CN211665954U - Mounting and connecting structure of prefabricated air conditioner board - Google Patents

Mounting and connecting structure of prefabricated air conditioner board Download PDF

Info

Publication number
CN211665954U
CN211665954U CN202020008035.0U CN202020008035U CN211665954U CN 211665954 U CN211665954 U CN 211665954U CN 202020008035 U CN202020008035 U CN 202020008035U CN 211665954 U CN211665954 U CN 211665954U
Authority
CN
China
Prior art keywords
air conditioner
prefabricated air
plate body
supporting plate
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020008035.0U
Other languages
Chinese (zh)
Inventor
吴庆群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dongzhan Green Building Materials Co ltd
Original Assignee
Shandong Dongzhan Xinglu Prefabricated New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dongzhan Xinglu Prefabricated New Building Materials Co ltd filed Critical Shandong Dongzhan Xinglu Prefabricated New Building Materials Co ltd
Priority to CN202020008035.0U priority Critical patent/CN211665954U/en
Application granted granted Critical
Publication of CN211665954U publication Critical patent/CN211665954U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model discloses a mounting and connecting structure of a prefabricated air conditioner plate, which comprises a prefabricated air conditioner plate body, wherein a supporting plate is arranged on the surface of the top of the prefabricated air conditioner plate body, a tenon is integrally formed on the surface of the top of the prefabricated air conditioner plate body, a mortise is arranged on the surface of the bottom of the supporting plate, a damping pad is arranged on the surface of the top of the cavity of the mortise, a groove is arranged on the surface of the top of the supporting plate, a drainage groove is arranged on the surface of the bottom of the groove, a drainage hole is arranged on the surface of the supporting plate, and an internal thread sleeve is embedded and connected at both ends of the surface of the top of the supporting plate. And then it is possible to make it possible to improve the beauty of both ends of the pallet.

