CN211643183U - Capacitor loading device - Google Patents
Capacitor loading device Download PDFInfo
- Publication number
- CN211643183U CN211643183U CN201921803165.7U CN201921803165U CN211643183U CN 211643183 U CN211643183 U CN 211643183U CN 201921803165 U CN201921803165 U CN 201921803165U CN 211643183 U CN211643183 U CN 211643183U
- Authority
- CN
- China
- Prior art keywords
- staving
- barrel
- barrel body
- loading device
- capacitor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fixed Capacitors And Capacitor Manufacturing Machines (AREA)
Abstract
The utility model relates to a condenser apparatus for producing technical field discloses a condenser loading attachment, and it includes first staving, first staving inside is provided with the second staving that a plurality of is used for splendid attire condenser core, each the second staving is inserted respectively and is located in the first staving. This condenser loading attachment can effectually avoid the actual operation in-process because the core pin bend that leads to the fact is expected greatly, improves the qualification rate of capacitor bank, reduces the work load that the staff revised the pin bend, the cost of using manpower sparingly.
Description
Technical Field
The utility model relates to a condenser apparatus for producing technical field especially relates to a condenser loading attachment.
Background
The core barrel for loading the capacitor in the prior art is a large groove, when the capacitor is assembled and fed, a worker needs to hold materials in the large groove by a box to a vibration disc, but the process of directly holding the materials in the large groove by the box easily causes the core bent leg of the capacitor, so that more waste products are produced when the capacitor is assembled in the vibration disc, and the qualification rate of the capacitor assembly is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the not enough of existence among the prior art, provide a condenser loading attachment, this condenser loading attachment can effectually avoid the actual operation in-process because the core pin bending that leads to the fact is expected greatly, improves the qualification rate that the capacitor bank founds, reduces the work load that the staff revised the pin bending, the cost of using manpower sparingly.
In order to achieve the above object, the utility model provides a capacitor loading device, it includes first staving, first staving inside is provided with the second staving that a plurality of is used for splendid attire condenser core, each the second staving is inserted respectively and is located in the first staving.
Optionally, a plurality of mutually independent groove bodies are arranged inside the first barrel body, each groove body is arranged in one-to-one correspondence with the second barrel body, and the second barrel body is positioned and inserted into the groove bodies.
Optionally, the grooves are arranged in an array in the first barrel.
Optionally, the notches of the respective groove bodies are located in the same plane.
Optionally, the height of the second barrel body is greater than or equal to the depth of the groove body.
Optionally, a supporting plate extending outwards is arranged at the outer edge of the bucket opening of the second bucket body, and the supporting plate is erected at the top of the wall of the groove.
Optionally, the support plate is annularly arranged at the barrel opening of the second barrel body, and the width of the support plate is smaller than or equal to the thickness of the wall of the groove.
Optionally, a gap is formed between the outer wall of the second barrel body and the inner wall of the groove body, and the value range of the gap value is 0.5-2 mm.
Optionally, the first barrel body is of a cuboid structure, the second barrel body is of a prismatic table structure, and the area of the barrel opening of the second barrel body is larger than that of the barrel bottom of the second barrel body.
Optionally, the four edges of the first barrel body are in arc transition, the four edges of the second barrel body are in arc transition, and the four edges of the inner portion of the groove body are in arc transition. The embodiment of the utility model provides a condenser loading attachment compares with prior art, and its beneficial effect lies in:
the utility model discloses condenser loading attachment, it includes first staving, first staving inside is provided with the second staving that a plurality of is used for splendid attire condenser core, each the second staving is inserted respectively and is located in the first staving. From this, when assembling the condenser, need not to carry out the mode of expecting greatly from the vat through the box, at every turn when the material loading directly through the second staving add can, avoid expecting the condition that causes the core hook that the in-process appears greatly, reduce the waste product of resistance, the qualification rate of very big improvement assemblage reduces the work load that the staff pulled the hook, practices thrift the human cost. The first barrel body can collect and arrange the second barrel bodies, so that the storage tidiness of the capacitor is guaranteed, and the capacitor can be conveniently moved and carried.
Drawings
Fig. 1 is a schematic perspective view of a capacitor loading device according to an embodiment of the present invention;
fig. 2 is a perspective schematic structural view of a capacitor loading device according to an embodiment of the present invention;
fig. 3 is a schematic top view of a capacitor loading device according to an embodiment of the present invention;
fig. 4 is a schematic view of a matching structure of the first barrel body and the second barrel body of the capacitor loading apparatus according to the embodiment of the present invention.
In the figure, 1, a first barrel body; 2. a second barrel body; 3. a trough body; 4. and a support plate.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
As shown in fig. 1 to 4 capacitor loading device, it includes first staving 1, first staving 1 is inside to be provided with a plurality of second staving 2 that is used for splendid attire capacitor core, each second staving 2 is inserted respectively and is located shown in the first staving 1, the utility model discloses a preferred embodiment's one kind.
Based on above structure, in the in-process of actual production, when the staff need carry out the material loading to the condenser, can directly take out second staving 2 from first staving 1, use the condenser in the second staving 2, add the condenser in the second staving 2 into the dish that shakes, thereby avoided the staff to adopt the operation that the box was expected from flourishing in first staving 1, reduce the damage that leads to the fact the bending at flourishing material in-process to the pin of condenser core, the staff also need not draw the operation of bending the foot to the condenser core of damage in addition, effectual reduction work load, practice thrift the human cost. The adoption is stored the condenser with the mode that second staving 2 inserted first staving 1 inside, and first staving 1 can be effectual collects a plurality of second staving 2, conveniently improves the regularity that the condenser was collected, and adopts first staving 1 to concentrate a plurality of second staving 2 and can conveniently remove and carry a large amount of condensers, and convenient operation is simple. The whole capacitor loading device is very simple in structural design, convenient to produce and manufacture and low in cost.
Wherein, first staving 1 is inside to be provided with a plurality of mutually independent's cell body 3 each other, and each cell body 3 arranges with second staving 2 one-to-one, and second staving 2 location is inserted and is located in cell body 3, and each cell body 3 can carry on spacingly to second staving 2 respectively, guarantees second staving 2 at the accuracy of first staving 1 internally mounted, and is convenient for carry out reasonable placing, conveniently takes and inserts second staving 2. It should be noted that, in this embodiment, each trough body 3 is the array and arranges in first staving 1, and the arrangement is simple neat, makes things convenient for the staff can directly extract when using, and the simplified operation. And the specification and the size of each second barrel body 2 are consistent, so that the storage amount of the capacitor can be ensured, the storage amount is constant when the capacitor is put into the vibration disc, and the reliability of capacitor assembly can be further ensured.
In addition, the notch of each cell body 3 is located the coplanar, makes things convenient for the staff to extract second staving 2, and can guarantee whole device overall structure's aesthetic property, and the phenomenon of interfering can not directly appear in adjacent second cell body 3, avoids causing the inconvenient condition of second staving 2 take out, improves the efficiency of taking second staving 2 that bears the weight of the condenser. The degree of depth of the high more than or equal to cell body 3 of second staving 2 avoids second staving 2 to imbed into cell body 3, if the inner wall of cell body 3 is higher than the lateral wall of second staving 2, then the inner wall of cell body 3 can block the bung hole of second staving 2, the staff is inconvenient stretches into the inside of cell body 3 with the hand and takes out second staving 2, the application of force is difficult, so the high degree of need more than or equal to the degree of depth of cell body 3 of second staving 2, staff's operation can be simplified, and work efficiency is improved.
Further, the outward flange department of the bung hole of second staving 2 is provided with backup pad 4 that extends to the outside, backup pad 4 is taken and is established at the top of the cell wall of cell body 3, backup pad 4 can provide certain supporting part for the staff, make things convenient for the staff to hold, the application of force is more convenient, and backup pad 4 is taken and is established on the cell wall of cell body 3, also can avoid second staving 2 directly to fall into in cell body 3 when inserting in cell body 3, and then play effectual limiting displacement, ensure that second staving 2 conveniently takes out from first staving 1. The bung hole department of second staving 2 is located to the backup pad 4 ring, and the width less than or equal to cell body 3's of backup pad 4 thickness, avoids the mutual interference between backup pad 4 on two adjacent second staving 2 for backup pad 4 homoenergetic is reliable to be taken and is established in the cell wall upper end of cell body 3, and the upper end of whole first staving 1 can keep leveling, and is clean and tidy pleasing to the eye, is convenient for collect and arrange in order. Be equipped with the clearance between the outer wall of second staving 2 and the inner wall of cell body 3, the value range of clearance value is 0.5 ~ 2mm, the operation in the second staving 2 inserts and takes out cell body 3, there can be the friction between the outer wall of second staving 2 and the inner wall of cell body 3, frictional force can hinder the laborsaving second staving 2 of taking out or inserting from cell body 3 of staff, so set up certain clearance between second staving 2 and cell body 3, make things convenient for taking out of second staving 2 to move, make the staff operation more laborsaving, and the labor intensity is reduced.
It should be noted that, in this embodiment, first staving 1 is the cuboid structure, and second staving 2 is the terrace with edge structure, and the bung hole area of second staving 2 is greater than the barrel head area of second staving 2, and each second staving 2 is array arrangement in first staving 1 and makes the appearance design of whole device more elegant appearance, and the space of the first staving 1 inside of utilization that can the at utmost, carry out reasonable arranging to second staving 2, the improvement is to the storage capacity of condenser. The second staving 2 adopts the terrace with edge structure of invering, is convenient for take out second staving 2 from cell body 3, and the bottom area is less than the top area, so the bottom of second staving 2 can be faster take out from the notch, the phenomenon that the card is dunked can not appear. However, in other embodiments, the shapes of the first tub 1 and the second tub 2 are not limited to this embodiment, and may be appropriately selected according to actual needs. Four edges of first staving 1 department adopt the circular arc transition, four edges of second staving 2 department adopt the circular arc transition, four edges of the inside of cell body 3 department adopt the circular arc transition, from this first staving 1 and second staving 2 are placing or the in-process of extraction, the edge all can not cause the injury to the staff, the security of the high pressure heater unit use, and the circular arc transition can increase the degree of holding of edge department to a certain extent, can guarantee the smooth cooperation between second staving 2 and the cell body 3, also be convenient for insert into in the cell body 3 with second cell body 3.
To sum up, the embodiment of the utility model provides a capacitor loading device, it includes first staving 1, and 1 inside second staving 2 that is provided with a plurality of and is used for splendid attire condenser core of first staving, each second staving 2 is inserted respectively and is located first staving 1. From this, when assembling the condenser, need not to carry out the mode of expecting greatly from the vat through the box, at every turn when the material loading directly through second staving 2 add can, avoid the circumstances that causes the core hook that the expecting in-process appears greatly, reduce the waste product of resistance, the qualification rate of very big improvement assemblage reduces the work load that the staff pulled the hook, practices thrift the human cost. The first barrel body 1 can collect and arrange the second barrel bodies 2, so that the storage regularity of the capacitor is guaranteed, and the capacitor is convenient to move and carry.
It should be understood that the terms "first", "second", etc. are used herein to describe various information, but the information should not be limited to these terms, and these terms are only used to distinguish one type of information from another. For example, "first" information may also be referred to as "second" information, and similarly, "second" information may also be referred to as "first" information, without departing from the scope of the present invention.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and replacements can be made without departing from the technical principle of the present invention, and these modifications and replacements should also be regarded as the protection scope of the present invention.
Claims (10)
1. The capacitor loading device is characterized by comprising a first barrel body, wherein a plurality of second barrel bodies used for containing capacitor cores are arranged in the first barrel body, and the second barrel bodies are respectively inserted in the first barrel body.
2. The capacitor loading device according to claim 1, wherein a plurality of mutually independent groove bodies are arranged inside the first barrel body, each groove body is arranged in one-to-one correspondence with the second barrel body, and the second barrel body is positioned and inserted in the groove bodies.
3. The capacitor loading apparatus of claim 2 wherein the slots are arranged in an array within the first barrel.
4. A capacitor loading apparatus as claimed in any one of claims 2 to 3 wherein the slots of the channels lie in the same plane.
5. The capacitor loading device according to any one of claims 2 to 3, wherein the height of the second barrel is equal to or greater than the depth of the tank.
6. The capacitor loading device according to claim 5, wherein a support plate extending outward is provided at an outer edge of the bung of the second tub, and the support plate is erected at a top of a wall of the slot.
7. The capacitor loading device according to claim 6, wherein the support plate is annularly arranged at the opening of the second barrel body, and the width of the support plate is less than or equal to the thickness of the wall of the groove.
8. The capacitor loading device according to any one of claims 2 to 3, wherein a gap is provided between the outer wall of the second barrel body and the inner wall of the tank body, and the value range of the gap is 0.5-2 mm.
9. The capacitor loading device according to any one of claims 1 to 3, wherein the first barrel body is a rectangular parallelepiped structure, the second barrel body is a prismoid structure, and a barrel mouth area of the second barrel body is larger than a barrel bottom area of the second barrel body.
10. The capacitor loading device according to claim 2, wherein the four edges of the first barrel body are in arc transition, the four edges of the second barrel body are in arc transition, and the four edges of the inside of the tank body are in arc transition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921803165.7U CN211643183U (en) | 2019-10-24 | 2019-10-24 | Capacitor loading device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921803165.7U CN211643183U (en) | 2019-10-24 | 2019-10-24 | Capacitor loading device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211643183U true CN211643183U (en) | 2020-10-09 |
Family
ID=72690984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921803165.7U Active CN211643183U (en) | 2019-10-24 | 2019-10-24 | Capacitor loading device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211643183U (en) |
-
2019
- 2019-10-24 CN CN201921803165.7U patent/CN211643183U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211643183U (en) | Capacitor loading device | |
CN208775292U (en) | A kind of plastic sucking disc being conveniently adjusted placement space | |
CN208821824U (en) | Multifunctional combination storage box and storage unit | |
CN201027020Y (en) | Accepting box | |
KR200471575Y1 (en) | Apparatus for Collecting Clothes | |
CN205505551U (en) | Drawer tray for refrigerator | |
CN204453368U (en) | A kind of drawer footwear box | |
CN208755832U (en) | A kind of paper-extracting box of Band clamp | |
CN204158016U (en) | A kind of multifunctional combination tea table | |
CN216494763U (en) | Multi-functional house receiver | |
CN211299067U (en) | Movable built-in side cabinet type combined tool cabinet | |
CN201370278Y (en) | Multifunctional bookshelf | |
CN210970474U (en) | Multifunctional combined pen container | |
CN205267255U (en) | Have pen container and clock function's jar of saving concurrently | |
CN206729820U (en) | A kind of Domestic paper-extracting box | |
CN209209321U (en) | A kind of storage box | |
CN210137980U (en) | Drawer inside storage box | |
US20130056430A1 (en) | Napkin Holder | |
CN210556359U (en) | Dress designing instrument receiver | |
CN209527296U (en) | A kind of forest seedling nursing case convenient for storage | |
CN204076228U (en) | A kind of tool box | |
CN108106319A (en) | Refrigerator and its article-storage device | |
CN219270444U (en) | Student's noon break locker | |
CN210184892U (en) | Multifunctional desk | |
CN212354714U (en) | Combined storage box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |