CN211622111U - House building rapid construction environmental protection wall - Google Patents

House building rapid construction environmental protection wall Download PDF

Info

Publication number
CN211622111U
CN211622111U CN202020059512.6U CN202020059512U CN211622111U CN 211622111 U CN211622111 U CN 211622111U CN 202020059512 U CN202020059512 U CN 202020059512U CN 211622111 U CN211622111 U CN 211622111U
Authority
CN
China
Prior art keywords
wall body
wallboard
reinforcing bar
bar post
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020059512.6U
Other languages
Chinese (zh)
Inventor
徐建刚
廖子先
徐建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Zhongyu Construction Engineering Co ltd
Original Assignee
Sichuan Zhongyu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Zhongyu Construction Engineering Co ltd filed Critical Sichuan Zhongyu Construction Engineering Co ltd
Priority to CN202020059512.6U priority Critical patent/CN211622111U/en
Application granted granted Critical
Publication of CN211622111U publication Critical patent/CN211622111U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a housing construction environmental protection wall body of being under construction fast, it includes wall body and wallboard, is provided with the reinforcing bar net in the wall body, is the even array of rectangle many reinforcing bars posts of having arranged on the wall body, the reinforcing bar post perpendicular and wall body surface, reinforcing bar post and reinforcing bar net fixed connection, set up four recesses with the reinforcing bar post position looks adaptation of arranging on the wallboard is close to the face of wall body, is equipped with the connecting piece that is used for connecting the reinforcing bar post in the recess. Fitment personnel when installing the wallboard, bury the reinforcing bar net underground at the internal fixation of wall in advance to make each branch's steel bar post on the reinforcing bar net stretch out the wall body, align each steel bar post on the wall body and insert with the recess of wallboard after that, it is fixed with the steel bar post connection through wallboard in-connection union piece, thereby fix the wallboard on the wall body, and through the reasonable wallboard that splices in succession, can make the wallboard complete cover on the wall body, effectively avoid the wallboard to appear the deviation aversion when the installation, the utility model discloses simple to operate has, improve the effect of wallboard installation effectiveness.

Description

House building rapid construction environmental protection wall
Technical Field
The utility model belongs to the technical field of the technique of housing construction wall body and specifically relates to a housing construction environmental protection wall body of being under construction fast.
Background
The fabricated building is a building which is formed by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories (such as floor slabs, wall slabs, stairs, balconies and the like) in the factory, transporting the components and accessories to a building construction site, and assembling and installing the components and the accessories on the site in a reliable connection mode.
Chinese patent with grant publication number CN207453190U discloses a housing construction environmental protection wall body of constructing fast, including concrete layer, first layer tie coat, second layer tie coat, third layer tie coat and steel column net, fixed mounting has the acoustic celotex board between first layer tie coat and second layer tie coat, and fixed mounting has the heated board between second layer tie coat and third layer tie coat, makes the wall body have good heat preservation sound insulation function, equal fixed mounting has the steel column net in first layer tie coat, second layer tie coat and the third layer tie coat, the steel column net is formed by steel column in violently, steel column in erecting, horizontal frame steel column and the vertical frame steel column interlude fixed connection each other. The connection mode has strong stability, so that the wall has compressive strength and durability.
The above prior art solutions have the following drawbacks: the rapid construction environmental protection wall body that most house building used is comparatively inconvenient in the aspect of erection joint, when two solitary wallboard interconnect, often can need use concrete placement or purpose-built glue bonding, but does not have fine positioner when two wallboard are connected, the condition that the butt joint deviation shifted often can appear to produce the influence to subsequent building construction, also hinder the whole of wall body pleasing to the eye. Therefore, a novel rapid construction method of the wallboard is provided.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, one of the purposes of the utility model is to provide a house building rapid construction environmental protection wall body that is under construction fast and conveniently.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a housing construction environmental protection wall body of being under construction fast, includes the wall body, still includes the wallboard, be provided with the reinforcing bar net in the wall body, be the even array of rectangle many reinforcing bar posts of having arranged on the wall body, the reinforcing bar post is perpendicular and wall body surface, reinforcing bar post and reinforcing bar net fixed connection, the wallboard size is 1.5 times of reinforcing bar post spacing distance, four recesses of arranging the position looks adaptation with the reinforcing bar post are seted up on the wallboard is close to the face of wall body, be equipped with the connecting piece that is used for connecting the reinforcing bar post in the recess.
Through adopting above-mentioned technical scheme, the decorator is when the installation wallboard, steel bar net is buried underground at the wall internal fixation in advance, and make each branch's steel bar post on the steel bar net stretch out the wall body, then, pack into the connecting piece in the recess of wallboard, then align each steel bar post on the wall body and insert with wallboard upper groove, it is fixed with steel bar post connection through wallboard in-connection piece, thereby fix the wallboard on the wall body, and through reasonable continuous concatenation wallboard, can make the wallboard complete cover on the wall body, effectively avoid the wallboard when the installation deviation aversion to appear, and simple to operate, improve wallboard installation effectiveness greatly.
The present invention may be further configured in a preferred embodiment as: the connecting piece is the connecting cylinder, the connecting cylinder includes support sheet, lower support sheet and sleeve, the big footpath of sleeve equals with the flute diameter, the sleeve is pegged graft in the recess, sleeve length is less than the depth of groove, go up the coaxial rigid coupling of support sheet on the outer wall that the connecting cylinder is close to wall body one end, the coaxial rigid coupling of lower support sheet is kept away from on the inner wall of support sheet one end at the connecting cylinder, the coaxial perforation of having seted up on the lower support sheet, fenestrate diameter is less than the steel bar post diameter, telescopic internal diameter is greater than the steel bar post diameter.
Through adopting above-mentioned technical scheme, when the installation wallboard, insert the connecting cylinder in the recess on the wallboard earlier, with the sleeve embedding recess of connecting cylinder, align the reinforcing bar post on the wall body with the recess on the wallboard after that, align the opening that the sleeve has last stay piece one end with the reinforcing bar post, promote the wallboard to pressing close to with the wall body after that, and at promotion wallboard in-process, reinforcing bar post butt is on the telescopic bottom suspension fagging, and make bottom suspension fagging and sleeve deformation, the reinforcing bar post is worn out from the perforation on the bottom suspension fagging, the sleeve takes place to warp the back and dies with the recess card, thereby it is fixed to make wallboard and reinforcing bar post be connected, the wallboard installation is convenient fast.
