CN211670549U - Water conservancy construction cable installation mechanism - Google Patents

Water conservancy construction cable installation mechanism Download PDF

Info

Publication number
CN211670549U
CN211670549U CN202020134071.1U CN202020134071U CN211670549U CN 211670549 U CN211670549 U CN 211670549U CN 202020134071 U CN202020134071 U CN 202020134071U CN 211670549 U CN211670549 U CN 211670549U
Authority
CN
China
Prior art keywords
shell
fixedly connected
motor
installation mechanism
cable installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020134071.1U
Other languages
Chinese (zh)
Inventor
张芳奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Wandexiang Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020134071.1U priority Critical patent/CN211670549U/en
Application granted granted Critical
Publication of CN211670549U publication Critical patent/CN211670549U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses a water conservancy construction cable installation mechanism relates to the cable field, the camera includes a supporting plate, the top fixedly connected with shell of backup pad, the inside fixed mounting of shell has first motor, the first pivot of right side fixedly connected with of first motor, the first unwrapping wire roller of surface fixed connection of first pivot, the inside fixed mounting of shell has the second motor, the left side fixedly connected with second pivot of second motor. The utility model discloses a set up the brake and detain, can make wheel stop motion by effectual cooperation brake block, played cable installation mechanism's brake effect to can effectual improvement cable mounting structure to precipitous or the environmental suitability on grade of slope ground, through setting up first motor, first pivot and second motor, second pivot, can effectually drive first unwrapping wire roller and second unwrapping wire roller respectively and rotate, thereby realized the unwrapping wire effect.

Description

Water conservancy construction cable installation mechanism
Technical Field
The utility model relates to a cable field, in particular to water conservancy construction cable installation mechanism.
Background
In the water conservancy construction process, the pipeline is laid in the dug groove, the cable is placed in the pipeline, in the specific construction process, the cable is gradually inserted into the pipeline to lay the pipeline, the cable is a general name of articles such as optical cables and electric cables, the cable has multiple purposes, is mainly used for controlling multiple functions such as installation, connecting equipment and electric power transmission, is a common and indispensable object in daily life, and needs to be particularly cautious to install because the cable is electrified.
However, the existing water conservancy construction cable installation mechanism cannot flexibly fix the cable installation mechanism when the cable is laid out on a steep or certain-gradient ground in a moving mode, so that the environmental adaptability of the cable installation mechanism is reduced, and cables of different types cannot be installed at the same time.
Therefore, it is necessary to provide a hydraulic construction cable installation mechanism to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy construction cable installation mechanism to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a water conservancy construction cable installation mechanism comprises a supporting plate, wherein a shell is fixedly connected to the top of the supporting plate, a first motor is fixedly installed inside the shell, a first rotating shaft is fixedly connected to the right side of the first motor, a first pay-off roller is fixedly connected to the outer surface of the first rotating shaft, a second motor is fixedly installed inside the shell, a second rotating shaft is fixedly connected to the left side of the second motor, a second pay-off roller is fixedly connected to the outer surface of the second rotating shaft, a lead block is fixedly connected to the inside of the shell, a connecting column is fixedly installed inside the shell and located on the rear side of the lead block, a spring is fixedly installed inside the connecting column, a push block is fixedly connected to the bottom end of the spring, a connecting block is fixedly connected to one end, away from the spring, of the push block, a handrail is fixedly connected to the, the equal swing joint in bottom four corners of backup pad has the universal wheel shell, the inside movable mounting of universal wheel shell has the wheel, the inside movable mounting of universal wheel shell has the brake block, the inside movable mounting of universal wheel shell has the brake to detain, the top swing joint of shell has the top cap, the top fixedly connected with stopper of backup pad.
Optionally, the first rotating shaft is movably connected with the housing through a bearing, and the second rotating shaft is movably connected with the housing through a bearing.
Optionally, the second motor is located on the right side of the first motor, and the left side and the right side of the first pay-off roller and the second pay-off roller are both movably connected with the shell.
Optionally, the outer surfaces of the first pay-off roller and the second pay-off roller are fixedly connected with pay-off ring plates, and the lead block is located above the pay-off ring plates.
Optionally, the push block is movably connected with the connecting column, and the armrest is located on the left side of the housing.
Optionally, a wire outlet hole is formed in the back surface of the shell, and the brake buckle is located below the brake pad.
Optionally, the brake block is located the left side of wheel, the left and right sides of shell all with stopper fixed connection.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a set up the brake and detain, can make wheel stop motion by effectual cooperation brake block, played cable installation mechanism's brake effect to can effectual improvement cable mounting structure to precipitous or the environmental suitability on grade of slope ground, through setting up first unwrapping wire roller and second unwrapping wire roller, the cable of different models of effectual installation has thus played cable installation mechanism's variety.
2. The utility model discloses a set up first motor, first pivot and second motor, second pivot, can effectually drive first unwrapping wire roller and second unwrapping wire roller respectively and rotate to realized the unwrapping wire effect, through set up spring and ejector pad on the spliced pole, can effectual cooperation connecting block to the effect of flare-outing of different diameter cables, through setting up the wire piece, can effectual guide cable rotate, through setting up the handrail, can effectually drive cable installation mechanism and remove.
Drawings
Fig. 1 is a schematic front view of the structure of the present invention.
Fig. 2 is a right side schematic view of the structure of the present invention.
Fig. 3 is a schematic perspective view of the connecting column structure of the present invention.
Fig. 4 is an enlarged schematic view of the structure at a in fig. 2 according to the present invention.
Fig. 5 is an enlarged schematic view of the structure at B in fig. 1 according to the present invention.
In the figure: 1. a support plate; 2. a housing; 3. a first motor; 4. a first rotating shaft; 5. a first pay-off roller; 6. a second motor; 7. a second rotating shaft; 8. a second pay-off roller; 9. paying off a ring plate; 10. a lead block; 11. connecting columns; 12. a spring; 13. a push block; 14. connecting blocks; 15. a handrail; 16. a wire outlet hole; 17. a universal wheel housing; 18. a wheel; 19. a brake pad; 20. a brake buckle; 21. a top cover; 22. and a limiting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The utility model provides a water conservancy construction cable installation mechanism as shown in figures 1-5, which comprises a support plate 1, a shell 2 is fixedly connected on the top of the support plate 1, a first motor 3 is fixedly arranged in the shell 2, a first rotating shaft 4 is fixedly connected on the right side of the first motor 3, the first rotating shaft 4 is movably connected with the shell 2 through a bearing, a first paying-off roller 5 is fixedly connected on the outer surface of the first rotating shaft 4, a second motor 6 is fixedly arranged in the shell 2, a second rotating shaft 7 is fixedly connected on the left side of the second motor 6, the second rotating shaft 7 is movably connected with the shell 2 through a bearing, the second motor 6 is positioned on the right side of the first motor 3, a second paying-off roller 8 is fixedly connected on the outer surface of the second rotating shaft 7, the first motor 3, the first rotating shaft 4, the second motor 6 and the second rotating shaft 7 are arranged to effectively drive the first paying-off roller 5 and the second paying-off roller 8 to rotate, thereby realizing the paying-off effect, the left and right sides of the first paying-off roller 5 and the second paying-off roller 8 are movably connected with the shell 2, cables with different types can be effectively installed by arranging the first paying-off roller 5 and the second paying-off roller 8, thereby playing the diversity of a cable installation mechanism, the outer surfaces of the first paying-off roller 5 and the second paying-off roller 8 are fixedly connected with a paying-off ring plate 9, the inside of the shell 2 is fixedly connected with a lead block 10, the cable can be effectively guided to rotate by arranging the lead block 10, the lead block 10 is positioned above the paying-off ring plate 9, the inside of the shell 2 is fixedly provided with a connecting column 11, the connecting column 11 is positioned at the rear side of the lead block 10, the inside of the connecting column 11 is fixedly provided with a spring 12, the bottom end of the spring 12 is fixedly connected with a push block 13, the push block 13 is movably connected with the connecting column, the spring 12 and the push block 13 are arranged on the connecting column 11, so that the straightening effect of the connecting block 14 on cables with different diameters can be effectively matched, the handrail 15 is fixedly connected to the top of the supporting plate 1, the cable installation mechanism can be effectively driven to move by arranging the handrail 15, the handrail 15 is positioned on the left side of the shell 2, the back surface of the shell 2 is provided with the wire outlet 16, four corners of the bottom of the supporting plate 1 are movably connected with the universal wheel shell 17, wheels 18 are movably arranged in the universal wheel shell 17, the brake pad 19 is movably arranged in the universal wheel shell 17, the brake buckle 20 is positioned below the brake pad 19, the brake pad 19 is positioned on the left side of the wheels 18, the brake effect of the cable installation mechanism can be effectively matched with the brake pad 19 to stop the movement of the wheels 18 by arranging, thereby can effectual improvement cable mounting structure to precipitous or the environmental suitability on grade of slope ground, the top swing joint of shell 2 has top cap 21, the top fixedly connected with stopper 22 of backup pad 1, the left and right sides of shell 2 all with stopper 22 fixed connection.
This practical theory of operation:
during operation, the cable installation mechanism can be moved to a designated position through the handrail 15, then the brake block 19 is buckled down through the brake buckle 20 to realize the fixing effect on the cable installation mechanism, then a worker can take out a required cable through the wire outlet hole 16, and simultaneously the first motor 3 and the first rotating shaft 4 or the second motor 6 and the second rotating shaft 7 drive the first paying-off roller 5 or the second paying-off roller 8 to rotate so as to realize the uniform paying-off effect, and when paying off, the straightening effect on cables with different diameters can be realized through the spring 12, the push block 13 and the connecting block 14, so that the movement and the paying-off of the water conservancy construction cable installation mechanism are completed.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. The utility model provides a water conservancy construction cable installation mechanism, includes backup pad (1), its characterized in that: the top of the supporting plate (1) is fixedly connected with a shell (2), the inside of the shell (2) is fixedly provided with a first motor (3), the right side of the first motor (3) is fixedly connected with a first rotating shaft (4), the outer surface of the first rotating shaft (4) is fixedly connected with a first paying-off roller (5), the inside of the shell (2) is fixedly provided with a second motor (6), the left side of the second motor (6) is fixedly connected with a second rotating shaft (7), the outer surface of the second rotating shaft (7) is fixedly connected with a second paying-off roller (8), the inside of the shell (2) is fixedly connected with a lead block (10), the inside of the shell (2) is fixedly provided with a connecting column (11), the connecting column (11) is positioned at the rear side of the lead block (10), the inside of the connecting column (11) is fixedly provided with a spring (12), the bottom fixedly connected with ejector pad (13) of spring (12), the one end fixedly connected with connecting block (14) of spring (12) is kept away from ejector pad (13), the top fixedly connected with handrail (15) of backup pad (1), the equal swing joint in bottom four corners of backup pad (1) has universal wheel shell (17), the inside movable mounting of universal wheel shell (17) has wheel (18), the inside movable mounting of universal wheel shell (17) has brake block (19), the inside movable mounting of universal wheel shell (17) has the brake to detain (20), the top swing joint of shell (2) has top cap (21), the top fixedly connected with stopper (22) of backup pad (1).
2. The water conservancy construction cable installation mechanism of claim 1, wherein:
the first rotating shaft (4) is movably connected with the shell (2) through a bearing, and the second rotating shaft (7) is movably connected with the shell (2) through a bearing.
3. The water conservancy construction cable installation mechanism of claim 1, wherein:
the second motor (6) is located on the right side of the first motor (3), and the left side and the right side of the first pay-off roller (5) and the second pay-off roller (8) are both movably connected with the shell (2).
4. The water conservancy construction cable installation mechanism of claim 1, wherein:
the outer surface of the first paying-off roller (5) and the outer surface of the second paying-off roller (8) are fixedly connected with a paying-off ring plate (9), and the wire block (10) is located above the paying-off ring plate (9).
5. The water conservancy construction cable installation mechanism of claim 1, wherein:
the push block (13) is movably connected with the connecting column (11), and the handrail (15) is positioned on the left side of the shell (2).
6. The water conservancy construction cable installation mechanism of claim 1, wherein:
the back of the shell (2) is provided with a wire outlet hole (16), and the brake buckle (20) is positioned below the brake pad (19).
7. The water conservancy construction cable installation mechanism of claim 1, wherein:
brake block (19) are located the left side of wheel (18), the left and right sides of shell (2) all with stopper (22) fixed connection.
CN202020134071.1U 2020-01-21 2020-01-21 Water conservancy construction cable installation mechanism Expired - Fee Related CN211670549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020134071.1U CN211670549U (en) 2020-01-21 2020-01-21 Water conservancy construction cable installation mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020134071.1U CN211670549U (en) 2020-01-21 2020-01-21 Water conservancy construction cable installation mechanism

Publications (1)

Publication Number Publication Date
CN211670549U true CN211670549U (en) 2020-10-13

Family

ID=72740140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020134071.1U Expired - Fee Related CN211670549U (en) 2020-01-21 2020-01-21 Water conservancy construction cable installation mechanism

Country Status (1)

Country Link
CN (1) CN211670549U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112821290A (en) * 2020-12-31 2021-05-18 北京希福电气安装工程有限公司 Electric power engineering pipeline and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112821290A (en) * 2020-12-31 2021-05-18 北京希福电气安装工程有限公司 Electric power engineering pipeline and construction method thereof
CN112821290B (en) * 2020-12-31 2021-08-20 北京希福电气安装工程有限公司 Electric power engineering pipeline and construction method thereof

Similar Documents

Publication Publication Date Title
CN211670549U (en) Water conservancy construction cable installation mechanism
CN112821290B (en) Electric power engineering pipeline and construction method thereof
CN213622698U (en) Cable paying-off device for power construction
CN212475582U (en) Wire winding vehicle for electric power engineering
CN211470345U (en) Metal cable coiling mechanism
CN211034752U (en) Cable unwinding device for mining machinery
CN110902501A (en) Cable winding and unwinding equipment for power engineering
CN216004746U (en) Coiling mechanism is used in electric power engineering construction
GB2574735A (en) Cable retraction apparatus
CN212485980U (en) Bridge cable laying device
CN220098194U (en) Automatic telescopic building construction paying-off equipment
CN210029630U (en) Automatic cable tray
CN220570195U (en) Silica gel cable installation guide
CN217555438U (en) Electric power engineering circuit pay-off
CN115308858B (en) Tail fiber distributing device
CN216489457U (en) High-strength pipeline supporting structure for weak current engineering
CN217821023U (en) Equipment is laid to power communication optical cable
CN214828098U (en) Cable reel receive and releases cable auxiliary assembly
CN214755196U (en) Cable support convenient to lay cable
CN216583439U (en) Cable pay-off for weak current engineering that flexibility is high
CN221026815U (en) Paying-off lead wire device for automatic production of electric wires and cables
CN219408728U (en) Hydraulic engineering construction buried pipe pay-off
CN220107407U (en) Portable cable device that electric power installation was used
CN218642118U (en) Rectilinear many drum one-way paying out machine
CN213326175U (en) Full-automatic combined cable take-up and pay-off reel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220331

Address after: 610000 room 1114, floor 11, building 1, No. 88, Guanghua South Third Road, Qingyang District, Chengdu, Sichuan

Patentee after: Sichuan wandexiang Construction Engineering Co.,Ltd.

Address before: Luoyang Water Conservancy Construction Investment Group Co., Ltd

Patentee before: Zhang Fangqi

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201013

CF01 Termination of patent right due to non-payment of annual fee