CN211768100U - Brick clamp for building construction - Google Patents

Brick clamp for building construction Download PDF

Info

Publication number
CN211768100U
CN211768100U CN202020082798.XU CN202020082798U CN211768100U CN 211768100 U CN211768100 U CN 211768100U CN 202020082798 U CN202020082798 U CN 202020082798U CN 211768100 U CN211768100 U CN 211768100U
Authority
CN
China
Prior art keywords
clamp
brick
rotate
pivot
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020082798.XU
Other languages
Chinese (zh)
Inventor
胡章贵
杨贤才
陈怡�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou University of Engineering Science
Original Assignee
Guizhou University of Engineering Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou University of Engineering Science filed Critical Guizhou University of Engineering Science
Priority to CN202020082798.XU priority Critical patent/CN211768100U/en
Application granted granted Critical
Publication of CN211768100U publication Critical patent/CN211768100U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a brick clamp for construction, including handheld pole, handheld pole one end for fixed arc fixation clamp and the other end rotate the clamp for the pivoted arc, the rotation clamp rotate with the handheld pole other end through the pivot and be connected, pivot outer end still fixedly connected with depression bar, the depression bar make progress to rotate and drive and rotate the clamp and rotate and then press from both sides a plurality of fragment of brick of tight inside, the pivot on still movable sleeve be equipped with about two stable frames, stable frame top for L shape and suit in the inboard pivot of depression bar, stable frame below for the card frame that has the inside recess. This brick clamp structure compares traditional brick clamp structure, can once only the more fragment of brick of centre gripping, in addition, has better stable security, improves masonry engineering's construction security and work efficiency.

Description

Brick clamp for building construction
Technical Field
The utility model relates to a construction equipment technical field, more specifically the theory relates to a brick clamp for construction.
Background
The masonry engineering refers to the engineering work of building and forming a wall body by ordinary clay bricks, load-bearing clay hollow bricks, autoclaved sand-lime bricks, flyash bricks and the like, when the work is carried out, brick clamps are needed to carry the bricks, the traditional brick clamps are of an iron frame type structure, rotating rods are kneaded by hands to clamp the outermost two sides of overlapped bricks inside the brick clamps, in the carrying process, a user is required to continuously apply force to the brick clamps to prevent the bricks from falling off in the carrying process, the labor expenditure is increased, the production efficiency is reduced while the cost is increased, the inconvenience is brought to the use of the user, in addition, as the outermost two sides of the overlapped bricks are only clamped, the stability is not good enough, when the clamped bricks are heavy, the condition that the bricks can fall together possibly occurs, the accidental accidents such as crushing injury and the like are caused by influencing the construction safety of the masonry engineering, and only the bricks can be overlapped in a single layer in the brick clamps, the number of bricks transported at one time is limited, which also affects the efficiency of masonry construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a brick clamp for construction, traditional brick clamp structure is compared to this brick clamp structure, can once only the more quantity's of centre gripping fragment of brick, in addition, has better stable security, improves masonry engineering's construction security and work efficiency.
In order to realize the purpose, the utility model discloses a technical scheme as follows:
a brick clamp for building construction comprises a handheld rod, wherein one end of the handheld rod is a fixed arc-shaped fixed clamp, the other end of the handheld rod is a rotating arc-shaped rotating clamp, the rotating clamp is rotatably connected with the other end of the handheld rod through a rotating shaft, a pressing rod is fixedly connected to the outer end of the rotating shaft, the pressing rod rotates upwards to drive the rotating clamp to rotate so as to clamp a plurality of bricks inside, the rotating shaft is movably sleeved with a left stabilizing frame and a right stabilizing frame, the upper portion of each stabilizing frame is L-shaped and sleeved on the rotating shaft on the inner side of the pressing rod, a clamping frame with an inward groove is arranged below the stabilizing frame, a plurality of bricks are clamped inside the clamping frame, a transverse through groove is arranged at the contact position of the inner side of a groove of the clamping frame and the upper edge and the lower edge of each brick, a stabilizing rod is inserted into the transverse through groove, a placing groove is arranged above the handheld rod, a rectangular through groove is arranged on one side, close, an elastic pull ring is sleeved in the rectangular through groove, and a pressure rod is sleeved in the elastic pull ring.
Furthermore, the stabilizer bar piece is respectively inserted into the transverse through grooves of the left and right stabilizer frames when in use and is placed in the placing groove above the handheld bar when not in use.
Furthermore, the elastic pull ring moves towards the inner side when in use, and the upward rotating press rod is sleeved for locking the position of the press rod.
Furthermore, the size of the clamping frame of the stabilizing frame is 20-30 cm.
Furthermore, the stabilizing rod pieces penetrate through the positions of the four peripheral corners of the overlapped bricks in the clamping frame respectively and are used for fixing the positions of the overlapped bricks.
Compared with the prior art, the utility model has the advantages that:
in the scheme, the stable safety of the superposed bricks in the traditional brick clamp can be obviously improved through the structures such as the stable frame, the stable rod piece and the like, and in addition, a plurality of bricks can be clamped at one time through the clamping frame structure of the stable frame, so that the transportation efficiency is improved on the premise of ensuring the safety, and the construction safety and the working efficiency of the masonry engineering are ensured; through the elastic pull ring and the rectangular through groove and other structures, the pressing rod is fixed, the situation that a user applies force for a long time to control the position of a brick can be avoided, and the use experience and the safety are improved.
Drawings
FIG. 1 is a schematic view of the brick clamp of the present invention in a non-use state;
FIG. 2 is a schematic view of the brick clamp of the present invention in use;
in the figure: 1. a hand-held wand; 2. a rectangular through groove; 3. an elastic pull ring; 4. fixing the clamp; 5. a pressure lever; 6. a stabilizing frame; 7. a transverse through groove; 8. rotating the clamp; 9. a rotating shaft; 10. stabilizing the rod member; 11. a placement groove; 12. partially overlapping the blocks.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the utility model easy to understand and understand, the utility model is further explained by combining with the specific figures.
As shown in figures 1 and 2, a brick clamp for building construction comprises a handheld rod 1, one end of the handheld rod 1 is a fixed arc-shaped fixed clamp 4, the other end of the handheld rod 1 is a rotating arc-shaped rotating clamp 8, the rotating clamp 8 is rotatably connected with the other end of the handheld rod 1 through a rotating shaft 9, the outer end of the rotating shaft 9 is also fixedly connected with a pressure lever 5, the pressure lever 5 rotates upwards to drive the rotating clamp 8 to rotate so as to clamp a plurality of bricks inside, the rotating shaft 9 is movably sleeved with a left stabilizing frame 6 and a right stabilizing frame 6, the upper portion of the stabilizing frame 6 is L-shaped and sleeved on the rotating shaft 9 at the inner side of the pressure lever 5, a clamping frame with an inward groove is arranged below the stabilizing frame 6, a plurality of bricks are clamped inside the clamping frame, a transverse through groove 7 is arranged at the contact position of the inner side of the groove of the clamping frame and the upper and lower edges of the transverse through groove 7, a stabilizing rod 10 is inserted inside the transverse through groove, the inside cover of rectangular through groove 2 is equipped with elasticity pull ring 3, the inside pressure bar 5 of entangling of elasticity pull ring 3, it is inside to insert the horizontal logical groove 7 of two stable frames 6 about respectively when stabilizing the member 10 and using, place inside the standing groove 11 of handheld pole 1 top when not using, the inboard removal of elasticity pull ring 3 when using, entangle the depression bar 5 of upwards pivoted, be used for pinning the depression bar 5 position, the card frame size of stabilizing frame 6 is 20-30 centimetres, stabilize member 10 and run through the inside peripheral angular position department of a plurality of coincide back fragment of brick of card frame respectively, be used for fixed coincide back fragment of brick position.
During the use, pile up the combination with the fragment of brick and put into stable frame 6 inside, then insert all stabilizing rod 10 in horizontal logical groove 7 inside, again in proper order to stabilizing more fragments of brick of the inside coincide of rod 10 (only draw partial coincide fragment of brick 12 in the picture), after the coincide finishes, drive the rotation clamp 8 through upwards rotating depression bar 5 and rotate, cooperate fixed clamp 4 to press from both sides all post-coincidence fragments of brick between the brick clamp, 3 covers at depression bar 5 rear end fixed depression bar 5 positions in inside pulling elasticity pull ring, constructor can hold handheld pole 1 through one hand or both hands, carry and draw and remove this brick clamp, reach appointed construction position after, reverse above-mentioned operation, take off all fragments of brick of transportation, when not using, put stabilizing rod 10 into standing groove 11 inside in proper order, avoid stabilizing rod 10 to lose, make things convenient for next time to continue to use.
The basic principles and main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the foregoing embodiments and description are illustrative only of the principles of the invention, and that various changes and modifications may be made without departing from the spirit and scope of the invention, which fall within the scope of the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a brick clamp for construction, includes handheld pole, handheld pole one end for fixed arc fixation clamp and the other end rotate the clamp for the pivoted arc, the rotation clamp rotate with the handheld pole other end through the pivot and be connected, pivot outer end still fixedly connected with depression bar, the depression bar make progress to rotate and drive the rotation clamp and rotate and then press from both sides a plurality of fragment of brick of tight inside, its characterized in that: the pivot on still movable sleeve be equipped with about two stable frames, stable frame top for L shape and suit in the inboard pivot of depression bar, stable frame below for the card frame that has inside concave groove, the card frame inside clamp a plurality of brick pieces, card frame recess inboard and the lower limb contact position department all be equipped with a horizontal logical groove on the fragment of brick, horizontal logical inslot insert stable member, handheld pole top be equipped with the standing groove, handheld pole inside be close to fixed clamp one side and be equipped with the rectangle and lead to the groove, the rectangle lead to inslot portion suit have the elasticity pull ring, the inside cover of elasticity pull ring live the depression bar.
2. The brick clamp for building construction according to claim 1, wherein: the stabilizer bar piece is respectively inserted into the transverse through grooves of the left and right stabilizing frames when in use and is placed in the placing groove above the handheld bar when not in use.
3. The brick clamp for building construction according to claim 1, wherein: the elastic pull ring moves towards the inner side when in use, and the upward rotating press rod is sleeved for locking the position of the press rod.
4. The brick clamp for building construction according to claim 1, wherein: the size of the clamping frame of the stabilizing frame is 20-30 cm.
5. The brick clamp for building construction according to claim 1, wherein: the stabilizing rod pieces penetrate through the positions of the four peripheral corners of the overlapped bricks in the clamping frame respectively and are used for fixing the positions of the overlapped bricks.
CN202020082798.XU 2020-01-15 2020-01-15 Brick clamp for building construction Expired - Fee Related CN211768100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020082798.XU CN211768100U (en) 2020-01-15 2020-01-15 Brick clamp for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020082798.XU CN211768100U (en) 2020-01-15 2020-01-15 Brick clamp for building construction

Publications (1)

Publication Number Publication Date
CN211768100U true CN211768100U (en) 2020-10-27

Family

ID=72891981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020082798.XU Expired - Fee Related CN211768100U (en) 2020-01-15 2020-01-15 Brick clamp for building construction

Country Status (1)

Country Link
CN (1) CN211768100U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113850954A (en) * 2021-09-06 2021-12-28 广州宏途教育网络科技有限公司 Uncovering device and vending machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113850954A (en) * 2021-09-06 2021-12-28 广州宏途教育网络科技有限公司 Uncovering device and vending machine

Similar Documents

Publication Publication Date Title
CN211768100U (en) Brick clamp for building construction
CN107244547A (en) A kind of brick holding machine chuck and brick holding machine
CN108163440A (en) A kind of brickwork of removing for building has
CN202209040U (en) Floor tile tiling device
CN213199861U (en) Building material carrying device used in building construction
CN207001453U (en) A kind of brick body clamping device for building
CN208039767U (en) A kind of plank laydown machine
CN202609443U (en) Device for loading and unloading bricks
CN216130588U (en) Brick clamp for building
CN210062362U (en) Transfer printing chromatography positioning auxiliary clamp
CN208790599U (en) Plank tipping arrangement
CN207107844U (en) A kind of brick holding machine chuck and brick holding machine
CN216888439U (en) Portable special clamp device for carrying stone
CN206769413U (en) A kind of new fixing device that can integrally lift assembling reinforcement
CN206558518U (en) Solar panels
CN206619845U (en) A kind of portable cable trench cover starts shipment instrument
CN212249255U (en) Single-person operated portable concrete surface collecting machine
CN212668019U (en) Ceramic tile mobile device convenient to it is fixed
CN210285565U (en) Pavior brick production and processing is with putting things in good order pliers
CN212605239U (en) Composite sheet handling device for building decoration
CN209291259U (en) A kind of brick clamp for building
CN212638736U (en) Manual brick lifting device for building construction
CN211279116U (en) Concrete agitating unit is used in construction
CN216051577U (en) Portable atmospheric environment quality monitoring device
CN212240327U (en) Pump station structure of gas-adding block peeling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027

Termination date: 20220115

CF01 Termination of patent right due to non-payment of annual fee