CN211662925U - Engineering cost progress management device - Google Patents
Engineering cost progress management device Download PDFInfo
- Publication number
- CN211662925U CN211662925U CN202020238636.0U CN202020238636U CN211662925U CN 211662925 U CN211662925 U CN 211662925U CN 202020238636 U CN202020238636 U CN 202020238636U CN 211662925 U CN211662925 U CN 211662925U
- Authority
- CN
- China
- Prior art keywords
- magnetic
- progress
- fixedly connected
- plate
- plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005389 magnetism Effects 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 claims description 16
- 238000000034 method Methods 0.000 description 7
- 238000005286 illumination Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to an engineering cost technical field just discloses an engineering cost progress management device, including the progress panel, still include: the rain shield is fixedly connected to the top of the progress display plate; the plurality of grooves are formed in the middle of the surface of the progress display board; the first magnetic plate of a plurality of, a plurality of fixed connection that first magnetic plate equidistance is even is at a plurality of plan magnetic pasting plates in the bottom on progress panel surface, a plurality of plan magnetic pasting plate magnetism is connected on the surface of first magnetic plate. The utility model discloses a cooperation between a plurality of first magnetic plates that set up and the plan magnetic flitch for record and manage the different stages of engineering, and utilize the sleeve on the surface of dead lever through the fixed block, make the fixture block joint conveniently take notes in the recess that corresponds the stage, and get off the required time record of the different stages of engineering through a plurality of second magnetic plates and time magnetic flitch, make things convenient for the later stage to make statistics of.
Description
Technical Field
The utility model relates to an engineering cost technical field specifically is an engineering cost progress management device.
Background
The construction cost refers to the construction price of a project, and refers to the total sum of all expected or actually required expenses for completing the construction of a project, so in this sense, the construction cost refers to the fixed asset investment of a construction project, and is defined from the perspective of a contract and issue package, and the construction cost refers to the construction price, i.e., the price of a construction installation project and the total price of a construction project, which are predicted or actually formed in the markets of land, equipment, technical labor, contract and the like through transaction modes such as bidding and the like.
The current project cost progress management device mainly manages through the plan book of posting the paper on the show board, and the total time of inconvenient to the engineering is counted and project plan is managed to it is inconvenient enough to use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to solve the above problems of the prior art, the utility model provides an engineering cost progress management device.
(II) technical scheme
In order to achieve the above object, the utility model discloses a main technical scheme include:
the utility model provides a construction cost progress management device, includes the progress panel, still includes:
the rain shield is fixedly connected to the top of the progress display plate;
the plurality of grooves are formed in the middle of the surface of the progress display board;
the plurality of first magnetic plates are uniformly and fixedly connected to the bottom of the surface of the progress display plate at equal intervals;
the plurality of planned magnetic pasting plates are magnetically connected to the surface of the first magnetic plate;
the two fixing plates are fixedly connected to the tops of the left side surface and the right side surface of the progress display plate;
the fixed rod is fixedly connected between the two fixed plates, and the fixed plates are positioned in front of the progress display plate;
the fixed block is sleeved on the surface of the fixed rod;
the sleeve is embedded in the side face of the fixed block, and the inner ring of the sleeve is sleeved on the surface of the fixed rod;
the connecting plate is fixedly connected to the bottom of the fixing block;
the fixture block is fixedly connected to the back face of the connecting plate, and the fixture block is clamped inside the groove.
In a further embodiment, the bottom fixedly connected with four supporting legs of progress panel, and four the supporting legs keep away from the one end fixedly connected with backing plate of progress panel.
In a further embodiment, the top fixedly connected with a plurality of second magnetic plates on the surface of the progress display board, and a plurality of the equal magnetism in surface of second magnetic plate is connected with a time magnetic plate, the width of second magnetic plate, recess and first magnetic plate is the same, and second magnetic plate, recess and first magnetic plate are located on the same straight line.
In a further embodiment, the left side and the right side of the bottom of the rain shield are provided with illuminating lamps, and the two illuminating lamps are located in front of the progress display board.