Description

Mounting and connecting structure of prefabricated air conditioner board
Technical Field
The utility model relates to an air conditioner board installation field specifically is a mounting connection structure of prefabricated air conditioner board.
Background
With the continuous improvement of living standard of people, the air conditioner is often used in life to improve living environment. In order to facilitate the placement of the air conditioner outdoor unit, the air conditioner plate is basically prefabricated in the building of the residential houses of the city, so that the air conditioner outdoor unit can be conveniently placed in the decoration.
However, the existing installation connection structure for the prefabricated air conditioner panel has the following disadvantages:
1. when the mounting and connecting structure of the existing prefabricated air conditioning plate is used, the single-layer prefabricated air conditioning plate is mostly used, and the shock absorption and protection performance are insufficient, so that the use functionality of the prefabricated air conditioning plate is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation connection structure of prefabricated air conditioner board to when solving the installation connection structure use of the prefabricated air conditioner board that has now among the above-mentioned background art, mostly be the prefabricated air conditioner board of individual layer, and shock attenuation and barrier propterty are not enough, and then have reduced the service function nature of prefabricated air conditioner board.
In order to achieve the above object, the utility model provides a following technical scheme: a mounting and connecting structure of a prefabricated air conditioner plate comprises a prefabricated air conditioner plate body, wherein a supporting plate is mounted on the surface of the top of the prefabricated air conditioner plate body, tenons are integrally formed on the surface of the top of the prefabricated air conditioner plate body, tenons are arranged on the surface of the bottom of the supporting plate, a shock absorption pad is mounted on the surface of the top of an inner cavity of each tenon, a groove is formed in the surface of the top of the supporting plate, a water drainage groove is formed in the surface of the bottom of the groove, water drainage holes are formed in the surface of the supporting plate, internal thread sleeves are connected to two ends of the surface of the top of the supporting plate in an embedded mode, modeling strips are mounted on the surface of the top of each internal thread sleeve and are matched with each other through the tenons and the tenons, so that the connecting strength between the prefabricated air conditioner plate body and the, the further safety in utilization that has protected the air conditioner mutually supports through screw rod and internal thread sleeve simultaneously, can install the molding strip on layer board top surface, and then can make and to improve the aesthetic property at layer board both ends.
Preferably, the outer diameter of the tenon is the same as the inner diameter of the mortise, and an embedded structure is formed, so that the supporting plate can be stably located on the bottom surface of the prefabricated air conditioner plate body, and the connection stability of the prefabricated air conditioner plate body and the supporting plate can be enhanced.
Preferably, the water drainage tank both sides all are equipped with anti-skidding line, and anti-skidding line is located recess bottom surface, through anti-skidding line, can prevent that the air conditioner from sliding on the layer board surface, and then has improved the safety in utilization of air conditioner.
Preferably, the water drainage tank specifically is equipped with a plurality of groups, outlet one end switches on with the water drainage tank and links to each other, through multiunit water drainage tank, can carry the water in the recess to outlet department, and then can discharge water.
Preferably, the modeling strip is rotationally connected with the internal thread sleeve through the screw rod, so that the modeling strip can be arranged on the top surface of the supporting plate through the mutual matching of the screw rod and the internal thread sleeve, and the attractiveness of the two ends of the supporting plate can be improved.
Preferably, the through-hole has been seted up on the layer board surface, and the through-hole runs through layer board and prefabricated air conditioner plate body, through-hole inner wall surface mounting has the rubber ring, through having seted up the through-hole on the layer board surface, and the through-hole runs through layer board and prefabricated air conditioner plate body to the use of air conditioner pipe has been saved in the installation of the air conditioner pipeline of can being convenient for, has reduced owner's economic spending, simultaneously through having the rubber ring at through-hole inner wall surface mounting, can reduce the wearing and tearing of through-hole to air conditioner pipeline again, has improved air conditioner pipeline's life.
The utility model provides a mounting and connecting structure of prefabricated air conditioner board possesses following beneficial effect:
(1) the utility model discloses an there is the tenon at prefabricated air conditioner plate body top surface integrated into one piece, and the tenon has been seted up on layer board bottom surface, tenon external diameter is the same with tenon internal diameter size simultaneously, and constitute embedded structure, thereby can make the steady seat of layer board at prefabricated air conditioner plate body bottom surface, can strengthen the stability that prefabricated air conditioner plate body and layer board are connected again, because tenon inner chamber top surface mounting has the shock pad, thereby can make tenon and tenon junction have certain shock attenuation effect, and then can play the safe in utilization of air conditioner on the protection layer board.
(2) The utility model discloses a recess to the installation that can be convenient for the air conditioner is fixed, and water drainage tank can play the function of carrying again, and then can make ponding in the recess trickle to the layer board surface from water drainage tank and seted up outlet department and discharge, further protection the safe in utilization of air conditioner.
(3) The utility model discloses an it is connected with the internal thread sleeve all to inlay at layer board top surface both ends to internal thread sleeve top surface mounting has the molding strip, and the molding strip passes through the screw rod simultaneously and links to each other with the internal thread sleeve rotation, thereby can mutually support through screw rod and internal thread sleeve, can install the molding strip on layer board top surface, and then can make can improve the aesthetic property at layer board both ends.
(4) The utility model discloses a through-hole has been seted up on the layer board surface, and the through-hole runs through layer board and prefabricated air conditioner plate body to the use of air conditioner pipe has been saved in the installation of the air conditioner pipeline of can being convenient for, has reduced owner's economic spending, has the rubber circle through surface mounting at the through-hole inner wall simultaneously, can reduce the wearing and tearing of low pore pair air conditioner pipeline again, has improved air conditioner pipeline's life.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic sectional structure of the present invention;
FIG. 3 is a schematic view of the structure of part A of the present invention;
fig. 4 is a schematic diagram of the cross-sectional structure of the through hole of the present invention.
In the figure: 1. prefabricating an air conditioner plate body; 2. a support plate; 3. a tenon; 4. a mortise and tenon; 401. a shock pad; 5. a groove; 6. a water discharge tank; 7. anti-skid lines; 8. a water drain hole; 9. molding strips; 10. an internally threaded sleeve; 11. a screw; 12. a through hole; 1201. a rubber ring.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: a mounting and connecting structure of a prefabricated air conditioner plate comprises a prefabricated air conditioner plate body 1, a supporting plate 2 is mounted on the top surface of the prefabricated air conditioner plate body 1, a tenon 3 is integrally formed on the top surface of the prefabricated air conditioner plate body 1, a tenon 4 is arranged on the bottom surface of the supporting plate 2, a shock absorption pad 401 is mounted on the top surface of an inner cavity of the tenon 4, a groove 5 is arranged on the top surface of the supporting plate 2, a drainage groove 6 is arranged on the bottom surface of the groove 5, a drainage hole 8 is arranged on the surface of the supporting plate 2, an internal thread sleeve 10 is connected to both ends of the top surface of the supporting plate 2 in an embedded mode, a modeling strip 9 is mounted on the top surface of the internal thread sleeve 10, the tenon 3 and the tenon 4 are mutually matched, so that the connecting strength of the prefabricated air conditioner plate body 1 and the supporting plate 2 can be enhanced, and, through water drainage tank 6 and outlet 8 mutually supporting, can be with the water discharge in the recess 5, further protect the safe in utilization of air conditioner, mutually support through screw rod 11 and internal thread sleeve 10 simultaneously, can install molding 9 on 2 top surfaces of layer board, and then can make and to improve the aesthetic property at layer board 2 both ends.
The outer diameter of the tenon 3 is the same as the inner diameter of the mortise 4, and an embedded structure is formed, so that the supporting plate 2 can be stably located on the surface of the bottom of the prefabricated air conditioner plate body 1, and the connection stability of the prefabricated air conditioner plate body 1 and the supporting plate 2 can be enhanced.
The two sides of the drainage groove 6 are provided with anti-skidding lines 7, the anti-skidding lines 7 are located on the bottom surface of the groove 5, the air conditioner can be prevented from sliding on the surface of the supporting plate 2 through the anti-skidding lines 7, and the use safety of the air conditioner is further improved.
The water drainage tank 6 specifically is equipped with a plurality of groups, 8 one end in outlet 6 switches on with water drainage tank and links to each other, through multiunit water drainage tank 6, can carry the water in the recess 5 to outlet 8 departments, and then can discharge water.
The modeling strip 9 is rotationally connected with the internal thread sleeve 10 through the screw rod 11, so that the modeling strip 9 can be arranged on the top surface of the supporting plate 2 through the mutual matching of the screw rod 11 and the internal thread sleeve 10, and the attractiveness of the two ends of the supporting plate 2 can be improved.
Through-hole 12 has been seted up on 2 surfaces of layer board, and through-hole 12 runs through layer board 2 and prefabricated air conditioner plate body 1, through-hole 12 inner wall surface mounting has rubber ring 1201, through having seted up through-hole 12 on 2 surfaces of layer board, and through-hole 12 runs through layer board 2 and prefabricated air conditioner plate body 1 to the installation of air conditioner pipeline that can be convenient for has saved the use of air conditioner pipe, has reduced owner's economic spending, simultaneously through having rubber ring 1201 at 12 inner wall surface mounting of through-hole, can reduce the wearing and tearing of through-hole 12 to air conditioner pipeline again, has improved air conditioner pipeline's life.
It should be noted that, in the mounting and connecting structure of the prefabricated air-conditioning plate, when in work, the prefabricated air-conditioning plate body 1 can provide support for the supporting plate 2 and the air conditioner and provide a stable foundation for the supporting plate 2, because the tenon 3 is integrally formed on the top surface of the prefabricated air-conditioning plate body 1, the bottom surface of the supporting plate 2 is provided with the tenon 4, the outer diameter of the tenon 3 is the same as the inner diameter of the tenon 4, and an embedded structure is formed, the supporting plate 2 can be stably located on the bottom surface of the prefabricated air-conditioning plate body 1, the connection stability of the prefabricated air-conditioning plate body 1 and the supporting plate 2 can be enhanced, because the damping pad 401 is arranged on the top surface of the inner cavity of the tenon 4, the joint of the tenon 3 and the tenon 4 can have a certain damping effect, the use safety of the air conditioner on the supporting plate 2 can be protected, and through the groove 5, therefore, the air conditioner can be conveniently installed and fixed, meanwhile, the water drainage groove 6 is formed in the bottom surface of the groove 5, the conveying function can be achieved, accumulated water in the groove 5 can flow from the water drainage groove 6 to the position, where the water drainage hole 8 is formed in the surface of the supporting plate 2 to be discharged, the use safety of the air conditioner is further protected, the air conditioner can be prevented from sliding on the surface of the supporting plate 2 through the anti-sliding patterns 7, the use safety of the air conditioner is further improved, the internal thread sleeves 10 are connected to the two ends of the top surface of the supporting plate 2 in an embedded mode, the modeling strip 9 is installed on the top surface of the supporting plate 2 through the screw 11 and the internal thread sleeves 10 in a rotating mode, meanwhile, the modeling strip 9 is connected with the internal thread sleeves 10 through the screw 11 in a rotating mode, the modeling strip 9 can be installed on the top surface of the supporting plate 2 through the mutual matching, and the through hole 12 runs through the supporting plate 2 and the prefabricated air-conditioning plate body 1, thereby being convenient for the installation of the air-conditioning pipeline, saving the use of the air-conditioning pipe, reducing the economic expenditure of owners, and simultaneously reducing the abrasion of the through hole 12 to the air-conditioning pipeline and prolonging the service life of the air-conditioning pipeline by installing the rubber ring 1201 on the inner wall surface of the through hole 12.
It should be noted that the utility model relates to a mounting connection structure of prefabricated air conditioner board, including prefabricated air conditioner plate body 1, layer board 2, tenon 3, mortise 4, shock pad 401, recess 5, water drainage tank 6, anti-skidding line 7, outlet 8, molding 9, internal thread sleeve 10, screw rod 11, through-hole 12 and rubber circle 1201, the part is general standard component or the part that technical staff in this field knows, and its structure and principle all are that this technical staff all can learn through the technical manual or obtain through conventional experimental method, and above-mentioned electrical components are by the nimble selection of technical staff in this field, install and accomplish the circuit debugging, guarantee that each equipment can normal operating, do not too much restriction requirement here.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a mounting connection structure of prefabricated air conditioner board, includes prefabricated air conditioner plate body (1), its characterized in that, prefabricated air conditioner plate body (1) top surface mounting has layer board (2), prefabricated air conditioner plate body (1) top surface integrated into one piece has tenon (3), layer board (2) bottom surface has seted up mortise (4), mortise (4) inner chamber top surface mounting has shock pad (401), layer board (2) top surface has seted up fluted (5), water drainage tank (6) have been seted up on recess (5) bottom surface, wash-out hole (8) have been seted up on layer board (2) surface, layer board (2) top surface both ends all are inlayed and are connected with internal thread sleeve (10), internal thread sleeve (10) top surface mounting has molding strip (9).
2. A prefabricated air conditioning panel installation-connecting structure according to claim 1, wherein: the outer diameter of the tenon (3) is the same as the inner diameter of the mortise (4), and an embedded structure is formed.
3. A prefabricated air conditioning panel installation-connecting structure according to claim 1, wherein: and anti-skidding patterns (7) are arranged on two sides of the drainage groove (6), and the anti-skidding patterns (7) are positioned on the bottom surface of the groove (5).
4. A prefabricated air conditioning panel installation-connecting structure according to claim 1, wherein: the drainage channel (6) is specifically provided with a plurality of groups, and one end of the water drainage hole (8) is communicated with the drainage channel (6).
5. A prefabricated air conditioning panel installation-connecting structure according to claim 1, wherein: the modeling strip (9) is rotationally connected with the internal thread sleeve (10) through a screw rod (11).
6. A prefabricated air conditioning panel installation-connecting structure according to claim 1, wherein: the surface of the supporting plate (2) is provided with a through hole (12), the through hole (12) penetrates through the supporting plate (2) and the prefabricated air conditioner plate body (1), and the inner wall surface of the through hole (12) is provided with a rubber ring (1201).
CN202020008035.0U 2020-01-03 2020-01-03 Mounting and connecting structure of prefabricated air conditioner board Expired - Fee Related CN211665954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020008035.0U CN211665954U (en) 2020-01-03 2020-01-03 Mounting and connecting structure of prefabricated air conditioner board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020008035.0U CN211665954U (en) 2020-01-03 2020-01-03 Mounting and connecting structure of prefabricated air conditioner board

Publications (1)

Publication Number Publication Date
CN211665954U true CN211665954U (en) 2020-10-13

Family

ID=72737995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020008035.0U Expired - Fee Related CN211665954U (en) 2020-01-03 2020-01-03 Mounting and connecting structure of prefabricated air conditioner board

Country Status (1)

Country Link
CN (1) CN211665954U (en)

Similar Documents

Publication Publication Date Title
KR100843128B1 (en) Water tank with a water supply device
CN211665954U (en) Mounting and connecting structure of prefabricated air conditioner board
CN202007680U (en) Structure of tunnel ventilation booth
CN202990036U (en) Connecting piece special for ventilation of high-rise buildings
CN207453025U (en) A kind of drainage system for setting room toilet
CN104947748B (en) Method for preventing supply line trough or water supply trough from being mounted on house wall
CN201433431Y (en) Domestic wastewater utilization device
CN103015496A (en) Special connector for ventilation of high-rise building
CN2425253Y (en) Plastic pipe
CN219060218U (en) Drainage pipe fitting for assembled toilet
CN215669993U (en) Same-floor drainage floor drain
CN204691609U (en) The ventilative groove of a kind of door pocket
CN203248913U (en) Sewer pipe silencer
CN218269545U (en) Air conditioner water discharging assembly for high-rise building
CN217580691U (en) Outer facade structure of assembled house new trend system
CN219175432U (en) Floor drain with displaceable slide plate
CN211312709U (en) Building sewage and wastewater double-riser drainage system
CN208219795U (en) A kind of urinal rushing urine convenient for automatic control toilet
CN215571379U (en) Air source heat pump with noise reduction function
CN214090154U (en) Vegetable washing basin structure arranged on floating platform
CN216618795U (en) Installation fastener and drain pipe of this fastener of installation
CN219196197U (en) Civil air defense engineering drainage structures
CN208262969U (en) A kind of portable structural walls Type B osmos tube boring device
CN211116563U (en) Pump case of clean water pump
ATE435340T1 (en) FLUSH VALVE MOUNTING SYSTEM

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 250000 west of Laicheng Avenue and north of Huihe Avenue, Laiwu District, Jinan City, Shandong Province

Patentee after: Shandong Dongzhan green building materials Co.,Ltd.

Address before: 250000 west of Laicheng Avenue and north of Huihe Avenue, Laiwu District, Jinan City, Shandong Province

Patentee before: Shandong Dongzhan Xinglu prefabricated new building materials Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201013