CN211621652U - Bearing platform template for building construction - Google Patents
Bearing platform template for building construction Download PDFInfo
- Publication number
- CN211621652U CN211621652U CN202020020803.4U CN202020020803U CN211621652U CN 211621652 U CN211621652 U CN 211621652U CN 202020020803 U CN202020020803 U CN 202020020803U CN 211621652 U CN211621652 U CN 211621652U
- Authority
- CN
- China
- Prior art keywords
- template
- shaped
- welded
- shaped piece
- bearing platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title claims description 7
- 238000010276 construction Methods 0.000 claims abstract description 16
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 238000005728 strengthening Methods 0.000 claims description 6
- 238000003825 pressing Methods 0.000 claims description 4
- 238000009415 formwork Methods 0.000 claims 5
- 238000001125 extrusion Methods 0.000 abstract description 2
- 238000010030 laminating Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 7
- 238000003466 welding Methods 0.000 description 5
- 239000003351 stiffener Substances 0.000 description 4
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 241001391944 Commicarpus scandens Species 0.000 description 1
- 229920000742 Cotton Polymers 0.000 description 1
- 239000002585 base Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 239000013013 elastic material Substances 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a cushion cap template for construction relates to template technical field. This cushion cap template for construction, including first template and second template, first template and second template fixed connection, the inboard of first template has seted up the T-slot near both ends, and the both ends of second template have all been welded T-shaped piece, and T-shaped piece is located the T-slot. This cushion cap template for construction, can be in between two first templates by the second template, make the T-shaped piece insert the T-shaped inslot, the T-shaped piece slides down, along with the removal of T-shaped piece, the elastic ring receives the extrusion, insert the back completely, the locating piece can enter into in the arc wall this moment, the realization is to the primary fixation of first template and second template, this moment, the round hole is aligned with the screwed hole, easily to the hole, save time, the T-shaped piece is in the T-shaped inslot, the fixed mode of the laminating of traditional first template and second template case has been changed, the junction has been avoided taking place to break away from.
Description
Technical Field
The utility model relates to a template technical field specifically is a cushion cap template for construction.
Background
The bearing platform is a reinforced concrete platform which is arranged on the top of the pile foundation and is used for connecting the pile tops in order to bear and distribute the load transmitted by the pier body. The cap is the part of the pile-to-column or pier connection. The bearing platform connects several or even more than ten piles together to form a pile foundation. The existing bearing platform template is generally assembled and installed in a splicing mode, and needs to be fixed through screws when being spliced, but the holes are time-consuming, and the connecting part is easy to break away, so that the requirement cannot be met.
SUMMERY OF THE UTILITY MODEL
The utility model provides a cushion cap template for construction, can be in between two first templates by the second template, make the T-shaped piece insert the T-shaped inslot, the T-shaped piece slides downwards, along with the removal of T-shaped piece, the elastic ring receives the extrusion, insert the back completely, the locating piece can enter into in the arc wall this moment, realize the initial fixation to first template and second template, this moment, the round hole aligns with the screw thread hole, easily to the hole, save time, the T-shaped piece is in the T-shaped inslot, the fixed mode of traditional first template and second template case laminating has been changed, the junction has been avoided taking place to break away from.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a cushion cap template for construction, includes first template and second template, first template and second template fixed connection, the inboard of first template is close to both ends and has seted up the T-slot, the both ends of second template have all been welded T-shaped piece, and T-shaped piece is located the T-slot, round hole and screw hole have been seted up respectively along the horizontal direction in first template and the second template, and round hole and screw hole are located same straight line to the embedded bolt that is equipped with of round hole and screw hole.
In order to strengthen the fixed strength who supports the base, as the utility model relates to a cushion cap template for construction is preferred, all weld on the outer wall of first template and second template and have support base and stiffener, and stiffener and support base welding to the mounting hole has been seted up in the support base.
In order to easily install first template and second template, conduct the utility model relates to a cushion cap template is preferred for construction, the arc wall has been seted up on lieing in the horizontal central line in the T-shaped piece.
Can remove in order easily the locating piece, conduct the utility model relates to a cushion cap template is preferred for construction, seted up the movable groove in the first template, and sliding fit has the locating piece in the movable groove to the one end of locating piece is located the arc wall, the one end that the locating piece is located the arc wall is the arc form.
In order to make the locating piece can get into the arc wall automatically, conduct the utility model relates to a cushion cap template is preferred for construction, the one end welding that the locating piece is located the activity inslot has the briquetting, and the opposite side welding elastic ring of briquetting to the inner wall welding of elastic ring and activity groove.
In order to strengthen the intensity of first template and second template, as the utility model relates to a cushion cap template is preferred for construction, all weld on the outer wall of first template and second template has the strengthening rib, and the strengthening rib is latticedly, first template and second template all are provided with two.
The utility model provides a cushion cap template for construction. The method has the following beneficial effects:
(1) this cushion cap template for construction, when the installation, align T-shaped piece and T-shaped groove, the second template that moves down, make T-shaped piece slide in the T-shaped groove, T-shaped piece can extrude the locating piece, make the locating piece enter into the activity inslot, the elastic ring also can be in the compression state, when inserting T-shaped piece completely, this moment, the arc wall is aligned with the locating piece, under the effect of elastic ring restoring force, can make the locating piece enter into the arc wall, realize tentatively fixed, this moment, the round hole is aligned with the screwed hole, alright in order to twist the bolt, realize the fixed of first template and second template.
(2) This cushion cap template for construction because the T-shaped piece is located the T-slot, can avoid first template and the cotton board of second to take place to break away from, has strengthened the stability of connecting.
Drawings
Fig. 1 is a top view of the present invention;
fig. 2 is a front view of the present invention;
fig. 3 is an enlarged view of a portion of a section a in fig. 1 according to the present invention;
fig. 4 is an enlarged view of a part of a cross section B in fig. 2 according to the present invention.
In the figure: 1. a first template; 101. a T-shaped slot; 102. a circular hole; 103. a movable groove; 2. a second template; 201. a threaded hole; 202. an arc-shaped slot; 3. a support base; 4. a reinforcing bar; 5. a bolt; 6. a T-shaped block; 7. positioning blocks; 8. briquetting; 9. an elastic ring; 10. and (5) reinforcing ribs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a cushion cap template for construction, including first template 1 and second template 2, first template 1 and 2 fixed connection of second template, T-slot 101 has been seted up near both ends to the inboard of first template 1, T-shaped piece 6 has all been welded at the both ends of second template 2, and T-shaped piece 6 is located T-slot 101, round hole 102 and screw hole 201 have been seted up respectively along the horizontal direction in first template 1 and the second template 2, and round hole 102 is located same straight line with screw hole 201, and the embedded bolt 5 that is equipped with of round hole 102 and screw hole 201.
In this embodiment: the T-shaped block 6 is inserted into the T-shaped groove 101, after the T-shaped block 6 is completely inserted, the round hole 102 is aligned with the threaded hole 201, the bolt 5 can be inserted, and the first template 1 and the second template 2 are fixed through the bolt 5.
Specifically, all weld on the outer wall of first template 1 and second template 2 and have support base 3 and stiffener 4, and stiffener 4 with support base 3 welding to set up the mounting hole in the support base 3.
In this embodiment: the reinforcing rod 4 that sets up plays the effect that the reinforcing supported 3 fixed strength of base, can realize supporting 3's fixed through the mounting hole of seting up.
Specifically, an arc-shaped groove 202 is formed in the T-shaped block 6 on the horizontal center line.
In this embodiment: the arc-shaped groove 202 is matched with the positioning block 7 and used for the arc-shaped end of the positioning block 7 to enter.
Specifically, a movable groove 103 is formed in the first template 1, a positioning block 7 is embedded in the movable groove 103 in a sliding manner, one end of the positioning block 7 is located in the arc-shaped groove 202, and one end of the positioning block 7 located in the arc-shaped groove 202 is arc-shaped.
In this embodiment: the positioning block 7 can slide in the movable groove 103, and one end of the positioning block 7 is arc-shaped, so that the positioning block 7 can move in the movable groove 103 when being extruded.
Specifically, one end of the positioning block 7, which is located in the movable groove 103, is welded with a pressing block 8, the other side of the pressing block 8 is welded with an elastic ring 9, and the elastic ring 9 is welded with the inner wall of the movable groove 103.
In this embodiment: elastic ring 9 comprises elastic material, and locating piece 7 can drive briquetting 8 and extrude elastic ring 9, after inserting T-shaped piece 6 completely, under the effect of elastic ring 9 restoring force, can make locating piece 7 automatic enter into in the arc wall 202.
Specifically, all weld on the outer wall of first template 1 and second template 2 has strengthening rib 10, and strengthening rib 10 is latticed, and first template 1 and second template 2 all are provided with two.
In this embodiment: the arranged reinforcing ribs 10 play a role in enhancing the compressive strength of the first template 1 and the second template 2.
During the use, when the installation, align T-shaped piece 6 and T-shaped groove 101, remove second template 2 downwards, make T-shaped piece 6 slide in T-shaped groove 101, slide in T-shaped groove 101 along with T-shaped piece 6, T-shaped piece can 6 extrude locating piece 7, make locating piece 7 enter into movable groove 103 in, elastic ring 9 also can be in compression state, when inserting T-shaped piece 6 completely, this moment, arc groove 202 is aligned with locating piece 7, under the effect of elastic ring 9 restoring force, can make locating piece 7 enter into arc groove 202 in, realize preliminary fixed, this moment, round hole 102 aligns with screw hole 201, alright twist bolt 5, realize the fixed of first template 1 and second template 2, accomplish fixed first template 1 and second template 2's fixed back, will support base 3 and fix, alright use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a cushion cap template for construction, includes first template (1) and second template (2), its characterized in that: first template (1) and second template (2) fixed connection, T-shaped groove (101) have been seted up near both ends to the inboard of first template (1), T-shaped piece (6) have all been welded at the both ends of second template (2), and T-shaped piece (6) are located T-shaped groove (101), round hole (102) and screw hole (201) have been seted up respectively along the horizontal direction in first template (1) and second template (2), and round hole (102) and screw hole (201) are located same straight line to embedded bolt (5) that is equipped with in round hole (102) and screw hole (201).
2. The bearing platform formwork for building construction according to claim 1, wherein: the outer walls of the first template (1) and the second template (2) are welded with supporting bases (3) and reinforcing rods (4), the reinforcing rods (4) are welded with the supporting bases (3), and mounting holes are formed in the supporting bases (3).
3. The bearing platform formwork for building construction according to claim 1, wherein: an arc-shaped groove (202) is arranged on the horizontal middle line in the T-shaped block (6).
4. The bearing platform formwork for building construction according to claim 1, wherein: a movable groove (103) is formed in the first template (1), a positioning block (7) is embedded in the movable groove (103) in a sliding mode, one end of the positioning block (7) is located in the arc-shaped groove (202), and one end, located in the arc-shaped groove (202), of the positioning block (7) is arc-shaped.
5. The bearing platform formwork for building construction as claimed in claim 4, wherein: one end of the positioning block (7) located in the movable groove (103) is welded with a pressing block (8), the other side of the pressing block (8) is welded with an elastic ring (9), and the elastic ring (9) is welded with the inner wall of the movable groove (103).
6. The bearing platform formwork for building construction according to claim 1, wherein: all welded on the outer wall of first template (1) and second template (2) has strengthening rib (10), and strengthening rib (10) are latticed, first template (1) and second template (2) all are provided with two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020020803.4U CN211621652U (en) | 2020-01-07 | 2020-01-07 | Bearing platform template for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020020803.4U CN211621652U (en) | 2020-01-07 | 2020-01-07 | Bearing platform template for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211621652U true CN211621652U (en) | 2020-10-02 |
Family
ID=72636005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020020803.4U Expired - Fee Related CN211621652U (en) | 2020-01-07 | 2020-01-07 | Bearing platform template for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211621652U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114776000A (en) * | 2022-05-28 | 2022-07-22 | 中铁广州工程局集团第三工程有限公司 | Construction method of arc-shaped roof double-layer formwork system |
-
2020
- 2020-01-07 CN CN202020020803.4U patent/CN211621652U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114776000A (en) * | 2022-05-28 | 2022-07-22 | 中铁广州工程局集团第三工程有限公司 | Construction method of arc-shaped roof double-layer formwork system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111206675B (en) | Steel structure corridor structure and hoisting construction method | |
CN211621652U (en) | Bearing platform template for building construction | |
CN218091303U (en) | Assembled concrete frame and steel shotcrete's connected node | |
CN216304958U (en) | Beam column structure of energy-saving and environment-friendly steel structure factory building | |
CN210917962U (en) | Steel bar truss floor support plate framework | |
CN214034103U (en) | Splicing node of prefabricated I-steel main beam and double-side secondary beam | |
CN211735808U (en) | Girder and crossbeam connection structure of H shaped steel concrete | |
CN111677321B (en) | Assembled building reinforced structure | |
CN215978075U (en) | Steel bar stirrup for building engineering | |
CN216194136U (en) | Anti T type roof beam of buckling | |
CN221193897U (en) | Assembled steel bar truss building carrier plate | |
CN216195483U (en) | Steel construction with joggle joint structure | |
CN219909327U (en) | High-rise building steel construction convenient to installation | |
CN215858562U (en) | Light steel frame composite wall structure | |
CN218465385U (en) | Transition plate for tower crane standard section supporting system | |
CN220747423U (en) | Fracture-preventing assembled precast beam | |
CN220267246U (en) | Steel member bracket | |
CN217027736U (en) | High bearing capacity combination H shaped steel girder structure | |
CN219794181U (en) | Combined stable type corridor steel reinforced concrete structure | |
CN214998660U (en) | High-fastening C-shaped steel component | |
CN221524742U (en) | Building engineering building climbing frame | |
CN215858983U (en) | Large-scale closed well construction platform of high-rise building | |
CN216380182U (en) | Prestressed steel bar truss floor support plate | |
CN213684139U (en) | Novel shield constructs section of jurisdiction | |
CN220666476U (en) | Steel pipe connecting hole reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201002 |