CN211623459U - Novel mining anchor rope - Google Patents
Novel mining anchor rope Download PDFInfo
- Publication number
- CN211623459U CN211623459U CN201922323033.0U CN201922323033U CN211623459U CN 211623459 U CN211623459 U CN 211623459U CN 201922323033 U CN201922323033 U CN 201922323033U CN 211623459 U CN211623459 U CN 211623459U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- sleeve pipe
- anchor rope
- hole
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005065 mining Methods 0.000 title claims abstract description 9
- 238000001125 extrusion Methods 0.000 claims abstract description 44
- 239000010963 304 stainless steel Substances 0.000 claims description 21
- 229910000589 SAE 304 stainless steel Inorganic materials 0.000 claims description 21
- 230000003064 anti-oxidating effect Effects 0.000 claims description 18
- 239000000463 material Substances 0.000 claims description 4
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 claims description 2
- 230000006978 adaptation Effects 0.000 claims description 2
- 239000011701 zinc Substances 0.000 claims description 2
- 229910052725 zinc Inorganic materials 0.000 claims description 2
- 230000003647 oxidation Effects 0.000 description 9
- 238000007254 oxidation reaction Methods 0.000 description 9
- 230000007613 environmental effect Effects 0.000 description 5
- 239000011435 rock Substances 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 230000007797 corrosion Effects 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 239000003963 antioxidant agent Substances 0.000 description 1
- 230000003078 antioxidant effect Effects 0.000 description 1
- 235000006708 antioxidants Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Ropes Or Cables (AREA)
Abstract
The utility model discloses a novel mining anchor rope, including the anchor rope, the surface cover of anchor rope is equipped with the sleeve pipe, the top and the bottom of cover intraductal chamber are all seted up flutedly, the inner wall fixedly connected with spring of recess, the one end fixedly connected with clamp splice of recess inner wall is kept away from to the spring, the through-hole has all been seted up to sheathed tube top and bottom, through-hole and recess intercommunication, the clamp splice is close to one side fixedly connected with connecting rod of through-hole, the one end that the clamp splice was kept away from to the connecting rod runs through to the inner chamber of through-hole, the connecting rod is located the one end fixedly connected with extrusion. The utility model discloses possess and be convenient for dismantle anchor rope tip sleeve pipe, save the advantage of resource, solved anchor rope tip fixed cover and be difficult to dismantle after connecting, mostly be disposable, cut the anchor rope mostly when needing to dismantle, install new fixed cover, wasted the resource, be not conform to the problem of energy-concerving and environment-protective requirement.
Description
Technical Field
The utility model relates to an anchor rope technical field specifically is a novel mining anchor rope.
Background
The anchor cable is characterized in that when the main cable is anchored in a side hole in a suspension bridge, the main cable is divided into a plurality of steel strands which are respectively anchored in an anchor ingot, the steel strands are called as the anchor cables, the anchor cable is fixed on a slope surface through the outer end, the other end of the anchor cable is anchored in a stable rock body within a sliding surface and penetrates through a prestressed steel strand of the sliding surface of the side slope, the anti-sliding resistance is directly generated on the sliding surface, the anti-sliding friction resistance is increased, the structural surface is in a compression state, the integrity of the rock body of the side slope is improved, the mechanical property of the rock body is fundamentally improved, the displacement of the rock body is effectively controlled, the stability of the rock body is promoted, and the purposes of rectifying bedding.
The tip of anchor rope all fixed mounting have fixed cover for the tip of fixed anchor rope avoids anchor rope tip pine to take off, and fixed cover is difficult to dismantle after being connected with the anchor rope, mostly is disposable, cuts the anchor rope mostly when needing to dismantle, installs new fixed cover, has wasted the resource, is not conform to energy-concerving and environment-protective requirement.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel mining anchor rope possesses and is convenient for dismantle anchor rope tip sleeve pipe, saves the advantage of resource, has solved anchor rope tip fixed cover and has been difficult to dismantle after connecting, mostly is disposable, mostly cuts the anchor rope when needing to dismantle, installs new fixed cover, has wasted the resource, is not conform to the problem of energy-concerving and environment-protective requirement.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel mining anchor rope, includes the anchor rope, the surface cover of anchor rope is equipped with the sleeve pipe, the top and the bottom of sleeve pipe inner chamber are all seted up flutedly, the inner wall fixedly connected with spring of recess, the one end fixedly connected with clamp splice of recess inner wall is kept away from to the spring, the through-hole has all been seted up to sheathed tube top and bottom, through-hole and recess intercommunication, the clamp splice is close to one side fixedly connected with connecting rod of through-hole, the one end that the clamp splice was kept away from to the connecting rod runs through to the inner chamber of through-hole, the connecting rod is located the one end fixedly connected with extrusion piece of through-hole inner chamber, one side that the connecting rod was kept away from to the extrusion piece runs.
Preferably, the left side fixedly connected with extrusion ring of nut, the extrusion ring cover is established on the sheathed tube surface, the internal diameter of extrusion ring is greater than sheathed tube external diameter, the surface of extrusion piece is provided with the inclined plane with extrusion ring looks adaptation.
Preferably, the fixed cover in sheathed tube left end is equipped with rotatory piece, the side shape of rotatory piece is regular hexagon, the right side fixedly connected with disc of rotatory piece, the fixed cover of disc is established on sheathed tube surface.
Preferably, the surface of the sleeve is provided with an external thread, and the inner wall of the nut is provided with an internal thread matched with the external thread.
Preferably, the sleeve pipe includes 304 stainless steel layers, antioxidation layer in the inner wall fixedly connected with of 304 stainless steel layers, the outer antioxidation layer of outer fixed surface connected with of 304 stainless steel layers, interior antioxidation layer is the same with outer antioxidation layer's material, interior antioxidation layer is zinc with outer antioxidation layer main material.
Preferably, one end of the clamping block, which is far away from the spring, extends to an inner cavity of the sleeve, and the clamping block is positioned on one side of the inner cavity of the sleeve and is in contact with the anchor cable.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses an anchor rope, sleeve pipe, recess, spring, clamp splice, through-hole, connecting rod, extrusion piece, nut and extrusion ring cooperate, possess and be convenient for dismantle anchor rope tip sleeve pipe, the advantage of saving the resource has solved the fixed cover of anchor rope tip and has been difficult to dismantle after connecting, mostly is disposable, mostly cuts the anchor rope when needing to dismantle, installs new fixed cover, has wasted the resource, is not conform to the problem of energy-concerving and environment-protective requirement.
2. The utility model discloses a set up the spring, can be to extrusion piece joint support, through setting up the clamp splice, can press from both sides tightly the anchor rope, through setting up nut and sleeve pipe threaded connection, swivel nut makes the nut drive extrusion ring lateral shifting, the extrusion ring extrudees the extrusion piece, through setting up rotatory piece, can dismantle the position joint with the spanner, be convenient for fix the sleeve pipe, thereby be convenient for rotatory with spanner operating nut, oxidation resisting layer and outer oxidation resisting layer in through setting up, can carry out anti-oxidation treatment to the surface on 304 stainless steel layer, avoid 304 stainless steel layer to corrode by the environmental impact, adopt 304 stainless steel through setting up 304 stainless steel layers, environmental protection and sanitation have, stand wear and tear, low temperature resistance, thermal expansion performance and thermal insulation performance are fabulous and advantages such as corrosion resistance is strong, can serious sheathed tube life greatly.
Drawings
FIG. 1 is a schematic sectional view of the structure of the present invention;
FIG. 2 is a right sectional view of the sleeve of the present invention;
FIG. 3 is a front view of the structure of the present invention;
fig. 4 is a schematic view of the right side of the local structure of the present invention.
In the figure: anchor rope 1, sleeve pipe 2, 3 recesses, 4 springs, 5 clamp blocks, 6 through-holes, 7 connecting rods, 8 extrusion blocks, 9 nuts, 10 extrusion rings, 11 rotating blocks, 12 discs, 13304 stainless steel layer, 14 inner oxidation resistant layer, 15 outer oxidation resistant layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model discloses an anchor rope 1, sleeve pipe 2, spring 4, clamp splice 5, connecting rod 7, extrusion piece 8, nut 9, extrusion ring 10, rotatory piece 11, disc 12, 304 stainless steel layer 13, interior oxidation resisting layer 14 and outer oxidation resisting layer 15 part are the parts that general standard spare or technical field personnel know, and its structure and principle all are that this technical staff all can learn through the technical manual or learn through conventional experimental approach.
Referring to fig. 1-4, a novel anchor cable for mining, includes an anchor cable 1, a sleeve 2 is sleeved on the surface of the anchor cable 1, grooves 3 are formed at the top and bottom of an inner cavity of the sleeve 2, a spring 4 is fixedly connected to the inner wall of the groove 3, a clamping block 5 is fixedly connected to one end of the spring 4 away from the inner wall of the groove 3, one end of the clamping block 5 away from the spring 4 extends to the inner cavity of the sleeve 2, the clamping block 5 is located at one side of the inner cavity of the sleeve 2 and contacts with the anchor cable 1, through holes 6 are formed at the top and bottom of the sleeve 2, the through holes 6 are communicated with the groove 3, a connecting rod 7 is fixedly connected to one side of the clamping block 5 close to the through holes 6, one end of the connecting rod 7 away from the clamping block 5 penetrates to the inner cavity of the through holes 6, a squeezing block 8 is fixedly connected to one end of the inner cavity of the through holes 6, a, the left side of the nut 9 is fixedly connected with an extrusion ring 10, the extrusion ring 10 is sleeved on the surface of the sleeve 2, the inner diameter of the extrusion ring 10 is larger than the outer diameter of the sleeve 2, the surface of the extrusion block 8 is provided with an inclined plane matched with the extrusion ring 10, the surface of the sleeve 2 is provided with an external thread, the inner wall of the nut 9 is provided with an internal thread matched with the external thread, the left end of the sleeve 2 is fixedly sleeved with a rotating block 11, the side surface of the rotating block 11 is in a regular hexagon shape, the right side of the rotating block 11 is fixedly connected with a disc 12, the disc 12 is fixedly sleeved on the surface of the sleeve 2, the sleeve 2 comprises a 304 stainless steel layer 13, the inner wall of the 304 stainless steel layer 13 is fixedly connected with an inner oxidation resistant layer 14, the outer surface of the 304 stainless steel layer 13 is fixedly connected with an outer oxidation resistant layer 15, the inner oxidation, through setting up the spring 4, can be to extrusion piece 8 joint support, through setting up clamp splice 5, can press from both sides tight anchor rope 1, through setting up nut 9 and sleeve pipe 2 threaded connection, swivel nut 9 makes nut 9 drive extrusion ring 10 lateral shifting, extrusion ring 10 extrudees extrusion piece 8, through setting up swivel block 11, can dismantle the position joint with the spanner, it is convenient for fix sleeve pipe 2, thereby it is rotatory to be convenient for operate nut 9 with the spanner, through setting up interior antioxidation coating 14 and outer antioxidation coating 15, can carry out anti-oxidant treatment to the surface of 304 stainless steel layer 13, avoid 304 stainless steel layer 13 to be corroded by the environmental impact, through setting up 304 stainless steel layer 13 and adopting 304 stainless steel, have environmental protection health, stand wear and tear, low temperature resistant, thermal expansion performance and thermal insulation performance are fabulous and a great deal of advantage such as corrosion resistance is strong, can seriously sleeve pipe 2's life, through anchor rope 1, sleeve pipe 2, recess 3, spring 4, clamp splice 5, through-hole 6, connecting rod 7, extrusion piece 8, nut 9 and extrusion ring 10 cooperate, possess and be convenient for dismantle 1 tip sleeve pipe 2 of anchor rope, the advantage of saving the resource, it is difficult to dismantle after 1 tip fixed cover of anchor rope is connected to have solved, mostly be disposable, cut the anchor rope when needing to dismantle mostly, install new fixed cover, the resource has been wasted, be not conform to the problem of energy-concerving and environment-protective requirement.
When the anchor cable fixing device is used, the anchor cable 1 extends into the space between the two clamping blocks 5 in the inner cavity of the sleeve 2, the anchor cable is clamped with the rotating block 11 through a spanner and is clamped with the nut 9 through another spanner, the nut 9 is in threaded connection with the sleeve 2 and moves leftwards, the nut 9 drives the extrusion ring 10 to move leftwards, the extrusion ring 10 is in contact with the extrusion block 8 to extrude the extrusion block 8, the extrusion block 8 moves vertically, the extrusion block 8 pushes the connecting rod 7 to move vertically, the connecting rod 7 pushes the clamping blocks 5 to clamp the anchor cable 1, so that the sleeve 2 and the anchor cable 1 are fixedly installed, the surface of the 304 stainless steel layer 13 can be subjected to anti-oxidation treatment through the arrangement of the inner anti-oxidation layer 14 and the outer anti-oxidation layer 15, the corrosion of the 304 stainless steel layer 13 caused by the environment is avoided, the 304 stainless steel layer 13 is adopted, and the anchor cable fixing device has the advantages of environmental protection, sanitation, wear resistance, the service life of the casing 2 can be greatly increased.
In summary, the following steps: this novel mining anchor rope cooperates through anchor rope 1, sleeve pipe 2, recess 3, spring 4, clamp splice 5, through-hole 6, connecting rod 7, extrusion piece 8, nut 9 and extrusion ring 10, has solved and has been difficult to dismantle after the fixed cover of anchor rope tip is connected, mostly is disposable, cuts the anchor rope mostly when needing to dismantle, installs new fixed cover, has wasted the resource, is not conform to the problem of energy-concerving and environment-protective requirement.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a novel mining anchor rope, includes anchor rope (1), its characterized in that: the anchor rope (1) surface cover is equipped with sleeve pipe (2), recess (3) have all been seted up to the top and the bottom of sleeve pipe (2) inner chamber, the inner wall fixedly connected with spring (4) of recess (3), one end fixedly connected with clamp splice (5) of recess (3) inner wall are kept away from in spring (4), through-hole (6) have all been seted up to the top and the bottom of sleeve pipe (2), through-hole (6) and recess (3) intercommunication, one side fixedly connected with connecting rod (7) that clamp splice (5) are close to through-hole (6), the one end that clamp splice (5) were kept away from in connecting rod (7) runs through to the inner chamber of through-hole (6), connecting rod (7) are located one end fixedly connected with extrusion piece (8) of through to the outside of through-hole (6), the surface of sleeve pipe (2) and the right side thread bush that is located extrusion piece (8) are equipped with nut (9).
2. The novel mine anchor cable of claim 1, wherein: the left side fixedly connected with extrusion ring (10) of nut (9), the surface at sleeve pipe (2) is established in extrusion ring (10) cover, the internal diameter of extrusion ring (10) is greater than the external diameter of sleeve pipe (2), the surface of extrusion piece (8) is provided with the inclined plane with extrusion ring (10) looks adaptation.
3. The novel mine anchor cable of claim 1, wherein: the left end of sleeve pipe (2) is fixed to be equipped with rotatory piece (11), the side shape of rotatory piece (11) is regular hexagon, the right side fixedly connected with disc (12) of rotatory piece (11), disc (12) fixed cover is established on the surface of sleeve pipe (2).
4. The novel mine anchor cable of claim 1, wherein: the surface of the sleeve (2) is provided with an external thread, and the inner wall of the nut (9) is provided with an internal thread matched with the external thread.
5. The novel mine anchor cable of claim 1, wherein: sleeve pipe (2) include 304 stainless steel layer (13), antioxidation layer (14) in the inner wall fixedly connected with of 304 stainless steel layer (13), antioxidation layer (15) outside the external fixed surface of 304 stainless steel layer (13) is connected with, the material of interior antioxidation layer (14) and outer antioxidation layer (15) is the same, interior antioxidation layer (14) and outer antioxidation layer (15) main material are zinc.
6. The novel mine anchor cable of claim 1, wherein: one end, far away from the spring (4), of the clamping block (5) extends to the inner cavity of the sleeve (2), and the clamping block (5) is located on one side of the inner cavity of the sleeve (2) and is in contact with the anchor cable (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922323033.0U CN211623459U (en) | 2019-12-23 | 2019-12-23 | Novel mining anchor rope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922323033.0U CN211623459U (en) | 2019-12-23 | 2019-12-23 | Novel mining anchor rope |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211623459U true CN211623459U (en) | 2020-10-02 |
Family
ID=72631023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922323033.0U Active CN211623459U (en) | 2019-12-23 | 2019-12-23 | Novel mining anchor rope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211623459U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113187471A (en) * | 2021-04-26 | 2021-07-30 | 中国矿业大学(北京) | Active measurement device and method for cross-fault interface Newtonian force in shale gas exploitation process |
-
2019
- 2019-12-23 CN CN201922323033.0U patent/CN211623459U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113187471A (en) * | 2021-04-26 | 2021-07-30 | 中国矿业大学(北京) | Active measurement device and method for cross-fault interface Newtonian force in shale gas exploitation process |
CN113187471B (en) * | 2021-04-26 | 2023-06-06 | 中国矿业大学(北京) | Active measurement device and method for Newton force crossing fault interface in shale gas exploitation process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3221316U (en) | Tension line clamp for carbon fiber composite core | |
CN211623459U (en) | Novel mining anchor rope | |
CN210890520U (en) | A pipeline for hydraulic engineering | |
CN108538472B (en) | High-elasticity composite cable | |
CN107461160B (en) | Arc-shaped flexible slip tooth long-life casing head | |
CN202167814U (en) | Flexible fixing device for vertical laying of cable with large cross-section | |
CN212011974U (en) | Aluminum alloy single core cable clamp | |
CN202513519U (en) | Carbon fiber photoelectric composite wire connecting hardware | |
CN213419789U (en) | Steel strand wires connecting piece convenient to maintenance | |
CN210800318U (en) | Anticorrosive wear-resisting interior outer oil pipe that plates with external structure | |
CN114961626A (en) | Electric pump oil production wellhead well completion process using steel continuous pipe built-in cable | |
CN211193729U (en) | Horse faucet mounting tool | |
CN209298844U (en) | A kind of supply lines compact suspension clamp | |
CN210218987U (en) | Automobile brake oil pipe with electroplating coating | |
CN212258355U (en) | Cluster type strain clamp that fixity is good | |
CN218325907U (en) | Brake disc structure of oil drilling machine | |
CN211126121U (en) | Cable end connecting and positioning device | |
CN221074183U (en) | Double-seal coiled tubing hanger | |
CN211779367U (en) | Pipeline fixing device for water conservancy construction | |
CN220956295U (en) | U-shaped mounting of high friction | |
CN213018158U (en) | High-temperature-resistant and high-pressure-resistant rubber pipe | |
CN218671012U (en) | Oil leakage prevention pipe head | |
CN213366206U (en) | Communication cable with good wear-resistant protection effect | |
CN212407262U (en) | Wind tower high-strength bolt protective sleeve | |
CN219801762U (en) | High-strength low-temperature-resistant CPVC protection tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201119 Address after: Cai Yuan Zhen Lai Shan Cun, Qian'an City, Tangshan City, Hebei Province Patentee after: Qian'an Jiayuan industry and Trade Co., Ltd Address before: 610000 building 23, Gongren village, caojia lane, Jinniu District, Chengdu City, Sichuan Province Patentee before: Chen Guiyun |