CN211735394U - Positioning pile for construction site - Google Patents
Positioning pile for construction site Download PDFInfo
- Publication number
- CN211735394U CN211735394U CN201922385580.1U CN201922385580U CN211735394U CN 211735394 U CN211735394 U CN 211735394U CN 201922385580 U CN201922385580 U CN 201922385580U CN 211735394 U CN211735394 U CN 211735394U
- Authority
- CN
- China
- Prior art keywords
- wall
- spud
- screw
- box
- fix
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a spud for building site, including location case and wire winding case, the four corners department of location bottom of the case portion outer wall all has the surge tank through the fix with screw, the bottom outer wall of surge tank is opened there is the slide opening, the inner wall of slide opening is pegged graft and is had the installation pole, the bottom outer wall of installation pole has the universal wheel through the fix with screw, and the outer wall of installation pole has cup jointed damping spring, the top outer wall of location case is opened there is the spliced eye, the inner wall of spliced eye is pegged graft and has the spud, the top outer wall of spud has the bearing plate through the fix with screw, the four corners department of location bottom of the case portion outer wall all has the hydraulic stem through the fix with screw, the bottom outer wall of hydraulic stem has the backup pad through the fix with screw. The utility model discloses control hydraulic stem extracts whole locating box and guide pile ground, then drives the guide pile through the universal wheel and removes to accomplish the recovery to can recycle the guide pile.
Description
Technical Field
The utility model relates to a spud technical field especially relates to a spud for building site.
Background
Before the construction of a building, the building is positioned on a construction site to form at least more than 4 positioning points, which are represented by steel pipes or concrete piles and used for guiding the subsequent construction, namely positioning piles, wherein the bearing capacity of the piles is calculated according to the structural strength of pile bodies and the supporting capacity of foundation soil to the piles according to different stress conditions, and the small value of the bearing capacity is taken.
The existing positioning pile for the construction site has the following defects: when building construction, need use the spud to carry out preliminary location to the ground, and when fixing a position some large buildings at present, the spud is disposable usually, can not recycle the reference column usually to lead to the wasting of resources, the practicality is relatively poor.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the utility model provides a spud for building site.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a spud for building site, includes position box and wire winding case, the four corners department of position box bottom outer wall all has the surge tank through the fix with screw, the bottom outer wall of surge tank is opened there is the slide opening, the inner wall of slide opening is pegged graft and is had the installation pole, the bottom outer wall of installation pole has the universal wheel through the fix with screw, and the outer wall of installation pole has cup jointed damping spring, the top outer wall of position box is opened there is the spliced eye, the inner wall of spliced eye has been pegged graft and has the spud, the top outer wall of spud has the bearing plate through the fix with screw, the four corners department of position box bottom outer wall all has the hydraulic stem through the fix with screw.
Furthermore, the bottom outer wall of hydraulic stem has the backup pad through the fix with screw, and one side outer wall of locating box has the push rod through the fix with screw, and the outer wall of spud is opened has the mounting groove, and the inner wall of mounting groove has the scale through the fix with screw.
Furthermore, the outer wall of the top of the positioning box is connected with a supporting block through a hinge, and a handle is fixed on the outer wall of the supporting block through a screw.
Furthermore, the inner wall of the bottom of the winding box is connected with a winding roller through a bearing, and the outer wall of the top of the winding roller is fixed with a rocker through a screw.
Furthermore, the outer wall all around of locating box all opens the fixed slot, and the inner wall of fixed slot is pegged graft and is had the stay wire ring.
Furthermore, the outer wall of the winding roller is connected with a positioning wire in a bolted mode, and one end, far away from the winding roller, of the positioning wire is connected to the inner wall of the pull wire ring in a fastened mode.
Furthermore, a bolt connecting ring is fixed on the outer wall of the bottom of the positioning box through a screw, a calibration line is bolted on the inner wall of the bolt connecting ring, and a calibration weight is bolted on one end of the calibration line.
The utility model has the advantages that:
1. this spud for building site, through being provided with universal wheel, hydraulic stem and spud, the universal wheel that spud bottom portion set up can strengthen the mobility of spud, inserts the underground with the spud through the bearing plate after, can control the hydraulic stem and extract ground with whole spud and spud, then drive the spud through the universal wheel and remove to accomplish the recovery to can recycle the spud, rational in infrastructure, easy operation.
2. This spud for building site through being provided with winding roller, rocker and stay wire ring, inserts ground when the spud and accomplishes the location back, can pull out the location line above the winding roller through pulling location case stay wire ring all around to completion work of acting as go-between that can be quick can accomplish fast receipts line or the work of winding wire through rotating the rocker, and the practicality is stronger.
3. This spud pile for building site through being provided with the calibration stone roller, can judge through the angle that the calibration line of observing calibration stone roller top and locating box become whether whole locating box is the parallel state with ground to through the angle of hydraulic stem adjustment locating box, guaranteed that the spud pile is perpendicular with ground, the precision is higher.
The part not related in the device all is the same with prior art or can adopt prior art to realize, and the device design structure is reasonable, and convenient to use satisfies people's user demand.
Drawings
Fig. 1 is a three-dimensional structure diagram of a positioning pile for a construction site according to embodiment 1 of the present invention;
fig. 2 is a schematic structural view of a positioning pile for a construction site according to the present invention;
fig. 3 is a three-dimensional structure diagram of a spud for construction site that embodiment 2 of the present invention provides.
In the figure: the device comprises a push rod 1, a positioning box 2, a damping box 3, a positioning pile 4, a universal wheel 5, a hydraulic rod 6, a pull wire ring 7, a supporting block 8, a bearing plate 9, a handle 10, a rocker 11, a winding roller 12, a winding box 13, a damping spring 14, a graduated scale 15 and a calibration weight 16.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Referring to fig. 1-2, a spud for building site, including position box 2 and wire winding case 13, the four corners department of 2 bottom outer walls of position box all has surge tank 3 through the fix with screw, the bottom outer wall of surge tank 3 is opened there is the slide opening, the inner wall of slide opening is pegged graft and is had the installation pole, the bottom outer wall of installation pole has universal wheel 5 through the fix with screw, and damping spring 14 has been cup jointed to the outer wall of installation pole, the top outer wall of position box 2 is opened there is the spliced eye, the inner wall of spliced eye is pegged graft and is had spud 4, the top outer wall of spud 4 has bearing plate 9 through the fix with screw, the four corners department of 2 bottom outer walls of position box all has hydraulic stem 6 through the fix with.
The utility model discloses in, the bottom outer wall of hydraulic stem 6 has the backup pad through the fix with screw, and one side outer wall of locating box 2 has push rod 1 through the fix with screw, and the outer wall of spud pile 4 is opened has the mounting groove, and the inner wall of mounting groove has scale 15 through the fix with screw.
The utility model discloses in, there is supporting shoe 8 top outer wall of locating box 2 through hinged joint, and the outer wall of supporting shoe 8 has handle 10 through the fix with screw.
The utility model discloses in, the bottom inner wall of winding box 13 is connected with winding roller 12 through the bearing, and the top outer wall of winding roller 12 has rocker 11 through the fix with screw.
The utility model discloses in, the outer wall all around of locating box 2 has all opened the fixed slot, and the inner wall of fixed slot is pegged graft and is had the stay wire ring 7.
The utility model discloses in, the outer wall bolt of winding roller 12 has connect the location line, and the one end that the winding roller 12 was kept away from to the location line is tied and is connect in the inner wall of stay wire ring 7.
The working principle is as follows: when the device is used, the push rod 1 is held to move the whole device to a working area through the universal wheel 5, the damping spring 14 below the damping box 3 can reduce the influence of vibration generated by movement on the positioning pile 4, then the handle 10 is held to move the supporting block 8 away, the positioning pile 4 can fall to the ground, then the bearing plate 9 is pressed to enable the whole positioning pile 4 to enter the ground, the sinking depth of the positioning pile 4 can be mastered by observing the graduated scale 15 above the positioning pile 4, after the positioning pile 4 is inserted into the ground to complete positioning, the positioning line above the winding roller 12 can be pulled out by pulling the pull wire rings 7 around the positioning box 2, so that the wire pulling work can be rapidly completed, the quick wire winding or winding work can be completed by rotating the rocker 11, the hydraulic rod 6 can be controlled to pull the whole positioning box 2 and the positioning pile 4 out of the ground after the positioning work is completed, then the positioning pile 4 is driven by the universal wheels 5 to move to complete recovery, so that the positioning pile 4 can be recycled.
Example 2
Referring to fig. 3, a spud for a construction site, in this embodiment, compared with embodiment 1, further includes a bolting ring fixed to the outer wall of the bottom of the positioning box 2 through a screw, a calibration line bolted to the inner wall of the bolting ring, and a calibration weight 16 bolted to one end of the calibration line.
