CN211667271U - Support arrangement for municipal construction pipeline - Google Patents

Support arrangement for municipal construction pipeline Download PDF

Info

Publication number
CN211667271U
CN211667271U CN202020112878.5U CN202020112878U CN211667271U CN 211667271 U CN211667271 U CN 211667271U CN 202020112878 U CN202020112878 U CN 202020112878U CN 211667271 U CN211667271 U CN 211667271U
Authority
CN
China
Prior art keywords
bracket
pipeline
lead screw
tank tower
box frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020112878.5U
Other languages
Chinese (zh)
Inventor
张成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Sanyou Engineering Co ltd
Original Assignee
Yunnan Sanyou Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Sanyou Engineering Co ltd filed Critical Yunnan Sanyou Engineering Co ltd
Priority to CN202020112878.5U priority Critical patent/CN211667271U/en
Application granted granted Critical
Publication of CN211667271U publication Critical patent/CN211667271U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a support device for municipal construction pipelines, which comprises a box frame, a bracket and a drawstring, wherein the middle part of the box frame is provided with a bearing group for connecting a lead screw, the lead screw is in shaft motion connection with a graduated disk, the lead screw is in threaded connection with the bracket, the bracket is provided with a pipeline, the pipeline is externally provided with a drawstring for pre-tightening, one end of the drawstring is locked by a pin shaft, the other end is pressed by a nut gasket component, one end of the box frame is fixedly provided with a guide rod, a connecting rod is sleeved on the guide rod shaft, the bottom part of the box frame is fixedly provided with a bottom plate, two sides of the bottom plate are fixedly provided with adjusting foot components, the drawstring is wound around the pipeline before use, the drawstring and an elastic balance cable are respectively placed into a proper groove and fastened, the graduated disk is rotated to drive the lead screw, the self-adaptive pipeline with various sizes does not damage the surface of the pipeline, and provides great help for people.

Description

Support arrangement for municipal construction pipeline
Technical Field
The utility model relates to a strutting arrangement especially relates to a strutting arrangement for municipal construction pipeline.
Background
In the construction process of municipal pipeline laying, because the pipeline span is big, often need add strutting arrangement in middle part or junction to reduce the crooked amount of deflection of pipeline, guarantee the assembly precision. Municipal pipeline commonly used is of a great variety, and the pipe diameter thickness is not equal, and the mounting height is different, has often to install and remove the demand, and the surface anticorrosion coating is scraped easily in the work progress, uses for a long time and can produce the corrosion. At present, the existing similar pipeline supporting device has the defects that a clamping head for fastening a pipeline cannot be used universally, the replacement operation is complicated and time-consuming, the efficiency is low, the clamping heads with various specifications are required to be prepared and carried, and when the metal clamping head is locked, the coating on the surface of the pipeline is difficult to scratch, so that the service life of the pipeline is shortened.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, provide a strutting arrangement for municipal construction pipeline to solve above-mentioned problem.
In order to achieve the above object, the utility model provides a following technical scheme: a supporting device for municipal construction pipelines comprises a box frame, a bracket and a pull belt, wherein the middle part of the box frame is provided with a bearing group connected with a lead screw, the lead screw is in threaded transmission connection with the bracket, one end of the box frame is fixedly provided with a guide rod, the guide rod is movably sleeved with a connecting rod, the other end of the connecting rod is fixed at the lower side of the bracket by using a nut assembly, the lower part of the lead screw is in shaft-movable connection with a dividing wheel disc, a hole of the dividing wheel disc can be inserted with a positioning rod after being aligned with a hole position on the box frame below, a pipeline is arranged above the bracket, the outer part of the pipeline is provided with a pull belt pretightening, one end of the pull belt passes through a groove at one side of the bracket and is locked by using a pin shaft, the pin shaft is provided with an opening pin for locking, the other end of the pull belt, the hinge pin is provided with a cotter pin for locking, the hinge pin locks one end of the elastic balance cable, the lower end of the groove of the box frame is fixedly provided with the other end of the elastic balance cable, the bottom of the box frame is fixedly provided with a bolt connecting bottom plate, and the two sides of the bottom plate are fixedly provided with adjusting foot components.
As a preferred technical scheme of the utility model, be equipped with three radius the same on the graduation rim plate, with the different through-hole of axis distance, the line between hole and the axis differs one degree, and radial position corresponds the through-hole of the three equipartitions of group on the under tank tower respectively.
As an optimized technical scheme of the utility model, the bracket surface is opened has the rectangle to lead to the groove, and the radius of slotted hole edge is handled.
Compared with the prior art, the beneficial effects of the utility model are that: before using, adjust the regulation foot subassembly well, put the device level on the construction subaerial, during the use, walk around the pipeline with the stretching strap, put into suitable slot and fastening with the elastic balance cable respectively, rotate the graduation rim plate, it is rotatory to drive the lead screw, the bracket rises, tensioning stretching strap gradually, rise to required high back, insert the locating lever and correspond the hole site and can support and fasten the pipeline, the pipeline of multiple size of self-adaptation, do not harm the pipeline surface, for people provide very big help, this kind of strutting arrangement for municipal construction pipeline, structure scientific and reasonable, safety in utilization is convenient, provide very big help for people.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is the utility model relates to a strutting arrangement schematic structure for municipal construction pipeline.
Fig. 2 is the utility model relates to a schematic diagram is connected to strutting arrangement layer board for municipal construction pipeline.
FIG. 3 is a strutting arrangement connecting rod stretching strap cross-sectional view for municipal construction pipeline.
Figure 4 is the utility model relates to a strutting arrangement graduation hole site distribution diagram for municipal construction pipeline.
In the figure: 1. guide rod, 2, box frame, 3, nut gasket assembly, 4, bottom plate, 5, adjusting foot assembly, 6, elastic balance cable, 7, positioning rod, 8, bearing assembly, 9, indexing wheel disc, 10, screw rod, 11, bracket, 12, pin shaft, 13, split pin, 14, pipeline, 15, drawstring, 16, nut assembly, 17 and connecting rod.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a supporting device for municipal construction pipelines comprises a box frame 2, a bracket 11 and a drawstring 15, wherein the middle part of the box frame 2 is provided with a bearing group 8 connected with a screw rod 10, the screw rod 10 is in threaded transmission connection with the bracket 11, one end of the box frame 2 is fixedly provided with a guide rod 1, the guide rod 1 is movably sleeved with a connecting rod 17, the other end of the connecting rod 17 is fixed at the lower side of the bracket 11 by using a nut component 16, the lower part of the screw rod 10 is in shaft-movable connection with an indexing wheel disc 9, a positioning rod 7 can be inserted after holes of the indexing wheel disc 9 are aligned with holes on the box frame 2 below, a pipeline 14 is arranged above the bracket 11, the exterior of the pipeline 14 is provided with the drawstring 15 for pre-tightening, one end of the drawstring 15 passes through a groove at one side of the bracket 11 and is locked by using a pin shaft 12, an opening pin 13 is arranged on, a pin shaft 12 is arranged on a groove at the outermost end of the opposite side of the guide rod 1 on the bracket 11, a cotter pin 13 is arranged on the pin shaft 12 for locking, one end of an elastic balance cable 6 is locked by the pin shaft 12, the other end of the elastic balance cable 6 is fixedly arranged at the lower end of the groove of the box frame 2, a bolt connecting bottom plate 4 is fixedly arranged at the bottom of the box frame 2, and adjusting foot assemblies 5 are fixedly arranged on two sides of the bottom plate 4.
The utility model discloses, it is preferred, be equipped with three radius the same on the graduation rim plate 9, with the different through-hole of axis distance, the line between hole and the axis differs one degree, and radial position corresponds to the through-hole of the three equipartitions of group on the tank tower 2 under respectively.
The utility model discloses, preferred, 11 surface openings on bracket have the rectangle to lead to the groove, and the slot edge radius is handled.
Before use, the adjusting foot component 5 is adjusted, the device is horizontally placed on a construction ground, when the device is used, the pull belt 15 bypasses the pipeline 14, the pull belt and the elastic balance rope 6 are respectively placed in the grooves at proper positions on the bracket 11 and are fastened by using the pin shaft 12 and the cotter pin 13, the indexing wheel disc 9 is manually rotated to drive the screw rod 10 to rotate, the bracket 11 is driven to ascend, the pull belt 15 and the elastic balance rope 6 are gradually tensioned, the pipeline 14 is positioned on the V-shaped opening of the bracket 11, after the pipeline 14 continuously ascends to a required height, the positioning rod 7 is inserted into the nearest corresponding hole position on the indexing wheel disc 9 and the box frame 2, the pipeline 14 can be supported and automatically fastened, the device can be self-adaptive to pipelines 14 with various sizes, the surface of the pipeline 14 cannot be damaged when the flexible pull belt 15 is fastened, great help is provided for people, and the support device for municipal construction pipelines has a scientific and reasonable, the use is safe and convenient, and great help is provided for people.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (3)

1. The utility model provides a strutting arrangement for municipal construction pipeline, includes tank tower (2), bracket (11) and stretching strap (15), its characterized in that, tank tower (2) middle part is equipped with bearing group (8) and connects lead screw (10), lead screw (10) screw thread transmission connection bracket (11), tank tower (2) one end is fixed and is equipped with guide arm (1), guide arm (1) epaxial loop has connecting rod (17), the connecting rod (17) other end uses nut component (16) to fix at bracket (11) downside, lead screw (10) lower part axle moves and connects indexing wheel dish (9), can insert locating lever (7) after hole site aligns on indexing wheel dish (9) hole and below tank tower (2), bracket (11) top is equipped with pipeline (14), pipeline (14) outside is equipped with stretching strap (15) pretension, stretching strap (15) one end passes bracket (11) one side slot, use round pin axle (12) locking, be equipped with cotter pin (13) locking on round pin axle (12), bracket (11) opposite side slot is walked around to stretching strap (15) other end, passes recess on guide arm (1) and the slot on tank tower (2), uses nut spacer subassembly (3) to compress tightly at guide arm (1) lower extreme, be equipped with round pin axle (12) on bracket (11) the outermost end slot of guide arm (1) offside, be equipped with cotter pin (13) locking on round pin axle (12), round pin axle (12) locking elastic balance cable (6) one end, the fixed other end that is equipped with elastic balance cable (6) of tank tower (2) slot lower extreme, tank tower (2) bottom is fixed and is equipped with bolted connection bottom plate (4), bottom plate (4) both sides are fixed and are equipped with regulation foot subassembly (5).
2. The supporting device for the municipal construction pipeline according to claim 1, wherein the indexing wheel (9) is provided with three through holes having the same radius and different distances from the axis, the connecting line between the holes and the axis has a certain difference, and the radial positions respectively correspond to three groups of uniformly distributed through holes on the box frame (2) right below.
3. The support device for the municipal construction pipe according to claim 1, wherein the surface of the bracket (11) is provided with a rectangular through groove, and the edge of the through groove is rounded.
CN202020112878.5U 2020-01-17 2020-01-17 Support arrangement for municipal construction pipeline Expired - Fee Related CN211667271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020112878.5U CN211667271U (en) 2020-01-17 2020-01-17 Support arrangement for municipal construction pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020112878.5U CN211667271U (en) 2020-01-17 2020-01-17 Support arrangement for municipal construction pipeline

Publications (1)

Publication Number Publication Date
CN211667271U true CN211667271U (en) 2020-10-13

Family

ID=72738200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020112878.5U Expired - Fee Related CN211667271U (en) 2020-01-17 2020-01-17 Support arrangement for municipal construction pipeline

Country Status (1)

Country Link
CN (1) CN211667271U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112696531A (en) * 2021-01-02 2021-04-23 西南石油大学 Supporting device for emergency repair of pipeline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112696531A (en) * 2021-01-02 2021-04-23 西南石油大学 Supporting device for emergency repair of pipeline

Similar Documents

Publication Publication Date Title
CN211667271U (en) Support arrangement for municipal construction pipeline
CN210439423U (en) Pipeline anti-floating mechanism based on building construction application
CN219243108U (en) Vibration monitoring analyzer installation mechanism
CN218326581U (en) Locking device for pipe fitting hoisting elevator
CN217362336U (en) Clamp for mounting and fixing power cable
CN213575938U (en) Municipal administration gas transmission pipeline fixed knot constructs
CN202259345U (en) Adjustable pressing block of solar cell panel
CN108644472B (en) Petroleum pipeline supporting structure and mounting method thereof
CN217440974U (en) Chemical pipeline support convenient to fix
CN219993309U (en) Holding pole fixing device
CN211338519U (en) Blade replacing clamp for wind driven generator
CN211946034U (en) Hoisting equipment for natural gas pipeline installation
CN221723535U (en) Petroleum pipeline supporting device
CN214519768U (en) Clamping device for machining steel structure
CN217741260U (en) Fastener for tangent tower convenient to dismouting
CN221348184U (en) A fire control pipeline fixed knot constructs for fire engineering
CN218199917U (en) Wind power tower cylinder transportation fixing device
CN220234520U (en) Photovoltaic module cable lock catch
CN219199051U (en) Rush repair lighting device
CN220623008U (en) Water supply pipeline construction reinforcing apparatus
CN217272437U (en) Anti-seismic support capable of adapting to different installation objects
CN218932896U (en) Beam piece support bolt pre-buried positioner with adjustable
CN221171049U (en) Sewage treatment water supply and drainage pipeline laying construction equipment
CN221250385U (en) Multi-groove guide wheel rim
CN215736129U (en) Fruit tree is transplanted and uses field planting frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201013

CF01 Termination of patent right due to non-payment of annual fee