(III) advantageous effects
The utility model provides an engineering cost progress management device. The method has the following beneficial effects:
this engineering cost progress management device through the cooperation between a plurality of first magnetic plates that set up and the plan magnetism flitch for record and the management in the different stages of engineering, and utilize the sleeve on the surface of dead lever through the fixed block, make the fixture block joint in the recess that corresponds the stage, conveniently record, and get off the required time record in the different stages of engineering through a plurality of second magnetic plates and time magnetism flitch, make things convenient for the later stage to make statistics of.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a side view of the progress board of the present invention.
[ description of reference ]
In the figure: 1 progress panel, 2 weather shield, 3 recesses, 4 first magnetic sheet, 5 plan magnetism flitch, 6 fixed plates, 7 dead levers, 8 fixed blocks, 9 sleeves, 10 connecting plates, 11 fixture blocks, 12 supporting legs, 13 backing plates, 14 second magnetic sheets, 15 time magnetism flitch, 16 lights.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-2, the utility model provides a technical solution: the utility model provides a construction cost progress management device, includes progress panel 1, still includes:
the rain shield 2 is fixedly connected to the top of the progress display plate 1;
the plurality of grooves 3 are formed in the middle of the surface of the progress display board 1;
the plurality of first magnetic plates 4 are uniformly and fixedly connected to the bottom of the surface of the progress display plate 1 at equal intervals;
the plurality of planned magnetic pasting plates 5 are magnetically connected to the surface of the first magnetic plate 4;
the two fixing plates 6 are fixedly connected to the tops of the left side surface and the right side surface of the progress display plate 1;
the fixed rod 7 is fixedly connected between the two fixed plates 6, and the fixed plates 6 are positioned in front of the progress display plate 1;
the fixed block 8 is sleeved on the surface of the fixed rod 7;
the sleeve 9 is embedded in the side face of the fixed block 8, and the inner ring of the sleeve 9 is sleeved on the surface of the fixed rod 7;
the connecting plate 10 is fixedly connected to the bottom of the fixing block 8;
the fixture block 11 and the fixture block 11 are fixedly connected to the back face of the connecting plate 10, and the fixture block 11 is clamped in the groove 3.
In one embodiment, four support legs 12 are fixedly connected to the bottom of progress board 1, and a backing plate 13 is fixedly connected to one end of each support leg 12 far away from progress board 1.
Through adopting above-mentioned scheme, can utilize supporting leg 12 to support progress panel 1, convenient record and statistics utilize backing plate 13 to increase the stability of supporting simultaneously.
In one embodiment, a plurality of second magnetic plates 14 are fixedly connected to the top of the surface of the progress display board 1, the surfaces of the plurality of second magnetic plates 14 are magnetically connected to a time magnetic plate 15, the widths of the second magnetic plates 14, the grooves 3 and the first magnetic plates 4 are the same, and the second magnetic plates 14, the grooves 3 and the first magnetic plates 4 are located on the same straight line.
Through adopting above-mentioned scheme, can utilize a plurality of second magnetic sheet 14 and time magnetic paste board 15 to get down the required time record of the different stages of engineering, make things convenient for the later stage to count.
In one embodiment, the illumination lamps 16 are disposed on both left and right sides of the bottom of the rain shield 2, and the two illumination lamps 16 are located in front of the progress display board 1.
Through adopting above-mentioned scheme, can utilize light 16 to throw light on, conveniently record and make statistics of when light is poor.
The working principle is as follows: when the magnetic paste plate is used, plans of different stages of a project are recorded on the plan magnetic paste plate 5, then when each stage is implemented, the plan magnetic paste plate 5 of the stage is adsorbed on the first magnetic plate 4, then the fixing block 8 is moved under the action of the sleeve 9, the clamping block 11 is clamped in the groove 3 corresponding to the second magnetic plate 4, the current construction progress of the project is conveniently represented, after the project of the stage is finished, the spent time is recorded on the time magnetic paste plate 15 and adsorbed on the second magnetic plate 14, and later-stage statistics is facilitated.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a reference structure" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a construction cost progress management device, includes progress panel (1), its characterized in that still includes:
the rain shield (2), the rain shield (2) is fixedly connected to the top of the progress display board (1);
the plurality of grooves (3) are formed in the middle of the surface of the progress display board (1);
the plurality of first magnetic plates (4) are uniformly and fixedly connected to the bottom of the surface of the progress display plate (1) at equal intervals;
the plurality of planned magnetic pasting plates (5) are magnetically connected to the surface of the first magnetic plate (4);
the two fixing plates (6) are fixedly connected to the tops of the left side surface and the right side surface of the progress display plate (1);
the fixing rod (7) is fixedly connected between the two fixing plates (6), and the fixing plates (6) are positioned in front of the progress display plate (1);
the fixing block (8), the fixing block (8) is sleeved on the surface of the fixing rod (7);
the sleeve (9) is embedded in the side face of the fixed block (8), and the inner ring of the sleeve (9) is sleeved on the surface of the fixed rod (7);
the connecting plate (10), the said connecting plate (10) is connected to the bottom of the fixed block (8) fixedly;
the clamping block (11) is fixedly connected to the back face of the connecting plate (10), and the clamping block (11) is clamped inside the groove (3).
2. A construction cost progress management apparatus according to claim 1, characterized in that: the bottom fixedly connected with four supporting legs (12) of progress panel (1), and four the supporting legs (12) keep away from one end fixedly connected with backing plate (13) of progress panel (1).
3. A construction cost progress management apparatus according to claim 1, characterized in that: progress panel (1) surperficial top fixedly connected with a plurality of second magnetic sheet (14), and a plurality of the equal magnetism in surface of second magnetic sheet (14) is connected and is had time magnetic patch board (15), the width of second magnetic sheet (14), recess (3) and first magnetic sheet (4) is the same, just second magnetic sheet (14), recess (3) and first magnetic sheet (4) are located same straight line.
4. A construction cost progress management apparatus according to claim 1, characterized in that: the left and right sides of weather shield (2) bottom all is provided with light (16), and two light (16) are located the place ahead of progress panel (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020238636.0U CN211662925U (en) | 2020-03-02 | 2020-03-02 | Engineering cost progress management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020238636.0U CN211662925U (en) | 2020-03-02 | 2020-03-02 | Engineering cost progress management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211662925U true CN211662925U (en) | 2020-10-13 |
Family
ID=72741838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020238636.0U Expired - Fee Related CN211662925U (en) | 2020-03-02 | 2020-03-02 | Engineering cost progress management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211662925U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112976880A (en) * | 2021-03-17 | 2021-06-18 | 章小波 | Engineering cost building progress management equipment |
-
2020
- 2020-03-02 CN CN202020238636.0U patent/CN211662925U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112976880A (en) * | 2021-03-17 | 2021-06-18 | 章小波 | Engineering cost building progress management equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211662925U (en) | Engineering cost progress management device | |
CN206930796U (en) | A kind of seamless spliced light guide plate | |
CN206931325U (en) | A kind of LED module and LED display | |
CN202145260U (en) | Film locating structure | |
CN206257624U (en) | A kind of lamp power component | |
CN207473956U (en) | A kind of rummy Na overlay film storey index plate | |
CN220521822U (en) | Decoration board alignment splicing structure | |
CN219649981U (en) | Acrylic plate cutting equipment | |
CN217584237U (en) | Street lamp pole with billboard rack | |
CN216312578U (en) | Plug-in type cable bridge | |
CN213453158U (en) | Novel steel landing stage LED guardrail lamp | |
CN213079008U (en) | Light movable gluing frame | |
CN216428037U (en) | Fingerpost for exhibitions with illumination prompt facility | |
CN216973203U (en) | Municipal administration road surface is maintained with preventing road repair warning sign that removes | |
CN214156841U (en) | Building engineering management bid inviting device | |
CN203465919U (en) | Publicity board for schools | |
CN212295904U (en) | Landscape protective equipment for garden design | |
CN213025320U (en) | Spirit fort with splicing structure | |
CN211447601U (en) | Concatenation formula PVC floor | |
CN210095092U (en) | Reinforced bookend | |
CN204525254U (en) | A kind of public transport type tap cover plate cutting and positioning device | |
CN214459482U (en) | Asphalt road repairing device | |
CN213183491U (en) | Publicity column for real estate | |
CN214820882U (en) | Light guide plate tectorial membrane tool | |
CN214671639U (en) | Progress display board for construction management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201013 |