The working principle is as follows: whether the whole positioning box 2 is parallel to the ground or not can be judged by observing the angle formed by the calibration line above the calibration weight 16 and the positioning box 2, so that the angle of the positioning box 2 is adjusted through the hydraulic rod 6, the positioning pile 4 is ensured to be vertical to the ground, and the wire drawing precision of the positioning box 2 is ensured.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. The utility model provides a spud for building site, includes position box (2) and wire winding case (13), its characterized in that, the four corners department of position box (2) bottom outer wall all has shock-absorbing box (3) through the fix with screw, the bottom outer wall of shock-absorbing box (3) is opened there is the slide opening, the inner wall of slide opening is pegged graft and is had the installation pole, the bottom outer wall of installation pole has universal wheel (5) through the fix with screw, and the outer wall of installation pole has cup jointed damping spring (14), the top outer wall of position box (2) is opened there is the spliced eye, the inner wall of spliced eye is pegged graft and is had spud (4), the top outer wall of spud (4) has bearing plate (9) through the fix with screw, the four corners department of position box (2) bottom outer wall all has hydraulic stem (6) through the fix with screw.
2. The spud for construction sites according to claim 1, characterized in that the outer wall of the bottom end of the hydraulic rod (6) is fixed with a support plate through screws, the outer wall of one side of the positioning box (2) is fixed with a push rod (1) through screws, the outer wall of the spud (4) is provided with a mounting groove, and the inner wall of the mounting groove is fixed with a graduated scale (15) through screws.
3. The spud for construction sites according to claim 1, characterized in that the top outer wall of the spud box (2) is connected with a supporting block (8) through a hinge, and the outer wall of the supporting block (8) is fixed with a handle (10) through a screw.
4. The spud for a construction site according to claim 1, characterized in that the winding roller (12) is connected to the bottom inner wall of the winding box (13) through a bearing, and the rocker (11) is fixed to the top outer wall of the winding roller (12) through a screw.
5. The positioning pile for the construction site as claimed in claim 1, wherein fixing grooves are formed on the peripheral outer walls of the positioning box (2), and pull wire rings (7) are inserted into the inner walls of the fixing grooves.
6. The spud for construction sites according to claim 4, characterized in that the outer wall of the winding roller (12) is bolted with a positioning wire, and the end of the positioning wire away from the winding roller (12) is bolted with the inner wall of the pull wire ring (7).
7. The spud for the construction site according to claim 1, characterized in that the bottom outer wall of the positioning box (2) is fixed with a bolt ring through a screw, the inner wall of the bolt ring is bolted with a calibration line, and one end of the calibration line is bolted with a calibration weight (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922385580.1U CN211735394U (en) | 2019-12-26 | 2019-12-26 | Positioning pile for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922385580.1U CN211735394U (en) | 2019-12-26 | 2019-12-26 | Positioning pile for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211735394U true CN211735394U (en) | 2020-10-23 |
Family
ID=72871044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922385580.1U Active CN211735394U (en) | 2019-12-26 | 2019-12-26 | Positioning pile for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211735394U (en) |
-
2019
- 2019-12-26 CN CN201922385580.1U patent/CN211735394U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019128155A1 (en) | Open caisson construction structure and method | |
CN212007009U (en) | Hydraulic ring geological crack measuring device | |
CN211735394U (en) | Positioning pile for construction site | |
CN111648366B (en) | Portable pile device for building site | |
CN210163898U (en) | Fixing mechanical device for building pile | |
JP4377311B2 (en) | Pile column erection device | |
CN211472518U (en) | Removable supporting is used in building engineering construction | |
CN204298830U (en) | Based on lattice column plane in subterranean excavation and elevation regulation device | |
CN213926341U (en) | Positioning pile auxiliary open caisson positioning lowering system | |
CN110847175A (en) | Foundation pile cuts off guide bracket | |
CN212565174U (en) | Foundation pit supporting monitoring device | |
CN211395652U (en) | Steel-pipe pile foundation reinforced structure | |
CN211818104U (en) | Reverse construction method construction wall body reinforcing bar location structure | |
CN211902182U (en) | Mapping device for land resources | |
CN114197557A (en) | Pipeline landfill device and method for road construction | |
CN210401101U (en) | Low supplementary hammering device of method of meeting an emergency | |
CN208039253U (en) | A kind of upper clamping mechanism of pile-grafting machine | |
CN206605072U (en) | Portable top plate drilling device | |
CN221167850U (en) | Deep foundation pit supporting anchor rod reinforcing device | |
CN214997424U (en) | Portable wheeled shallow layer is directly pushed away and is sampled rig | |
CN214695614U (en) | Constructional engineering pile device | |
CN213358595U (en) | Mechanical connecting structure for precast pile | |
CN213682183U (en) | Prefabricated pile foundation for building engineering | |
CN215169724U (en) | Novel convenient roofbolter | |
CN221798450U (en) | Rotary digging pore-forming bored concrete pile operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |