CN211625305U - Distributed energy combustion purifying equipment - Google Patents
Distributed energy combustion purifying equipment Download PDFInfo
- Publication number
- CN211625305U CN211625305U CN202020255431.3U CN202020255431U CN211625305U CN 211625305 U CN211625305 U CN 211625305U CN 202020255431 U CN202020255431 U CN 202020255431U CN 211625305 U CN211625305 U CN 211625305U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- tobacco pipe
- pipe
- purification
- collection tobacco
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Chimneys And Flues (AREA)
Abstract
The utility model discloses a distributing type energy burning clarification plant, including collection tobacco pipe dead lever, the upper end surface fixed mounting of collection tobacco pipe dead lever has collection tobacco pipe way, one side surface fixed mounting that collection tobacco pipe said has an aviation duct, the one end fixed mounting that collection tobacco pipe said was kept away from to an aviation duct has an air-blower, the lower fixed surface that collection tobacco pipe said installs four butt joint pipes, the last fixed surface that collection tobacco pipe said installs four distribution purification barrel, the internal fixed surface who distributes the purification barrel installs smog purification layer, the opposite side surface fixed mounting that collection tobacco pipe said has the discharge flue. A distributed energy combustion clarification plant, can carry out the purification of distributing type to harmful gas, improved the quality of purification for purifying effect improves, can blow to equipment in, accelerate harmful gas's mobile speed, thereby improve harmful gas's purification efficiency.
Description
Technical Field
The utility model relates to a clarification plant field, in particular to distributing type energy burning clarification plant.
Background
The energy combustion purification equipment is used for purifying harmful gas generated in energy combustion, is widely applied to various combustion chemical engineering occasions, has a better use effect, gradually increases the demand of people on energy combustion along with the continuous development of society, and simultaneously, the demand of the energy combustion purification equipment is also gradually increased, but the existing energy combustion purification equipment cannot purify the quality, so the energy combustion purification equipment which can purify more thoroughly is needed; when energy burning clarification plant used, concentrated the harmful gas that the energy burning produced usually, carried out purification treatment again, led to unable more careful purifying for purifying effect is not good enough, and simultaneously, when purifying harmful gas, gaseous flow velocity was slower, has led to the reduction of purification efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a distributing type energy burning clarification plant, can effectively solve unable more careful purification in the background art, the slower problem of gaseous flow velocity.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a distributed energy combustion purification device comprises a smoke collection pipe fixing rod, wherein a smoke collection pipe is fixedly arranged on the outer surface of the upper end of the smoke collection pipe fixing rod, a first air guide pipe is fixedly arranged on the outer surface of one side of the smoke collection pipe, a first air blower is fixedly arranged at one end, far away from the smoke collection pipe, of the first air guide pipe, four butt-joint pipes are fixedly arranged on the lower surface of the smoke collection pipe, four distribution purification barrels are fixedly arranged on the upper surface of the smoke collection pipe, smoke purification layers are fixedly arranged on the inner surfaces of the distribution purification barrels, a smoke discharge pipe is fixedly arranged on the outer surface of the other side of the smoke collection pipe, a smoke discharge pipe fixing rod is fixedly arranged on the outer surface of the lower end of the smoke discharge pipe, an integration pipe is fixedly arranged at the position, above the smoke collection pipe, of the outer surface of one side of, and a second air blower is fixedly arranged at one end, far away from the smoke exhaust pipeline, of the second air guide pipe.
Preferably, the outer surface of the upper end of the smoke exhaust pipeline is fixedly provided with a pipeline outer cover, the outer surface of one side of the smoke exhaust pipeline is fixedly provided with a water inlet pipeline at a position above the second air guide pipe, the water inlet pipeline penetrates through the inner surface of the smoke exhaust pipeline, and the outer surface of the water inlet pipeline is fixedly provided with a plurality of drain pipes at a position inside the smoke exhaust pipeline.
Preferably, the first air guide pipe is communicated with the smoke collection pipe, and the second air guide pipe is communicated with the smoke discharge pipe.
Preferably, the first blower and the second blower have the same power, and are arranged in parallel.
Preferably, the integration pipeline is respectively communicated with the four distributed purification barrels, the butt joint pipes and the distributed purification barrels are symmetrically arranged and installed, and the butt joint pipes are communicated with the distributed purification barrels through smoke collecting pipelines.
Compared with the prior art, the utility model discloses following beneficial effect has: this distributed energy burning clarification plant, through the butt joint pipe that sets up, distribution purification bucket and smog purification layer, can carry out the purification of distributing type to harmful gas, improved the quality of purification for purifying effect improves, through a guide duct, an air-blower, No. two guide ducts and No. two air-blowers that set up, can blow to the equipment is inside, accelerates harmful gas's flow rate, thereby improves harmful gas's purification efficiency.
Drawings
Fig. 1 is a schematic view of the overall structure of a distributed energy combustion purification apparatus of the present invention;
fig. 2 is an internal structure diagram of a distributed purification barrel of the distributed energy combustion purification device of the present invention;
fig. 3 is an internal structure diagram of a smoke exhaust pipe of the distributed energy combustion purification equipment.
In the figure: 1. a smoke collecting pipe fixing rod; 2. a smoke collecting pipeline; 3. a first air guide pipe; 4. a first blower; 5. butt-joint pipes; 6. distributing and purifying barrels; 7. a smoke purification layer; 8. a smoke exhaust pipe fixing rod; 9. a smoke exhaust duct; 10. integrating the pipeline; 11. a second air guide pipe; 12. a second blower; 13. a duct enclosure; 14. a water inlet pipe; 15. and a water discharge pipe.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-3, a distributed energy combustion purification apparatus comprises a smoke collection pipe fixing rod 1, wherein a smoke collection pipe 2 is fixedly installed on the outer surface of the upper end of the smoke collection pipe fixing rod 1, a first air guide pipe 3 is fixedly installed on the outer surface of one side of the smoke collection pipe 2, a first air blower 4 is fixedly installed at one end, away from the smoke collection pipe 2, of the first air guide pipe 3, four butt-joint pipes 5 are fixedly installed on the lower surface of the smoke collection pipe 2, four distribution purification barrels 6 are fixedly installed on the upper surface of the smoke collection pipe 2, a smoke purification layer 7 is fixedly installed on the inner surface of the distribution purification barrel 6, a smoke discharge pipe 9 is fixedly installed on the outer surface of the other side of the smoke collection pipe 2, a smoke discharge pipe fixing rod 8 is fixedly installed on the outer surface of the lower end of the smoke discharge pipe 9, and an integration pipe 10 is fixedly installed at a position, a second air guide pipe 11 is fixedly installed on the outer surface of the other side of the smoke exhaust pipeline 9, and a second air blower 12 is fixedly installed at one end, far away from the smoke exhaust pipeline 9, of the second air guide pipe 11;
a pipeline outer cover 13 is fixedly arranged on the outer surface of the upper end of the smoke exhaust pipeline 9, a water inlet pipeline 14 is fixedly arranged on the outer surface of one side of the smoke exhaust pipeline 9, which is positioned above the second air guide pipe 11, the water inlet pipeline 14 penetrates through the inner surface of the smoke exhaust pipeline 9, a plurality of drain pipes 15 are fixedly arranged on the outer surface of the water inlet pipeline 14, which is positioned on the inner surface of the smoke exhaust pipeline 9, the water inlet pipeline 14 and the drain pipes 15 are used for connecting a water source to spray water into the smoke exhaust pipeline 9, and the harmful gases are humidified and; the first air guide pipe 3 is communicated with the smoke collection pipeline 2, and the second air guide pipe 11 is communicated with the smoke discharge pipeline 9; the first air blower 4 and the second air blower 12 have the same power, and the first air blower 4 and the second air blower 12 are arranged in parallel; the integration pipeline 10 is respectively communicated with the four distributed purification barrels 6, the butt joint pipes 5 and the distributed purification barrels 6 are symmetrically arranged and installed, and the butt joint pipes 5 are communicated with the distributed purification barrels 6 through the smoke collection pipeline 2.
It should be noted that the utility model relates to a distributed energy combustion purification device, the smoke collecting pipe fixing rod 1 is used for supporting and fixing the smoke collecting pipe 2, the smoke discharging pipe fixing rod 8 is used for supporting and fixing the smoke discharging pipe 9, when in use, the exhaust pipe is connected through the butt joint pipe 5, the harmful gas generated by energy combustion enters the smoke collecting pipe 2, the harmful gas enters the four distributed purification barrels 6 through the smoke collecting pipe 2, the harmful gas is filtered and purified through the smoke purification layers 7 in the distributed purification barrels 6, the purified harmful gas enters the smoke discharging pipe 9 through the integration pipe 10, and finally the purified gas is discharged through the pipe outer cover 13, when the harmful gas is purified, the four butt joint pipes 5 and the four distributed purification barrels 6 can be respectively connected with the four exhaust pipes, the harmful gas is purified in a distributed manner, when the gas enters the smoke collecting pipe 2 and the smoke discharging pipe 9, the first air blower 4 and the second air blower 12 can be connected with a power supply to operate, the first air blower 4 blows air into the smoke collection pipe 2 through the first air guide pipe 3, and the second air blower 12 blows air into the smoke discharge pipe 9 through the second air guide pipe 11, so that the air flowing speed in the smoke collection pipe 2 and the smoke discharge pipe 9 is increased.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a distributed energy combustion clarification plant which characterized in that: including collection tobacco pipe dead lever (1), the upper end external surface fixed mounting of collection tobacco pipe dead lever (1) has collection tobacco pipe way (2), one side external surface fixed mounting of collection tobacco pipe way (2) has guide duct (3) No. one, the one end fixed mounting that collection tobacco pipe way (2) was kept away from in guide duct (3) has air-blower (4) No. one, the lower fixed surface of collection tobacco pipe way (2) installs four butt-joint pipe (5), the last fixed surface of collection tobacco pipe way (2) installs four distribution purifying barrel (6), the internal surface fixed mounting who distributes purifying barrel (6) has smog to purify layer (7), the opposite side external surface fixed mounting of collection tobacco pipe way (2) has exhaust pipe (9), the lower extreme external surface fixed mounting of exhaust pipe (9) has exhaust pipe dead lever (8), the top position fixed mounting that one side external surface of pipeline (9) is located collection tobacco pipe way (2) has integration pipeline (2) 10) The outer surface of the other side of the smoke exhaust pipeline (9) is fixedly provided with a second air guide pipe (11), and one end, far away from the smoke exhaust pipeline (9), of the second air guide pipe (11) is fixedly provided with a second air blower (12).
2. The distributed energy source combustion purification apparatus of claim 1, wherein: the outer surface of the upper end of the smoke exhaust pipeline (9) is fixedly provided with a pipeline outer cover (13), the outer surface of one side of the smoke exhaust pipeline (9) is fixedly provided with a water inlet pipeline (14) at the position above the second air guide pipe (11), the water inlet pipeline (14) penetrates through the inner surface of the smoke exhaust pipeline (9), and the outer surface of the water inlet pipeline (14) is fixedly provided with a plurality of drain pipes (15) at the position of the inner surface of the smoke exhaust pipeline (9).
3. The distributed energy source combustion purification apparatus of claim 1, wherein: the first air guide pipe (3) is communicated with the smoke collection pipeline (2), and the second air guide pipe (11) is communicated with the smoke discharge pipeline (9).
4. The distributed energy source combustion purification apparatus of claim 1, wherein: the first air blower (4) and the second air blower (12) are identical in power, and the first air blower (4) and the second air blower (12) are arranged in parallel.
5. The distributed energy source combustion purification apparatus of claim 1, wherein: the integrated pipeline (10) is respectively communicated with the four distributed purification barrels (6), the butt joint pipes (5) and the distributed purification barrels (6) are symmetrically arranged and installed, and the butt joint pipes (5) are communicated with the distributed purification barrels (6) through the smoke collecting pipeline (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020255431.3U CN211625305U (en) | 2020-03-03 | 2020-03-03 | Distributed energy combustion purifying equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020255431.3U CN211625305U (en) | 2020-03-03 | 2020-03-03 | Distributed energy combustion purifying equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211625305U true CN211625305U (en) | 2020-10-02 |
Family
ID=72620838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020255431.3U Active CN211625305U (en) | 2020-03-03 | 2020-03-03 | Distributed energy combustion purifying equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211625305U (en) |
-
2020
- 2020-03-03 CN CN202020255431.3U patent/CN211625305U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211274184U (en) | High-temperature waste gas purification device | |
CN211625305U (en) | Distributed energy combustion purifying equipment | |
CN211328808U (en) | Negative pressure flue gas purification device of thermal power plant | |
CN205164470U (en) | Exhaust purifying device | |
CN2732356Y (en) | Wet method cyclone multi-duct dust collector | |
CN210814671U (en) | Noise reduction and waste gas treatment device for chemical pipeline | |
CN206411504U (en) | Concentrate treating vehicle exhaust complete set of equipments | |
CN210717618U (en) | Can purify sound-proof housing of boiler tail gas | |
CN210448473U (en) | Desulfurization dust collector | |
CN204911130U (en) | Energy -concerving and environment -protective dust removal, sulphur removal, smoke abatement system | |
CN209204962U (en) | A kind of high-temperature flue gas purification processing system | |
CN207708821U (en) | A kind of VOC gas processing unit | |
CN220424961U (en) | Efficient deacidification mechanism | |
CN205627558U (en) | Plasma photocatalyst exhaust gas purification device | |
CN111102666A (en) | Air purification treatment facility | |
CN217163775U (en) | Waste gas treatment device for gas outlet of glass fiber reinforced plastic septic tank | |
CN217737236U (en) | Incinerator with waste gas purification treatment function | |
CN213643428U (en) | Environmental protection purifier for flue gas ventilation pipeline | |
CN205435231U (en) | Horizontal acidic waste gas purifier | |
CN108654266A (en) | A kind of workshop disordered exhaust gas collection and purification device | |
CN211716742U (en) | Air purification treatment facility | |
CN216361028U (en) | Exhaust pipe capable of recovering heat energy and purifying automobile exhaust gas | |
CN211864551U (en) | Vortex optical catalytic pollutant degradation system for heating ventilation air conditioner | |
CN215692622U (en) | Combustor exhaust treatment device based on new forms of energy fuel | |
CN212838018U (en) | Tail gas purification device for high-power generator set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 030032 No. 8, Xinhua Road, Tanghuai Industrial Park, Shanxi transformation and comprehensive reform demonstration zone, Taiyuan City, Shanxi Province Patentee after: Shanxi Installation Group Co.,Ltd. Address before: 030021 No.8, Xinhua Road, Taiyuan Tanghuai Park, Shanxi comprehensive reform demonstration zone, Taiyuan City, Shanxi Province Patentee before: SHANXI INDUSTRIAL EQUIPMENT INSTALLATION GROUP Co.,Ltd. |