The present invention may be further configured in a preferred embodiment as: the open position of recess is equipped with the step, go up the stay butt on the step, it demolishs the clearance to leave between stay and the wall body to go up, the coaxial chimb that has set firmly on the outer wall of steel bar column, the chimb is close to wall body one end and wall body butt, and the outward flange that wall body one end was kept away from to the chimb sets up to the circular conical surface.
Through adopting above-mentioned technical scheme, the fitment personnel damage at the wallboard, when needing to be changed, keep away from the wall body from the wallboard and break the wallboard simultaneously, expose the bottom of recess, use extracting tool after that, the bottom suspension fagging that promotes sleeve bottom is close to the wall body, make telescopic last stay butt on the conical surface on the chimb, and have the sleeve and go up the stay one end and prop big to both ends equidimension, thereby make the connecting cylinder deviate from in can following the recess on the wallboard, the convenience is changed the wallboard.
The present invention may be further configured in a preferred embodiment as: the top wall of the upper supporting sheet is radially provided with a first pulling and cracking groove along the self, the inner wall of the sleeve is radially provided with a second pulling and cracking groove along the self, and one end of the first pulling and cracking groove is communicated with one end of the second pulling and cracking groove.
Through adopting above-mentioned technical scheme, dismantle the wallboard at operating personnel, when promoting the sleeve to butt on the chimb conical surface, the sleeve has upper strut piece one end and follows sleeve and the first split groove and the second on the upper strut piece and draw split groove fracture, support greatly, and the wallboard is dismantled to the operating personnel near the limit.
The present invention may be further configured in a preferred embodiment as: and a disassembly mark sinking groove coaxial with the groove is formed in the surface of the wallboard far away from the wall body.
Through adopting above-mentioned technical scheme, operating personnel when dismantling the wallboard, follow the wallboard and keep away from the definite groove position of the heavy groove of dismantlement sign on the wall body face, the operating personnel of being convenient for dismantles the wallboard.
The present invention may be further configured in a preferred embodiment as: and annular anti-skidding lines are arranged on the outer wall of the steel bar column.
Through adopting above-mentioned technical scheme, install on the wall body at the wallboard, when the perforation on the under bracing piece was propped up tightly on the outer wall of reinforced column, the last anti-skidding line of reinforced column can increase down the backing sheet and the reinforced column between frictional force, makes the connecting cylinder be difficult to deviate from the reinforced column, improves wallboard installation stability.
The present invention may be further configured in a preferred embodiment as: and an elastic filling layer is laid on the wall body.
By adopting the technical scheme, the elastic filling layer is laid on the surface of the wall body, so that when the wall board is installed on the wall body, the gap between the wall board and the wall body is filled by the elastic filling layer, the wall body is filled, and the structural stability of the wall body is improved.
The present invention may be further configured in a preferred embodiment as: the elastic filling layer is a polypropylene plastic foaming plate.
By adopting the technical scheme, the polypropylene plastic foaming material has the advantages of low heat conductivity, low water vapor permeability, high energy absorbability, compressibility and the like, so that the polypropylene plastic foaming material is suitable for filling gaps between the wall board and the wall body and has a good sound insulation effect.
To sum up, the utility model discloses a following at least one useful technological effect:
1. when a decoration worker installs the wallboard, a reinforcing mesh is fixedly embedded in the wall in advance, each branch reinforcing steel bar column on the reinforcing mesh extends out of the wall, then the groove of the wallboard is aligned with and inserted into each reinforcing steel bar column on the wall, and the wallboard is fixedly connected with the reinforcing steel bar columns through the connecting piece in the wallboard, so that the wallboard is fixed on the wall, and the wallboard can be completely covered on the wall through reasonably and continuously splicing the wallboard, thereby effectively avoiding the deviation and displacement of the wallboard during installation, being convenient to install and greatly improving the installation efficiency of the wallboard;
2. when the wallboard is installed, the reinforcing steel bar columns on the wall body are inserted into the sleeves in the grooves on the wallboard in an aligned mode, the wallboard is pushed to be close to the wall body, the reinforcing steel bar columns abut against the lower supporting pieces in the sleeves in the process of pushing the wallboard, the lower supporting pieces and the sleeves are deformed, the reinforcing steel bar columns penetrate through the through holes in the lower supporting pieces, the sleeves are clamped with the grooves after being deformed, and therefore the wallboard and the reinforcing steel bar columns are fixedly connected, and the wallboard is installed quickly and conveniently;
3. the polypropylene plastic foaming material has the advantages of low heat conductivity, low water vapor permeability, high energy absorption, compressibility and the like, so that the polypropylene plastic foaming material is suitable for filling gaps between the wall board and the wall body and has a good sound insulation effect.
Drawings
Fig. 1 is a schematic plan sectional structure of the whole of the present invention.
Fig. 2 is a schematic view of the whole three-dimensional partial sectional structure of the present invention.
Fig. 3 is a schematic view of a partial cross-sectional structure of the connecting cylinder of the present invention.
In the figure, 1, a wall body; 11. a wallboard; 12. a reinforcing mesh; 2. a steel bar column; 21. a convex edge; 3. a groove; 31. a step; 4. a connecting cylinder; 41. an upper support sheet; 42. a lower support sheet; 43. a sleeve; 44. perforating; 45. a first stretch-break groove; 46. a second pulling and cracking groove; 5. disassembling the mark sink; 6. an elastic filling layer.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Refer to fig. 1 and 2, do the utility model discloses a housing construction environmental protection wall body of being under construction fast, including wall body 1 and wallboard 11. The reinforcing mesh 12 is preset in the wall body 1 in the pouring process, the reinforcing columns 2 are welded at the nodes on the net rack mesh, the reinforcing columns 2 are uniformly distributed on the reinforcing mesh 12 in a rectangular array, and the reinforcing columns 2 vertically extend out of the surface of the wall body 1. An elastic filling layer 6 is laid on the surface of the wallboard 11, in the embodiment, the elastic filling layer 6 is a polypropylene plastic foam board, which has the advantages of low heat conductivity, low water vapor permeability, high energy absorbability, compressibility and the like, and can effectively fill the gap between the wallboard 11 and the wall body 1 when being installed.
Referring to fig. 1 and 2, the wall panel 11 is sized to be 1.5 times the spacing between four reinforcing bars 2 distributed in the form of the smallest rectangular unit. The back of wallboard 11, on the one side towards wall body 1 promptly, set up four recesses 3 with four reinforcing bar post 2 configuration position looks adaptations in the minimum rectangle unit, the open position of recess 3 is equipped with step 31. Offer on wallboard 11's the front with the coaxial dismantlement sign heavy groove 5 of recess 3, dismantle sign heavy groove 5 degree of depth and be 1mm ~2 mm.
Referring to fig. 2 and 3, a connecting piece for connecting the reinforcing steel bar column 2 is arranged in the groove 3, in the embodiment, the connecting piece is a connecting cylinder 4, and the connecting cylinder 4 comprises an upper supporting piece 41, a lower supporting piece 42 and a sleeve 43. The major diameter of sleeve 43 equals with recess 3 internal diameter, goes up the major diameter of stay 41 and is not more than the major diameter of step 31, goes up stay 41 and locates on the outer wall of sleeve 43 one end, and lower support 42 locates on the inner wall of the sleeve 43 other end, and this connecting cylinder 4 is through punching press integrated into one piece. The lower support piece 42 is coaxially provided with a through hole 44, the diameter of the through hole 44 is smaller than that of the steel bar column 2, the inner diameter of the sleeve 43 is larger than that of the steel bar column 2, and the length of the sleeve 43 is smaller than the depth of the groove 3. One end of the connecting tube 4 with the lower support piece 42 is inserted into the groove 3, so that when the upper support piece 41 is abutted on the step 31, a detachment gap exists between the upper support piece 41 and the back surface of the wall plate 11. The wall surface of the upper supporting sheet 41 far away from the lower supporting sheet 42 is radially provided with a first pulling and cracking groove 45 along the self, the inner wall of the sleeve 43 is provided with a second pulling and cracking groove 46 along the self depth direction, and the first pulling and cracking groove 45 is communicated with the second pulling and cracking groove 46. The first pulling and cracking grooves 45 and the second pulling and cracking grooves 46 are evenly distributed in seven groups at intervals along the circumferential direction of the connecting cylinder 4.
Referring to fig. 1, a section of annular anti-slip pattern is arranged at the end part of the reinforced column 2, which is close to the reinforced column 2, on the outer wall of the part of the reinforced column 2 extending out of the wall body 1. The part of the reinforcing steel bar column 2 extending out of the wall body 1 is close to one end of the wall, a section of convex edge 21 is coaxially arranged, and the outer edge of one end, away from the wall body 1, of the convex edge 21 is a conical surface. The outer diameter of the collar 21 is equal to the inner diameter of the sleeve 43.
The implementation principle of the embodiment is as follows: when installing the wall panel 11, the fitter fixes and buries the reinforcing mesh 12 in the wall body 1 in advance, and makes each branch reinforcing steel bar column 2 on the reinforcing mesh 12 extend out of the wall body 1. Next, a connector is inserted into the groove 3 of the wall plate 11, the connecting sleeve 43 of the connector is inserted into the groove 3, then the groove 3 of the wall plate 11 is aligned with the steel bar column 2 on the wall body 1, and the steel bar column 2 is aligned with the opening of the sleeve 43 with one end of the upper supporting piece 41. Then, the wall plate 11 is pushed to be close to the wall body 1, in the process of pushing the wall plate 11, the steel bar column 2 abuts against the lower support piece 42 in the sleeve 43, the lower support piece 42 and the sleeve 43 are deformed, the steel bar column 2 penetrates out of a through hole 44 in the lower support piece 42, and the sleeve 43 is clamped with the groove 3 after being deformed, so that the wall plate 11 is fixedly connected with the steel bar column 2. And through splicing the wallboard 11 in a reasonable and continuous manner, the wallboard 11 can be completely covered on the wall body 1, the deviation and displacement of the wallboard 11 during installation are effectively avoided, the installation is convenient, and the installation efficiency of the wallboard 11 is greatly improved.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a housing construction environmental protection wall body of being under construction fast, includes wall body (1), its characterized in that: still include wallboard (11), be provided with reinforcing bar net (12) in wall body (1), be many reinforcing bar post (2) of the even array arrangement of rectangle on wall body (1), reinforcing bar post (2) perpendicular and wall body (1) surface, reinforcing bar post (2) and reinforcing bar net (12) fixed connection, wallboard (11) size is 1.5 times of reinforcing bar post (2) interval distance, set up four recess (3) of arranging position looks adaptation with reinforcing bar post (2) on wallboard (11) is close to the face of wall body (1), be equipped with the connecting piece that is used for connecting reinforcing bar post (2) in recess (3).
2. The building construction rapid construction environment-friendly wall body as claimed in claim 1, characterized in that: the connecting piece is connecting cylinder (4), connecting cylinder (4) are including support piece (41), bottom suspension strut (42) and sleeve (43), sleeve (43) major diameter equals with recess (3) internal diameter, sleeve (43) are pegged graft in recess (3), sleeve (43) length is less than recess (3) degree of depth, go up the coaxial rigid coupling of support piece (41) on connecting cylinder (4) is close to the outer wall of wall body (1) one end, the coaxial rigid coupling of bottom suspension strut (42) is kept away from on the inner wall of support piece (41) one end in connecting cylinder (4), perforation (44) have coaxially been seted up on bottom suspension strut (42), the diameter of perforation (44) is less than steel bar post (2) diameter, the internal diameter of sleeve (43) is greater than steel bar post (2) diameter.
3. The building construction rapid construction environment-friendly wall body as claimed in claim 2, characterized in that: the opening position of recess (3) is equipped with step (31), go up supporting piece (41) butt on step (31), it demolishs the clearance to leave between supporting piece (41) and wall body (1), coaxial chimb (21) have set firmly on the outer wall of steel bar post (2), chimb (21) are close to wall body (1) one end and wall body (1) butt, and the outward flange that wall body (1) one end was kept away from in chimb (21) sets up to the circular conical surface.
4. The building construction rapid construction environment-friendly wall body as claimed in claim 3, characterized in that: go up the roof of stay (41) and radially seted up first drawing and splitting groove (45) along self, radially seted up second drawing and splitting groove (46) along self on the inner wall of sleeve (43), the one end of first drawing and splitting groove (45) and the one end intercommunication of second drawing and splitting groove (46).
5. The building construction rapid construction environment-friendly wall body as claimed in claim 4, characterized in that: the panel surface of the wallboard (11) far away from the wall body (1) is provided with a disassembly mark sink groove (5) coaxial with the groove (3).
6. The building construction rapid construction environment-friendly wall body as claimed in claim 5, characterized in that: and annular anti-skidding lines are arranged on the outer wall of the steel bar column (2).
7. The building construction rapid construction environment-friendly wall body as claimed in claim 1, characterized in that: an elastic filling layer (6) is laid on the wall body (1).
8. The building construction rapid construction environment-friendly wall body as claimed in claim 7, characterized in that: the elastic filling layer (6) is a polypropylene plastic foaming plate.
CN202020059512.6U 2020-01-11 2020-01-11 House building rapid construction environmental protection wall Expired - Fee Related CN211622111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020059512.6U CN211622111U (en) 2020-01-11 2020-01-11 House building rapid construction environmental protection wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020059512.6U CN211622111U (en) 2020-01-11 2020-01-11 House building rapid construction environmental protection wall

Publications (1)

Publication Number Publication Date
CN211622111U true CN211622111U (en) 2020-10-02

Family

ID=72637217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020059512.6U Expired - Fee Related CN211622111U (en) 2020-01-11 2020-01-11 House building rapid construction environmental protection wall

Country Status (1)

Country Link
CN (1) CN211622111U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177270A (en) * 2020-10-30 2021-01-05 怀化简美装饰设计工程有限公司 Home decoration is with avoiding destroying wall nail external member of wall body
CN114250883A (en) * 2022-01-04 2022-03-29 内蒙古工业大学 Energy-saving structure integrated assembly type heat-insulation wall and assembly method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177270A (en) * 2020-10-30 2021-01-05 怀化简美装饰设计工程有限公司 Home decoration is with avoiding destroying wall nail external member of wall body
CN114250883A (en) * 2022-01-04 2022-03-29 内蒙古工业大学 Energy-saving structure integrated assembly type heat-insulation wall and assembly method

Similar Documents

Publication Publication Date Title
CN211622111U (en) House building rapid construction environmental protection wall
CN201635388U (en) Cast-in-place concrete arc outer wall body unilateral formwork system
KR100654781B1 (en) Bricks wall reinforcing method
CN108425442B (en) Connection structure of concrete prefabricated wallboard and steel column and construction method thereof
KR100807810B1 (en) Structure lifting method by foundation strengthening
CN101839061A (en) Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof
CN109339287A (en) Wall connecting component is embedded in a kind of assembling type steel structure system
KR101743758B1 (en) Downward construction method for vertical extension of building using base block
KR101714371B1 (en) Joints Appartus of The Concrete Piles and Steel Pipe
CN114482691B (en) Assembled airport enclosure foundation template and use method thereof
EP2075391A1 (en) Forms structure, panel support material, panel support material for internal corner, panel support material for external corner and construction method of forms
CN104989098A (en) Laminated plate support frame
CN102352690B (en) Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube
KR100814442B1 (en) Concrete mold for flat plate slab/flat slab and construction method using the same
CN106284978A (en) A kind of movement joint both sides shear wall synchronous construction technique and canalization template
CN101886470B (en) Construction method of exposed concrete ribbed beams
KR200496837Y1 (en) Foundation structure for fixing wire mesh fence columns
CN115538793A (en) Pre-assembly construction method for composite insulation board of outer wall of shear wall structure
CN201801980U (en) Structure of composite wall body produced by taking stone columns and stone plates as main bodies
CN112144867A (en) Reserved joint bar template structure for combined steel template cast-in-place structure
KR102050170B1 (en) Foundation enlargement method for strengthening and lifting the foundation of a structure
CN112647620A (en) Cast-in-place foam concrete light steel keel composite wall structure and construction method thereof
CN113323334A (en) Template for forming expansion joint and using method thereof
CN111173190A (en) Heat-insulation wallboard
CN214330031U (en) Column expanding cross section supporting and reinforcing structure of ancient building factory building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201002