CN211736301U - Operation platform for prefabricated staircase - Google Patents

Operation platform for prefabricated staircase Download PDF

Info

Publication number
CN211736301U
CN211736301U CN202020119581.1U CN202020119581U CN211736301U CN 211736301 U CN211736301 U CN 211736301U CN 202020119581 U CN202020119581 U CN 202020119581U CN 211736301 U CN211736301 U CN 211736301U
Authority
CN
China
Prior art keywords
vertical support
steel
support steel
steel pipe
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020119581.1U
Other languages
Chinese (zh)
Inventor
成弦
孙亚东
桑友耀
崔浩然
梁晔华
张佳男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202020119581.1U priority Critical patent/CN211736301U/en
Application granted granted Critical
Publication of CN211736301U publication Critical patent/CN211736301U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an operation platform that prefabricated staircase used, include: the welding machine comprises a fixed platform, wherein a support frame is arranged on the left side of the lower end of the fixed platform in a welding mode, the support frame comprises two first vertical support steel pipes which are parallel and three first cross support steel pipes, the three first cross support steel pipes are respectively positioned at the upper end, the middle part and the lower part between the two first vertical support steel pipes, and a plurality of inclined support rods are welded between the lower part of the right side of the support frame and the right part of the lower end of the fixed platform. When the utility model is used, the lifting device can be directly lifted to a staircase without repeated mounting and dismounting, thereby avoiding the waste of manpower, materials and machines; the utility model has simple manufacture, no complex process, and can be processed and manufactured on site, and the utility model can be manufactured by welding the redundant steel on site, without purchasing additional materials, thereby saving the cost; the utility model discloses well rings that set up make things convenient for on-the-spot loading and unloading and handling, and the on-the-spot use of having enough to meet the need many times.

Description

Operation platform for prefabricated staircase
Technical Field
The utility model belongs to the technical field of operation platform, especially, relate to an operation platform that prefabricated staircase used.
Background
In recent years, with the rapid development of assembly type buildings in China, the application of prefabricated assembly type stairs is more and more common. In the cast-in-place concrete structure of the prefabricated staircase, the rest platform of the staircase is generally cast in-place concrete, and the prefabricated staircase needs to be installed after the concrete of the rest platform of the staircase reaches a certain strength. The installation lag of the prefabricated staircase causes the workers to have no operating space for the construction operation of the previous layer. The prefabricated assembled stairway is affected by factors such as field supply, construction arrangement and the like, and can not be installed in place in time, so that the construction height of the stairway is too high. If no reliable hole opening sealing measure or anti-falling measure exists, safety accidents are easy to happen.
The traditional solution is to set up or place temporary scaffold construction chute on the next floor of prefabricated staircase, and the worker carries out construction operation on the temporary construction chute. And after the concrete pouring of the construction layer is finished, the construction chute is dismantled, or the construction chute is lifted away from the staircase by using a tower crane. When the prefabricated staircase on the previous layer is installed, a construction chute needs to be erected on the staircase again, or the prefabricated staircase is hung on the staircase again by a tower crane, and then the construction operation of the previous layer is carried out. When the number of the lagging layers of the prefabricated stair sections is too large, the scaffold construction inclined channel is limited by the height and the weight of the scaffold construction inclined channel, the construction operation with too high height is difficult to support, I-shaped steel needs to be overhung, and then the construction inclined channel is erected and placed on the I-shaped steel.
If the method is adopted, scaffolds are required to be erected during the construction of each floor of the stairs, and the repeated installation and removal work causes great waste of labor, materials and machines. In addition, the stairwell space is narrow and small, and the scaffold is built and is spent time and power, influences the project progress. Meanwhile, the stability of the floor scaffold is poor, and great safety risk exists in construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an operation platform that prefabricated staircase used to solve the technical problem that above-mentioned background art mentioned.
The utility model provides an above-mentioned technical problem's technical scheme as follows: an operating platform used for a prefabricated staircase comprises a fixed platform, wherein a support frame is welded on the left side of the lower end of the fixed platform, the support frame comprises two first vertical support steel pipes which are parallel and three first transverse support steel pipes which are respectively positioned at the upper end, the middle part and the lower part between the two first vertical support steel pipes, a plurality of inclined support rods are welded between the lower part of the right side of the support frame and the right part of the lower end of the fixed platform, a lifting frame is arranged at the lower end of the support frame, fine adjustment leg assemblies are arranged on the front side and the rear side of the lower end of the lifting frame, channel steel slide rails are symmetrically welded on the front side and the rear side of the upper end of the fixed platform, and a movable platform is connected between the two channel steel slide rails in a sliding way, the movable platform and the fixed platform have the same structure and size, the left side and the right side of the upper end of the channel steel slide rail are symmetrically welded with hanging rings, and the upper end of the channel steel slide rail is provided with fastening buttons corresponding to the movable platform on the right side of the hanging rings on the right side.
The utility model adopts the above an operation platform for prefabricated staircase uses, it is further: the crane includes that two parallels second props steel pipe and a second stull steel pipe immediately, the second stull steel pipe is located two seconds and props the lower part between the steel pipe immediately, the external diameter that the second propped the steel pipe immediately is the same with the first internal diameter that props the steel pipe immediately, and two seconds prop the steel pipe upper end respectively and stretch into two first steel pipe lower extremes that prop immediately, and the second props the steel pipe immediately and prop the steel pipe relative slip with first immediately, first prop and seted up first pinhole on the pipe wall of steel pipe lower part immediately, the second props to correspond with first pinhole on the steel pipe wall immediately and has seted up a plurality of second pinholes, and first upright props the steel pipe lower part and is provided with the bolt in first pinhole department.
The utility model adopts the above an operation platform for prefabricated staircase uses, it is further: the fine setting leg assembly comprises a first screw post, a base plate is fixedly connected to the lower end of the first screw post, an anti-slip pad is arranged at the lower end of the base plate, a first nut is sleeved on the middle portion of the outer side of the first screw post, and the upper end of the first nut is welded to the lower end of a vertical support steel pipe with the second in the lifting frame.
The utility model adopts the above an operation platform for prefabricated staircase uses, it is further: the fastening button comprises a second screw post, a rotating disc is arranged at the upper end of the second screw post, anti-skid stripes are arranged on the outer side surface of the rotating disc, a second nut is sleeved at the middle of the outer side of the second screw post, the lower end of the second nut is welded with the top wall of the channel steel slide rail, and the top wall of the channel steel slide rail corresponds to the lower end of the second screw post and is provided with a through hole.
The utility model adopts the above an operation platform for prefabricated staircase uses, it is further: the fixed platform comprises a steel pipe framework and a steel plate, and the upper end face of the steel pipe framework is welded with the lower end face of the steel plate.
The utility model adopts the above an operation platform for prefabricated staircase uses, it is further: the number of the inclined supporting rods is two, and the two inclined supporting rods are respectively positioned at the front side and the rear side between the supporting frame and the fixed platform.
The utility model has the advantages that:
1. when the utility model is used, the lifting device can be directly lifted to a staircase without repeated mounting and dismounting, thereby avoiding the waste of manpower, materials and machines; the utility model has simple manufacture, no complex process, and can be processed and manufactured on site, and the utility model can be manufactured by welding the redundant steel on site, without purchasing additional materials, thereby saving the cost; the utility model discloses well rings that set up make things convenient for on-the-spot loading and unloading and handling, and the on-the-spot use of having enough to meet the need many times.
2. The utility model discloses its height is adjusted to the accessible crane, and is concrete, props the lift that the crane was adjusted to the steel pipe immediately through the second on the slip crane to fix crane and support frame through the bolt, the utility model discloses still can adjust its length through slip movable platform to the accessible rotates fastening button and fixes movable platform, just so can realize that this operation platform installs in the prefabricated staircase of multiple size, has improved this operation platform's suitability.
3. The utility model discloses in the fine setting leg subassembly that sets up can carry out high fine setting, and is concrete, drives first silk post through rotating the backing plate and rotates, utilizes the screw thread transmission action of first nut and first silk post to be used for realizing the lift of adjusting the backing plate to realize high fine setting, just so can uneven ground under the situation, highly adjust this operation platform's steady through adjusting fine setting leg subassembly, thereby improved this operation platform safety and stability.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
FIG. 1 is a schematic front view of an embodiment of the present invention;
fig. 2 is a schematic top view of a fixing platform according to an embodiment of the present invention;
fig. 3 is a schematic left side view of an embodiment of the present invention;
fig. 4 is an enlarged schematic view of a in an embodiment of the present invention;
fig. 5 is an enlarged schematic view of embodiment B of the present invention;
fig. 6 is a schematic structural diagram of a fastening button according to an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a fixed platform; 101. a steel pipe framework; 102. a steel plate; 2. a support frame; 201. a first vertical support steel pipe; 2011. a first pin hole; 202. a first cross-brace steel pipe; 3. a diagonal brace; 4. a lifting frame; 401. a second vertical support steel pipe; 4011. a second pin hole; 402. a second cross-brace steel pipe; 5. fine tuning the leg assembly; 501. a first wire column; 502. a first nut; 503. a base plate; 504. a non-slip mat; 6. a channel steel slide rail; 601. perforating; 7. a movable platform; 8. a hoisting ring; 9. fastening the button; 901. a second wire column; 902. a second nut; 903. rotating the disc; 10. and (4) a bolt.
Detailed Description
Hereinafter, embodiments of an operation platform for a prefabricated staircase according to the present invention will be described with reference to the accompanying drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
Fig. 1-4 show an operation platform for a prefabricated staircase according to an embodiment of the present invention, comprising: the fixed platform 1 comprises a steel pipe framework 101 and a steel plate 102, the upper end face of the steel pipe framework 101 is welded with the lower end face of the steel plate 102, a support frame 2 is welded on the left side of the lower end of the fixed platform 1, the support frame 2 comprises two first vertical support steel pipes 201 parallel and three first cross support steel pipes 202, the three first cross support steel pipes 202 are respectively positioned at the upper end, the middle part and the lower part between the two first vertical support steel pipes 201, a plurality of inclined support rods 3 are welded between the lower part of the right side of the support frame 2 and the right part of the lower end of the fixed platform 1, the number of the inclined support rods 3 is two, the two inclined support rods 3 are respectively positioned at the front side and the rear side between the support frame 2 and the fixed platform 1, a crane 4 is arranged at the lower end of the support frame 2, the crane 4 comprises two second vertical support steel pipes 401 parallel and a second cross support steel pipe 402, the, the outer diameter of the second vertical bracing steel tube 401 is the same as the inner diameter of the first vertical bracing steel tube 201, the upper ends of the two second vertical bracing steel tubes 401 respectively extend into the lower ends of the two first vertical bracing steel tubes 201, the second vertical bracing steel tube 401 slides relative to the first vertical bracing steel tube 201, a first pin hole 2011 is arranged on the tube wall of the lower part of the first vertical bracing steel tube 201, a plurality of second pin holes 4011 are arranged on the tube wall of the second vertical bracing steel tube 401 corresponding to the first pin holes 2011, a bolt 10 is arranged at the first pin hole 2011 at the lower part of the first vertical bracing steel tube 201, fine tuning leg assemblies 5 are arranged at the front side and the rear side of the lower end of the crane 4, each fine tuning leg assembly 5 comprises a first screw column 501, a backing plate is fixedly connected to the lower end of the first screw column 501, a non-slip mat 504 is arranged at the lower end of the backing plate 503, a first nut 503 is sleeved at the middle part of the outer side of the first screw column 501, the upper end of the first nut 502, and sliding connection has movable platform 7 between two channel-section steel slide rails 6, movable platform 7 is the same with fixed platform 1's structure and size homogeneous phase, 6 upper end left and right sides symmetrical welding of channel-section steel slide rail has rings 8, and 6 upper ends of channel-section steel slide rail correspond with movable platform 7 in the right-hand of right side rings 8 and are provided with fastening button 9, fastening button 9 includes second silk column 901, second silk column 901 upper end is provided with rolling disc 903, and rolling disc 903 lateral surface is provided with anti-skidding stripe, second silk column 901 outside middle part cover is equipped with second nut 902, second nut 902 lower extreme and 6 roof welding of channel-section steel slide rail, and 6 roof of channel-section steel slide rail corresponds with second silk column 901 lower extreme and has seted up perforation 601.
The working principle is as follows:
when the utility model is used, the lifting device can be directly lifted to a staircase without repeated mounting and dismounting, thereby avoiding the waste of manpower, materials and machines; the utility model has simple manufacture, no complex process, and can be processed and manufactured on site, and the utility model can be manufactured by welding the redundant steel on site, without purchasing additional materials, thereby saving the cost; the utility model discloses well rings 8 that set up make things convenient for on-the-spot loading and unloading and handling, and the on-the-spot use of having enough to meet the need many times.
The utility model discloses its height is adjusted to accessible crane 4, and is concrete, props the lift that crane 4 was adjusted to steel pipe 401 immediately through the second on the slip crane 4 to fix crane 4 and support frame 2 through bolt 10, the utility model discloses still can adjust its length through slip movable platform 7 to the accessible rotates fastening button 9 and fixes movable platform 7, just so can realize that this operation platform installs in the prefabricated staircase of multiple size, has improved this operation platform's suitability.
The utility model discloses in fine setting leg subassembly 5 that sets up can carry out high fine setting, and is concrete, drives first silk column 501 through rotating backing plate 503 and rotates, utilizes the screw thread transmission action of first nut 502 and first silk column 501 to be used for realizing the lift of adjusting backing plate 503 to realize high fine setting, just so can uneven ground under the situation, highly adjust this operation platform's steady through adjusting fine setting leg subassembly 5, thereby improved this operation platform safety and stability.
The technical features disclosed above are not limited to the combinations with other features disclosed, and other combinations between the technical features can be performed by those skilled in the art according to the purpose of the invention to achieve the aim of the invention.

Claims (6)

1. An operation platform for a prefabricated staircase, comprising: the device comprises a fixed platform (1), wherein a support frame (2) is welded on the left side of the lower end of the fixed platform (1), the support frame (2) comprises two first vertical support steel pipes (201) which are parallel and three first cross support steel pipes (202), the three first cross support steel pipes (202) are respectively positioned at the upper end, the middle part and the lower part between the two first vertical support steel pipes (201), a plurality of inclined support rods (3) are welded between the lower part of the right side of the support frame (2) and the right part of the lower end of the fixed platform (1), a lifting frame (4) is arranged at the lower end of the support frame (2), fine adjustment leg assemblies (5) are respectively arranged at the front side and the rear side of the lower end of the lifting frame (4), channel steel slide rails (6) are symmetrically welded at the front side and the rear side of the upper end of the fixed platform (1), a movable platform (7) is slidably connected between the two channel, the steel channel sliding rail is characterized in that hanging rings (8) are symmetrically welded on the left side and the right side of the upper end of the steel channel sliding rail (6), and fastening buttons (9) are correspondingly arranged on the right side of the steel channel sliding rail (6) at the hanging rings (8) on the right side and the movable platform (7).
2. A prefabricated staircase for use as claimed in claim 1, wherein, the lifting frame (4) comprises two second vertical support steel pipes (401) and a second transverse support steel pipe (402) which are parallel and parallel, the second cross-brace steel pipe (402) is positioned at the lower part between the two second vertical brace steel pipes (401), the outer diameter of the second vertical support steel pipe (401) is the same as the inner diameter of the first vertical support steel pipe (201), the upper ends of the two second vertical support steel pipes (401) respectively extend into the lower ends of the two first vertical support steel pipes (201), and the second vertical support steel pipe (401) and the first vertical support steel pipe (201) slide relatively, a first pin hole (2011) is formed in the pipe wall at the lower part of the first vertical support steel pipe (201), a plurality of second pin holes (4011) are formed in the pipe wall of the second vertical support steel pipe (401) corresponding to the first pin holes (2011), and a bolt (10) is arranged at the first pin hole (2011) at the lower part of the first vertical support steel pipe (201).
3. The operation platform for the prefabricated staircase according to claim 1, wherein the fine tuning leg assembly (5) comprises a first wire column (501), a base plate (503) is fixedly connected to the lower end of the first wire column (501), an anti-slip pad (504) is arranged on the lower end of the base plate (503), a first nut (502) is sleeved on the middle portion of the outer side of the first wire column (501), and the upper end of the first nut (502) is welded to the lower end of the second vertical support steel pipe (401) in the lifting frame (4).
4. The operation platform for the prefabricated staircase according to claim 1, wherein the fastening button (9) comprises a second wire column (901), a rotating disc (903) is arranged at the upper end of the second wire column (901), anti-skid stripes are arranged on the outer side surface of the rotating disc (903), a second nut (902) is sleeved in the middle of the outer side of the second wire column (901), the lower end of the second nut (902) is welded with the top wall of the channel steel slide rail (6), and through holes (601) are correspondingly formed in the top wall of the channel steel slide rail (6) and the lower end of the second wire column (901).
5. An operation platform for a prefabricated staircase according to claim 1, characterized in that said fixed platform (1) comprises a steel tube skeleton (101) and a steel plate (102), the upper end surface of said steel tube skeleton (101) being welded to the lower end surface of said steel plate (102).
6. A prefabricated staircase for use as in claim 1, characterised in that said diagonal braces (3) are provided in two and that said two diagonal braces (3) are located on each of the front and rear sides between the support frame (2) and the fixed platform (1).
CN202020119581.1U 2020-01-19 2020-01-19 Operation platform for prefabricated staircase Expired - Fee Related CN211736301U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020119581.1U CN211736301U (en) 2020-01-19 2020-01-19 Operation platform for prefabricated staircase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020119581.1U CN211736301U (en) 2020-01-19 2020-01-19 Operation platform for prefabricated staircase

Publications (1)

Publication Number Publication Date
CN211736301U true CN211736301U (en) 2020-10-23

Family

ID=72879872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020119581.1U Expired - Fee Related CN211736301U (en) 2020-01-19 2020-01-19 Operation platform for prefabricated staircase

Country Status (1)

Country Link
CN (1) CN211736301U (en)

Similar Documents

Publication Publication Date Title
CN101435276B (en) Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN104564104B (en) A kind of table system for tunnel-liner
CN205476401U (en) Elevator well type steel protection construction platform
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN112663501A (en) Upper-span existing line steel box girder structure and construction method
CN206110635U (en) Automatic convertible integrally lift up elevator shaft operating platform of landing leg
JPH09310492A (en) Self elevating type form device and elevating method thereof
CN115324321A (en) Telescopic quick-release cantilever operation platform for elevator track installation and construction method
CN103114754A (en) Alternative hoisting method for conjoined coal bunker top truss girder pre-placing
CN106437123A (en) Supporting leg automatic turnover type overall lifting elevator well operation platform
CN110185247A (en) Mobile outrigger platform
CN211736301U (en) Operation platform for prefabricated staircase
JP3074765U (en) Pillar building construction system equipment
CN207727440U (en) Whole self-crawling type integrated platform for bridge tower construction
CN108118620A (en) For the whole self-crawling type integrated platform and its construction method of bridge tower construction
CN210289072U (en) Adjustable instrument formula elevartor shaft protection operation platform and operation are strutted
CN209741677U (en) A assembled work platform for high mound construction
KR100816493B1 (en) Slip form for forming concrete wall of vertical tunnel and method for construction of the concrete wall
CN212478487U (en) Construction platform for building construction
CN113738125B (en) Construction method for lifting limited-space large-span steel structure of station house under line
CN106245531B (en) Steel structural bridge installation method is hung under bilateral derrick type
CN211776076U (en) Steel construction retractable cat ladder of going to people for elevator well
CN211257773U (en) Door type integral lifting steel platform
CN113309256A (en) Construction device and construction method for prefabricated shear wall with post-pouring section
KR100925806B1 (en) Construction method of window in parallel with framework

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201023

Termination date: 20220119

CF01 Termination of patent right due to non-payment of annual fee