CN211736838U - Waterproof structure for door pocket - Google Patents
Waterproof structure for door pocket Download PDFInfo
- Publication number
- CN211736838U CN211736838U CN201921672514.6U CN201921672514U CN211736838U CN 211736838 U CN211736838 U CN 211736838U CN 201921672514 U CN201921672514 U CN 201921672514U CN 211736838 U CN211736838 U CN 211736838U
- Authority
- CN
- China
- Prior art keywords
- floor
- layer
- waterproof
- waterproof structure
- door pocket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to an architectural decoration technical field, in particular to a waterproof construction for door pocket, include: first waterproof construction, second waterproof construction, third waterproof construction, door pocket frame and stone material cover boots. The first waterproof structure is positioned in a toilet area, the second waterproof structure is positioned in a doorsill area, the second waterproof structure is higher than the first waterproof structure, and accumulated water on the first waterproof structure cannot flow onto the second waterproof structure; the door pocket frame is installed in the wall body and is located second waterproof construction top, the both ends of stone material cover boots are connected respectively the door pocket frame with second waterproof construction, the door pocket frame not direct with second waterproof construction direct contact has avoided the door pocket frame wets and produces inflation, deformation, go mildy and rot scheduling problem.
Description
[ technical field ] A method for producing a semiconductor device
The utility model relates to an architectural decoration technical field, in particular to a waterproof construction for door pocket.
[ background of the invention ]
In the family life, the bathroom is often in the environment of comparison humidity, after daily water use, there is ponding ground, and the mounting means of common door pocket frame installs the threshold stone under the door pocket line, and the both ends of threshold stone just in time imbed in the end department pocket line, and door pocket bottom then direct contact ground, and general door pocket all adopts xylogen, and wooden door pocket bottom contacts with bathroom ground for a long time, and the inflation of producing easily getting damp, deformation, rotten scheduling problem.
[ Utility model ] content
In order to solve the technical problem, an embodiment of the utility model provides a waterproof construction for door pocket can avoid the door pocket to wet the deformation.
The embodiment of the utility model provides a solve its technical problem and adopt following technical scheme:
the utility model provides a waterproof construction for door pocket is located on the building floor, the building floor includes first floor, second floor and third floor, first floor is regional for the bathroom, the second floor is regional for the threshold, the third floor is bathroom outside area, a waterproof construction for door pocket includes:
the first waterproof structure is arranged on the first floor slab;
the first waterproof structure is arranged on the first floor slab, and the second waterproof structure is higher than the first waterproof structure;
the third water prevention structure is arranged on the third floor slab and is not higher than the second waterproof structure;
the door pocket frame is arranged on the wall and is arranged above the second waterproof structure;
and the stone sleeve shoes are adhered to the wall body, and two ends of the stone sleeve shoes are respectively connected with the door sleeve frame and the second waterproof structure.
Optionally, the first waterproof structure comprises a first film waterproof layer provided on the first floor slab;
the second waterproof structure comprises a second coating waterproof layer arranged on the second floor slab;
and the third water prevention structure comprises a third coating waterproof layer arranged on the third floor slab.
Optionally, the first waterproof structure comprises a first leveling layer, and the third waterproof structure comprises a second leveling layer;
the first leveling layer is arranged on the first film waterproof layer, the second leveling layer is arranged on the third film waterproof layer, and the height of the first leveling layer and the height of the second leveling layer are both lower than the height of the second film waterproof layer.
Optionally, the first waterproof structure comprises a first adhesive layer and a first floor board, wherein the first adhesive layer adheres the first floor board to the first leveling layer;
the height of the first bonding layer is not more than that of the second coating waterproof layer, and one side, facing the second floor, of the first floor does not protrude out of the first floor.
Optionally, the second waterproof structure further comprises a second adhesive layer and a second floor, the second adhesive layer adhering the second floor to the second coated waterproof layer;
one side of the second bonding layer facing the first floor slab protrudes out of the second floor slab and is connected with the first floor slab, and the second bonding layer is flush with the first floor slab in height;
one side of the second floor, which faces the first floor, protrudes out of the second bonding layer and covers the first floor.
Optionally, the third waterproof structure further comprises a third adhesive layer and a third floor, and the third adhesive layer adheres the third floor to the second leveling layer;
the height of the third floor is flush with the height of the second floor.
Optionally, the third water proofing structure still includes dampproofing pad, dampproofing pad is located the second screed-coat with between the third tie coat.
Optionally, the waterproof structure for the door pocket comprises a metal piece, wherein the metal piece comprises two side plates which are perpendicular to each other;
one side plate is buried in the second leveling layer, and two surfaces of the other side plate are respectively abutted to the second floor and the third floor.
Optionally, a first step surface is arranged between the first floor slab and the second floor slab;
the waterproof structure comprises a fillet transition layer, the fillet transition layer is arranged on the first floor slab, the first step surface and the second floor slab, and a fillet is formed at the joint of the first floor slab and the first step surface by the fillet transition layer;
the first coating waterproof layer and the second coating waterproof layer are both arranged on the fillet transition layer.
Optionally, the door pocket frame comprises two side frames, the number of the stone shoe sleeves is two, and the two stone shoe sleeves are respectively connected with the two side frames;
and one end of the two stone sleeve shoes, which faces the second floor, is connected to the second floor.
Compared with the prior art, the embodiment of the utility model provides a be equipped with first waterproof construction second waterproof construction and third waterproof construction, second waterproof construction is higher than first waterproof construction makes ponding on the first waterproof construction can not flow on the second waterproof construction, the door pocket frame install in second waterproof construction top, just the door pocket frame with pass through between the second waterproof construction stone material cover boots are connected, the door pocket frame not direct with second waterproof construction direct contact has avoided the door pocket frame wets and produces inflation, deformation, go mildy rot scheduling problem.
[ description of the drawings ]
One or more embodiments are illustrated in drawings corresponding to, and not limiting to, the embodiments, in which elements having the same reference number designation may be represented as similar elements, unless specifically noted, the drawings in the figures are not to scale.
Fig. 1 is a schematic structural diagram of a waterproof structure for a door pocket according to an embodiment of the present invention;
fig. 2 is an enlarged view of a structure at a of the waterproof structure for a door pocket shown in fig. 1;
FIG. 3 is a schematic structural view of a door pocket and a second floor of the waterproof structure for a door pocket shown in FIG. 1;
fig. 4 is a schematic structural view of a waterproof structure for a door pocket according to another embodiment of the present invention;
fig. 5 is an enlarged view of a structure at B of the waterproof structure for door pocket shown in fig. 4;
fig. 6 is a structural view of a door pocket and a second floor of the waterproof structure for a door pocket shown in fig. 4.
[ detailed description ] embodiments
In order to facilitate understanding of the present invention, the present invention will be described in more detail with reference to the accompanying drawings and specific embodiments. It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may be present. The terms "vertical," "horizontal," "left," "right," "inner," "outer," and the like as used herein are for descriptive purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
Referring to fig. 1, a waterproof structure 100 for a door pocket according to an embodiment of the present invention is disposed on a building floor 500. The waterproof structure 100 for the door pocket comprises a waterproof structure 10 and a door pocket 20, wherein the door pocket 20 is installed on the waterproof structure 10.
The building floor 500 is convex, the building floor 500 comprises a first floor 51, a second floor 52 and a third floor 53, the first floor 51, the second floor 52 and the third floor 53 are all parallel to each other, the second floor 52 is higher than the first floor 51 and the third floor 53, and the third floor 53 is higher than the first floor 51. Wherein the first floor 51 is located in the area of the toilet, the second floor 52 is located in the door sill area where the door pocket is installed, and the third floor 53 is located in the aisle area outside the toilet. Preferably, the second floor 52 is treated with a roughening slurry towards the end of the door pocket 20.
A first step surface 54 is disposed between the first floor 51 and the second floor 52, and the first step surface 54 is perpendicular to the first floor 51 and the second floor 52, respectively. A second step surface 55 is arranged between the second floor slab 52 and the third floor slab 53, and the second step surface 55 is perpendicular to the second floor slab 52 and the third floor slab 53 respectively.
Referring to fig. 2, the waterproof structure 10 includes a first waterproof structure 11, a second waterproof structure 12, and a third waterproof structure 13, the first waterproof structure 11, the second waterproof structure 12, and the third waterproof structure 13 are respectively disposed on the first floor 51, the second floor 52, and the third floor 53, the first waterproof structure 11 is level with or slightly higher than the third waterproof structure 13, and the first waterproof structure 11 and the third waterproof structure 13 are both higher than the second waterproof structure 12.
The first waterproof structure 11 and the third waterproof structure 13 respectively include a first leveling layer 112 and a second leveling layer 132. The first leveling layer 112 is arranged on the first coating waterproof layer 110, and the first leveling layer 112 is formed by building cement mortar. The second leveling layer 132 is disposed on the third coating waterproof layer 130, and the second leveling layer 132 is formed by masonry of fine aggregate concrete. The height of the first leveling layer 112 and the height of the second leveling layer 132 are slightly lower than the height of the second coating waterproof layer 120.
The first waterproof structure 11 further includes a first adhesive layer 114 and a first floor 116, the second waterproof structure 12 further includes a second adhesive layer 124 and a second floor 126, and the third waterproof structure 13 further includes a third adhesive layer 134 and a third floor 136. The first, second, and third floor panels 116, 126, 136 are disposed on the first, second, and third adhesive layers 114, 124, 134, respectively. Preferably, the first adhesive layer 114, the second adhesive layer 124, and the third adhesive layer 134 are all 10mm thick.
The first adhesive layer 114 is a tile-specific adhesive, the first flooring 116 is a tile, and the first adhesive layer 114 adheres the first flooring 116 to the first leveling layer 112. The height of the first adhesive layer 114 does not exceed the height of the second coated waterproof layer 120, and the side of the first floor panel 116 facing the second floor panel 52 does not protrude from the first floor panel 51, that is, the side of the first floor panel 116 facing the second floor panel 52 does not exceed the first step surface 54.
The second adhesive layer 124 is a special stone adhesive, the second floor 126 is a threshold stone, and the second adhesive layer 124 adheres the second floor 126 to the second coating waterproof layer 120. The width of the second adhesive layer 124 is greater than the width of the second floor 52, that is, the side of the second adhesive layer 124 facing the first floor 51 protrudes from the second floor 52, the side of the second adhesive layer 124 facing the first floor 51 covers the first adhesive layer 114 and is connected to the first floor 116, and the height of the second adhesive layer 124 is equal to the height of the first floor 116. The width of the second floor 126 is greater than the width of the second adhesive layer 124, and the side of the second floor 126 facing the first floor 51 protrudes from the second adhesive layer 124 and covers the first floor 116.
The third adhesive layer 132 is an adhesive specially used for wood, the third floor 136 is a wood floor, and the third adhesive layer 132 adheres the third floor 136 to the second leveling layer 132. The third floor 136 is flush in height with the second floor 126.
It can be understood that the materials of the first floor 116, the second floor 126 and the third floor 136 may be set according to actual requirements, for example, the materials of the first floor 116, the second floor 126 and the third floor 136 are all set to marble and terrazzo, or the materials of the first floor 116 and the second floor 126 are all set to marble, the materials of the third floor 136 are set to ceramic tiles, and it is only necessary that the first floor 116 and the second floor 126 are both made of waterproof materials. The adhesive used for the first adhesive layer 114, the second adhesive layer 124 and the third adhesive layer 134 is selected according to the material of the first floor board 116, the second floor board 126 and the third floor board 136.
The third waterproof structure 13 further includes a moisture-proof pad 138, which is disposed between the second leveling layer 132 and the third bonding layer 134, and is used for keeping warm, preventing moisture, protecting the floor, and increasing the elasticity of the floor. Preferably, dampproofing pad 138 is the dampproofing pad of aluminium membrane, the thickness of the dampproofing pad of aluminium membrane is 3mm, when guaranteeing dampproofing and buffering effect, avoids the timber apron to convolute the leeway too big, and it is protruding easily to have lasted for a long time. It should be noted that in some other embodiments, when the third floor 136 is made of a material that is not easily affected by moisture, such as ceramic tile, marble, etc., the moisture-proof pad 138 may be omitted.
The waterproof structure 10 may further include a fillet transition layer 170, the fillet transition layer 170 is disposed on the first floor 51, the first step surface 54, and the second floor 52, the fillet transition layer 170 forms a fillet at a joint of the first floor 51 and the first step surface 54, and the first paint waterproof layer 110 and the second paint waterproof layer 120 are both disposed on the fillet transition layer 170. The fillet transition layer 170 is formed by building cement mortar, preferably, the building width of the fillet transition layer 170 on the first floor slab 51 is 150mm, that is, the width of the fillet transition layer 170 extending from one side to the other side of the first step surface 54 is 150mm, and the fillet radius formed by the fillet transition layer 170 at the connection position of the first floor slab 51 and the first step surface 54 is 50 mm.
Referring to fig. 3, the door pocket 20 includes a door pocket frame 21 and a stone shoe 22, and the stone shoe 22 is spliced with the door pocket frame 21.
The door pocket frame 21 is made of wood materials, and the door pocket frame 21 is installed on a wall body and used for installing and fixing a door leaf. Door pocket frame 21 is located the top of second floor 126, door pocket frame 21 includes two side frames 210, and two side frames 120 are located respectively the relative both sides of second floor 126, two side frame 210 orientation the one end of second floor 126 all with stone material cover boots 22 are connected.
The quantity of stone boots 22 is two, two the surface that stone boots 22 deviate from each other all pastes and is fixed in the wall body. One end of each of the two stone boots 22 facing away from the second floor 52 is connected to each of the two side frames 210, and one end of each of the two stone boots 22 facing the second floor 52 is connected to the second film waterproof layer 120. The second floor 126 is disposed between the two stone boots 22, the length of the second floor 126 is equal to the distance between the two stone boots 22, and two sides of the second floor 126 abut against the two stone boots 22 respectively. When the door pocket 20 is installed, the door pocket frame 21 is firstly adhered to a wall body, the stone shoe sleeves 22 are spliced at the lower end of the door pocket frame 21, and finally the second floor 126 is fixed between the two stone shoe sleeves 22 through the second adhesive layer 124. Because the toilet is wet, the stone shoe 22a can prevent the lower end of the wooden door frame 21 from contacting water, so that the door frame 21 is cracked and rotten after absorbing water.
The width of the stone shoe 22 is greater than the width of the side frame 210, and both sides of the stone shoe 22 protrude out of the side frame 210. The width of the stone shoe 22 is greater than the width of the second floor 126, the side of the stone shoe 22 facing the first floor 116 is not flush with the second floor 126, and the side of the stone shoe 22 protrudes relative to the second floor 126 in the direction of the first floor 116. The widths of the stone shoe 22, the side frame 210 and the second floor 126 are the distance from one side of the first floor 116 to the other side thereof. Preferably, the height of the stone shoe 22 is 120 mm.
Referring to fig. 4 to 6, another embodiment of the present invention provides a waterproof structure 200 for a door pocket, which is different from the waterproof structure 100 for a door pocket in the above embodiments in that the installation structure of the stone shoe 22 is different from that of the second floor 126.
One end of each of the two stone shoes 22a facing away from the second floor 52 is connected to each of the two side frames 210, and one end of each of the two stone shoes 22a facing the second floor 52 abuts against the second floor 126 a. The second floor 126a is disposed below the two stone boots 22a, the length of the second floor 126a is greater than the distance between the two stone boots 22a, and two sides of the second floor 126a protrude from the two stone boots 22a respectively. When the door pocket 20a is installed, the second floor 126a is fixed by the second adhesive layer 124, the door pocket frame 21 is adhered to the wall, and finally the stone shoe 22a is spliced to the lower end of the door pocket frame 21.
The width of the stone shoe 22a is greater than the width of the side frame 210, and both sides of the stone shoe 22a protrude from the side frame 210. The width of the stone shoe 22a is smaller than that of the second floor 126a, one end of the stone shoe 22a facing the first floor 116 is not flush with the second floor 126a, and one end of the stone shoe 22a is concave relative to the second floor 126a in a direction away from the first floor 116. The width of the stone shoe 22a, the side frame 210 and the second floor 126a is the distance from one side of the first floor 116 to the other side thereof. Preferably, the stone shoe 22a is recessed relative to the second floor 126a by a distance of 20 mm.
The waterproof structure 10 in the embodiment of the present invention includes the first waterproof structure 11 and the second waterproof structure 12, the second waterproof structure 12 is higher than the first waterproof structure 11, the accumulated water on the first waterproof structure 11 cannot flow onto the second waterproof structure 12, that is, the threshold area is higher than the toilet area, so that the accumulated water on the toilet floor cannot flow into the threshold area, and the door pocket frame 21 in the threshold area can be prevented from being affected with damp due to the contact with the accumulated water; door pocket frame 21 install in second waterproof construction 12 top, just door pocket frame 21 orientation the one end of second waterproof construction 12 is equipped with stone material cover boots make door pocket frame 21 not direct with second waterproof construction 12 direct contact has further avoided door pocket frame 21 wets and produces inflation, deformation, go mildy and rot scheduling problem.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; within the idea of the invention, also technical features in the above embodiments or in different embodiments may be combined, steps may be implemented in any order, and there are many other variations of the different aspects of the invention as described above, which are not provided in detail for the sake of brevity; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.
Claims (10)
1. The utility model provides a waterproof construction for door pocket locates on the building floor, the building floor includes first floor, second floor and third floor, first floor is regional for the bathroom, the second floor is regional for the threshold, the third floor is bathroom outside area, a serial communication port, a waterproof construction for door pocket includes:
the first waterproof structure is arranged on the first floor slab;
the first waterproof structure is arranged on the first floor slab, and the second waterproof structure is higher than the first waterproof structure;
the third water prevention structure is arranged on the third floor slab and is not higher than the second waterproof structure;
the door pocket frame is arranged on the wall and is arranged above the second waterproof structure;
and the stone sleeve shoes are adhered to the wall body, and two ends of the stone sleeve shoes are respectively connected with the door sleeve frame and the second waterproof structure.
2. The waterproof structure for a door pocket according to claim 1, wherein the first waterproof structure comprises a first coated waterproof layer provided to the first floor;
the second waterproof structure comprises a second coating waterproof layer arranged on the second floor slab;
and the third water prevention structure comprises a third coating waterproof layer arranged on the third floor slab.
3. The waterproof structure for door pocket according to claim 2, wherein the first waterproof structure comprises a first leveling layer, and the third waterproof structure comprises a second leveling layer;
the first leveling layer is arranged on the first film waterproof layer, the second leveling layer is arranged on the third film waterproof layer, and the height of the first leveling layer and the height of the second leveling layer are both lower than the height of the second film waterproof layer.
4. The waterproof structure for a door pocket according to claim 3, wherein the first waterproof structure comprises a first adhesive layer and a first floor panel, the first adhesive layer adhering the first floor panel to the first leveling layer;
the height of the first bonding layer is not more than that of the second coating waterproof layer, and one side, facing the second floor, of the first floor does not protrude out of the first floor.
5. The waterproof structure for door pocket according to claim 4, wherein the second waterproof structure further comprises a second adhesive layer and a second floor, the second adhesive layer adhering the second floor to the second coated waterproof layer;
one side of the second bonding layer facing the first floor slab protrudes out of the second floor slab and is connected with the first floor slab, and the second bonding layer is flush with the first floor slab in height;
one side of the second floor, which faces the first floor, protrudes out of the second bonding layer and covers the first floor.
6. The waterproof structure for door pocket according to claim 5, wherein said third waterproof structure further comprises a third adhesive layer and a third floor, said third adhesive layer adhering said third floor to said second leveling layer;
the height of the third floor is flush with the height of the second floor.
7. The waterproof structure for door pocket according to claim 6, wherein the third waterproof structure further comprises a moisture-proof pad, and the moisture-proof pad is disposed between the second leveling layer and the third bonding layer.
8. The waterproof structure for a door pocket according to claim 6, characterized in that the waterproof structure for a door pocket comprises a metal member including two side plates perpendicular to each other;
one side plate is buried in the second leveling layer, and two surfaces of the other side plate are respectively abutted to the second floor and the third floor.
9. The waterproof structure for a door pocket according to claim 2, wherein a first step surface is provided between the first floor and the second floor;
the waterproof structure comprises a fillet transition layer, the fillet transition layer is arranged on the first floor slab, the first step surface and the second floor slab, and a fillet is formed at the joint of the first floor slab and the first step surface by the fillet transition layer;
the first coating waterproof layer and the second coating waterproof layer are both arranged on the fillet transition layer.
10. The waterproof structure for a door pocket according to claim 5, wherein the door pocket frame comprises two side frames, the number of the stone shoe is two, and the two stone shoes are connected with the two side frames respectively;
and one end of the two stone sleeve shoes, which faces the second floor, is connected to the second floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921672514.6U CN211736838U (en) | 2019-09-29 | 2019-09-29 | Waterproof structure for door pocket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921672514.6U CN211736838U (en) | 2019-09-29 | 2019-09-29 | Waterproof structure for door pocket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211736838U true CN211736838U (en) | 2020-10-23 |
Family
ID=72849126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921672514.6U Active CN211736838U (en) | 2019-09-29 | 2019-09-29 | Waterproof structure for door pocket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211736838U (en) |
-
2019
- 2019-09-29 CN CN201921672514.6U patent/CN211736838U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11241121B2 (en) | One-piece shower base | |
US20080005986A1 (en) | Floating-wall base and method of installation | |
CN108222405B (en) | Interior decoration method | |
US9464429B2 (en) | Waterproofing system for wet areas | |
US20030172453A1 (en) | Water containment block | |
EP1857029B1 (en) | Floor element and method for making a floor element | |
CN207863243U (en) | A kind of waterproof curtain wall | |
US8522508B1 (en) | Flashing support cant for a wall assembly and associated method | |
CN104499614A (en) | Wall heat-preservation integration point hanging system and mounting method thereof | |
CN211422313U (en) | Novel waterproof and heat-preservation energy-saving outer window | |
US20070193201A1 (en) | Shower recess and method of construction | |
CN211736838U (en) | Waterproof structure for door pocket | |
AU2012101755A4 (en) | Waterproofing System for Wet Areas | |
CN211432637U (en) | Shower partition waterproof system | |
CN210767273U (en) | Node processing structure at separation position of shower room and washing room | |
CN206545279U (en) | A kind of toilet waterproofing structure | |
CN210887905U (en) | Kitchen floor seepage prevention structure | |
CN211776812U (en) | Dampproofing structure of bathroom door pocket | |
CN204225324U (en) | Wall thermal insulating integration point extension system | |
CN212897218U (en) | Extremely thin roof eaves mouth | |
CN212271521U (en) | Connecting structure for brick wall glass veneer and floor tile veneer | |
CN213038756U (en) | Be used for interior basin node structure of launching of shower stall | |
CN210685245U (en) | Building wooden foundation moisture-proof structure | |
CN212224496U (en) | Partition wall glass veneer and stone material ground connection structure | |
CN111519774B (en) | Construction method of shower room water bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 411, 413, building B, Funian Plaza, No. 3, Shihua Road, Futian Free Trade Zone, Fubao community, Fubao street, Futian District, Shenzhen, Guangdong 518000 Patentee after: Matrix Design Co.,Ltd. Address before: 518000 rooms 439, 441 and 443, unit 2, building B, Funian Plaza, South huashaonian Road, Shenzhen free trade zone, Guangdong Province Patentee before: SHENZHEN MATRIX INTERIOR DECORATION DESIGN Co.,Ltd. |
|
CP03 | Change of name, title or address |