CN211691528U - Building engineering construction handling device - Google Patents

Building engineering construction handling device Download PDF

Info

Publication number
CN211691528U
CN211691528U CN201922158288.6U CN201922158288U CN211691528U CN 211691528 U CN211691528 U CN 211691528U CN 201922158288 U CN201922158288 U CN 201922158288U CN 211691528 U CN211691528 U CN 211691528U
Authority
CN
China
Prior art keywords
fixing plate
fixedly connected
handling device
vehicle body
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922158288.6U
Other languages
Chinese (zh)
Inventor
傅春兴
高斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922158288.6U priority Critical patent/CN211691528U/en
Application granted granted Critical
Publication of CN211691528U publication Critical patent/CN211691528U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a construction equipment technical field just discloses a building engineering construction handling device, including the transport automobile body, the equal fixedly connected with wheel in both sides around the transport automobile body lower surface, the inside wall of transport automobile body is provided with damping spring, damping spring's inner fixedly connected with shock attenuation board, the fixed handrail of back fixedly connected with of transport automobile body, the left and right sides of transport automobile body all is provided with first fixed plate. This building engineering construction handling device carries out the oscilaltion to the ceramic tile through left elevating gear, carries the upper surface of shock attenuation board, realizes the shipment to the ceramic tile, has improved the convenience of transport, has reduced the waste to the manpower, has improved handling efficiency, drives the chain through elevator motor and removes, and the chain drives the lifting hook and reciprocates, realizes unloading the automation of ceramic tile and transports, has further improved the convenience of transport, very big reduction the waste to the manpower resources.

Description

Building engineering construction handling device
Technical Field
The utility model relates to a construction equipment technical field specifically is a building engineering construction handling device.
Background
The ceramic tile is also called as ceramic tile, which is made of refractory metal oxide and semimetal oxide through the processes of grinding, mixing, pressing, glazing and sintering, and is acid and alkali resistant porcelain or stone, building or decorative material, and the raw material of the ceramic tile is mostly formed by mixing clay, quartz sand and the like, the ceramic tile is needed to be used during building construction, a transportation device is needed to be used during the use of the ceramic tile, and the existing transportation device is mostly used for directly placing the ceramic tile on the transportation device, so that the transportation is very inconvenient and laborious.
For example, chinese patent application No. 201822135174.5 discloses a tile carrying device for building construction, which is basically described as follows: including placing the box, it is provided with the push rod to place box one side, and it is provided with the support frame to place the box lower extreme, and the support frame both sides are provided with the wheel, it is provided with first connecting axle to place the box opposite side, and first connecting axle one side is provided with first apron, first apron opposite side is provided with the second connecting axle, and second connecting axle opposite side is provided with the second apron, first apron and second apron inner wall all are provided with roller bearing and baffle, and second apron inner wall is provided with the lifting plate, the lifting plate is the sponge material, and this handling device carries through apron and roller bearing mutually supporting, and such transport mode can only facilitate when the shipment, and is very inconvenient when unloading, still needs the manpower to unload, and very extravagant manpower carries very difficultly.
In view of the above, the inventor provides a carrying device for construction engineering, which is developed and improved aiming at the existing structure and deficiency, with the experience of abundant design development and actual manufacturing in the related industry for many years.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering construction handling device has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a construction and transportation device for building engineering comprises a transportation vehicle body, wherein wheels are fixedly connected to the front side and the rear side of the lower surface of the transportation vehicle body, a damping spring is arranged on the inner side wall of the transportation vehicle body, a damping plate is fixedly connected to the inner end of the damping spring, a fixed handrail is fixedly connected to the back side of the transportation vehicle body, first fixed plates are arranged on the left side and the right side of the transportation vehicle body, rotary hinges are fixedly connected to the bottoms of the left side and the right side of the transportation vehicle body, the first fixed plates and the transportation vehicle body are hinged through the rotary hinges, a second fixed plate is arranged right above the first fixed plates, rotary hinges are fixedly connected to the upper surfaces of the first fixed plates, the first fixed plates and the second fixed plates are hinged through the rotary hinges, fixed columns are fixedly connected to the tops of the front side and the back side, the top of dead lever is provided with clamping rod, the equal fixedly connected with in top of transport automobile body left and right sides face spacing draw-in groove, the equal fixedly connected with sliding tray in top of first fixed plate left and right sides face, the inside spacing fixture block that is provided with of sliding tray, the left and right sides face of first fixed plate all is provided with elevating gear.
The lifting device comprises a lifting motor, a transmission shaft is fixedly connected with the output end of the lifting motor, a support frame is sleeved on the outer surface of the transmission shaft, two sets of rotating chain wheels are arranged on the inner side of the support frame, chains are sleeved on the outer surface of the rotating chain wheels, the rotating chain wheels are connected through chain transmission, and lifting hooks are fixedly connected with the bottoms of the outer side surfaces of the chains.
Preferably, the inner side surface of the first fixing plate is provided with three groups of strip-shaped through holes, and the length of each group of strip-shaped through holes is one thousand millimeters.
Preferably, the outer surface of the fixed handrail is provided with an anti-skid layer, and anti-skid lines are uniformly arranged on the outer surface of the anti-skid layer.
Preferably, the inner side surfaces of the damping plate and the first fixing plate are both provided with damping foam, and the damping foam is uniformly distributed on the surfaces of the damping plate and the first fixing plate.
Preferably, the outer side surface of the limiting clamping block is provided with a T-shaped block, the inner side surface of the limiting clamping groove is provided with a T-shaped groove, and the T-shaped block is matched with the T-shaped groove.
Preferably, the first fixing plate and the second fixing plate are both made of cast iron, and the outer side surfaces of the first fixing plate and the second fixing plate are coated with antirust coatings.
(III) advantageous effects
Compared with the prior art, the utility model provides a building engineering construction handling device possesses following beneficial effect:
1. this building engineering construction handling device carries out the oscilaltion to the ceramic tile through left elevating gear, carries the upper surface of shock attenuation board, realizes the shipment to the ceramic tile, has improved the convenience of transport, has reduced the waste to the manpower, has improved handling efficiency, drives the chain through elevator motor and removes, and the chain drives the lifting hook and reciprocates, realizes unloading the automation of ceramic tile and transports, has further improved the convenience of transport, very big reduction the waste to the manpower resources.
2. This building engineering construction handling device mutually supports through damping spring and the shock attenuation board of carrying 1 side of automobile body, carries out the shock attenuation buffering to the ceramic tile of placing, very big reduction the impaired probability of ceramic tile in the transportation, further improved the security of transportation.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the present invention;
fig. 3 is a schematic view of the lifting device of the present invention.
In the figure: 1. carrying the vehicle body; 2. a wheel; 3. a damping spring; 4. a damper plate; 5. fixing the handrail; 6. a first fixing plate; 7. rotating the hinge; 8. a second fixing plate; 9. rotating the rotary hinge; 10. fixing a column; 11. fixing the rod; 12. a clamping lever; 13. a limiting clamping groove; 14. a sliding groove; 15. a limiting clamping block; 16. a lifting device; 1601. a lifting motor; 1602. a drive shaft; 1603. a support frame; 1604. rotating the sprocket; 1605. a chain; 1606. lifting hooks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a construction carrying device for building engineering comprises a carrying vehicle body 1, wheels 2 are fixedly connected to the front side and the rear side of the lower surface of the carrying vehicle body 1, a damping spring 3 is arranged on the inner side wall of the carrying vehicle body 1, a damping plate 4 is fixedly connected to the inner end of the damping spring 3, the damping spring 3 and the damping plate 4 on the inner side surface of the carrying vehicle body 1 are matched with each other to perform damping and buffering on placed tiles, the probability of damage of the tiles in the conveying process is greatly reduced, the safety of conveying is further improved, a fixed handrail 5 is fixedly connected to the back surface of the carrying vehicle body 1, first fixing plates 6 are arranged on the left side and the right side of the carrying vehicle body 1, rotary hinges 7 are fixedly connected to the bottoms of the left side and the right side of the carrying vehicle body 1, the first fixing plates 6 are hinged to the carrying vehicle body 1 through the rotary hinges, the upper surface of the first fixing plate 6 is fixedly connected with a rotary hinge 9, the first fixing plate 6 is hinged with the second fixing plate 8 through the rotary hinge 9, the top of the front surface and the back surface of the first fixing plate 6 are fixedly connected with fixing columns 10, the outer surface of each fixing column 10 is sleeved with a fixing rod 11, the top of each fixing rod 11 is provided with a clamping rod 12, the top of each of the left side surface and the right side surface of the carrying vehicle body 1 is fixedly connected with a limiting clamping groove 13, the top of each of the left side surface and the right side surface of the first fixing plate 6 is fixedly connected with a sliding groove 14, a limiting clamping block 15 is arranged inside each sliding groove 14, the, go on the oscilaltion to the ceramic tile through left elevating gear 16, carry the upper surface of shock attenuation board 4, realize the shipment to the ceramic tile, improved the convenience of transport, reduced the waste to the manpower, improved handling efficiency.
Elevating gear 16 includes elevator motor 1601, elevator motor 1601's output fixedly connected with transmission shaft 1602, support frame 1603 has been cup jointed to the surface of transmission shaft 1602, the inboard of support frame 1603 is provided with two sets of rotation sprockets 1604, the surface of rotation sprocket 1604 has cup jointed chain 1605, two sets of rotation sprockets 1604 pass through the transmission of chain 1605 and connect, the hook 1606 is lifted to the bottom fixedly connected with of chain 1605 lateral surface, it removes to drive chain 1605 through elevator motor 1601, chain 1605 drives to lift hook 1606 and reciprocates, the realization is unloaded the transportation to the automation of ceramic tile, the convenience of transport has further been improved, very big reduction is to the waste of manpower resources.
The utility model discloses in for the convenience carry the ceramic tile, it is more convenient to rectangular shape through-hole has been seted up at the medial surface of first fixed plate 6, the quantity of rectangular shape through-hole is three groups, and the length of three group's rectangular shape through-holes is one thousand millimeters, and the rectangular shape through-hole of 6 medial surfaces of first fixed plate is convenient for lift hook 1606 and reciprocates.
The utility model discloses in order to make fixed handrail 5 have better anti-skidding effect, increase frictional force to be provided with the skid resistant course at the surface of fixed handrail 5, the surface of skid resistant course evenly is provided with anti-skidding line, frictional force when the anti-skidding line of fixed handrail 5 surface effectively increases and the hand contact.
The utility model discloses in order to prevent that the ceramic tile is impaired in the handling, reinforcing shock attenuation effect to medial surface at shock attenuation board 4 and first fixed plate 6 all is provided with the shock attenuation foam, and shock attenuation foam evenly distributed is on the surface of shock attenuation board 4 and first fixed plate 6, and the shock attenuation foam of shock attenuation board 4 and 6 medial surfaces of first fixed plate effectively alleviates vibrations.
The utility model discloses in order to make first fixed plate 6's fixed effect better, it is more steady to slide to be provided with T type piece at spacing fixture block 15's lateral surface, T type groove has been seted up to spacing draw-in groove 13's medial surface, T type piece and T type groove looks adaptation, and the T type piece of spacing fixture block 15 lateral surface and the T type groove mutual slip of spacing draw-in groove 13 medial surface are fixed.
The utility model discloses in order to make the life of first fixed plate 6 and second fixed plate 8 better, prevent the corrosion to the material of first fixed plate 6 and second fixed plate 8 is cast iron, and the lateral surface of first fixed plate 6 and second fixed plate 8 has all been scribbled the brush and has been had anti rust coating, and the cast iron has longer life, and anti rust coating prevents that first fixed plate 6 and second fixed plate 8 from receiving the corruption.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the tile lifting device is used, the carrying device is moved to a designated position, the limiting clamping block 15 positioned on the left side is scratched in the limiting clamping groove 13, the first fixing plate 6 positioned on the left side is inclined towards the outer side through the rotating hinge 7, the second fixing plate 8 is unfolded through rotating the rotating hinge 9, the fixing rod 11 is clamped and fixed in the clamping rod 12, the first fixing plate 6 and the second fixing plate 8 are fixedly locked, the lifting motor 1601 positioned on the left side is controlled to be started, the output end of the lifting motor 1601 drives the transmission shaft 1602 to rotate, the transmission shaft 1602 drives the rotating chain 1604 to rotate, the rotating chain 1604 drives the chain 1605 to rotate, the chain 1605 drives the lifting hook 1606 to move to the top, a tile is placed on the lifting hook, the lifting motor 1601 is controlled to descend to the bottom, the tile is placed on the damping plate 4, after shipment is completed, the lifting motor 1601 is closed, the first fixing plate 6 and the second fixing plate 8 are sequentially folded, retracted, accomplish all shipment works, remove handling device to the assigned position, will be located the first fixed plate 6 and the second fixed plate 8 on right side and expand in proper order, place the ceramic tile on lifting hook 1606, control elevator motor 1601 is with ceramic tile lifting to top, lift the ceramic tile again, unload and transport the completion back, close elevator motor 1601, fold in proper order first fixed plate 6 and second fixed plate 8 and withdraw fixedly, accomplish all work of unloading.
To sum up, this building engineering construction handling device carries out the oscilaltion to the ceramic tile through left elevating gear 16, carries the upper surface of damper plate 4, realizes the shipment to the ceramic tile, has improved the convenience of transport, has reduced the waste to manpower, has improved handling efficiency, drives the chain 1605 through elevator motor 1601 and removes, and chain 1605 drives lifting hook 1606 and reciprocates, realizes unloading the automation of ceramic tile, has further improved the convenience of transport, very big reduction the waste to manpower resources.
This building engineering construction handling device mutually supports through damping spring 3 and the shock attenuation board 4 of carrying 1 medial surface of automobile body, carries out the shock attenuation buffering to the ceramic tile of placing, very big reduction the impaired probability of ceramic tile in the transportation, further improved the security of transportation.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building engineering construction handling device, includes transport automobile body (1), its characterized in that: the front side and the rear side of the lower surface of the carrying vehicle body (1) are fixedly connected with wheels (2), the inner side wall of the carrying vehicle body (1) is provided with a damping spring (3), the inner end of the damping spring (3) is fixedly connected with a damping plate (4), the back side of the carrying vehicle body (1) is fixedly connected with a fixed handrail (5), the left side and the right side of the carrying vehicle body (1) are respectively provided with a first fixing plate (6), the bottoms of the left side and the right side of the carrying vehicle body (1) are respectively fixedly connected with a rotating hinge (7), the first fixing plate (6) is hinged with the carrying vehicle body (1) through the rotating hinge (7), a second fixing plate (8) is arranged right above the first fixing plate (6), the upper surface of the first fixing plate (6) is fixedly connected with a rotating hinge (9), and the first fixing plate (6) is hinged with the second fixing plate (8), the top parts of the front side and the back side of the first fixing plate (6) are fixedly connected with fixing columns (10), the outer surface of each fixing column (10) is sleeved with a fixing rod (11), the top part of each fixing rod (11) is provided with a clamping rod (12), the top parts of the left side surface and the right side surface of the carrying vehicle body (1) are fixedly connected with limiting clamping grooves (13), the top parts of the left side surface and the right side surface of the first fixing plate (6) are fixedly connected with sliding grooves (14), limiting clamping blocks (15) are arranged in the sliding grooves (14), and the left side surface and the right side surface of the first fixing plate (6) are provided with;
elevating gear (16) include elevator motor (1601), the output fixedly connected with transmission shaft (1602) of elevator motor (1601), support frame (1603) has been cup jointed to the surface of transmission shaft (1602), the inboard of support frame (1603) is provided with two sets of rotation sprocket (1604), the surface of rotation sprocket (1604) has cup jointed chain (1605), and is two sets of rotation sprocket (1604) pass through chain (1605) transmission and connect, the bottom fixedly connected with of chain (1605) lateral surface lifts hook (1606).
2. A construction handling device according to claim 1, characterised in that: the inner side surface of the first fixing plate (6) is provided with three groups of strip-shaped through holes, and the length of each group of strip-shaped through holes is one thousand millimeters.
3. A construction handling device according to claim 1, characterised in that: the outer surface of the fixed handrail (5) is provided with an anti-skid layer, and anti-skid lines are uniformly arranged on the outer surface of the anti-skid layer.
4. A construction handling device according to claim 1, characterised in that: the inner side surfaces of the damping plate (4) and the first fixing plate (6) are provided with damping foam, and the damping foam is uniformly distributed on the surfaces of the damping plate (4) and the first fixing plate (6).
5. A construction handling device according to claim 1, characterised in that: the outer side surface of the limiting clamping block (15) is provided with a T-shaped block, the inner side surface of the limiting clamping groove (13) is provided with a T-shaped groove, and the T-shaped block is matched with the T-shaped groove.
6. A construction handling device according to claim 1, characterised in that: the first fixing plate (6) and the second fixing plate (8) are both made of cast iron, and the outer side faces of the first fixing plate (6) and the second fixing plate (8) are coated with antirust coatings.
CN201922158288.6U 2019-12-05 2019-12-05 Building engineering construction handling device Expired - Fee Related CN211691528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922158288.6U CN211691528U (en) 2019-12-05 2019-12-05 Building engineering construction handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922158288.6U CN211691528U (en) 2019-12-05 2019-12-05 Building engineering construction handling device

Publications (1)

Publication Number Publication Date
CN211691528U true CN211691528U (en) 2020-10-16

Family

ID=72789715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922158288.6U Expired - Fee Related CN211691528U (en) 2019-12-05 2019-12-05 Building engineering construction handling device

Country Status (1)

Country Link
CN (1) CN211691528U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114084522A (en) * 2021-12-15 2022-02-25 哈尔滨龙为科技有限公司 Protective device for industrial automation equipment of transport instrument and meter

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114084522A (en) * 2021-12-15 2022-02-25 哈尔滨龙为科技有限公司 Protective device for industrial automation equipment of transport instrument and meter

Similar Documents

Publication Publication Date Title
CN106477483A (en) Lifting logistics trolley
CN211691528U (en) Building engineering construction handling device
CN206318667U (en) Lift logistics trolley
CN215847465U (en) Wood surface pretreatment device for preparing anticorrosion oil wood pole
CN213356738U (en) Hoisting equipment for prefabricated stair raw materials
CN210193292U (en) Civil engineering building material conveyer
CN210029883U (en) Workpiece feeding and discharging lifting device
CN211139384U (en) Transport trolley of integrated wallboard
CN213057185U (en) Cement conveyer for manufacturing
CN213035878U (en) Ceramic tile transfer device is used in ceramic tile production
CN109109716B (en) Telegraph pole conveying device
CN216234536U (en) Automatic loading and unloading system for sintered plates
CN214693002U (en) Fastener mould lifting device
CN217210297U (en) Transport vehicle for transporting silica bricks for tunnel kiln
CN213262475U (en) Ceramic tile production transfer device
CN205771603U (en) The conveying arrangement that a kind of tunnel cave slips with anti-material
CN209352256U (en) A kind of construction is unloaded goods device with floor tile
CN219339480U (en) Building materials are transported and are used dolly of usefulness of building materials sales
CN212828578U (en) Transfer device is used in heat preservation stone material board processing production
CN218619924U (en) Double-beam bridge crane for transferring calcium carbide pots
CN113716496B (en) Convenient various steel of unloading is rolled up production transfer conveyer
CN218402703U (en) Ceramic manufacture transfer device
CN211055184U (en) Transfer trolley for transferring silicon carbide composite bricks
CN219381019U (en) Ceramic production line with glazing and automatic loading and unloading functions
CN215324949U (en) Remove carrying device suitable for industrial robot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201016