sewage
park
analyzer
plant
outlet main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922444715.7U
Other languages
Chinese (zh)
Inventor
郭智慧
王文龙
闫素琴
杜贺威
赵炳鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Century Rotek Beijing Environmental Science And Technology Co ltd
Original Assignee
Century Rotek Beijing Environmental Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Century Rotek Beijing Environmental Science And Technology Co ltd filed Critical Century Rotek Beijing Environmental Science And Technology Co ltd
Priority to CN201922444715.7U priority Critical patent/CN211735657U/en
Application granted granted Critical
Publication of CN211735657U publication Critical patent/CN211735657U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a sewage treatment technical field especially relates to a sewage discharge system and sewage monitoring system, and this sewage discharge system includes: a sewage treatment station, a plant sewage outlet main pipe, an accident pool and a park sewage pipe network; the sewage treatment station is connected to the park sewage pipe network through the plant sewage outlet main pipe; a sampling port, a backflow port and an electric valve are sequentially arranged on the plant sewage outlet main pipe; the sampling port is connected with an online monitoring device through a first pipeline, and the online monitoring device is connected with a sewage analyzer; the return port is connected with the accident pool or the sewage treatment station through a second pipeline, and a first return valve is arranged on the second pipeline; the sewage analyzer is respectively connected with the electric valve and the reflux valve through signal lines, so that the real-time monitoring of sewage discharge is realized, and the qualification of effluent is ensured.

Description

Sewage discharge system and sewage monitoring system
Technical Field
The utility model relates to a sewage treatment technical field especially relates to a sewage discharge system and sewage monitoring system.
Background
The problem or the production accident of the sewage treatment system of the existing enterprise can sometimes cause sewage exceeding the nano-pipe standard, even high-concentration sewage which is not effectively pretreated enters a park pipeline system, the sewage contains high-concentration toxic and harmful substances, the standard treatment difficulty of the park sewage treatment plant is increased, adverse effects are caused to the normal and stable operation of the park sewage treatment plant, the risk of park pollution load discharge is aggravated to a certain extent, even the breakdown of the whole sewage treatment system is caused, the sewage stations of some enterprises lack of professional effective management, and the severity of the problem is aggravated.
In actual operation, some enterprises do not strictly carry out sewage disposal and diversion, domestic sewage, ground flushing and cooling water are mixed and discharged, and even part of industrial wastewater is mixed into cooling water and discharged; the sewage treatment process of some enterprises is relatively laggard, and the treated sewage is directly discharged when the treated sewage does not meet the takeover standard; and sewage treatment devices of some enterprises can not normally operate, and most of untreated industrial wastewater is directly drained to a sewage pipe network. And as the area of a general industrial park is large, sewage of most enterprises is mainly discharged into a park public sewage pipeline system, once the problems occur, responsibility units cannot be confirmed, great difficulty is caused to environmental management of the park and operation units of sewage treatment systems, and the problem is one of main reasons for causing pollution disputes of the park, which is a difficult problem to be solved as soon as possible in many industrial parks at present.
SUMMERY OF THE UTILITY MODEL
In view of the above, the present invention has been made to provide a sewage discharge system and a sewage monitoring system that overcome the above problems or at least partially solve the above problems.
The utility model provides a sewage discharge system, include:
a sewage treatment station, a plant sewage outlet main pipe, an accident pool and a park sewage pipe network;
the sewage treatment station is connected to the park sewage pipe network through the plant sewage outlet main pipe;
a sampling port, a backflow port and an electric valve are sequentially arranged on the plant sewage outlet main pipe;
the sampling port is connected with an online monitoring device through a first pipeline, and the online monitoring device is connected with a sewage analyzer;
the return port is connected with the accident pool or the sewage treatment station through a second pipeline, and a first return valve is arranged on the second pipeline;
the sewage analyzer is respectively connected with the electric valve and the reflux valve through signal lines.
Further, the system also comprises a flowmeter, wherein the flowmeter is arranged on the plant sewage outlet main pipe and is positioned between the backflow port and the electric valve, and the flowmeter is connected with the sewage analyzer through a signal line.
Further, the system also comprises a flowmeter, wherein the flowmeter is arranged on the field sewage outlet main pipe and is positioned between the electric valve and the park sewage pipe network, and the flowmeter is connected with the sewage analyzer through a signal line.
Further, a sampling pump is arranged on the first pipeline and connected with the online monitoring equipment.
Further, the on-line monitoring equipment specifically comprises a COD monitor, an NH3-N monitor, a characteristic pollution area monitor, a pH value monitor and an electric conductivity monitor.
Further, still include the alarm, the alarm passes through the signal line and connects sewage analysis appearance.
On the other hand, the utility model also provides a sewage monitoring system, include: n sewage discharge system as above-mentioned, cloud ware, garden sewage treatment pond, every sewage discharge system sets up in the enterprise that corresponds separately, and N sewage discharge system all is connected to through respective sewage analysis appearance cloud ware, N sewage discharge system all is connected to through respective garden sewage pipe network garden sewage treatment pond.
Further, the cloud server comprises a sending module, and the sending module is connected with any one terminal device.
The embodiment of the utility model provides an in one or more technical scheme, following technological effect or advantage have at least:
the utility model provides a sewage discharge system, include: a sewage treatment station, a plant sewage outlet main pipe, an accident pool and a park sewage pipe network; the system comprises a sewage treatment station, a factory sewage outlet main pipe, a factory sewage inlet, a factory sewage outlet main pipe; the return port is connected with the accident pool or the sewage treatment station through a second pipeline, and a return valve is arranged on the second pipeline; the sewage analysis appearance is respectively through signal line connection electric valve and return valve, when on-line monitoring equipment treats the sewage that discharges and samples the monitoring time measuring, data transmission to the sewage analysis appearance with the monitoring, this sewage analysis appearance detects this each item index of the sewage that treats the discharge, when detecting to obtain arbitrary index and be not conform to the requirement, control electric valve is closed, the simultaneous coordinated control return valve is opened, sewage discharge to accident pond or sewage treatment station that will treat the discharge, avoid the sewage outflow of not up to standard, and then realize the real time monitoring to sewage discharge, thereby the qualification of water has been guaranteed.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
FIG. 1 is a schematic view showing a sewage discharge system according to an embodiment of the present invention;
fig. 2 shows the sewage monitoring system in the embodiment of the utility model.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
The embodiment of the utility model provides a sewage discharge system, as shown in figure 1, include: a sewage treatment station 101, a factory sewage outlet main pipe 102, an accident pool 103 and a park sewage pipe network 104.
Wherein, the sewage treatment station 101 is connected to the park sewage pipe network 104 through the plant sewage outlet main pipe 102; the factory sewage outlet main pipe 102 is sequentially provided with a sampling port 1021, a return port 1022 and an electric valve 1023.
The sampling port 1021 is connected to an on-line monitoring device 105 through a first pipeline L1, and the on-line monitoring device 105 is connected to a sewage analyzer 106.
The return port 1022 is connected to the emergency pool 103 or the sewage treatment plant 101 via a second line L2, and a return valve 107 is provided in a second line L2.
The sewage analyzer 106 is connected to the electric valve 1023 and the return valve 107 through signal lines, respectively.
In a specific embodiment, the sewage flows out from the sewage treatment station 101 through the plant sewage outlet main pipe 102, and is sampled through the sampling port 1021 under the action of the on-line monitoring device 105, because the on-line monitoring device 105 specifically comprises a COD monitor, an NH3-N monitor, a characteristic pollutant monitor, a pH monitor, and a conductivity monitor, the COD index, the NH3-N index, the characteristic pollutant index, and the pH index in the sewage can be respectively monitored, and the monitoring result is reported to the sewage analyzer 106, the sewage analyzer 106 determines whether the sewage exceeds the standard or not based on the above indexes, and if the sewage exceeds the standard, sends a control instruction to control the electric valve 1023 to close, the sewage of the sewage treatment station stops discharging, and at the same time, controls the return valve 107 to open, so that the sewage flows back to the accident pool 103 through the second pipeline L2, or a sewage treatment station 101. So that the sewage is treated again until the sewage reaches the standard and then is discharged.
Adopt electric valve 1023 and return valve 107 with sewage analysis appearance 106 is connected, can shorten the time of sewage discharge that does not reach standard, close electric valve as soon as possible.
The sewage discharge system further comprises a flow meter 108, the flow meter 108 is arranged on the plant sewage outlet main pipe 102 and is located between the backflow port 1022 and the electric valve 1023, the flow meter 108 is connected with the sewage analyzer 106 through a signal line, so that the sewage analyzer 106 can know the total amount of sewage flowing through the plant sewage outlet main pipe 102, the total amount of sewage flowing through the flow meter is reported to the sewage analyzer through the signal line, and the electric valve 1023 is controlled to be closed when the sewage analyzer 106 determines that the total amount of sewage reaches the upper limit.
In another mode, the flow meter 108 is disposed on the plant sewage outlet main pipe 102 and located between the electric valve 1023 and the park sewage pipe network 104, and meanwhile, the flow meter 108 is connected to the sewage analyzer 106 through a signal line. The specific implementation principle is similar to that described above.
The flow meter 108 is adopted to provide a basis for collecting future sewage collection fees.
A sampling pump 109 is arranged on the first pipeline L1, the sampling pump 109 is connected to the on-line monitoring device 105, and the sampling pump 109 is used for pumping the sewage flowing through the plant sewage outlet main pipe 102 under the control of the on-line monitoring device 105, and the pumping amount is very small and can be ignored.
The device also comprises an alarm which is connected with the sewage analyzer 106 through a signal wire, and when the sewage analyzer 106 detects that the sewage exceeds the standard, the alarm gives an alarm. And further, related personnel of the enterprise can know the condition that the sewage exceeds the standard.
Based on the same inventive concept, the utility model also provides a sewage monitoring system, as shown in fig. 2, includes: n the aforesaid sewage discharge system 201, cloud ware 202, garden sewage treatment pond 203, every sewage discharge system 201 sets up in the enterprise that corresponds separately, and N sewage discharge system 201 all is connected to this cloud ware 202 through respective sewage analysis appearance, and N sewage discharge system 201 all is connected to this garden sewage treatment pond 203 through respective garden sewer network.
In a specific embodiment, the sewage analyzers of each enterprise report the respective detected sewage discharge conditions to the cloud server 202, where the reported contents specifically include a result of whether the discharged sewage exceeds the standard, an amount of the discharged sewage, and the like.
Only in the case where the discharged sewage does not exceed the standard, the sewage can be discharged into the park sewage treatment tank 203.
Specifically, the cloud server 202 includes a sending module, and the sending module is connected to any terminal device, for example, a computer or a mobile phone that can be connected to a relevant administrator, so that the administrator can view the monitoring result of the sewage analyzer in real time. The related management personnel can also use the browser on the terminal equipment to view the real-time data and information of the sewage discharge site.
The embodiment of the utility model provides an in one or more technical scheme, following technological effect or advantage have at least:
the utility model provides a sewage discharge system, include: a sewage treatment station, a plant sewage outlet main pipe, an accident pool and a park sewage pipe network; the system comprises a sewage treatment station, a factory sewage outlet main pipe, a factory sewage inlet, a factory sewage outlet main pipe; the return port is connected with the accident pool or the sewage treatment station through a second pipeline, and a return valve is arranged on the second pipeline; the sewage analysis appearance is respectively through signal line connection electric valve and return valve, when on-line monitoring equipment treats the sewage that discharges and samples the monitoring time measuring, data transmission to the sewage analysis appearance with the monitoring, this sewage analysis appearance detects this each item index of the sewage that treats the discharge, when detecting to obtain arbitrary index and be not conform to the requirement, control electric valve is closed, the simultaneous coordinated control return valve is opened, sewage discharge to accident pond or sewage treatment station that will treat the discharge, avoid the sewage outflow of not up to standard, and then realize the real time monitoring to sewage discharge, thereby the qualification of water has been guaranteed.
The utility model provides a pair of sewage monitoring system can make statistics of the drainage quality of water and the water yield of each delivery port of enterprise simultaneously, and unified dispatch of carrying out sewage discharge makes the sewage of different quality of water and water yield reach basic stability before getting into the biochemical system in garden sewage treatment pond, provides the foundation for receiving collecting of dirty expense in the future simultaneously.
Realize the drainage of each enterprise in this sewage monitoring system and monitor alone, combine sewage analyzer's control, the index according to each enterprise emission waste water, the electric valve that each enterprise of control corresponds and opening and closing of backwash valve, the realization is to the centralized monitoring of enterprise's enterprise in the industrial park one enterprise one management, avoid certain enterprise in the industrial park to steal the drainage and exceed standard waste water, also convenient timely accurate definite source that causes the pollution to the industrial park, be favorable to controlling the phenomenon of stealing the drainage of enterprise, it discharges the enterprise's self-identification main part clearly to surpass the sewage, strengthen the environmental protection consciousness of each enterprise, the reinforcing government is to the supervision dynamics of enterprise, greatly reduced garden sewage treatment plant is to the sewage treatment's in the sewage treatment pond degree of difficulty.
While the preferred embodiments of the present invention have been described, additional variations and modifications in those embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. It is therefore intended that the appended claims be interpreted as including the preferred embodiment and all such alterations and modifications as fall within the scope of the invention.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (8)

1. A sewage discharge system, comprising:
a sewage treatment station, a plant sewage outlet main pipe, an accident pool and a park sewage pipe network;
the sewage treatment station is connected to the park sewage pipe network through the plant sewage outlet main pipe;
a sampling port, a backflow port and an electric valve are sequentially arranged on the plant sewage outlet main pipe;
the sampling port is connected with an online monitoring device through a first pipeline, and the online monitoring device is connected with a sewage analyzer;
the return port is connected with the accident pool or the sewage treatment station through a second pipeline, and a first return valve is arranged on the second pipeline;
the sewage analyzer is respectively connected with the electric valve and the reflux valve through signal lines.
2. The wastewater discharge system according to claim 1, further comprising a flow meter disposed on the plant wastewater outlet main between the return port and the electrically operated valve, the flow meter being connected to the wastewater analyzer via a signal line.
3. The wastewater discharge system according to claim 1, further comprising a flow meter disposed on the plant wastewater outlet main between the electric valve and the park sewer network, wherein the flow meter is connected to the wastewater analyzer through a signal line.
4. The effluent discharge system as set forth in claim 1, wherein said first pipe has a sampling pump disposed thereon, said sampling pump being connected to said on-line monitoring apparatus.
5. The effluent disposal system of claim 1, wherein said on-line monitoring means comprises in particular a COD monitor, a NH3-N monitor, a characteristic pollution area monitor, a pH monitor, an electrical conductivity monitor.
6. The effluent discharge system as claimed in claim 1, further comprising an alarm connected to said effluent analyzer by a signal line.
7. A sewage monitoring system, comprising: the sewage discharge system of claim 1 to 6, the cloud server, and the park sewage treatment pool, wherein each sewage discharge system is disposed in a corresponding enterprise, the sewage discharge systems are connected to the cloud server through a sewage analyzer, and the sewage discharge systems are connected to the park sewage treatment pool through a park sewage network.
8. The wastewater monitoring system of claim 7, wherein the cloud server comprises a sending module, and the sending module is connected with any one of the terminal devices.
CN201922444715.7U 2019-12-27 2019-12-27 Sewage discharge system and sewage monitoring system Expired - Fee Related CN211735657U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922444715.7U CN211735657U (en) 2019-12-27 2019-12-27 Sewage discharge system and sewage monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922444715.7U CN211735657U (en) 2019-12-27 2019-12-27 Sewage discharge system and sewage monitoring system

Publications (1)

Publication Number Publication Date
CN211735657U true CN211735657U (en) 2020-10-23

Family

ID=72872040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922444715.7U Expired - Fee Related CN211735657U (en) 2019-12-27 2019-12-27 Sewage discharge system and sewage monitoring system

Country Status (1)

Country Link
CN (1) CN211735657U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112802560A (en) * 2021-02-08 2021-05-14 何羽强 Information processing method and system based on cloud computing
CN116216808A (en) * 2023-03-03 2023-06-06 龙游县河道疏浚砂资源开发有限公司 Automatic sludge wastewater treatment system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112802560A (en) * 2021-02-08 2021-05-14 何羽强 Information processing method and system based on cloud computing
CN116216808A (en) * 2023-03-03 2023-06-06 龙游县河道疏浚砂资源开发有限公司 Automatic sludge wastewater treatment system and method

Similar Documents

Publication Publication Date Title
CN110673566B (en) Multilayer intelligent supervision system and operation method of sewage mixing and collecting pipe network
KR102172981B1 (en) Smart sewage treatment Operation System
CN103984320B (en) A kind of enterprise's rainwater discharge outlet monitoring system based on Internet of Things and monitoring method thereof
CN106249676B (en) A kind of water pollution control facility monitoring system Internet-based and its method
CN205709935U (en) Waste water processes exhausting control management system
CN202936289U (en) Integrated monitoring system of landfill leachate treatment device
CN211735657U (en) Sewage discharge system and sewage monitoring system
CN104150652B (en) A kind of chemical industrial park centralized wastewater treatment factory water inletting monitoring regulation system and method
CN105974829B (en) A kind of intelligence adapter sewage control method
CN111489052A (en) Method for carrying out intercepting drainage scheduling by utilizing water quality and water quantity
CN111612678A (en) Method for realizing sewage management cloud platform
CN101468821B (en) Pretreatment system and pretreatment method for sewerage
CN205450634U (en) Intelligence rainwater drainage monitored control system based on internet of things
CN117872899B (en) System and method for monitoring rain drainage of industrial park
CN203849606U (en) Enterprise rainwater discharge outlet monitoring system
CN102629134A (en) Urban sewage treatment Orbal oxidation ditch industrial toxic pollutant impact resistance regulation and control system
CN212534410U (en) Drainage pipe network regulation system that dams
CN212620879U (en) Monitoring equipment for health condition of municipal sewage pipe network
CN205103590U (en) Monitoring system for water quality processing device
CN216892712U (en) Fluorine chemical enterprises's distribution of rain and sewage drainage system
CN215048803U (en) Sewage discharge treatment overall process supervisory systems
CN214738578U (en) Rain and sewage flow dividing device
CN210487391U (en) Effluent turbidity sampling and measuring device of domestic sewage treatment system
CN204939178U (en) Rural domestic sewage micro-power integrated equipment for wastewater treatment and management system for internet of things thereof
CN212111368U (en) Small-size drainage exceeds standard on-line monitoring stays appearance machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant