CN211691378U - A construction protection platform for high-rise building - Google Patents

A construction protection platform for high-rise building Download PDF

Info

Publication number
CN211691378U
CN211691378U CN201921390131.XU CN201921390131U CN211691378U CN 211691378 U CN211691378 U CN 211691378U CN 201921390131 U CN201921390131 U CN 201921390131U CN 211691378 U CN211691378 U CN 211691378U
Authority
CN
China
Prior art keywords
protection platform
construction protection
connecting plate
guard
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921390131.XU
Other languages
Chinese (zh)
Inventor
王宇飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921390131.XU priority Critical patent/CN211691378U/en
Application granted granted Critical
Publication of CN211691378U publication Critical patent/CN211691378U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction protection platform for high-rise building, including construction protection platform, be equipped with three spacing hole on the splice plate respectively, only need pass through the splice plate screw rod and the inseparable installation of limit nut on the L shaped plate, and it is downthehole to insert spacing to strengthen the montant, can accomplish the basic structure of construction protection platform, and simultaneously, it is fixed with the building to pass through several fixing bolt with the mounting panel, be connected with three stiffeners between one side of mounting panel and the construction protection platform bottom, can play fine support atress structure to construction protection platform, install the rail guard on the first connecting plate, install the dead lever at the both ends of second connecting plate, install first side guardrail and second side guardrail respectively between rail guard and the dead lever, play the guard action to the side, beneficial effect: the device has a simple structure, is very convenient to use and install, is convenient to remove the splice plates, can be secondarily utilized, and ensures the safety of workers.

Description

A construction protection platform for high-rise building
Technical Field
The utility model relates to a building engineering construction protective apparatus field particularly, relates to a construction protection platform for high-rise building.
Background
The construction platform is a peripheral protection facility which is operated by workers on a construction site and is erected for vertical and horizontal transportation, so that the construction of the workers is facilitated, and a safety protection effect is achieved.
The rise of the industry causes population to be concentrated in cities, so that land occupation is tense, the city range is still narrow due to gradual expansion, in order to build more building area in a smaller land range, buildings have to be developed to high-rise or even super high-rise, and the design of building structures also shows diversified development. In the high-rise building construction, various face limit, the construction incident of entrance to a cave sometimes takes place, consequently, when being under construction to high-rise building, generally all build construction protection platform outside it, however, its structural strength of current protection construction platform is poor, and the steadiness is also poor, though has certain guard action, nevertheless the emergence of accident still appears easily, its reason is that protection platform is not firm enough much, and it builds the back, can't the reutilization material after demolising, leads to certain waste.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the problem among the correlation technique, the utility model provides a construction protection platform for high-rise building to overcome the above-mentioned technical problem that current correlation technique exists.
The technical scheme of the utility model is realized like this:
a construction protection platform for high-rise buildings comprises a construction protection platform, wherein a first connecting plate and a second connecting plate are respectively arranged at two ends of the construction protection platform, the construction protection platform is formed by splicing a plurality of splicing plates, three limiting holes are respectively arranged on the splicing plates, reinforcing vertical rods are arranged in the limiting holes in a penetrating manner, L-shaped plates are fixedly arranged below the first connecting plate and the second connecting plate respectively, the splicing plates are arranged between the L-shaped plates through screw rods and limiting nuts, mounting plates are symmetrically arranged at two sides of the bottom of the construction protection platform and are fixed with buildings through a plurality of fixing bolts, three reinforcing rods are connected between one side of each mounting plate and the bottom of the construction protection platform, guard rails are arranged on the first connecting plate, and fixing rods are respectively fixedly arranged at two ends of the second connecting plate, the guardrail with be connected with first side guardrail and second curb plate guardrail between the dead lever respectively, be connected with the reinforcing plate between first side guardrail and the second curb plate guardrail.
Furthermore, a heat insulation ceiling is arranged on the guard rail through a movable shaft, and a mounting fixing block is arranged at the top end of the heat insulation ceiling.
Further, the protection railing is made of hollow square steel, and the outer wall of the protection railing is wrapped with a wear-resistant rubber layer.
Furthermore, the top surface of the heat insulation ceiling is coated with a paint surface reflecting layer.
Furthermore, a movable roller is arranged on the protective railing and is connected with a hanging basket through a cable.
Further, the guard rail is detachably mounted on the first connecting plate.
The utility model provides a construction protection platform for high-rise building, beneficial effect as follows:
(1) the construction protection platform is spliced by a plurality of splicing plates, three limiting holes are respectively arranged on the splicing plates, reinforcing vertical rods are arranged in the limiting holes in a penetrating manner, L-shaped plates are fixedly arranged below a first connecting plate and a second connecting plate respectively, the splicing plates are arranged between the L-shaped plates through screws and limiting nuts, when the construction protection platform is installed, the splicing plates are only required to be tightly installed on the L-shaped plates through the screws and the limiting nuts, and the reinforcing vertical rods are inserted into the limiting holes, so that the basic structure of the construction protection platform can be completed, meanwhile, the installation plate is fixed with a building through a plurality of fixing bolts, three reinforcing rods are connected between one side of the installation plate and the bottom of the construction protection platform, a good supporting stress structure can be realized for the construction protection platform, guard rails are installed on the first connecting plate, fixing rods are installed at two ends of the second connecting plate, and a first side guard rail and a second, the side edge is protected, the device is simple in structure, convenient to use and install, and convenient to detach the splice plates, secondary utilization can be achieved, and safety of workers is guaranteed.
(2) The heat-insulation ceiling is arranged on the protective guard through the movable shaft, and the mounting fixing block is arranged at the top end of the heat-insulation ceiling, so that workers are prevented from being grilled by sunlight.
(3) The protective railing is made of hollow square steel, and the outer wall of the protective railing is wrapped with the wear-resistant rubber layer, so that the weight of the protective railing can be reduced, and the protective railing has good wear resistance.
(4) The top surface of the heat-insulating ceiling is coated with a paint surface reflecting layer which plays a role in reflecting sunlight.
(5) The movable roller is arranged on the protective railing and is connected with the hanging basket through a cable, so that workers can conveniently transport lunch and the like.
(6) The guard rail and the first connecting plate are detachably mounted, so that the guard rail is convenient to detach.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a construction protection platform for high-rise buildings according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a construction platform in a construction protection platform for a high-rise building according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of the installation of splice plates in a construction protection platform for high-rise buildings according to an embodiment of the present invention.
In the figure:
1. constructing a protection platform; 2. a first connecting plate; 3. a second connecting plate; 4. splicing plates; 5. a limiting hole; 6. reinforcing the vertical rods; 7. mounting a plate; 8. fixing the bolt; 9. a reinforcing bar; 10. protecting the fence; 11. fixing the rod; 12. a second side plate guardrail; 13. a movable shaft; 14. a heat-insulating ceiling; 15. mounting a fixed block; 16. a reinforcing plate; 17. an L-shaped plate; 18. a screw; 19. a limit nut; 20. a movable drum; 21. a hanging basket; 22. the first side guardrail.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art all belong to the protection scope of the present invention.
The invention will be further described with reference to the accompanying drawings and specific embodiments:
the first embodiment is as follows:
referring to fig. 1-3, a construction protection platform for high-rise buildings according to an embodiment of the present invention includes a construction protection platform 1, a first connection plate 2 and a second connection plate 3 are respectively disposed at two ends of the construction protection platform 1, the construction protection platform 1 is formed by splicing a plurality of splicing plates 4, three limiting holes 5 are respectively disposed on the splicing plates 4, reinforcing vertical rods 6 are installed in the limiting holes 5, L-shaped plates 17 are fixedly installed below the first connection plate 2 and the second connection plate 3, the splicing plates 4 are installed between the L-shaped plates 17 through screws 18 and limiting nuts 19, mounting plates 7 are symmetrically disposed at two sides of the bottom of the construction protection platform 1, the mounting plates 7 are fixed to a building through a plurality of fixing bolts 8, three reinforcing rods 9 are connected between one side of the mounting plates 7 and the bottom of the construction protection platform 1, be equipped with rail guard 10 on first connecting plate 2, the both ends of second connecting plate 3 are all fixed dead lever 11 that is equipped with, rail guard 10 with be connected with first side guardrail 22 and second side guardrail 12 between the dead lever 11 respectively, be connected with reinforcing plate 16 between first side guardrail 22 and the second side guardrail 12.
Through the above scheme of the utility model, the construction protection platform 1 is spliced by a plurality of splice plates 4, three limiting holes 5 are respectively arranged on the splice plates 4, reinforcing vertical rods 6 are installed in the limiting holes 5 in a penetrating manner, L-shaped plates 17 are fixedly installed below the first connecting plate 2 and the second connecting plate 3, the splice plates 4 are installed between the L-shaped plates 17 through screw rods 18 and limiting nuts 19, during installation, the splice plates are only required to be tightly installed on the L-shaped plates through the screw rods and the limiting nuts, and the reinforcing vertical rods are inserted into the limiting holes, so that the basic structure of the construction protection platform can be completed, meanwhile, the mounting plate 7 is fixed with a building through a plurality of fixing bolts 8, three reinforcing rods 9 are connected between one side of the mounting plate 7 and the bottom of the construction protection platform 1, and a good supporting stress structure can be realized for the construction protection platform 1, install rail guard 10 on first connecting plate 2, install dead lever 11 at the both ends of second connecting plate 3, install first side guardrail 22 and second side guardrail 12 respectively between rail guard 10 and the dead lever 11, play the guard action to the side, such device simple structure, it is very convenient to use the installation, is convenient for demolish the splice plate simultaneously, can carry out reutilization, guarantees workman's safety.
Example two:
as shown in fig. 1-3, a heat insulation ceiling 14 is arranged on the guard rail 10 through a movable shaft 13, and a mounting fixing block 15 is arranged at the top end of the heat insulation ceiling 14 to prevent workers from being burned by sunlight; the protective guard 10 is made of hollow square steel, and the outer wall of the protective guard 10 is wrapped with a wear-resistant rubber layer, so that the weight of the protective guard can be reduced, and the protective guard has good wear resistance; the top surface of the heat insulation ceiling 14 is coated with a paint surface reflecting layer which plays a role in reflecting sunlight; the protective guard 10 is provided with a movable roller 20, and the movable roller 20 is connected with a hanging basket 21 through a cable, so that workers can conveniently transport lunch and the like; the guard rail 10 is detachably mounted to the first connection plate 2 to facilitate the detachment thereof.
For the convenience of understanding the technical solution of the present invention, the following detailed description is made on the working principle or the operation mode of the present invention in the practical process.
In the time of practical application, during the installation, only need pass through the inseparable installation of screw rod and stop nut with the splice plate on the L shaped plate to strengthen the montant and insert spacing downthehole, can accomplish the basic structure of construction protection platform, simultaneously, it is fixed with the building through several fixing bolt 8 with mounting panel 7, one side of mounting panel 7 with be connected with three stiffeners 9 between 1 bottom of construction protection platform, can play fine support stress structure to construction protection platform 1, install rail guard 10 on first connecting plate 2, install dead lever 11 at the both ends of second connecting plate 3, install first side guardrail 22 and second side guardrail 12 respectively between rail guard 10 and the dead lever 11, play the guard action to the side.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The construction protection platform for the high-rise building is characterized by comprising a construction protection platform (1), wherein a first connecting plate (2) and a second connecting plate (3) are respectively arranged at two ends of the construction protection platform (1), the construction protection platform (1) is spliced by a plurality of splicing plates (4), three limiting holes (5) are respectively arranged on the splicing plates (4), reinforcing vertical rods (6) are installed in the limiting holes (5) in a penetrating manner, L-shaped plates (17) are fixedly installed below the first connecting plate (2) and the second connecting plate (3), the splicing plates (4) are installed between the L-shaped plates (17) through screws (18) and limiting nuts (19), mounting plates (7) are symmetrically arranged at two sides of the bottom of the construction protection platform (1), and the mounting plates (7) are fixed with the building through a plurality of fixing bolts (8), one side of mounting panel (7) with be connected with three stiffener (9) between construction protection platform (1) bottom, be equipped with rail guard (10) on first connecting plate (2), the both ends of second connecting plate (3) are all fixed and are equipped with dead lever (11), rail guard (10) with be connected with first side guardrail (22) and second side guardrail (12) between dead lever (11) respectively, be connected with reinforcing plate (16) between first side guardrail (22) and second side guardrail (12).
2. The construction protection platform for the high-rise building according to claim 1, wherein a heat insulation ceiling (14) is arranged on the guard rail (10) through a movable shaft (13), and a mounting fixing block (15) is arranged at the top end of the heat insulation ceiling (14).
3. The construction protection platform for the high-rise building according to claim 1, wherein the guard rail (10) is made of hollow square steel, and the outer wall of the guard rail (10) is coated with a wear-resistant rubber layer.
4. The construction protection platform for high-rise buildings according to claim 2, wherein the top surface of the heat insulation ceiling (14) is decorated with a varnish reflective layer.
5. A construction protection platform for high-rise buildings according to claim 1, wherein the guard rail (10) is provided with a movable roller (20), and the movable roller (20) is connected with a hanging basket (21) through a cable.
6. A construction protection platform for high-rise buildings according to claim 1, wherein the guard rail (10) is detachably mounted with the first connection plate (2).
CN201921390131.XU 2019-08-26 2019-08-26 A construction protection platform for high-rise building Expired - Fee Related CN211691378U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921390131.XU CN211691378U (en) 2019-08-26 2019-08-26 A construction protection platform for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921390131.XU CN211691378U (en) 2019-08-26 2019-08-26 A construction protection platform for high-rise building

Publications (1)

Publication Number Publication Date
CN211691378U true CN211691378U (en) 2020-10-16

Family

ID=72769645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921390131.XU Expired - Fee Related CN211691378U (en) 2019-08-26 2019-08-26 A construction protection platform for high-rise building

Country Status (1)

Country Link
CN (1) CN211691378U (en)

Similar Documents

Publication Publication Date Title
CN109972849A (en) Inside and outside self-stabilising in sliding type electric stair shaft safety device construction method
CN211691378U (en) A construction protection platform for high-rise building
TWI673418B (en) External wall cantilever construction platform and its assembly method
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN108487621A (en) Assembled movement shield cage and its construction method
CN215889347U (en) Post-cast strip formwork device
CN211113196U (en) Multifunctional folding assembly type operating platform
CN111608376B (en) Comprehensive construction method for shaping component
CN210563531U (en) Steel structure support for building protection
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN103628673B (en) A kind of floor aluminum alloy pattern plate splicing formwork erecting structure system
CN213805817U (en) Steel frame structure with excellent deformation prevention effect
CN210563507U (en) Self-stabilizing inside and outside sliding type safety protection device in elevator shaft
CN213171372U (en) Light-duty assembled vertical transportation device
CN209780297U (en) Assembled floor hard protection shed structure capable of being transported reversely
CN211848955U (en) A climb awl for supporting high mound
CN220036212U (en) Safety protection platform for elevator shaft
CN218369137U (en) Temporary placement equipment in prefabricated external wall panel field
CN219241416U (en) Safety protection structure
CN218623410U (en) Attached discharging platform device
CN115288406B (en) Operating platform for cornice of metal roof
CN220166653U (en) Steel bridge assembly connecting mechanism
CN216921307U (en) A construction support that is used for building construction to have anti-drop structure
CN216892952U (en) Light-duty precast shear force wall
CN213573114U (en) Steel plate safety net protection system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201016

Termination date: 20210826