CN211771397U - Drum belt emergency water device - Google Patents

Drum belt emergency water device Download PDF

Info

Publication number
CN211771397U
CN211771397U CN201921580137.3U CN201921580137U CN211771397U CN 211771397 U CN211771397 U CN 211771397U CN 201921580137 U CN201921580137 U CN 201921580137U CN 211771397 U CN211771397 U CN 211771397U
Authority
CN
China
Prior art keywords
rotary drum
moisturizing pipeline
blast furnace
fire
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921580137.3U
Other languages
Chinese (zh)
Inventor
王佳熙
田业军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201921580137.3U priority Critical patent/CN211771397U/en
Application granted granted Critical
Publication of CN211771397U publication Critical patent/CN211771397U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Landscapes

  • Furnace Details (AREA)

Abstract

The utility model provides a rotary drum belt emergency water installation connects emergent water pipe on blast furnace hot water pond moisturizing pipeline, blast furnace cooling tower moisturizing pipeline and receiving tower moisturizing pipeline respectively, is equipped with the fire hydrant valve on the emergent water pipe, and the fire hydrant valve other end is equipped with the buckle, and the buckle passes through the fire hose and connects the squirt. The utility model discloses an use emergency water installation at the rotary drum belt, advance the minimum time behind the rotary drum at red sediment and cool off red sediment, prevent to ignite the belt and cause the fire incident, avoid the accident loss to win favourable operating condition for later stage rotary drum maintenance.

Description

Drum belt emergency water device
Technical Field
The utility model belongs to ironmaking fire-fighting equipment field especially relates to a rotary drum belt emergency water installation.
Background
At present, 8 blast furnaces of a saddle steel stock ironmaking main plant adopt a slag flushing process and are divided into a Yinba method, a wheel method and a Jiaheng method according to the process. In general, the water slag flushing process is a granulation, dehydration and external transportation process. Wherein, the rotary drum or the dehydrator is connected with the conveyer belt, and the grain slag is conveyed to a slag yard for outward transportation through the conveyer belt. The red slag enters the rotary drum or the dehydrator due to the reasons of incomplete confirmation of the stokehole and slag flushing operation, system power failure, red slag over Qileng slag and the like, and further causes the initial fire of the conveying belt, even the fire. The existing fire fighting measures and equipment for the grain slag outward conveying belt of the saddle steel are fire extinguishers or fire trucks. Because the temperature of the red slag is high, once the prevention, control and suppression are not timely, the fire disaster is easily caused from the initial fire disaster, even the large fire disaster occurs, the whole belt gallery is burnt, and the production is directly influenced. Because the corrosive gas in the slag flushing belt gallery is more, the slag flushing belt gallery is not suitable for storing fire extinguishers, and the loss of equipment is too large, the fire extinguishers are not configured on the site of the belt gallery. The existing emergency fire fighting mode is that a certain amount of 8kg dry powder fire extinguishers are stored in an electric room and a master control room nearby, and once an initial fire disaster is discovered, in order to extinguish fire timely and effectively, a spray dust suppression vehicle in a factory or a steel-saddle fire fighting emergency center is used for extinguishing fire if necessary.
Disclosure of Invention
The utility model aims at providing a can cool off the red sediment in the shortest time, prevent to ignite the belt, avoid burning the rotary drum belt emergency water installation of losing the belt.
Therefore, the utility model discloses the technical solution who takes does:
the utility model provides a rotary drum belt emergency water installation, includes blast furnace hot-water pond moisturizing pipeline, blast furnace cooling tower moisturizing pipeline and receiving tower moisturizing pipeline, connects emergent water pipe on blast furnace hot-water pond moisturizing pipeline, blast furnace cooling tower moisturizing pipeline and receiving tower moisturizing pipeline respectively, is equipped with the fire hydrant valve on the emergent water pipe, and the fire hydrant valve other end is equipped with the buckle, and the buckle passes through fire hose and connects the squirt.
The supply pressure of the emergency water is more than or equal to 6 kg.
The utility model has the advantages that:
the utility model discloses an use emergency water installation at the rotary drum belt, advance the minimum time behind the rotary drum at red sediment and cool off red sediment, prevent to ignite the belt and cause the fire incident, avoid the accident loss to win favourable operating condition for later stage rotary drum maintenance.
Drawings
Fig. 1 is a schematic structural diagram of a drum belt emergency water device.
In the figure: the system comprises a blast furnace cooling tower water replenishing pipeline 1, a cooling tower emergency water pipe 2, a fire hydrant valve a3, a buckle a4, a fire hydrant hose a5, a water gun a6, a blast furnace hot water pool water replenishing pipeline 7, a hot water emergency water pipe 8, a fire hydrant valve b9, a buckle b10, a fire hydrant hose b11, a water gun b12, a blast furnace receiving tower water replenishing pipeline 13, a receiving tower emergency water pipe 14, a fire hydrant valve c15, a buckle c16, a fire hydrant hose c17, a water gun c18, small flushing slag 19, a cooling tower 20, a water replenishing pipeline 21, a receiving tower 22, a rotary drum 23, a rotary drum belt 24 and a blast furnace 25.
Detailed Description
As can be seen from figure 1, the utility model discloses rotary drum belt emergency water installation is on blast furnace cooling tower moisturizing pipeline 1, blast furnace hot water pond moisturizing pipeline 7 and the basis of blast furnace receiving tower moisturizing pipeline 13 of connecting on the moisturizing pipeline 21 of original blast furnace 25, install the emergent water pipe 2 of cooling tower on blast furnace cooling tower moisturizing pipeline 1, the emergent water pipe 2 of cooling tower is equipped with fire hydrant valve a3, the fire hydrant valve a3 other end has buckle a4, buckle a4 connects squirt a6 through fire hose a 5. A hot water emergency water pipe 8 is installed on a water replenishing pipeline 7 of a blast furnace hot water pool, a fire hydrant valve b9 is installed on the hot water emergency water pipe 8, a buckle b10 is arranged at the other end of the fire hydrant valve b9, and a water gun b12 is connected to the buckle b10 through a fire hose b 11. A receiving tower emergency water pipe 14 is installed on a blast furnace receiving tower water supply pipeline 13, a fire hydrant valve c15 is installed on the receiving tower emergency water pipe 14, a buckle c16 is arranged at the other end of the fire hydrant valve c15, and a water gun c18 is connected to the buckle c16 through a fire hose c 17.
The supply pressure of the emergency water is more than or equal to 6kg, and the pressure can completely meet the use requirement.
Aiming at three states of red slag entering the rotary drum 23, a special emergency plan is established, effective emergency measures are formulated, the accident expansion caused by human errors after the red slag enters the rotary drum 23 is prevented, the accident is controlled in the shortest time, and the loss is reduced.
The first state: before tapping, the plant was not started. And opening a branch valve of the granulation pump at the site, and ensuring that the flushing tank is flushed by using the pressure difference of the cooling tower 20. Strictly forbidding starting the equipment, the emergency water device is used for cooling the rotary drum 23 and the rotary drum belt 24 with water.
And a second state: during tapping, the granulation pump is shut down suddenly (power off). Blocking the gun in front of the furnace, immediately stopping the rotation of the rotary drum 23, keeping the rotary drum belt 24 in the original state, and cooling by using an emergency water device; if black smoke appears on the drum belt 24, the machine is stopped immediately, and emergency water is used for pumping water.
And a third state: and (3) discharging small flushing slag 19 on the same site, if red slag crosses the slag gas and enters the receiving tower 22, further burning the rotary drum belt 24, starting a granulating pump or a circulating pump immediately, intermittently pumping water into the rotary drum 23, and pumping water to cool the rotary drum belt 24 by using an emergency water device.

Claims (2)

1. The utility model provides a rotary drum belt emergency water installation, includes blast furnace hot-water tank moisturizing pipeline, blast furnace cooling tower moisturizing pipeline and receiving tower moisturizing pipeline, its characterized in that connects emergent water pipe on blast furnace hot-water tank moisturizing pipeline, blast furnace cooling tower moisturizing pipeline and receiving tower moisturizing pipeline respectively, is equipped with the fire hydrant valve on the emergent water pipe, and the fire hydrant valve other end is equipped with the buckle, and the buckle passes through the fire hydrant and takes the connection squirt.
2. The drum belt emergency water device as in claim 1, wherein the emergency water supply pressure is greater than or equal to 6 kg.
CN201921580137.3U 2019-09-23 2019-09-23 Drum belt emergency water device Active CN211771397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921580137.3U CN211771397U (en) 2019-09-23 2019-09-23 Drum belt emergency water device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921580137.3U CN211771397U (en) 2019-09-23 2019-09-23 Drum belt emergency water device

Publications (1)

Publication Number Publication Date
CN211771397U true CN211771397U (en) 2020-10-27

Family

ID=72934147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921580137.3U Active CN211771397U (en) 2019-09-23 2019-09-23 Drum belt emergency water device

Country Status (1)

Country Link
CN (1) CN211771397U (en)

Similar Documents

Publication Publication Date Title
CN105749449B (en) A kind of tunnel fire system and extinguishing method
CN105457195A (en) Power transformer fire extinguishing system and control method
CN211771397U (en) Drum belt emergency water device
CN102688570A (en) Fire safety safeguards system for tunnel and extinguishing method thereof
CN220572548U (en) Active fire suppression device for electrochemical energy storage station
CN211726137U (en) Clean, efficient and safe multi-powder-grinding-function coal powder preparation device
CN105042632A (en) Control device and method for safety protection of boiler in oxygen-enriched combustion system
CN104089300A (en) Safety control method for preventing tempering explosion of gas boiler
CN204460200U (en) Boiler oxygen enrichment surely fires auxiliary combustion equipment
CN208652594U (en) A kind of dry slag emergency tapping equipment in coal-burning power plant
CN208160855U (en) A kind of high-pressure carbon dioxide fire extinguishing system for double helix charger chute
CN110986609A (en) Tail gas pressurization system for lime kiln
CN205590292U (en) Exhaust -heat boiler water charging system in sulfuric acid process alkanisation waste acid recycling workshop section
CN109439370B (en) Burner cooling water protection device and method
CN102179021A (en) Superfine dry powder fire-distinguishing system
CN104083834A (en) Multifunctional fire fighting truck for underground coal mine
CN211648225U (en) Tunnel fire smoke intelligent control system
CN210422676U (en) Differential pressure type mine automatic fire extinguisher based on novel fire extinguishing agent
CN217612584U (en) Steam fire extinguishing device for desulfurizing tower
CN106924921B (en) Special quick open-close type fire hydrant for corridor
CN207898826U (en) The city integrated piping lane fire-fighting system of high expansion foam
CN220002832U (en) Fire control system of fetching water based on hot metal car goes out iron
CN210125119U (en) Coal fired power plant cable intermediate layer distributing type fire extinguishing system
CN218281217U (en) Water spraying system for ammonia unloading area of power plant
KR200181316Y1 (en) An explosion detection and explosion prevention system of a hot wind blast combustion type air supply pipe in a blast furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant