is marked with 'motor vehicle no passing', and simultaneously, the direction of no passing is marked with a no passing mark, so that the method is very striking. The method is an upgraded version of the one-way traffic sign, and aims to achieve micro-circulation of a road with narrow roads and improve the traffic capacity; in order to draw the marks orderly, workers usually use a mold to standardize the jet-printed patterns, but the existing mold has single function, only can play a role in framing the jet-printed patterns, and cannot play more auxiliary effects on the scribing process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a newly repair road bridge is with supplementary marking device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a newly repair road bridge and use supplementary marking device, includes the mould box, the rear side integrated into one piece of mould box has the extension wall, and the lower lateral wall of mould box has seted up the nib, the slide opening has been seted up to the upper end of extension wall, the inside slidable mounting of slide opening has the slide bar, splint have all been welded at both ends around the slide bar, peg graft at the middle part of splint and have the material pipe that spouts that runs through the slide opening, the rear end of spouting the material pipe is linked together through pipe and compressor and storage bucket.
Preferably, a handle is integrally formed on the rear side wall of the clamping plate, the rear end of the material spraying pipe penetrates through the handle, a screw joint is fixedly installed at the tail end of the guide pipe, and the screw joint is screwed in the handle.
Preferably, the side wall of the mold box body is integrally formed with an inclined side wall between the mold holes.
Preferably, the outside welding of mould box left side wall has the comparison splint.
Preferably, the distance between the two comparison clamping plates is equal to the width of the die hole.
Preferably, the spray holes of the spray pipe are uniformly formed in the lower side wall of the spray pipe.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a newly repair road bridge and use supplementary marking device, the staff places this mould in the position that needs the rule, the equipment pipe chain that will be used for spraying coating connects the outer end at the handle, slide along the slide opening when starting outside compressor and spout the marking off work that the material pipe can accomplish the cost section, compare splint and be used for lining up with the lines of having drawn before, it is a complete straight line to guarantee to be after each section line concatenation of drawing next, when using this equipment to spout drawing ground sign, the staff only needs stage nature to remove this mould and spout the material pipe that slides repeatedly, the supplementary effect has been played marking off work, staff's work load has been reduced, in order to reach the purpose that improves marking off efficiency.
Drawings
Fig. 1 is a top view of the present invention;
fig. 2 is a front view of the present invention.
In the figure: the device comprises a die box body 1, an extension wall 2, a sliding hole 3, a clamping plate 4, a material spraying pipe 5, a die hole 6, an inclined side wall 7, a comparison clamping plate 8, a sliding rod 9, a handle 10, a screw joint 11 and a guide pipe 12.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: the utility model provides a newly repair road and bridge and use supplementary marking device, including mould box 1, the rear side integrated into one piece of mould box 1 has extension wall 2, and mould box 1's lower lateral wall has seted up nib 6, slide opening 3 has been seted up to extension wall 2's upper end, slide opening 3's inside slidable mounting has slide bar 9, splint 4 have all been welded at both ends around slide bar 9, splint 4's middle part is pegged graft and is had the material pipe 5 that spouts that runs through slide opening 9, the rear end of spouting material pipe 5 is linked together through pipe 12 and compressor and storage bucket.
Specifically, a grip 10 is integrally formed on the rear side wall of the clamp plate 4, the rear end of the spray tube 5 penetrates through the grip 10, a screw joint 11 is fixedly mounted at the tail end of the conduit 12, and the screw joint 11 is screwed in the grip 10.
Specifically, the side wall of the mold case 1 is integrally formed with an inclined side wall 7 between the die holes 6.
Specifically, the outside of the left side wall of the mold box 1 is welded with the comparison clamp plate 8.
Specifically, the distance between the two alignment jaws 8 is equal to the width of the die orifice 6.
Specifically, the spray holes of the spray pipe 5 are uniformly opened in the lower side wall of the spray pipe 5.
The working principle is as follows: when the utility model discloses when using, the staff places this mould in the position that needs the rule, the equipment pipe 12 that will be used for spraying coating links in the outer end of handle 10, slide along slide opening 3 when starting external compressor and spout the marking off work that material pipe 5 can accomplish the cost section, compare splint 8 and be used for lining up with the lines of drawing before, it is a complete straight line to guarantee to be after each section line concatenation of drawing next, when using this equipment to spout drawing ground sign, the staff only needs stage nature to remove this mould and slide repeatedly and spouts material pipe 5, auxiliary effect has been played marking off work, staff's work load has been reduced, in order to reach the purpose that improves marking off efficiency.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a newly repair road bridge auxiliary marking device for roof beam, includes mould box (1), its characterized in that: the rear side integrated into one piece of mould box (1) has extension wall (2), and the lower lateral wall of mould box (1) has seted up nib (6), slide opening (3) have been seted up to the upper end of extension wall (2), the inside slidable mounting of slide opening (3) has slide bar (9), splint (4) have all been welded at both ends around slide bar (9), the middle part of splint (4) is pegged graft and is had spout material pipe (5) that run through slide opening (3), the rear end of spouting material pipe (5) is linked together through pipe (12) and compressor and storage bucket.
2. The auxiliary marking device for the newly repaired road and bridge as claimed in claim 1, wherein: the rear side wall of the clamping plate (4) is integrally formed with a handle (10), the rear end of the material spraying pipe (5) penetrates through the handle (10), the tail end of the guide pipe (12) is fixedly provided with a screw joint (11), and the screw joint (11) is in screw connection with the handle (10).
3. The auxiliary marking device for the newly repaired road and bridge as claimed in claim 1, wherein: the side wall of the mould box body (1) is integrally formed with an inclined side wall (7) between the mould holes (6).
4. The auxiliary marking device for the newly repaired road and bridge as claimed in claim 1, wherein: the outside welding of mould box (1) left side wall has comparison splint (8).
5. The auxiliary line marking device for the newly repaired road and bridge as claimed in claim 4, wherein: the distance between the two comparison clamping plates (8) is equal to the width of the die hole (6).
6. The auxiliary marking device for the newly repaired road and bridge as claimed in claim 1, wherein: the spray holes of the spray pipe (5) are uniformly arranged on the lower side wall of the spray pipe (5).
CN201921985411.5U 2019-11-18 2019-11-18 Newly repair road bridge with supplementary marking device Expired - Fee Related CN211772727U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921985411.5U CN211772727U (en) 2019-11-18 2019-11-18 Newly repair road bridge with supplementary marking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921985411.5U CN211772727U (en) 2019-11-18 2019-11-18 Newly repair road bridge with supplementary marking device

Publications (1)

Publication Number Publication Date
CN211772727U true CN211772727U (en) 2020-10-27

Family

ID=72963081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921985411.5U Expired - Fee Related CN211772727U (en) 2019-11-18 2019-11-18 Newly repair road bridge with supplementary marking device

Country Status (1)

Country Link
CN (1) CN211772727U (en)

Similar Documents

Publication Publication Date Title
CN104453751A (en) Outburst-prevention, dust collection and slag discharging integrated device for coal roadway drilling construction
CN211772727U (en) Newly repair road bridge with supplementary marking device
CN204492706U (en) Coal roadway drilling construction protrusion-dispelling control of dust deslagging integrated apparatus
CN206636050U (en) Antirust H profile steel
CN203113272U (en) Snow shoveling device used for forklift
CN204919234U (en) Gauge-adjustable storage battery car track sleeper for shield construction
CN205063333U (en) Modular bathroom falls board and hangs mould device
CN201502217U (en) Fencing barrier being convenient to assemble and fix for construction site
CN208215208U (en) Built-in groove corrects spanner
CN107503309A (en) Combined changable changes the safety guide rail and combined method of any level angle
CN105993336A (en) Fertilizer applicator for paddy rice
CN214783185U (en) Line marking vehicle for road engineering
CN208650519U (en) The flooring de-molding device of concrete surface is pried away from for internal corner formwork
CN211522808U (en) Tool for drawing road marking contour line
CN205660004U (en) Waste material trimmer in pit
CN207420574U (en) A kind of shield is missed the stop steelframe
CN210262629U (en) Asphalt repairing device for highway maintenance
CN219710030U (en) Road marking scribing construction device
CN216074687U (en) Laboratory is with spraying type marking device
CN206185385U (en) Efficiency of stereo garage production is improved frock
CN217432685U (en) Simple plate folding machine on site
CN208970899U (en) A kind of linear movement guide jig of component pyrocondensation processing
CN210262622U (en) Highway marking device
CN217378891U (en) Marking device for marking cutting height of pile head
CN204524718U (en) A kind of boring and pressure lining composite structure of automobile secondary cistern

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210119

Address after: 110000 Shajin Xiang xizha Cun, Kangping County, Shenyang City, Liaoning Province

Patentee after: Liaoning Ping'an transportation facilities engineering maintenance Co.,Ltd.

Address before: 276500 no.085, nanshangzhuang village, Xiazhuang Town, Ju county, Rizhao City, Shandong Province

Patentee before: Zhang Ping

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027