CN211666252U - Supporting structure for support-free early-dismantling system of floor formwork - Google Patents
Supporting structure for support-free early-dismantling system of floor formwork Download PDFInfo
- Publication number
- CN211666252U CN211666252U CN201922385915.XU CN201922385915U CN211666252U CN 211666252 U CN211666252 U CN 211666252U CN 201922385915 U CN201922385915 U CN 201922385915U CN 211666252 U CN211666252 U CN 211666252U
- Authority
- CN
- China
- Prior art keywords
- hole
- floor
- support
- threaded hole
- matched
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a bearing structure especially relates to a bearing structure that is used for floor template to exempt from to support early system of tearing open. The embedded part is arranged in a building carrier and internally provided with a threaded hole; the connecting piece is provided with a threaded hole matched with the embedded part, the threaded hole is a longitudinal strip-shaped hole, and the diameter of a first hole at the upper end is smaller than that of a second hole at the lower end; the fastener comprises a rotating part matched with the inner threaded hole and the first hole of the embedded part and a clamping part matched with the inner diameter of the second hole, and the rotating part is fixedly connected with the clamping part. The utility model discloses the application not only can satisfy great required holding power of bearing on the early system of tearing open of floor template free from supporting, can reach again and simply make the object of taking leave the floor and do not take place the effect of destruction fast.
Description
Technical Field
The utility model relates to a bearing structure belongs to building engineering technical field, especially relates to a bearing structure that is used for floor template to exempt from to support early system of tearing open.
Background
At present, the floor slabs of the steel structure house mainly comprise a composite floor slab and a non-composite floor slab formed by casting concrete on a profiled steel sheet in situ, an assembled integral reinforced concrete floor slab, an assembled floor slab and the like. When a floor slab is built, templates are often needed to be used, the templates are important tools used in building construction, template frames are generally needed to be additionally arranged even when the existing templates are used, and adjacent templates are connected with each other through the template frames to form a complete template system.
Among the prior art when building floor needs the pouring concrete, use generally to nail into a floor die cavity with the plank, then pour into the die cavity of plank with the concrete thick liquid, it demolishs to need to prize the plank after the concrete setting shaping, this easily causes the plank to damage, the efficiency of construction is lower, can not form quick effectual demolishment structure after concrete placement accomplishes, cause man-hour overlength, intensity of labour is too high, be unfavorable for human cost and material cost's saving, removable floor template erects the bearing support usually in the floor below and is used for supporting among the prior art in addition, still have certain danger during the demolishment.
Most of the existing structures used as supports are generally fixed by bolts or screwed, the structures fixed by the bolts are inconvenient to dismount, the supporting structure capable of movably screwing is suitable for objects which can be movably dismounted or objects which need small bearing force, when the gravity borne by the supporting structure is too large, the supporting structure needs to be applied to a floor formwork support-free early-dismounting system by means of external force, the floor formwork can be damaged, and the operation is difficult.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to prior art's defect and not enough, provide a bearing structure of upper and lower activity that can be ingenious, application avoids supporting on the early system of tearing open of floor template, both can satisfy great required holding power that bears, can reach again and simply make fast to take the thing and leave the floor and do not take place the effect of destruction.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a supporting structure for a floor formwork support-free early-dismantling system comprises a building carrier,
the embedded part is arranged in the building carrier and is internally provided with a threaded hole;
the connecting piece is provided with a threaded hole matched with the embedded part, the threaded hole is a longitudinal strip-shaped hole, and the diameter of a first hole at the upper end is smaller than that of a second hole at the lower end;
the fastener comprises a rotating part matched with the inner threaded hole and the first hole of the embedded part and a clamping part matched with the inner diameter of the second hole, and the rotating part is fixedly connected with the clamping part.
The fixed mode of screw thread rotation is durable reliable, and the connecting piece passes through for the screw hole fastener and building carrier fixed connection, and the screw hole of special shape wants the cooperation with the fastener, can make bearing structure activity form the displacement from top to bottom, when using on floor template exempts from to support early dismantlement system, can provide ingenious lock joint relation for follow-up step of bearing on the arm and dismantling the template, and is easy and simple to handle.
The utility model discloses a further improvement scheme is, card portion is cylindrical.
The utility model discloses a further improvement scheme is, card portion thickness more than or equal to connecting piece thickness.
The utility model discloses a further improvement is, rotating part one end is kept away from to card portion still is fixed with the head, the head size is greater than card portion.
The utility model discloses a further improvement scheme is, the head is the polygon cylinder.
The utility model discloses a further improvement is, first hole and second hole are crossing the constitution with both central axis and perpendicular form in ground, the centre of a circle in first hole falls on both crossing chords and the centre of a circle that the position is higher than the second hole.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the fixed mode of screw thread rotation is durable reliable, and the connecting piece passes through for the screw hole fastener and building carrier fixed connection, and the screw hole of special shape wants the cooperation with the fastener, can make bearing structure activity form the displacement from top to bottom, when using on floor template exempts from to support early dismantlement system, can provide ingenious lock joint relation for follow-up step of bearing on the arm and dismantling the template, and is easy and simple to handle.
(2) When the thickness of the clamping part is larger than that of the connecting piece, the fastening piece can be screwed in and out more conveniently.
(3) The fastener sets up the head, can make the head laminating and cover on the second hole when screwing in the fastener wallboard, and when bearing capacity on bearing structure was too big, be equipped with more the big size head than card portion and can effectively prevent the connecting piece slippage, the twist of being more convenient for simultaneously.
(4) The head is designed into the polygonal column, so that slipping can be reduced when the connecting piece is fixed in a screwing mode, and the fastener is screwed more conveniently when friction force is increased.
(5) By deleting the middle channel of the strip-shaped hole, only two circular holes are intersected to form a threaded hole structure, the same effect can be achieved, and the displacement required to move can be reduced.
Drawings
FIG. 1 is a schematic view of the supporting structure of the present invention
FIG. 2 is a schematic view of the structure of the connecting member of the present invention
FIG. 3 is the improved schematic diagram of the connecting member hole structure of the present invention
Figure 4 is the structure schematic diagram of the fastener of the utility model
In the figure: 1-embedded parts; 2-connecting piece: 201-first hole, 202-second hole; 3-fastener: 301-rotating part, 302-clamping part, 303-head part.
Detailed Description
The present invention will be further clarified by the following detailed description, which is to be understood as being given by way of illustration only, and not by way of limitation, of the scope of the invention, which, after reading the present invention, is intended to fall within the scope of the appended claims, as modified by those skilled in the art in various equivalent forms.
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
The utility model discloses a concrete embodiment as follows:
example 1:
as shown in the drawings, the present embodiment mainly uses the support structure for a floor formwork support-free early-dismantling system, so the building carrier here is a wall, the connecting member 2 is an angle plate fixed on the wall, the fastening member 3 is a bolt, wherein the rotating part 301 is a screw, the head 303 is a nut, and a clamping part 302 is coaxially arranged between the screw and the nut.
The wall body to be cast is designed according to the floor distance, the embedded part 1 with the internal thread is embedded in a proper position when the wall body is cast, the opening of the embedded part 1 is outward, and the angle plate with a certain thickness is fixed on the wall body through bolts. The angle plate is provided with a threaded hole which is a longitudinal strip-shaped hole, and the diameter of a first hole 201 at the upper end is smaller than that of a second hole 202 at the lower end; the screw is matched with the internal threaded hole and the first hole 201 of the embedded part 1; the locking portion 302 is cylindrical and has a diameter matching the inner diameter of the second bore 202, and the nut is a polygonal cylinder. When the angle plate is installed, the first hole 201 of the angle plate is aligned with the position of the embedded part 1 and attached to a wall body, the bolt is screwed into the nut and attached to the angle plate, an upward force is applied to the angle plate to lift the angle plate, so that the part of the screw rod, which is positioned in the first hole 201 of the angle plate, is relatively dropped into the second hole 202, the bolt is continuously screwed into the clamping part 302 and enters the second hole 202, and at the moment, the nut covers the second hole 202. When the system is implemented, a plurality of groups of supporting structures are arranged as required to bear supporting beams required by the floor formwork support-free early-dismantling system on the angle plates, and the formwork is laid on the supporting beams to be poured with concrete.
When the bolt is firstly screwed out during disassembly, and the nut is rotated to the clamping part 302 to screw out the second hole 202 on the angle plate, the downward pressing force is applied to the angle plate, so that the screw rod falls into the first hole 201 relative to the angle plate, namely, the angle plate is downwards displaced, and the supporting beam arranged on the angle plate is downwards displaced to form a gap with the reinforced concrete floor slab, so that the floor formwork can be easily and nondestructively disassembled.
Example 2:
as shown in the figure, the embodiment 2 only further improves the threaded hole on the connecting piece 2, and only optimizes the structure of the threaded hole under the condition that other structures are not changed. The diameters of the first hole 201 and the second hole 202 are unchanged, the first hole 201 and the second hole 202 at the upper end of the threaded hole are formed in a mode that the central axes of the first hole 201 and the second hole 202 are perpendicular to the ground, and the circle center of the first hole 201 is located on the intersecting chord of the first hole 201 and is higher than the circle center of the second hole 202. The rest is the same as the embodiment 1 and is not repeated.
The foregoing illustrates and describes the principles of the present invention. And the main features and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a bearing structure that is used for floor template to exempt from to support early system of tearing open, includes the building carrier, its characterized in that:
the embedded part (1), the embedded part (1) is arranged in the building carrier and is internally provided with a threaded hole;
the connecting piece (2) is provided with a threaded hole matched with the embedded part (1), the threaded hole is a longitudinal strip-shaped hole, and the diameter of a first hole (201) at the upper end is smaller than that of a second hole (202) at the lower end;
the fastener (3) comprises a rotating part (301) matched with the internal threaded hole and the first hole (201) of the embedded part (1) and a clamping part (302) matched with the inner diameter of the second hole (202), and the rotating part (301) is fixedly connected with the clamping part (302) coaxially.
2. The support structure for a floor formwork support-free early demolition system as claimed in claim 1, wherein: the clamping portion (302) is cylindrical.
3. The support structure for a floor formwork support-free early demolition system as claimed in claim 2, wherein: the thickness of the clamping part (302) is more than or equal to that of the connecting piece (2).
4. A support structure for a floor formwork support-free early demolition system as claimed in claim 3, wherein: the clamping part (302) is far away from one end of the rotating part (301) and is further fixedly provided with a head part (303), and the size of the head part (303) is larger than that of the clamping part (302).
5. The support structure for a floor formwork support-free early demolition system as claimed in claim 4, wherein: the head (303) is a polygonal cylinder.
6. A support structure for a floor formwork support-free early demolition system as claimed in any one of claims 1 to 5, wherein: the first hole (201) and the second hole (202) are formed in a mode that central axes of the first hole and the second hole are perpendicular to the ground, and the center of the first hole (201) is located on a chord where the first hole and the second hole intersect and is higher than the center of the second hole (202).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922385915.XU CN211666252U (en) | 2019-12-26 | 2019-12-26 | Supporting structure for support-free early-dismantling system of floor formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922385915.XU CN211666252U (en) | 2019-12-26 | 2019-12-26 | Supporting structure for support-free early-dismantling system of floor formwork |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211666252U true CN211666252U (en) | 2020-10-13 |
Family
ID=72736115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922385915.XU Active CN211666252U (en) | 2019-12-26 | 2019-12-26 | Supporting structure for support-free early-dismantling system of floor formwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211666252U (en) |
-
2019
- 2019-12-26 CN CN201922385915.XU patent/CN211666252U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200985564Y (en) | TT-type built-in autospasy type anchorage | |
CN209682482U (en) | A kind of fabricated shear wall mold | |
CN201024681Y (en) | Cast-in-situ bottom formwork bracing column device | |
CN214657263U (en) | Adjustable post-cast strip power transmission device of prestressing force | |
CN211666252U (en) | Supporting structure for support-free early-dismantling system of floor formwork | |
CN103225396B (en) | Beam frame type construction template system | |
CN210013473U (en) | Inverted L-shaped side form reinforcing structure | |
CN210163783U (en) | Quick-inserting type steel beam flange plate construction supporting system | |
CN207643373U (en) | A kind of prefabricated anchor block adjustable composite steel form | |
CN211666254U (en) | Early system of tearing open of floor template free of support | |
CN201225008Y (en) | Self-locking type fastener of building floor preformed hole core die | |
CN211285285U (en) | Can have enough to meet need construction bracket attachment structure | |
CN100347393C (en) | Architectural engineering pattern plate strut and construction method | |
CN113266150A (en) | Tool for realizing dismantling bottom die of beam slab in advance | |
CN111058621B (en) | Early system of tearing open of floor template support-free | |
CN212428069U (en) | Upper wall post template erection joint | |
CN219731566U (en) | Novel cast-in-place concrete road side form reinforcement | |
CN220889627U (en) | Early top support structure of tearing open of post-cast strip formwork | |
CN219732750U (en) | Combined template for roof cast-in-situ deformation joint | |
CN220767725U (en) | Expressway pier capping beam template structure convenient to disassemble and assemble | |
CN218176636U (en) | Beam slab supporting device | |
CN218597777U (en) | Concrete floor slab thickness control device | |
CN214136554U (en) | Mould of adjustable reinforced concrete column height for building | |
CN210622148U (en) | Accurate pre-buried positioner of balcony railing base | |
CN218346811U (en) | Pre-positioning baffle at prefabricated wall joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |