CN211649383U - Clamping is used in quick installation of pipeline of building decoration construction - Google Patents

Clamping is used in quick installation of pipeline of building decoration construction Download PDF

Info

Publication number
CN211649383U
CN211649383U CN202020270445.2U CN202020270445U CN211649383U CN 211649383 U CN211649383 U CN 211649383U CN 202020270445 U CN202020270445 U CN 202020270445U CN 211649383 U CN211649383 U CN 211649383U
Authority
CN
China
Prior art keywords
pipeline
clamp
installation
fixedly connected
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020270445.2U
Other languages
Chinese (zh)
Inventor
周狄超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Yiang Construction Engineering Co ltd
Original Assignee
Zhuji Dachao Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuji Dachao Decoration Engineering Co ltd filed Critical Zhuji Dachao Decoration Engineering Co ltd
Priority to CN202020270445.2U priority Critical patent/CN211649383U/en
Application granted granted Critical
Publication of CN211649383U publication Critical patent/CN211649383U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a clamp for fast pipeline installation in building decoration construction, which comprises a pipeline installation clamp, wherein the outer wall of the pipeline installation clamp is provided with teeth, and both ends of the pipeline mounting clamp are provided with a plurality of openings, both ends of the pipeline mounting clamp are fixedly connected with a plurality of metal sheets, the lower surfaces of the metal sheets are all bonded with hot melt adhesive blocks, the pipeline mounting clamp is connected with two screwing nuts through tooth threads, the pipeline mounting clamp can realize the quick connection and mounting of pipelines, and can also be quickly installed aiming at pipelines with different materials and sizes, the pipeline sleeve sleeved on the pipeline opening seals the joint, the quick connection of pipeline is fixed through twisting the nut, and the leakproofness that the pipeline installation pressed from both sides the sealing washer that bonds on the inner wall can further improve the pipeline installation and press from both sides, and the sheetmetal that the pipeline installation pressed from both sides both ends can improve the speed that melts of hot melt adhesive block, and the hot melt adhesive block that the sheetmetal lower surface bonded can carry out further fixed to the pipeline.

Description

Clamping is used in quick installation of pipeline of building decoration construction
Technical Field
The utility model relates to a construction field, more specifically say, relate to a clamping is used in quick installation of pipeline of building decoration construction.
Background
The types of pipelines for building construction are roughly PPR pipelines, aluminum plastic pipes, copper pipes, UPVC pipes, stainless steel pipes and the like.
As a novel pipeline material, the PPR pipe has the advantages of unique thickness, no toxicity, light weight, pressure resistance and corrosion resistance. The aluminum-plastic composite pipe is a popular pipe in the past, is light in weight, durable and convenient to construct, and has a plurality of varieties and great quality and price difference in the current aluminum-plastic composite pipes sold in the market. When the pipe is used as a hot water pipeline, the clamping sleeve type connection can be dislocated due to long-term expansion and contraction, so that leakage is caused. The copper pipe has the advantages of corrosion resistance, bacteria elimination and the like, is a first-class product in a pipeline, and has two modes of clamping sleeve and welding for a copper pipe connector. The cutting ferrule is the same as the aluminum plastic pipe, and has the problem of aging and water leakage for a long time, so most users for installing the copper pipe adopt a welding type, the UPVC pipe is actually a plastic pipe, the joint part is generally bonded by glue, and the frost resistance and the heat resistance of the UPVC pipe are poor, so the cutting ferrule is difficult to be used as a hot water pipeline. Stainless steel pipes are expensive and difficult to construct.
Most of metal pipes for special building repair construction are connected by a welding method, the metal pipes are welded at a low speed, the pipes made of different materials are difficult to connect, and the joints of the pipes need to be melted when the plastic pipes are connected, so that the time is wasted in connection, the pipes are easy to damage, and the strength of the joints of the pipes is reduced.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Problem to exist among the prior art, an object of the utility model is to provide a clamping is used in quick installation of pipeline of building decoration construction, it can realize the high-speed joint installation of pipeline, and to different materials, the pipeline of size also can be installed fast, the pipe sleeve that the pipeline mouth cover was established seals joint department, it is fixed to move the quick connection of nut to the pipeline through twisting, the leakproofness that the sealing washer that bonds can further improve the piping erection clamp on the pipe erection clamp inner wall, the sheetmetal at piping erection clamp both ends can improve the speed of melting of hot melt adhesive block, the hot melt adhesive block that the sheetmetal lower surface bonds can further advance further fixed to the pipeline.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A clamping clip for quickly installing a pipeline in building decoration construction comprises a pipeline installation clip, wherein the outer wall of the pipeline installation clip is provided with teeth, two ends of the pipeline installation clip are provided with a plurality of openings, two ends of the pipeline installation clip are fixedly connected with a plurality of metal sheets, the lower surfaces of the metal sheets are respectively bonded with a hot melt adhesive block, the pipeline installation clip is connected with two screwing nuts through teeth and threads, the inner wall of the pipeline installation clip is bonded with a plurality of first sealing rings, the inner wall of the middle part of the pipeline installation clip is fixedly connected with a funnel, the bottom of the funnel is fixedly connected with two funnel limiting blocks, one end of the funnel, which is far away from the funnel limiting blocks, is fixedly connected with a limiting ring, one end of the pipeline installation clip is inserted with a first pipeline, one end of the pipeline installation clip, which is far away from the first pipeline, is inserted with a second pipeline, and two ends of the pipeline installation clip are both sleeved with pipeline, and the pipeline constant head tank has been seted up to the one end of pipeline cover, it can realize the high-speed joint installation of pipeline, and also can install fast to the pipeline of different materials, the pipeline cover that the pipeline oral siphon cover was established seals joint department, it is fixed to the quick connection of pipeline through twisting the nut, the leakproofness that the pipe installation pressed from both sides can further be improved to the sealing washer that bonds on the pipe installation presss from both sides the inner wall, the sheetmetal that the pipe installation pressed from both sides both ends can improve melting speed of hot melt adhesive block, the hot melt adhesive block that the sheetmetal lower surface bonded can further be fixed to the pipeline.
Further, the inside cover of pipeline cover establishes the first rubber layer of multilayer, and the upper end fixedly connected with second sealing strip on first rubber layer, can make the pipe erection clamp realize the connection to not unidimensional pipeline through increasing or reducing the number of piles on a plurality of first rubber layers.
Further, the outer fixed surface of pipeline cover is connected with pipeline cover sealing washer, and the below fixedly connected with pipeline cover retainer plate pipeline cover sealing washer of pipeline cover sealing washer can improve the leakproofness that the pipeline installation pressed from both sides, and the pipeline cover retainer plate can make the pipeline cover be difficult for droing.
Furthermore, two it all has seted up and has twisted the nut chamfer to twist to open on the nut, and two the surface of twisting the nut all bonds and have the second rubber layer, the fluting has been seted up to the surface on second rubber layer, twists the nut chamfer and can reduce the resistance when the nut is twisted, twists the second rubber layer and the fluting that the nut surface bonds and can improve the frictional force when twisting the nut and twist, makes the installation easier.
Further, the inside of pipeline installation clamp is close to the equal fixedly connected with retainer plate in both ends of hot melt adhesive piece, and the retainer plate material is PE plastics, and the retainer plate that the installation pressed from both sides inner wall bonded can make the pipeline of connection more firm, prevents to drop.
Furthermore, the external screw thread has all been seted up to the one end of first pipeline and second pipeline, the internal surface of pipeline cover is seted up there is the internal thread, and first pipeline and second pipeline all with pipeline cover threaded connection, can make pipeline cover more firm with pipe connection through threaded connection, effectively promote the leakproofness.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) this scheme can realize the high-speed joint installation of pipeline, and to different materials, the pipeline of size also can install fast, the pipeline cover that the pipeline oral siphon was established seals joint department, it is fixed to the quick connection of pipeline through twisting the nut, the leakproofness that the pipe installation pressed from both sides the sealing washer that bonds on the inner wall can further improve the pipe installation clamp, the sheetmetal that the pipe installation pressed from both sides both ends can improve melting speed of hot melt adhesive block, the hot melt adhesive block that the sheetmetal lower surface bonds can further advance further fixed to the pipeline.
(2) The first rubber layer of multilayer is established to inside cover of pipeline cover, and the upper end fixedly connected with second sealing strip on first rubber layer, can make the pipe erection press from both sides the realization to being connected of unidimensional pipeline through the number of piles that increases or reduces a plurality of first rubber layers.
(3) The outer fixed surface of pipeline cover is connected with pipeline cover sealing washer, and the below fixedly connected with pipeline cover retainer plate pipeline cover sealing washer of pipeline cover sealing washer can improve the leakproofness that the pipeline installation was pressed from both sides, and the pipeline cover retainer plate can make the pipeline cover be difficult for droing.
(4) Two are twisted and move the nut and go up to open and all have seted up and twist and move the nut chamfer, and two outer surfaces of twisting and moving the nut all bond and have the second rubber layer, and the fluting has been seted up to the surface on second rubber layer, twists and move the nut chamfer and can reduce the resistance when the nut is twisted, twists and move the second rubber layer that the nut surface bonds and fluting and can improve and twist and move the nut and twist the frictional force when moving, make the installation easier.
(5) The equal fixedly connected with retainer plate in both ends that the inside of pipe installation clamp is close to the hot melt adhesive piece, and the retainer plate material is PE plastics, and the retainer plate that the installation clamp inner wall bonded can make the pipeline of connection more firm, prevents to drop.
(6) The external screw thread has all been seted up to the one end of first pipeline and second pipeline, and the internal surface of pipeline cover is seted up there is the internal thread, and first pipeline and second pipeline all with pipeline cover threaded connection, can make pipeline cover more firm with pipe connection through threaded connection, effectively promote the leakproofness.
Drawings
Fig. 1 is a cross-sectional view of the present invention;
FIG. 2 is a schematic view of the present invention connecting pipes of the same type;
FIG. 3 is a schematic view of the present invention for connecting different types of pipes;
fig. 4 is a schematic perspective view of the present invention;
FIG. 5 is a schematic view of a first rubber layer according to the present invention;
fig. 6 is a schematic view of the pipe sleeve of the present invention;
fig. 7 is a schematic view of the screw nut of the present invention.
The reference numbers in the figures illustrate:
the pipeline installing device comprises a pipeline installing clamp 1, a 2-tooth, a 3-screwing nut, a 4-metal sheet, a 5-hot-melt adhesive block, a 6-fixing ring, a 7-first sealing ring, a 8-limiting ring, a 9-funnel, a 10-funnel limiting block, a 11-first pipeline, a 12-second pipeline, a 13-pipeline sleeve, a 14-second rubber layer, a 15-first rubber layer, a 16-opening, a 17-slotting, a 18-second sealing ring, a 19-pipeline-sleeve fixing ring, a 20-pipeline-sleeve sealing ring, a 21-pipeline-sleeve positioning groove and a 22-screwing nut chamfering.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1:
please refer to fig. 1, a clamping is used in quick installation of pipeline of building decoration construction, including the piping erection clamp 1, tooth 2 has been seted up to the outer wall of piping erection clamp 1, and many openings 16 have all been seted up at the both ends of piping erection clamp 1, the equal a plurality of sheetmetals 4 of fixedly connected with in both ends of piping erection clamp 1, and the lower surface of a plurality of sheetmetals 4 all bonds hot melt adhesive piece 5, the equal fixedly connected with retainer plate 6 in both ends that the inside of piping erection clamp 1 is close to hot melt adhesive piece 5, and the material of retainer plate 6 is PE plastics, retainer plate 6 that the inner wall of piping erection clamp 1 bonded can make the pipeline of connecting more firm, prevent to drop.
Referring to fig. 4 and 7, the pipe mounting clamp 1 is connected with two screwing nuts 3 through the teeth 2, the two screwing nuts 3 are provided with screwing nut chamfers 22, the outer surfaces of the two screwing nuts 3 are adhered with the second rubber layer 14, the outer surface of the second rubber layer 14 is provided with the slot 17, the screwing nut chamfers 22 can reduce the resistance of the nuts 3 during screwing, the second rubber layer 14 and the slot 17 adhered to the outer surface of the screwing nut 3 can improve the friction of the screwing nut 3 during screwing, and the mounting process is easier.
Please refer to fig. 2-3, a plurality of first sealing rings 7 are bonded on the inner wall of the pipeline mounting clamp 1, a funnel 9 is fixedly connected on the inner wall of the middle part of the pipeline mounting clamp 1, two funnel limit blocks 10 are fixedly connected to the bottom of the funnel 9, one end of the funnel 9 far away from the funnel limit blocks 10 is fixedly connected with a limit ring 8, one end of the pipeline mounting clamp 1 is inserted with a first pipeline 11, one end of the pipeline mounting clamp 1 far away from the first pipeline 11 is inserted with a second pipeline 12, and pipeline sleeves 13 are sleeved inside the two ends of the pipeline mounting clamp 1.
Referring to fig. 5-6, a plurality of first rubber layers 15 are sleeved inside a pipe sleeve 13, the upper end of each first rubber layer 15 is fixedly connected with a second sealing strip 18, the pipe mounting clamp 1 can be connected to pipes of different sizes by increasing or decreasing the number of the first rubber layers 15, the outer surface of the pipe sleeve 13 is fixedly connected with a pipe sleeve sealing ring 20, a pipe sleeve fixing ring 19 is fixedly connected below the pipe sleeve sealing ring 20 to improve the sealing performance of the pipe mounting clamp 1, the pipe sleeve fixing ring 19 can make the pipe sleeve 13 not easily fall off, one end of the pipe sleeve 13 is provided with a pipe positioning groove 21, one ends of the first pipe 11 and the second pipe 12 are both provided with external threads, the inner surface of the pipe sleeve 13 is provided with internal threads, the first pipe 11 and the second pipe 12 are both in threaded connection with the pipe sleeve 13, the pipe sleeve 13 can be more firmly connected with the pipe through threaded connection, effectively improve the leakproofness.
When the pipeline installation clamp 1 is installed, firstly, a pipeline sleeve 13 provided with an internal thread is spirally installed at one end provided with an external thread of a first pipeline 11 and a second pipeline 12, then two screwing nuts 3 are screwed to the most middle position of the pipeline installation clamp 1, so that the two ends of the pipeline installation clamp 1 are both opened to the maximum position, then the first pipeline 11 and the second pipeline 12 sleeved with the pipeline sleeve 13 are clamped in the pipeline installation clamp 1, a limiting ring 8 in the pipeline installation clamp 1 is butted with a pipeline sleeve positioning groove 21 arranged at one end of the two pipeline sleeves 13, then the two screwing nuts 3 are screwed, so that the pipeline installation clamp 1 is tightened, after the screwing nuts 3 rotate to the maximum position, a plurality of metal sheets 4 fixedly connected with the two ends of the pipeline installation clamp 1 are heated, a hot melt adhesive block bonded on the lower surfaces of the metal sheets 4 is melted, and the first pipeline 11 and the second pipeline 12 are firmly fixed, when connecting not unidimensional pipeline can establish first rubber layer 15 of multilayer earlier with pipeline pot head, the pipeline of the first rubber layer 15 of multilayer is overlapped to the cover again, cup joint in pipeline cover 13, repeat above-mentioned installation operation, it can realize the high-speed joint installation of pipeline, and to different materials, the pipeline of size also can be installed fast, the pipeline cover that the pipeline mouth cover was established seals joint department, it is fixed to the quick connection of pipeline through twisting the nut, the sealing washer that bonds on the pipeline installation presss from both sides the inner wall can further improve the leakproofness that the pipeline installation pressed from both sides, the sheetmetal at pipeline installation clamp both ends can improve the speed that melts of hot melt adhesive block, the hot melt adhesive block that the sheetmetal lower surface bonded can further fix the pipeline.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (6)

1. The utility model provides a quick for installation clamping of pipeline of building decoration construction, includes that the piping erection presss from both sides (1), its characterized in that: the outer wall of the pipeline installation clamp (1) is provided with teeth (2), the two ends of the pipeline installation clamp (1) are provided with a plurality of openings (16), the two ends of the pipeline installation clamp (1) are fixedly connected with a plurality of metal sheets (4), the lower surfaces of the metal sheets (4) are bonded with hot melt adhesive blocks (5), the pipeline installation clamp (1) is in threaded connection with two screwing nuts (3) through the teeth (2), the inner wall of the pipeline installation clamp (1) is bonded with a plurality of first sealing rings (7), the inner wall of the middle part of the pipeline installation clamp (1) is fixedly connected with a funnel (9), the bottom of the funnel (9) is fixedly connected with two funnel limiting blocks (10), one end of the funnel (9) far away from the funnel limiting blocks (10) is fixedly connected with a limiting ring (8), one end of the pipeline installation clamp (1) is inserted with a first pipeline (11), the pipeline installation presss from both sides (1) and keeps away from the one end of first pipeline (11) and pegs graft and have second pipeline (12), pipeline cover (13) have all been cup jointed to the both ends inside of pipeline installation clamp (1), and pipeline positioning groove (21) have been seted up to the one end of pipeline cover (13).
2. The clamp for quickly installing the pipeline in the building decoration construction according to claim 1, wherein: the pipeline sleeve (13) is internally sleeved with a plurality of first rubber layers (15), and the upper end of each first rubber layer (15) is fixedly connected with a second sealing strip (18).
3. The clamp for quickly installing the pipeline in the building decoration construction according to claim 1, wherein: the outer surface of the pipeline sleeve (13) is fixedly connected with a pipeline sleeve sealing ring (20), and a pipeline sleeve fixing ring (19) is fixedly connected below the pipeline sleeve sealing ring (20).
4. The clamp for quickly installing the pipeline in the building decoration construction according to claim 1, wherein: two it all has seted up and has twisted nut chamfer (22) to twist to open on twisting nut (3), and two the surface of twisting nut (3) all bonds and have second rubber layer (14), fluting (17) have been seted up to the surface of second rubber layer (14).
5. The clamp for quickly installing the pipeline in the building decoration construction according to claim 1, wherein: the pipeline installation presss from both sides the equal fixedly connected with retainer plate (6) in both ends that the inside of (1) is close to hot melt adhesive piece (5), and retainer plate (6) material is PE plastics.
6. The clamp for quickly installing the pipeline in the building decoration construction according to claim 1, wherein: external threads are formed in one ends of the first pipeline (11) and the second pipeline (12), internal threads are formed in the inner surface of the pipeline sleeve (13), and the first pipeline (11) and the second pipeline (12) are in threaded connection with the pipeline sleeve (13).
CN202020270445.2U 2020-03-08 2020-03-08 Clamping is used in quick installation of pipeline of building decoration construction Expired - Fee Related CN211649383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020270445.2U CN211649383U (en) 2020-03-08 2020-03-08 Clamping is used in quick installation of pipeline of building decoration construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020270445.2U CN211649383U (en) 2020-03-08 2020-03-08 Clamping is used in quick installation of pipeline of building decoration construction

Publications (1)

Publication Number Publication Date
CN211649383U true CN211649383U (en) 2020-10-09

Family

ID=72687345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020270445.2U Expired - Fee Related CN211649383U (en) 2020-03-08 2020-03-08 Clamping is used in quick installation of pipeline of building decoration construction

Country Status (1)

Country Link
CN (1) CN211649383U (en)

Similar Documents

Publication Publication Date Title
CN200972038Y (en) Clamp for connecting joint of plastic pipe and metal pipe
CN211649383U (en) Clamping is used in quick installation of pipeline of building decoration construction
CN1821644A (en) Pipeline connection pipe
JP4484852B2 (en) Thermoplastic pipe connection method, connection pipe set, and connection pipe
CN211259989U (en) Connecting assembly for valve
CN201187644Y (en) Clip pressure type thin wall connecting pipe fitting with guide
CN207381908U (en) The thin wall steel conduit connector of connection is withheld in socket
CN201322143Y (en) Glass fiber aluminum-plastic composite pipe
CN2830847Y (en) Pipeline connecting tube element
CN215721338U (en) Multipurpose spiral steel pipe
KR101664309B1 (en) Apparatus for clamping pipes in butt fusion of polyethylene pipes
CN215674177U (en) Connection structure of PPR pipe and plastic-aluminum pipe
CN101430031A (en) Pipe connecting fittings and its connecting method
GB2579845A (en) A device for marking a tubular member
CN2771612Y (en) Pipeline connecting pipe fitting (3)
CN218378277U (en) A kind of novel pipe fitting
CN102809016A (en) Joint for rapidly connecting pipes
CN212868822U (en) Quick connector with tightening structure for pipeline connection
CN220228186U (en) UPVC rectangular tube beam column frame structure
CN217903933U (en) Double-wall corrugated pipe orifice connecting structure
CN201322144Y (en) Stripping-free hot melt connecting aluminum-plastic composite pipe
CN211456577U (en) Fixing device for power tube joint
CN2589785Y (en) Soldering type and glue joint pipe fitting interconnecting piece for stainless steel and plastic composite tube
CN217463502U (en) Heat preservation engineering pipeline in wall of convenient butt joint installation
CN214579485U (en) Clamping and pressing pipe fitting connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220919

Address after: Room 302, Floor 2, Floor 2, West Side, Central Square, Central Square, Ulan Street, Jining District, Ulanqab City, Inner Mongolia Autonomous Region, 012000

Patentee after: Inner Mongolia Yiang Construction Engineering Co.,Ltd.

Address before: Room 2905, Furun house, 19 Dongxiang Road, Huandong street, Shaoxing City, Zhejiang Province

Patentee before: Zhuji Dachao Decoration Engineering Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201009

CF01 Termination of patent right due to non-payment of annual fee